Loading...
HomeMy WebLinkAboutMFP22004903.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22004903 IVR Number: 22004903 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:09/14/2022Application Date:3343901680Parcel Number: 1400 ABERDEEN AVE NE Permit Type:09/29/2022Issue Date:Franchise Permit Work Class:09/29/2023Expiration Date:Minor Utility Job Number: 101147812Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO REMOVE POLES AT P01, P02 AND P07. CREW TO INSTALL CONDUIT AND UF CABLE. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL MAINVUE WA LLC 121 3RD AVE KIRKLAND, WA 98033 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101147812 1400 ABERDEEN AVE NE RANDY BLACKIE 425-457-2614 MFP22004903 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 9/29/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG P03 P02 P01 ABERDEEN AVE NE10 10 10 10 W20-7AROAD WORKAHEAD W20-1W20-4ONE LANE ROADAHEAD200'200'200'STOP FLAGGER STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'NE 16TH ST RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARK28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/09/2022 512637211 1 1400 Aberdeen Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 1 OF 3 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22004903 P04 P01 ABERDEEN AVE NE10 10 10 10 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'W20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'STOP FLAGGER NE 16TH ST RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PARKTEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/09/2022 512637211 1 1400 Aberdeen Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 2 OF 3 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22004903 P06 P07 ABERDEEN AVE NE10 10 10 10 W20-7AROAD WORK AHEAD W20-1W20-4ONE LANEROADAHEAD200'200'200'STOP FLAGGERW20-7AROADWORKAHEADW20-1W20-4ONE LANEROADAHEAD200'200'200'STOP FLAGGER NE 16TH ST RESIDENT(S) - CLIENTS(S) WILL BE INFORMED IN ADVANCE OF TEMPORARY DRIVEWAY CLOSURE PLACE SIGNS ALONG WORK AREAFROMTOTOW AWAY AREAPHONE 888-9999INFRASOURCE LLC 000 0000000NO PARKINGNO-PAR K TEMPORARY TRAFFIC CONTROL PLAN N Notes: 1. All signs and spacing to conform to the MUTCD and City of Renton standards. 2. All sidewalks, driveways, exits and egresses shall be completely clear unless otherwise indicated. 3. Channelizing devices are 28" traffic cones. Use traffic drums (barrels) with steady burning Type C lights on all State State Routes and Hwys. 4. Sign size can be a minimum of 36" x 36" and shall not obstruct pedestrian access. 5. Crew is required to leave a minimum of 11' for traveling lane width. 6. Alert affected residents and businesses. 7. Work to take place between 9 a.m. and 4 p.m unless otherwise specified. All work for arterials and major roadways will be from 9 a.m. to 3 p.m. 28" TRAFFIC CONE LEGEND TRAFFIC FLOW SIGN LOCATION FLAGGER STOP POLE WORK VEHICLE/ FLASHING LIGHTS RIGHT OF WAY SIGN SPACING MPH 60/65 45/55 35/40 30 25 "X" 1000' 500' 350' 200' 100' CHANNELIZATION DEVICE SPACING MPH 55/70 35/45 25/30 TAPER 40 30 20 TANGENT 80 60 40 Project Address: Page PSE PUGETSOUNDENERGY Designer: Job # REV 08/09/2022 512637211 1 1400 Aberdeen Ave NE, Renton, WA Kali-Jamal Collins 425-424-6425 Kali-Jamal.Collins@pse.com 3 OF 3 Puget Sound Energy Traffic Control Supervisor: Gregory Harwood Card No. 012238 Card Exp. 09/30/2023 gregory.harwood@pse.com (425)424-6425 MFP22004903 N Vicinity Map 47.5051, -122.1908 Owner / Developer Contact Info officeATTN: MAINVUE WA, LLC 1110 112TH AVE NE, SUITE 202 BELLEVUE, WA 98004 SEAN DICKEY 425.754.6251 THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required" FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. GAS PHONE CABLE TV 512637211 101147812 N/A 108139090 N/A 583070178 N/A 584 N/A 593245864 N/A 594 N/A N/A N/A N/A N/A N/A PROJECT PHASE PWR NOTIF#ORDER# Superior Removal OH XFMR PM XFRM OH Wire UG Wire Distribution Service Stubs HP Svc/MSA 101147812N/ADESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R.BLACKIE 425.457.2614 . E. ARCIAGA .