HomeMy WebLinkAboutRC20220930000505 Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-1 of 8
Record Date:9/30/2022 1:09 PM
Electronically Recorded King County,WA
Keturn Address:
�ity�lerk's Uffice
City of Kenton
i055 S Grady Way
Renton,WA 98057
DECLARATION OF COVENANT
FnR INSPECTInN AND MAINTENANCE nF DRAINAGE FACILITIES AND
UN-SITE BMPS
Grantor: TRI POINTE HOMES
Grantee: Citv of Renton, a Washin�ton municipal corporation
Legal Description: Proposed Lots 30 &31 of Elliott Farms. PORTION OF SEC 22, TWP 23 N.,
RGE 05E W.M. CITY OF RENTON, KING COUNTY, WASHINGTON
Assessor's Tax Parcel ID#: 733093-0300/733093-0310
IN CONSIDERATION of the approved City of Renton (check one o}'the}'ollowing)
❑✓ Residential Building Permit �Commercial Building Permit
�Clearing and Grading Permit �Civil Construction or Utility Permit
for Permit(s)B22004227 (construction/euilding/utilityPermit#)relating to the real property
("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants (covenant)with the City of Renton ("City of Renton" or"Cit�'), a municipal corporation
of the state of Washington,that he/she(they)will observe,consent to,and abide by the conditions
and obligations set forth and described in Paragraphs 1 through 9 below with regard to the
Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants(grant),covenants (covenant), and agrees (agree) as follows:
1. The Grantor(s)or his/her(their)successors in interest and assigns("Owners")shall at their own
cost,operate, maintain,and keep in good repair,the Property's drainage facilities constructed
as required in the approved construction plans and specifications R-4166 (Project
P�an tt) on file with the Citv of Renton and submitted to the City of Renton for the review and
approval of permit(s)_C20005641 (Construction/euilding/Utility Permit#J.The
Property's drainage facilities are shown and/or listed on Exhibit A—Site Plan. The Property's
drainage facilities shall be maintained in compliance with the operation and maintenance
schedule included and attached herein as Exhibit B—Operations and Maintenance. Drainage
facilities include pipes, channels, flow control facilities, water quality facilities, on-site best
management practices (BMPs) and other engineered structures designed to manage and/or
Page 1 of 8
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-2 of 8
Record Date:9/30/2022 1:09 PM King County,WA
treat stormwater on the Property. On-site BMPs include dispersion and infiltration devices,
bioretention, permeable pavements, rainwater harvesting systems, tree retention credit,
reduced impervious surface footprint, vegetated roofs and other measures designed to mimic
pre-developed hydrology and minimize stormwater runoff on the Property.
2. City of Renton shall have the right to ingress and egress over those portions of the Property
necessary to perform inspections of the stormwater facilities and BMPs and conduct
maintenance activities specified in this Declaration of Covenant and in accordance with the
Renton Municipal Code. City of Renton shall provide at least thirty (30) days' written notice to
the Owners that entry on the Property is planned for the inspection of drainage facilities. After
the thirty (30) days, the Owners shall allow the City of Renton to enter for the sole purpose of
inspecting drainage facilities. In lieu of inspection by the City, the Owners may elect to engage
a licensed civil engineer registered in the state of Washington who has expertise in drainage to
inspect the drainage facilities and provide a written report describing their condition. If the
engineer option is chosen,the Owners shall provide written notice to the City of Renton within
fifteen (15)days of receiving the City's notice of inspection.Within thirty(30)days of giving this
notice,the Owners,or engineer on behalf of the C�wners,shall provide the engineer's report to
the City of Renton. If the report is not provided in a timely manner as specified above, the City
of Renton may inspect the drainage facilities without further notice.
3. If City of Renton determines from its inspection, or from an engineer's report provided in
accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work is
required to be done to any of the drainage facilities, City of Renton shall notify the Owners of
the specific maintenance, repair, restoration, and/or mitigation work ("Work") required
pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the
Owners to complete the Work, or to provide an engineer's report that verifies completion of
the Work. After the deadline has passed, the Owners shall allow the City access to re-inspect
the drainage facilities unless an engineer's report has been provided verifying completion of
the Work. If the Work is not completed within the time frame set by the City, the City may
initiate an enforcement action and/or perform the Work and hereby is given access to the
Property for such purposes. Written notice will be sent to the Owners stating the City's
intention to perform such Work.This Work will not commence until at least seven (7)days after
such notice is mailed. If, within the sole discretion of the City, there exists an imminent or
present danger, the seven (7) day notice period will be waived and Work will begin
immediately.
