Loading...
HomeMy WebLinkAboutP_Approved Plans_20220928_v1.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Conditions for Permit B22004791 Building 1 Commercial Alterations for food preparation, food service, or kitchen must have King County Health Department or State of Washington DOH Approved Plans onsite. 2 Ground Electrode System (either 1 or 2 are approved methods): 1. An electrode of at least 20 ft long bare copper, sized in accordance with NEC. 2. An electrode of 20 ft long #4 rebar (not less than 1/2 inch in diameter) and sized per NEC; either one shall be encased by at least 2 inches of concrete, located within and near the bottom of a concrete footing that is in direct contact with the Earth, and shall be installed in all new residential and commercial construction. 3 All construction, demolition and land clearing waste must be recycled at a King County licensed or approved facility, or taken to Regional Disposal Facilities. 4 Authorized hours of construction/activity: 7:00 a.m. - 8:00 p.m. Monday Through Friday; 9:00 a.m. - 8:00 p.m. Saturday; No work allowed on Sunday. Per Ordinance 4703, 2-2-1998 5 Approval for building permit only-separate approval and permits required for any mechanical, plumbing, electrical, fire suppression, or hazardous materials system. 6 Erosion Control may be required upon inspection. 7 TREE PROTECTION MEASURES FOR ALL TREES IN THE CONSTRUCTION AREA OF A DEVELOPMENT SITE. THESE MEASURES INCLUDE: 1. 6 foot high chain link fences around the trees out to and including the drip line of the tree. 2. All the area within the fenced area needs a minimum of 3" of bark mulch. 3. Warning signs must also be included on the fence. 4. Construction activity, parking, and storage of materials and equipment is not allowed within the drip line (and therefore fenced) area of any tree. 5. The only new impervious surfaces allowed within the drip line of existing trees are those shown on approved building or construction plans, which typically should be limited to the new buildings, new driveways, new parking lots, new streets and new sidewalks. 8 Instructions for Issued permits: 1. Print full~sized plan sheets in color for field inspector, plans must have text at 1/8" or larger for inspector, print conditions of approval and attach them to the approved set of plans for the inspector. 2. Hard copies of permit, approved plans, site plans, and conditions must remain on the job site for the inspector. Inspections will not take place if printed plans are not on site. Planning 9 Per LUA22-000316, a Critical Areas Exemption for the removal of pavement and restoration of the wetland buffer shall be submitted by December 26, 2022. Page 1 of 1 RECEIVED 09/08/2022 striplett BUILDING DIVISION B2 2 0 0 4 7 9 1 PROVIDE 8' WIDE ACCESSILE AISLE OR 11' WIDE VAN STALL. PROVIDE 60" h ACCESSIBLE SIGN PROVIDE ENGINEERED MODULAR HOLD DOWNS. as builds and cctv video indicate a sewer stub in the general area of the parcel but there is not a utility billing account or side sewer on record. applicant shall verify, in the presence of a public works inspector, that the existing building is connected to the city sewer. if the building is not connected to the sewer than the existing on-site septic system shall be decommissioned in accordance with King County Department of Health and City of Renton standard 4-6-040.I.6. a new sewer stub shall be installed in accordance with COR std. plan 406.1 with a building sewer installed in accordance with COR std. plan 406.2. a permit will be required for installation of new sewer stub and side sewer. utility review comments pertain to the office building only. separate permits are required for the lumber warehouse and the site paving. install a DCVA per COR std. plan 340.8. DCVA shall be installed on private property as close as possible to the existing meter. a separate plumbing permit is required, contact the building department for assistance in acquiring permit. Per LUA22-000316, a Critical Areas Exemption for the removal of pavement and restoration of the wetland buffer shall be submitted by December 26, 2022. EF1 EF1 PLUMBING AND ELECTRICAL UNDER SEPARATE PERMIT AND PER FIELD INSPECTORS REVIEWED BUILDING DIVISION By: Rick Lee Date: 09/09/2022 THIS SET OF REVIEWED PLANS INCLUDE BOTH THE SUBMITTED DESIGN AND ADDITIONAL CODE REQUIREMENTS MARKED IN RED. PLANS MUST BE MADE AVAILALE ON THE JOB AT ALL TIMES DURING CONSTRUCTION. THIS BUILDING / PROJECT IS NOT TO BE OCCUPIED UNTIL AFTER FINAL INSPECTION BY THE RENTON BUILDING DIVISION