---- ----.---- E. ARCIAGA .---- REDT # ( RW-TBD )RENTON BRENNON LANDING SCH73 - OH TO UG CONVERSION 1400 ABERDEEN AVENUE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 088-60 N/A 101147812 N/A 1 OF 4 KING 088A CIKNC QCSOKE 05SE-T23N-R05E 204.080 205.083 2305E020 2305E040 2305E020 HIG-15 COMCAST JAMES COHN 253.569.0636 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY ROW TBD ROW TEL TBD . . . E-Mail: Cell Phone: Project Manager Contact Information: Manager:RANDY BLACKIE 425.457.2614 randy.blackie@pse.com x xx ... ... ... x SEAN.DICKEY@MAINVUEHOMES.COM SITE GENERAL 1. Pre-construction Notify appropriate City or County 48 to 72 hours or as required by permitting agency before starting work on any right-of-way involving a permit. Follow all requirements as outlined by the permitting agency. Locate and mark all underground utilities prior to start of construction. If there is a conflict with the intended trench route as shown on the site plan and existing utilities or obstructions, trench route may need to be moved to opposite side of street. Cooperation with Quality Inspector, Puget Sound Energy Contractor, City or County authorities during Pre-construction meeting will determine the final trench route. 2. Existing Utilities Hand excavate (pothole) all marked utility crossings to verify exact location and depth at point of crossing. Protect underground utilities during excavation. Use hand excavation methods if necessary to avoid damage. Fabricate and install adequate temporary structures to support and protect underground utilities while exposed during construction. Maintain 6" minimum clearance at crossings between existing utilities and new duct installations. Transition trench or tunnel profile gradually as required at crossings. Maintain 24" minimum separation between new trench or tunnel and parallel existing utilities or as required by the permit agency. In the event of damage to an underground utility, notify Puget Sound Energy at once. Contractor agrees to make work force and resources available at once to Puget Sound Energy or municipal authorities to repair damage at no cost. 3. Work Drawings Maintain on site, in good condition, a complete file of all work drawings. These drawings shall be available at all times to a Puget Sound Energy representative. Corrections and changes made during the job shall be recorded continuously on these drawings. All underground electrical facilities shall have a minimum of 36 inches of cover. Any change must be approved by the PSE engineer or project manager. Furnish Puget Sound Energy a complete set of as built prints (foreman's copies) at the end of the job. 4. Safety Provide signs, barricades, and traffic control in conformance with local jurisdictions and regulations. Provide flagging and or other vehicle traffic control as needed in conformance with local regulations. (see SPM # 100.4000) Provide adequate signage and protection to traffic during non-working hours. Maintain traffic flow as required by permitting agency. Provide signs and barricades to warn pedestrians, motorcycles and bicycles. Install warning barricades at least every 50 feet along the trench route from the time the trench is opened until the trenching is complete. 