4. The Owners shall assume all responsibility for the cost of any Work, or any measures taken by
the City to address conditions as described in Paragraph 3. Such responsibility shall include
reimbursement to the City within thirty(30)days of the receipt of the invoice for any such Work
performed. Overdue payments will require payment of interest at the maximum legal rate
allowed by RCW 19.52.020 (currently twelve percent (12%)). If the City initiates legal action to
enforce this agreement, the prevailing party in such action is entitled to recover reasonable
litigation costs and attorney's fees.
5. The Owners are required to obtain written approval from City of Renton prior to filling, piping,
cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any
alterations or modifications to the drainage facilities referenced in this Declaration of Covenant.
Page Z of $
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-3 of 8
Record Date:9/30/2022 1:09 PM King County,WA
fi, Any natice or eonsent required ta be givera or c�t�erwis� pre�vid�d for by the provisions of this
Agreernent shall be effectiWe upc�n persanal delivery,orthree (3}clays after m�iling by C;ertified
Mail, return receipt rec�uested.
7. With regard to the rnatters address�d herein,this agreement constitutes the entire agreement
between the parties, and supers�des al! prior discussions, negotiations, and all agreemer�ts
whatsoe��r whether oral or written.
8. This peclaration of Cavenartt is inter�ded t�+ protect the �alue and desirability and prarr�ote
efficient anc� effectiue managem�nt of sr�rface water drair�a�e caf the real property describec�
a�o�e, and shall inure to the iaenefit af af I the citizens of the City c�f Rer�t�n and its successors
and assigns. This Dee[aratinn of Cnvenan� shall run with the land ancE be binding upan
Grantar(s), and Grantor's{s')succ�ssors in interest,and assigns.
9. This �eclaration of Covenant may be tarrninated by executian of a written agreement by the
Owners and the City that is recordecE by King County in its rea� property records.
IN WITNESS WHER�OF, this Declarati�n c�f Co�enant for the Inspection and Maintenance of
Dr-ainage Faciiities is executed this day af_ �. 2� �
_._.___.m_ '�.��
GRA TO , owner of the Prope y GRANTUR,ovuner of the Praperty �
STATE dF WASNINGTON )
C�UNTY OF KIf�G )sse
C1n this day personalfy ap�aeared before r�-se:
�. _ �� �, to rt�e known to be� the individual{s)
describec{ in and who executed the within and foregaing instrument and acknowledged that they
signed the same as their free and vvluntary act�nd cfeed,for the us�s and purposes therein s�ated.
Gi�en under my hand and official seal this � day c�f� C.. 20�
�° ��.,�,*��.�e'�1l411 � �
�,,�,'� Fd�� ,� � «��'. ._.... �,�,
�,-� ���� F�,� ��� —_
� � t
��A��w+,tio,aaseal►6ta '�` �t
��itl�����It.�ltd,��rJr�9i���°��` �r �
� �" '"' � �g�*g',�^�4°`pd
.� �� �' �, Pri�ted name
� ��' S�4S1 `"= ��r Public in and fc,r the State af
cfi�; = � .
�v °°� er,yi � �°��'�`��,4q 4�V.�sh ngton, residing at
�'�,�,�`5���°r°s°i�sa����,''��'��:
� �
���l�t������������My appointment expires �� �,.
.�
Page 3 of�
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-4 of 8
Record Date:9/30/2022 1:09 PM King County,WA
EXHIBIT A - ON-SITE BMP SITE PLAN
TOTAL LOT/SITE AREA: 5297 SF PERMIT #: B22004227
ADDRESS: 14191 & 14187 SE 153rd PI PARCEL NUMBER: 733093-0300/ 733093-0310
NEW/REPLACED IMPERV.AREA: 3656 SF MAX. IMPERV.SURFACE ALLOWED: 4237 SF
ON-SITE BMP S USED: D ell for limited filtration, erforated i e connection
10' BSBL/SDE/LANDSCAPE BUFFER
106' 104'
S89'18'39"E 32.13' S89'18'39"E 32.13' �p�
._ ._._ _._. ._._—._. . .-�- -=.-�—�-�-� ---�oz
106-----
100 ---`� ' ____ _ =—� Ex. Rockery
�
I , � ! I PATI � � 4� AC pad (typ)
II4 PATIO 70.0 F
I lil L�68.8 SF �� ,''� — _--
�
N Q �I�I 55r_nn _ _ _ I O
7 I
o m�il 27'-9° 27'-10" � �
� �I�I �� �
��� �il � LOT 30(Plan 1) LOT 31(Plan 2) I�
o ��i ,1, LOT: 2646 SF LOT: 2651 SF � Q PROPOSED
z I � 2x10� Trench w 6"
I I il � I Z 5.75' X 45.33'
�� Perforated Pipe � 2379 SF
Tightline (typ.) i (Detail C.2.2.C) � I ROOF=2815 SF
Footing Drain (typ.) i� i
Roof Overhang lil PORCH 48 SF PORCH 48 SF ' 20' GARAGE SETBACK
Downspout (typ) I - - �� _: _�_ � �i; ;i �' .� — 15' FRONT BSBL
�� �_-;.___-_-_- -� ,r�_��_�._ -- � STORM ESMT
. �� .- ----- --, .��_ _�d,. �.. S09'15'53"E 18.52'