5. Existing Systems Maintain existing electrical system in service until new system is complete, tested, and ready for service. Disable existing system only to make cutovers and connections as directed by Puget Sound Energy's representative. Provide temporary wiring and connections to maintain existing systems in service during construction; if a scheduled outage is not possible. When work must be performed on energized equipment or circuits, use qualified personnel for such operations. EARTHWORK See Puget Sound Energy SPM 6800.4050 1. Back hoe, Hand Dug Excavations Paved Surfaces Cut the edges of the trench prior to digging. Use the narrowest bucket practical or plow off the edge of paved surface far enough to minimize asphalt disturbance. Repair any blow out areas (where edge has been broken) by sawing. The depth of the trench shall be enough to allow 36" of cover . Backfill material shall be Controlled Density Fill (CDF) cover or select fill (5/8" minus) to meet permit requirements. Unpaved Surfaces Conduit/cable trenches are to be excavated just off the existing road edge or in the shoulder of the road behind the existing ditch line. Contractor shall use a back hoe with the narrowest width bucket practical or plow. Trench shall be deep enough to allow a minimum of 36" of cover over the top most cable. All ditch crossings shall have a minimum of 36" cover from the lowest point within the existing ditch line. Culverts; when installing facilities under a culvert, excavation must be filled with packed crush rock. If any culvert is damaged it will be repaired or replaced in accordance with permitting agency and contractors responsibility. Spoils shall be removed quickly to minimize blocking of traffic. All spoils and wastes become the property of the contractor immediately upon removal. Remove spoils and wastes promptly to an approved disposal site. Remove spoils containing asphalt or concrete to a disposal site specifically approved for such materials. Provide Puget Sound Energy with a disposal receipt for all spoils. 2. Backfill Unpaved Road Surfaces Backfill for unpaved road crossings shall consist of 1-1/2" to 2-1/2" material compacted to 95% density. Backfill for unpaved road sections shall consist of native material compacted to 95% density. At the end of each workday, backfill or plate all trench, remove all spoils and clean roadway surface of large hazardous debris. 3. Surface Restoration Unpaved Surfaces Restore ground surface to original contour. Restore to original condition or better. 4. Landscaping Arrange and perform work to minimize impact to existing landscaping. Restore landscaping that has been disturbed during the course of work, including seeding of banks and fills. Vaults set in bank areas may require re-sloping the surrounding land to avoid sloughing. Leave area in its original state or better at the end of construction. Hand dig if required to prevent damage to tree roots. ELECTRICAL 1. Conduit Conduit for installation in unpaved areas shall be 2", 3", 4", or 6" PVC DB120 direct burial. Maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Where conduit is routed from road edge to vault location, maintain 36" minimum cover above top conduit at all times or as required by the permitting agency. Bends shall be made with as long a radius as possible (48" minimum). Avoid making sharp bends or kinks in conduit during installation. Obtain exact location of conduit entrance into vault from Puget Sound Energy before penetrating vault. Penetrate the vault using existing knockout or use core drilled holes. Stub the 4" or 6" PVC 2"-3" into vault interior and grout between the conduit and vault wall. Leave a 10' minimum of extra pull rope in each end of installed conduit where 4" or 6" PVC is installed and cap conduit to prevent the entry of dirt and moisture. Arrange work so conduit plays directly off reel into trench. Place the conduit in the trench as straight as possible. Avoid vertical and horizontal "snaking" of the conduit. Multiple conduit runs may be stacked vertically. Where conduit must be pulled through a trench to allow a crossing under an existing utility, cap conduit end before pulling to avoid contamination. If a kink occurs, cut the conduit ahead of kink and splice to new conduit to continue run. 2. Underground Primary Cable Primary cable shall be 1/O Alum Sol Jacketed Cable rated for 15 KV service with a polyethylene jacket. Primary cable shall be 61 strand 750 MCM aluminum conductor rated for 15 KV service with a copper tape neutral conductor and polyethylene jacket. A 4/0 copper neutral shall be run with each 3 phase circuit of 750 MCM. Install cable into existing or new conduit systems using approved installation equipment. Approved equipment includes either cable pullers and/or cable pushers. Pulling socks shall be non-conductive or similar material. Steel pulling socks are prohibited. Bare steel cable shall not be used to pull cable. Cable pulling equipment (winches, hoist, driven reels, etc.) shall be equipped with instrumentation to continually monitor and record peak tension encountered during a pull. Before installing cable, obtain rated pulling tension for cable from Puget Sound Energy. Do not exceed rating at any time during installation. Notify Puget Sound Energy immediately if pulling tension equals or exceeds rating (828/1657lbs for 1/0 or 5000lbs for 750 .) Do not exceed minimum bend radius of cable or impose kinks or sharp bends on cable during pulling operations. Install cable directly off reel without dragging it on the ground. Apply Puget Sound Energy approved lubricant to cable continually during pulling to reduce pulling tension and to permit future removal. Install adequate amounts of 3/4 " plywood on existing sidewalk areas to support pulling equipment and prevent un-necessary damage to sidewalks. Train and coil cables in vaults as required to form a smooth transition from conduit to termination. if terminations are to be performed by others, coil 15' of cable in vault and cap end. 3. Terminations and Splices Install approved terminations on cables in accordance with Puget Sound Energy SPM 2247.5115- 5119. Unless otherwise directed, approved terminations will be load break elbows in vaults and cold shrink pin terminals on pole risers per Puget Sound Energy SPM 2247.9317. Splice cable with approved splice kits in vaults, hand holes or similar enclosures. Do not splice cables in runs between vaults. See Puget Sound Energy SPM 2233.2075-2076. 4. Concrete Vaults Excavate, install base material, and compact base material in accordance with Puget Sound Energy SPM 6775.0040. Install and seal precast sections in accordance with Puget Sound Energy SPM 6775.0040. Use precast neck and shaft sections to bring manhole entrance to proper elevation. Install manholes plumb. Set the top of each manhole to finished elevation or no higher than 6" above existing road elevation. Install hillholders as required on sketch or by construction notes. 5. Grounding Install ground rod per Puget Sound Energy SPM 6275.6100 at each vault in which primary cable is terminated. Locate rod in trench excavation wherever possible to obtain maximum driven depth in undisturbed soil. Connect each ground individually to ground loop inside vault with bare no. 2 copper jumper or to Concentric neutral at each splice vault location. Minimum grounding requirement is 4 grounds per mile. 6. Existing Underground Primary Cable (if applicable) Abandon existing primary cable in place. Cut off old cable ends inside vault flush with wall. Before cutting, pigtail concentric neutral strands and connect to ground loop inside vault. Return scrap cable and existing cable tags to Puget Sound Energy. Remove or fill existing vaults as required by permitting agency. 7. Traffic Control All traffic control to comply with current specifications in M.U.T.C.D. GENERAL OVERHEAD NOTES: 1. Poles, conductors, devices to be installed per PSE Standards & Specifications. 