98 ------- L � � _ `.. _
Concrete Drive ...�'.� . `�
- Storm
319 SF98. �.�:� �. .
Cgr��rete Drive 320 SF
�` �� :�� �:. ��.�5' 'fi9 1 E.3�1�' ��. 88'1 11"�.-1 .. 9.�� .�.
� � �Sidewalk
Silt Fence �
Sanitary ESMT R=116.00' L=16.75'
CL of 142nd AVE SE Water
Nor�s: Lo ber 30 31
1. The limits of dearing and Lot Size 2646 SF 2651 SF
grading are the lot lines. Roof Overhang 1430 SF 1385 SF
2. No existing buildings or
construction (only new PORTION OF SEC. 22, TWP 23N., Paved Areas 399 SF 413 SF
construction). RGE 05E., W.M. Total Impervious 1829 SF 1798 SF
3. Areas that have been CITY OF RENTON, KING COUNTY, Impervious 69% 68%
deared and graded must hove WASHINGTON
the soil moisture holding
capacity restored per City Std Lot Size 2646 SF 2651 SF
Plm 264.00 Footprint 1188 SF 1179 SF
ELLIOTT FARMS - LOT 30/31 Porch/Deck 48 SF 48 SF
Total Coverage 1236 SF 1227 SF
SECTION/TOWNSHIP/RANGE: 22-23N-05E Lot Coverage 47% 46�
City of Renton APPROVED BY: SCALE: 1"=20'
TITLE: DATE:
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-5 of 8
Record Date:9/30/2022 1:09 PM King County,WA
SECTION C2 ON-SITE BMPS
Future updates to the instructions will be posted on City of Renton's Sairface Water Design Manaial
website.
A reproducible copy of the instructions,prepared for inclusion with the declaration of covenant,is located
in Reference Section 8-M.
��trtz����,:�:i.a sc�r���mr���,�z��s��TaTiaiv o�'a P���oRa�rEn:a�ir�:ct��vr����ric��v Ft���
SINGLE FAIVIILY RESID�NC�
RANDOM FILL
6"MIN. o ' o
18"MIN� o FILTER FABRIC
�
6"PERFORATED PIPE
1 z"-4" WASHED ROCK
�24"MIN.�
TRENCH X-SECTION
NTS
SLOPE
TO ROAD
DRAINAGE SYSTEM
�2'x 10'LEVEL TRENCH
w/PERFORATED PIPE
PLAN VIEW OF ROOF
NTS
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-6 of 8
Record Date:9/30/2022 1:09 PM King County,WA
MAINTENANCE INSTRUCTIONS FOR A PERFORATED PIPE
CONNECTION
Your property contains an on-sitc BMP(bcst managcmcnt practicc) callcd a"perforated pipe
connection,"which was installed to reduce the stormwater runoff impacts of some or all of the
impervious surface on your property.
A perforated pipe connection is a length of drainage conveyance pipe with holes in the bottom,
designed to "leak"runoff, conveyed by the pipe,into a gravel filled trench where it can be soaked into
the surrounding soil. The connection is intended to provide opportunity for infiltration of any runoff
that is being conveyed from an impervious surface(usually a roof)to a local drainage system such as a
ditch or roadway pipe system. This on-site BMP shall be maintained per Appendix A of the City of
Renton's Surface Water Design Manual.
MAINTENANCE RESTRICTIONS
• The size and composition of the perforated pipe connection as depicted by the site plan and
design details must be maintained and may not be changed without written approval from the
City of Renton or through a future development permit from the City of Renton.
� Thc soil ovcrtop of thc perforatcd portion of thc systcm must not bc compactcd or covcrcd
with impervious materials.