2. Poles are to be installed or relocated as staked. 3. All new poles set shall be the class indicated on the sketch or better. 4. Install ground plate assembly on all new poles. 5. Install grid numbers on all new and existing poles as shown on sketch. 6. Treat all field-drilled poles with copper Naphthenate wood preservative. 7. Customer/Developer to coordinate between utilities. 8. All new and relocated poles -locations- to be approved by City of Renton BRENNON LANDING SCHEDULE 73 OH TO UG CONVERSION NOTE: DEVELOPER TO PROVIDE ALL CIVIL WORK: TO AND INCLUDING EXCAVATION, BACKFILL, SHORING, TRENCH MAINTENANCE, SANDING FOR DUCT, SELECT 5/8" CRUSH FOR UNDER VAULTS, COMPACTION, ALL HARDSURACE RESTORATION AND RELATED LANDSCAPING RESTORATION. DEVELOPER TO PROVIDE TEMPORARY EXCAVATION PLATING (IF REQUIRED). & ANY ADDITIONAL LOCAL JURISDICITON REQUIREMENTS. EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES EROSION & SEDIMENT CONTROL REQUIREMENTS STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION EXISTING PROPERTY LINE EXISTING UG RISER NEW UG RISER J-BOX NEW TRENCH LINE EXISTING 3Ø WIRE EXISTING CENTER LINE CONDUCTOR TO BE REMOVED DISCONNECT - FUSED EXISTING 1Ø WIRE EXISTING RIGHT OF WAY PULL VAULT EXISTING POLE DOWN GUY EXISTING SECONDARY SERVICE LINE DISCONNECT - UNFUSED STREETLIGHT NEW POLE NEW PADMOUNT TRANSFORMER EXISTING PADMOUNT TRANSFORMER NEW HANDHOLE P ELECTRIC SYMBOLS LEGEND OVERHEAD CIRCUIT MAP - EXISTING (2305E040) SCALE: 6" = 1 MILE JOB SITE MFP22004903 DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R.BLACKIE 425.457.2614 . E. ARCIAGA .---- ----.---- E. ARCIAGA .---- REDT # ( RW-TBD )RENTON BRENNON LANDING SCH73 - OH TO UG CONVERSION 1400 ABERDEEN AVENUE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 088-60 N/A 101147812 AS SHOWN 2 OF 4 KING 088A CIKNC QCSOKE 05SE-T23N-R05E 204.080 205.083 2305E020 2305E040 2305E020 HIG-15 COMCAST JAMES COHN 253.569.0636 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY ROW TBD ROW TEL TBD . . . ... ... ... CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) UNIVERSAL MAP - EXISTING (2305E020) SCALE: 1:50 SCALE: 1:100 UNDERGROUND CIRCUIT MAP - EXISTING (2305E020) MFP22004903 1401 1409 1328 1330 1417 1413 2007 ABERDEEN AVE NENE 15TH ST NE 16TH ST REMOVE REMOVE ROAD AFEEDHIG 15 #6CUBN#6CUBNBNBNBN#6CU TO REMAIN NEW POLE REMOVE TO REMAIN 1333 1323 1325 1319 1317 1309 1233 1302 1316 1324 TRANSFER TRANSFER #6CUBNFUSE @ 40T SW#T87571 FUSE @ 65T SW#T87570 FUT: 1-6" FUT: 1-4" FUT: 1-2" 'A' 1" = 50' DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R.BLACKIE 425.457.2614 . E. ARCIAGA .---- ----.---- E. ARCIAGA .---- REDT # ( RW-TBD )RENTON BRENNON LANDING SCH73 - OH TO UG CONVERSION 1400 ABERDEEN AVENUE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 088-60 N/A 101147812 1" = 50'3 OF 4 KING 088A CIKNC QCSOKE 05SE-T23N-R05E 204.080 205.083 2305E020 2305E040 2305E020 HIG-15 COMCAST JAMES COHN 253.569.0636 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY ROW TBD ROW TEL TBD . . . SITE PLAN CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE HIG-15 06.11.21 171 158 125 N/A 0 N/A 171 167 125 ... ... ... CIRCUIT FEET REMOVED: 475 FT CIRCUIT FEET ADDED: 675 FT THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) →SEE PSE HANDBOOKS← SEE 1218 (SF),1220 (MF), 6080, FOR TRENCH SEE 3061, 2809 FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 100kVA 0.5 2.43 57,300 AMPS 1.90 36,600 AMPS H1A -----10,942 AMPS H1B -----12,472 AMPS Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P01 318720-166480 25 Removed at site: Grid Number: kVA Rating: Foreman to redline the following information TRANSFORMER REMOVAL Company ID#: Primary phase connected to: Tested Secondary Voltage P02 318705-166479 50 SITE SPECIFIC NOTES AT P01 (318720-166480) 2011 CLASS 3 - 45' -POLE TO BE REMOVED -REMOVE EX. OH 25kVA TRANSFORMER -REMOVE POLE AND ALL OTHER PSE RELATED FACILITIES AT P02 (318705-166479) 1962 CLASS 1 - 40' -POLE TO BE REMOVED -REMOVE EX. OH 50kVA TRANSFORMER -REMOVE ST. LIGHT (SLAH4937), RETURN TO YARD -REMOVE POLE AND ALL OTHER PSE RELATED FACILITIES AT SP1 -INTERCEPT & RETAIN EX. UG TPX SERVICE (ADDRESS 1328) -REROUTE EX. CABLE AND CONDUIT TO H1B, RETAIN CABLE IN RISER AT SP2 -INTERCEPT & RETAIN EX. UG TPX SERVICE (ADDRESS 1330) -REROUTE EX. CABLE AND CONDUIT TO H1B, RETAIN CABLE IN RISER AT P03 (318690-166479) 1972 CLASS 1 - 40' -POLE TO REMAIN -INSTALL 1Ø ARM-MOUNT DEAD END (S) (DE0115A) 6031.3011, #6CU DE (2223000) -INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT & SURGE ARRESTOR (TSU1L1) 6043.1000 -STIRRUP (2254200) -ALUM "H" CONNECTOR (2168000) -FUSE @ 40T (3412500), TAP 'B' PHASE -INSTALL SWITCH# T87571 -ROTATE EX. OH TRANSFORMER TO (S) FACE OF POLE -INSTALL 2" PRI. RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000 -INSTALL 4" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS4CSS) 6042.1000 -CAP RISER 10' UP POLE -INSTALL 6" PRI RISER ON NEW STANDOFF BRACKETS (RIS6CSS) 6042.1000 -CAP RISER 10' UP POLE -INSTALL 3/8" PRIMARY DOWN GUY (N) (GYD3SA) 6013.0100 -INSTALL 3/8" NEUTRAL DOWN GUY (N) (GYD3SAN) 6013.0100 -INSTALL SINGLE HELIX 10" ANCHOR (ANDH1) 6012.1000 (L=10', N) AT P04 (318734-166480) 1973 CLASS 4 - 40' -POLE TO REMAIN -INSTALL 1Ø ARM-MOUNT DEAD END (N) (DE0115A) 6031.3011, #6CU DE (2223000) -INSTALL 1Ø TERM ON FIBERGLASS ARM W/ LOAD INTERRUPTER CUTOUT & SURGE ARRESTOR (TSU1L1) 6043.1000 -STIRRUP (2254200) -ALUM "H" CONNECTOR (2168000) -FUSE @ 65T (3412600), TAP 'B' PHASE -INSTALL SWITCH# T87570 -ROTATE EX. OH TRANSFORMER TO THE NORTH FACE OF POLE -INSTALL 2" PR. RISER ON NEW STANDOFF BRACKETS (RIS2CSS) 6042.1000 -INSTALL 4" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS4CSS) 6042.1000 -CAP RISER 10' UP POLE -INSTALL 6" PARTIAL RISER ON NEW STANDOFF BRACKETS (RIS6CSS) 6042.1000 -CAP RISER 10' UP POLE -INSTALL 3/8" PRIMARY DOWN GUY (S) (GYD3SA) 6013.0100 -INSTALL 3/8" NEUTRAL DOWN GUY (S) (GYD3SAN) 6013.0100 -INSTALL SINGLE HELIX 10" ANCHOR (ANDH1) 6012.1000 (L=7', S) AT P05 (318720-166465) 2011 CLASS 2 - 35' -POLE TO REMAIN AT P06 DEVELOPER TO STAKE CENTER OF POLE -INSTALL NEW 35' CL3 POLE (PS353), DEEP SET 1 FOOT - 6010.1100 -INSTALL 4" RIGID CLEVIS (SOUTH) -INSTALL 4" RIGID CLEVIS (INDNRC) WEST -INSTALL 3" SEC. RISER (RIS3CSS) 6042.1000 -INSTALL NEW GRID (318728-166471) AT P07 (318706-166473) 2016 CLASS 1 - 35' -POLE TO BE REMOVED -REMOVE POLE AND ALL PSE RELATED FACILITIES AT SP3 -INTERCEPT & RETAIN EX. UG CABLE FROM P08 -REROUTE EX. CABLE AND CONDUIT TO H1A, RETAIN CABLE IN RISER SPAN NOTES P01 TO P02 REMOVE ± 165' #6 CU OH PRI.( )' #6 CU REMOVE ± 165' #6 CU OH NEUT.( )' #6 CU P01 TO P04 REMOVE ± 185' #6 CU OH PRI. ( )' #6 CU REMOVE ± 185' #6 CU OH NEUT. ( )' #6 CU P02 TO P03 REMOVE ± 125 ' #6 CU OH PRI.( )' #6CU REMOVE ± 125' #6 CU OH NEUT. ( )' #6CU P01 TO P05 TRANSFER (2) EX. 1/O OH SEC. TPX TO P07 REMOVE ± 100' 1/O TPX ( )' 1/O TPX P02 TO P07 REMOVE ± 70' 1/O OH SEC. TPX ( )' 1/O TPX 1417 TO P01 TRANSFER EX. 1/O OH TPX SERVICE TO P07 REMOVE ± 30' 1/O TPX ( )' 1/O TPX RETIREMENT POLE TABLE SITE # POLE DATA POLE TRANSFERS REMARKS GRID #HEIGHT CLASS YEAR XFMR CO. ID#TOPPED RMVD TEL TV FIBER ST. LIGHT (ADDITIONAL INFORMATION) P01 318720-166480 45'3 2011 LUMEN TECH/COMCAST P02 318705-166479 40'1 1962 LUMEN TECH/COMCAST P07 318706-166473 35'1 2016 LUMEN TECH POLE TABLE (NEW) Site # Pole Data Grid #Height Class Year Remarks / Location Ref. P06 318728-166471 35 3 2022 PSE Equip # CROSSING CONDUIT TABLE X-ING # LOCATION POWER XING LENGTH ASBUILT LOCATION TYPE OF