RECORDING REQUIREMENT
These perforated pipe connection on-site BMP maintenance and operation instructions must be
recorded as an attachment to the required declaration of covenant and grant of easement per
Requirement 3 of Section C.1.3.4 of the City of Renton Surface Water Design Manual. The intent of
these instructions is to explain to future property owners,the purpose of the BMP and how it must be
maintained and operated. These instructions are intended to be a minimum;the City of Renton may
require additional instructions based on site-specific conditions. See the City of Renton's Surface
Water Design Manual website for additional uifonnation and updates.
', �fi'�'PICAL PERF()RATED PIPE C(}NNECTI�N FQR A SII�+TGLE FAMILY RESIUEIYCE `
����� ,���������p�r
.�_. �
���r�rc� �,�,....�,�. _�_ � "f����'��s�,����,"�`-�—�
:� �
��rru.ara��,���rr , w ;""�� ��'� �
Y��� —Poy��� �`���,+'�
� t�"'�uiirr � a a G�,� a�n
� e^'. "�i��f.� � �ro, .� �tl R9�''_Uk'�1°'V'r^'N,9'�h�'i't5w'!M."
�r'��eaefiir�rc:bn ���a�u��w��°��a���c��
wd�a�etp��r� c��"a«u ��q���w�.w��
..�...'�._:�.,.�..�_a..ma5..�.�°o*.�
.. . . � �r^^,�.—^�,:9"�YY167,....._,......r�
I�'�4�������'���'
. . .. ..�� . . .
��i��,��e�y�,�,�i'v�i�� r��,i.��
IYB.�M.
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-7 of 8
Record Date:9/30/2022 1:09 PM King County,WA
SOIL AMENDMENT - SITE PLAN
AMENDED SOIL AREA: 1748 SF ADDRESS: 14191 & 14187 SE 153rd PI
TOTAL LOT/SITE AREA: 5297 SF PARCEL NUMBER: 733093-0300/ 733093-0310
1748 SF-AMENDED SOIL
. . . . . . . . . . . . . . . . . . . . . . . . . .�
5297 SF-LOT SF
a . . '�,� ' , ' ' ° .
. • _ •� .� �• ' . . ' �♦
N
5 15
0 10 20 40
ELLIOTT FARMS - LOTS 30/31
SEC.22, TWP 23N, RGE 05E
City of Renton APPROVED BY: SCALE: 1"=20'
TITLE: DATE:
Instrument Number: 20220930000505 Document:COV Rec: $210.50 Page-8 of 8
Record Date:9/30/2022 1:09 PM King County,WA
MAINTENANCE INSTRUCTIONS FOR SOIL AMENDMENT
Your property contains an on-sitc BMP(bcst managcmcnt practicc) called"soil a�nend�nent,"which
was installed to mitigate the stormwater quantity and quality impacts of some or all of the pervious
surfaces on your property.
Soil amendment is a method of regaining greater stormwater functions in the post development
landscape by increasing treatment of pollutants and sediments, and minimizing the need for some
landscaping chemicals. To be successful,the soil condition must be able to soak water into the ground
for a rcasonablc numbcr of ycars. This on-sitc BMP shall bc maintaincd per Appcndix A of thc City of
Renton's Surface Water Design Manual.
MAINTENANCE RESTRICTIONS
The size,placement, and composition of these devices as depicted by the site plan and design details
must be maintained and may not be changed without written approval from the City of Renton or
through a future development permit from the City of Renton.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
To be successful,the soil must be able to soak water into the ground for a reasonable number of years.
• Return leaf fall and shredded woody materials from the landscape to the site when possible in
order to replenish soil nutrients and structure.
� On turf areas, "grasscycle"(mulch-mow or leave the clippings)to build turf health.
� Maintain 2 to 3 inches of mulch over bare areas in landscape beds.
• Re-seed bare turf areas until the vegetation fully covers the ground surface.
• Avoid using pesticides (bug and weed killers)which damage the soil.
• Where fertilization is needed(mainly turf and annual flower beds), a moderate fertilization
program should be used which relies on compost,natural fertilizers, or slow-release synthetic
balanced fertilizers.
RECORDING REQUIREMENT
These on-site BMP maintenance and operation instructions must be recorded as an attachment to the
required declaration of covenant and grant of easement per Requirement 3 of Section C.13.4 of the
City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future
property owners,the purpose of the BMP and how it must be maintained and operated. These
instructions are intended to be a minimum;the City of Renton may require additional instructions
based on site-speci�c conditions. See the City of Renton's Surface Water Design Manual website for
additional information and updates.