CROSSING (Feeder, Primary, Secondary, etc.)FROM TO SIZE (IN)TYPE QTY X01 LOT 1 P06 3 SCH80 1 60 ( )'NCL SECONDARY X02 LOT 1 LOT 8 2 SCH80 1 80 ( )'ECL PRIMARY 3 SCH80 1 80 SECONDARY 4 SCH80 1 80 PRIMARY 6 SCH80 1 80 FEEDER X03 LOT 8 H1A 3 SCH80 1 60 ( )'SCL SECONDARY X04 P02 P03 2 SCH80 1 120 ( )'ECL PRIMARY 4 SCH80 1 120 PRIMARY 6 SCH80 1 120 FEEDER X05 P04 'A' 2 SCH80 1 80 ( )'ECL PRIMARY 4 SCH80 1 80 PRIMARY 6 SCH80 1 80 FEEDER 2" SCH80 GREY PVC = 280 FT 2" PVC PLUG /CAPS = 6 3" SCH80 GREY PVC = 200 FT 3" PVC PLUG /CAPS = 6 4" SCH80 GREY PVC = 280 FT 4" PVC PLUG /CAPS = 6 6" SCH80 GREY PVC = 280 FT 6" PVC PLUG /CAPS = 6 Lock Cover Captive L-Bolt service Customer's conductors Set handhole flush to final grade Side View 17" Approx 30" Approx 2" 18" Captive L-Bolt Lock Cover, 10 lbs 40-1/2"27-1/4" Conductors enter from beneath and shall be folded back with handhole SINGLE PHASE SECONDARY HANDHOLE @ H1A NOT TO SCALE @ H1B SHALL BE STAGGERED CONNECTOR BARS IN THE FRONT NEUTRALS SHALL BE 18" 16" 13" 12"10" 2" 10" Pedestal will accept up to six 3" conduits SEALED WITH FOAM CONDUIT SHALL BE 120 PVC CONDUIT ELBOWS TYPICAL 24" RADIUS DB SIDE VIEW WITH CONDUIT 10" 18" 16" 13" 10" 2" 36" FRONT VIEW WITH CONDUIT SECONDARY PEDESTAL DETAIL NOT TO SCALE Utility Pole Erosion Control UTILITY POLE EROSION CONTROL DETAIL NOT TO SCALE Drainage ditches or Dry vegetated sites TOP VIEW DRY DRAINAGE DITCH or DRY VEGETATED SITE SLOPE Place gravel bags for Sediment Trap Place straw mulch on disturbed areaExcavated or Augered Hole Pole SLOPE MFP22004903 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS FEEDHIG 15 #6CUBN#6CUBNFUSE @ 40T SW#T87571 FUSE @ 65T SW#T87570 NEW 1/O AL EIB674-BØ NEW 1/O AL EIB675-BØ DESIGNED BY UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP R.BLACKIE 425.457.2614 . E. ARCIAGA .---- ----.---- E. ARCIAGA .---- REDT # ( RW-TBD )RENTON BRENNON LANDING SCH73 - OH TO UG CONVERSION 1400 ABERDEEN AVENUE NE, RENTON, WA 98056 PUGET SOUND ENERGY N/A IP 088-60 N/A 101147812 AS SHOWN 4 OF 4 KING 088A CIKNC QCSOKE 05SE-T23N-R05E 204.080 205.083 2305E020 2305E040 2305E020 HIG-15 COMCAST JAMES COHN 253.569.0636 LUMEN AMY ALLISTON 206.794.8534 RIGHT OF WAY ROW TBD ROW TEL TBD . . . ... ... ... NEW PRIMARY UNDERGROUND CIRCUIT ONE-LINE DIAGRAM NOT TO SCALE THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL (800) 424-5555 2 BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) PRIMARY CABLE & CONDUIT TABLE LOCATION CONDUIT CABLE ASBUILT INFORMATION - FOREMAN COMPLETE CONDUIT TYPE (DB120, HDPE, SCH80), FEEDER CABLE TYPE (TAPE, CN, #4/O NEU) FROM TO SIZE (IN)QTY. DESIGN LENGTH (FT) BENDS PULL (LBS) PULL REV (LBS) CABLE SIZE DESIGN LENGTH (FT) PHASE - ID TAG RECORD RECORD PHASE TAPPED & ACTUAL FOOTAGES & TYPES INSTALLED LUBRICANT (Gal.) 90°45°22°11°A B C MANUFACTURER COMPOUND YEAR NOTES CONDUIT TYPE CABLE TYPE EST.ACTUAL P04 P03 6 1 210 -2 2 -CONDUIT ONLY ----SCH80 . P04 P03 4 1 210 -2 2 -CONDUIT ONLY --- P04 V01 2 1 120 -1 2 -59 123 1/0 AL JKT 325 -EIB674 --SCH80 1.0 V01 P03 2 1 90 -1 2 -178 80 1/0 AL JKT 250 -EIB675 - SCH80 2" PVC TOTAL (ft) =210 0 2 4 0 1/0 AL JKT TOTAL (ft) =575 TTL 2.9 SCH80 4" PVC TOTAL (ft) =210 0 2 2 0 SCH80 6" PVC TOTAL (ft) =210 0 2 2 0 NOT TO SCALE NEW CONDUIT DIAGRAM FEEDER 6" CONDUIT LEGEND SECONDARY 3" PRIMARY 2" VAULT & EQUIPMENT TABLE SITE #GRID # VAULT SIZE & COVER TYPE & SIZE EQUIPMENT IN VAULT PRIMARY BUSHINGS TRANSFORMER ID NUMBERS (COMPANY ID) AS-BUILT INFORMATION LB DC FOREMAN: INCLUDE PHASE TAPPED V01 318720 166478 4'x6'x3'6" Combo Vault Matid: 7664000 Cover: 9997174 100kVA MP TRF 120/240 Matid: 6247200 3 3 CMBO15RL 6045.1050 BØ ELB10J 6041.1000 CAP (7630600) SECONDARY HH/PEDESTAL TABLE Site Pedestal or Handhole Number of Positions Required Remarks H1A HANDHOLE 2 - HH16350 6050.2000 H1B PEDESTAL 3 - SEPS4 6050.1000 SECONDARY CABLE & CONDUIT TABLE LOCATION CABLE CONDUIT VOLTAGE ASBUILT INFORMATION SIZE LENGTH ASSUMED SIZE LENGTH BENDS DROP FLICKER Foreman - Complete FROM TO (1/O,4/O,350)Design (ft)Lot Corner to Meter (ft)(in)Design (ft)90°45°22°11°(Percent)(Percent)Actual Amount Installed Cable Conduit V01 P06 350 190 .3 25 2 ---2.4 1.5 (PRE. 1.5,3.8) V01 H1A 350 130 .3 70 3 ---2.7 1.7 (PRE. 1.0,2.8) V01 H1B 350 100 .3 100 2 ---2.2 1.5 (PRE. 0.8,2.2) 350 UG TRIPLEX TOTAL (ft) =420 SCH80 3" PVC TTL (ft)=195 7 0 0 0 0.7 TOTAL QTS OF GLUE 0.7 JOINT TRENCH DETAIL ROAD SIDE NATIVE SECONDARY POWER PEDESTAL MATERIAL P/L Power Secondary Power Primary Conduit Tel. & TV 12" Min 12" Sand Cover when gas line is in trench Sand 6" or 12" 4" Sand Bedding 1' 36" Cover 42" Gas 12" 18" Lower 2" 10" Pedestal PSE 10' FRONTAGE EASEMENT 1' Cover ROAD SIDE MINIPAD MINIPAD FIELD SIDE VAULT 6" of crushed rock (base for vault) P/L Power Secondary Power Primary Gas 12" Min Horizontal Separation Communications 42" Min 21"1' Feeder 38" 2" 4" Sand Bedding 12" Sand Cover 36" Cover 4" Sand Bedding 42" 6" Additional depth when Feeder is required PSE 10' FRONTAGE EASEMENT 1' TRANSFORMER Final Backfill Initial Backfill Trench Depth 42" - 48" MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE OIL-FILLED EQUIPMENT TRANSFORMER APPROVED AREA COMBUSTIBLE BUILDING WALLS & ROOF10' 10' 10' JOINT TRENCH DETAIL NOTES: 1. If the final backfill contains rocks greater than 8 inches in diameter, install 12 inches compacted sand shading across the full width of the trench. * If the final backfill contains rocks 8 inches in diameter or smaller, install 6 inches compacted sand shading across the full width of the trench. * 2. Rocks greater than 10 inches diameter are not permitted in the final backfill. 3. Sand bedding is required under PSE gas pipe. Bedding is not required for the full width of the trench; it shall extend from the side of the trench nearest to where the gas main/service is installed to a minimum of 6 inches on the opposite side of the gas line. 4. Utilities shall not be stacked over the gas line in the trench. 5. If wet utilities will be included in the trench, please contact PSE or local power company directly for clearance requirements. 6. Reduced clearance of 4 inches between power and communication, must have approval of the communications companies. * Alternatives to full-width trench shading require PSE approval. Primary & Secondary-Mainline Gas & Communications (NTS) Primary Dirt Pile Final Grade 24" Min 36" Min Cover Over Power 48" Max Depth Final Backfill Gas 4" Sand Bedding Property Line intercept (depth varies). SidewalkCurb Location of roof drain 48" Typical Width may vary per Number of Utilities and Conduits 6" or 12" Min Sand Shading Over Gas after Compaction 12" Min R/W or Excavated 12" Typical Power Secondary Power TV & TEL 12" Min 12" Min Separation 4,5 1,2 1 3 6 6" or 12" Min Sand Shading Over Power after Compaction1 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PSE EQUIPMENT NOT TO SCALE CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 3' MIN 3' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA 3' MIN Standoff Bracket 15" Min Length Conduit Clamp Conduit Field Face Quadrant Climbing SpaceRoad Face Quadrant Climbing Space 5" Min CL LCDirection of Vehicular Traffic CONDUIT RISER PLACEMENT DETAIL TOP VIEW NOT TO SCALE NOT TO SCALE ANCHOR DETAIL - SINGLE HELIX Single Helix 6" to 12" Under Normal Conditions 40" Min for Single Helix 65" Min for Triple Helix POST CONSTRUCTION POWER QUALITY CALCULATIONS INCLUDES FUTURE 8 LOT PLAT DEVELOPMENT AND FUTURE 2 LOT SP PRIMARY 4" Excavation - 11-1/4 cubic yards SIDE VIEW Rock Crushed 6" 4'-4" 2" 4'-0"6'-0" 6"6'-7" 3'-6" 4'-0" 7' 10' TOP VIEW NOT TO SCALE VAULT DETAIL @ V01 MFP22004903