Loading...
HomeMy WebLinkAboutMFP22004957.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP22004957 IVR Number: 22004957 Permit Information Permit Name: Comcast Cable Franchise Permit-JB0001113691 Address/Location:09/19/2022Application Date:0007200189Parcel Number: 78 WILLIAMS AVE S Permit Type:10/03/2022Issue Date:Franchise Permit Work Class:10/03/2023Expiration Date:Minor Utility Job Number: JB0001113691Franchise Type:Cable Description: Comcast JB0001113691 REPLACE DAMAGED VAULT WITH LOAD BEARING TRAFFIC RATED 17X30 VAULT MISSILE BORE (1) 2" CONDUIT & PULL (1) .625 COAX THROUGH. RESTORATION PER CITY OF RENTON STANDARDS. Contacts Name Address PhoneTypeBilling David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 ApplicantX Corrie Lamb Comcast 2525 Beaufort Dr. Modesto, CA 95355 Contact David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 Contact David Standring Cannon Construction LLC 406 Porter Way Milton, WA 98354 Contractor Business License Number: 20838Construction Contractor: CANNOCL791JK Electrical Contractor: CANNOCI873CL CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Laurie Dietz Comcast - Billing 1701 John F. Kennedy Blvd. Philadelphia, PA 19103 H: (425) 741-5733Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES DEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Page 1 of 1 | Published: 1/2/2019 Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200 Email: franchisepermits@rentonwa.gov Website: rentonwa.gov FRANCHISE PERMIT APPLICATION Published: 1/2/2019 TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour. Franchise Agency: Franchise Job Number: Phone: Contact Name: Email: Job Site Address: Project Name: Description of Work: Please check all that apply: ☐ New Construction ☐ Repair/Relocate ☐ Underground ☐ Overhead ☐ Sidewalk ☐ Street ☐ Open Trench ☐ Bore # of feet: Contractor Name: Phone: State Contractors License #: City of Renton Business License #: “I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ” Signature Date INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at $125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date. Plan Review/Development Engineering Date Approved as submitted Pre-Construction Meeting required Site Construction Inspector Date Approved with comments or redlines Camera inspection of utilities required Development Engineering Manager Date Comcast Cable Communications Management JB0001113691 Corrie Lamb 209-985-3769 corrie_lamb@comcast.com 78 WILLIAMS AVE S RENTON, WA 98057 78 WILLIAMS AVE S APT A RENTON, WA 98057 Replace damaged vault with load bearing traffic rated 17x30 vault; Missile bore (1) 2" conduit & pull (1) .625 coax through 6 Cannon Construction LLC - David Standring 253-922-2787 601590363 20838 09/19/2022 Scott Warlick 10/3/2022 MFP22004957 POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐ Electronic Copy of the TCP Application ☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:  Include map(s) showing the location of the project and work area.  Be legible lettering and clear, contrasting, symbols of viewing or printing.  Must indicate street names, and north arrow and scale.  Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering 78 WILLIAMS AVE S APT ARENTON, WA 98057 MFP22004957 78 WILLIAMS AVE S RENTON, WA 98057 Monday Friday 8:00am 3:00pm Cannon Construction Corrie Lamb 209-985-3769 410 Valley Ave NW, Suite 12, Bldg C Puyallup Replace damaged vault with load bearing traffic rated 17x30 vault; Missile bore (1) 2" conduit & pull (1) .625 coax through Scott Warlick CED 10/3/2022 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING:  Must have approved Traffic Control Plan (TCP) prior to commencing the work.  Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians.  WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way.  Comply with all traffic regulations of the City of Renton and the State of Washington.  Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices.  Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.  Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work.  Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions.  Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.  Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees.  The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim.  In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same.  Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel.  All permit conditions shall be met. NOTES:  Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.  Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT.  Approved Temporary Traffic Control Plan must be at the work site during work hours.  Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone.  Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours.  Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021  In the case of Temporary No Parking Zones, all the following apply in addition to previous:  Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage.  Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time.  The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site.  Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) David Standring 09/19/2022 11'ROWROWROWROWROWROWROWROWROWROWROWROWROWROWROWROW74 81 75 84 91 79 82 78 87 EOPEOPEOPEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WEOPEOPEOPEOPEOPEOPEOPEOPS/WS/WS/WS/WS/WS/WS/WLANDSCAPINGLANDSCAPINGDWYDWYDWYSIDEWALKSIDEWALKDWYLANDSCAPINGLANDSCAPINGWTWILLIAMS AVE SR2-1 WORK AREA STREET PARKINGSTREET PARKING74.4028 PARKINGNO FROM TO NAME OF FIRM 000-0000 PHONE (CONTACT #) TOW-AWAY AREA XXXDWYDWYCONTACT PROPERTY OWNER(S) 72 HOURS PRIOR TO START OF WORK TO ALERT OWNER(S) TO POSSIBLE DRIVEWAY CLOSURES AND ALTERNATE ACCESSPLACE AT THE SE CORNER OF S RIVERSIDE DR & WILLIAMS AVE S PLACE AT THE SE CORNER OF WILLIAMS AVE S & S 2ND ST 9'11'9' TRAFFIC CONTROL PLAN THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED BY THE PUBLIC AUTHORITY HAVING JURISDICTION DISCLAIMER All traffic control setups, sign spacing, and procedures will conform to the specifications stated in the federal Manual on Uniform Traffic Control Devices (M.U.T.C.D) Cities and various municipalities may have also adopted specialized guidelines for traffic control within their jurisdiction. It is the responsibility of the on-sitetraffic control personnel to verify if any special conditions exist. TRAFFIC CONTROL ADDITIONAL NOTES - Will coordinate with any businesses that will be affected by construction - Temporary "NO PARKING" signs to be placed at least 72 hours prior to work - Driveway access will be maintained unless otherwise noted - Sidewalk of 4' width will be maintained for pedestrian access unless otherwise noted, spotter on site to escort pedestrians through work zone- All work will stop while pedestrians are escorted through work zones- Signs within roadway will be protected by channelization devices- All traffic control devices used for night work must be retroreflective FLAGGERSPOTTERLEGEND Work Vehicle Truck Mounted Attenuator Work Area Flagger Spotter Traffic Safety Cone/Drum WT WT SIGN SPACING = X (FEET) FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO) RURAL HIGHWAYS 60/65 MPH 800' +/- RURAL ROADS 45/55 MPH 500' +/- RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/- RURAL ROADS & URBAN ARTERIALS RESIDENTAL & BUSINESS DISTRICTS URBAN STREETS 25 MPH OR LESS 100' +/- 25/30 MPH 200' +/- ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED (1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE INTERSECTIONS AND DRIVEWAYS. (2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS. SPEED 25 30 35 45 50 55 155 200 250 360 425 495 570 LONGITUDINAL BUFFER SPACE = B LENGTH 40 305 60 65 70 780 840 10 105 150 205 270 450 500 550 --- 11 115 160 225 295 495 550 605 660 -- 12 125 180 245 320 540 600 660 720 780 840 LANE WIDTH 25 30 35 40 45 50 55 60 65 70 MINIMUM TAPER LENGTH IN FEET = L POSTED SPEED LIMIT (MPH) / PM CONTACT INFORMATION: DRAWN BY: PROJECT MANAGER: N S EW CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCZack Rollins (P): (253) 754-1914 (E): zrollins@teamcannon.comJB000111369178 WILLIAMS AVE S APT ARENTON, WA 98057PLANT REPAIRS17-050 09/14/2022 Z. ROLLINS AB TRAFFIC CONTROL 1 1 WORK TYPE:UNDERGROUND WORK CANNON CONSTRUCTION LLC CONTRO L S U P E R V I S O R ANGELIC A B O N G O T C E R T I F I E D TR A F F IC #013108 E X P . 6 / 3 0 / 2 0 2 6 MFP22004957 WORK AREA PROJECT MAP: POLE INFORMATION: POLE COUNT = POLES THAT NEED PERMIT = POLES THAT NEED MAKE READY = TRANSMISSION = DISTRIBUTION = 0 0 0 0 0 CANNON COMPANIES SAFETY | QUALITY | INTEGRITY | TEAMWORK Connecting The Future Since 1985 SITE ADDRESS: 78 Williams Ave S Renton, WA 98057 CONTACTS: CANNON COMPANIES Zack Rollins - (253) 754-1914- zrollins@teamcannon.com COMCAST COMMUNICATION Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com SCOPE OF WORK: JB0001113691 78 WILLIAMS AVE S RENTON, WA 98057 SHEET INDEX 1 -COVER 2 -GENERAL NOTES 3 -LEGEND 4 -DETAILS 5 -CONSTRUCTION PLAN - REPLACE DAMAGED VAULT WITH LOAD BEARING TRAFFIC RATED 17X30 VAULT - MISSILE BORE (1) 2" CONDUIT & PULL (1) .625 COAX THROUGH N S EW *ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*: NEW AERIAL = OVERLASH = NEW UNDERGROUND = EXISTING UNDERGROUND = RISER = TOTAL ROW FOOTAGE = FT. FT. FT. FT. FT. FT. ROW FOOTAGES*: NEW BUILDING PATHWAY = EXISTING BUILDING PATHWAY = NEW UNDERGROUND = EXISTING UNDERGROUND = TOTAL SITE FOOTAGE = FT. FT. FT. FT. FT. SITE FOOTAGES*: TOTAL PROJECT FOOTAGE = FT. 0 0 6 0 (0)0 0 0 0 0 0 0 6 FT.625 COAX 6 Plant Repairs MFP22004957 STANDARD 1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION. THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY RELOCATIONS DUE TO SAID CONFLICTS. 2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811 3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES. 4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER, AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES. 5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM. 6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE. 7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS. 8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS. 9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS. 10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED. 11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED. 12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION. TRAFFIC CONTROL 1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS. 2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS. EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN. SITE PREPARATION 1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE. 2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL (I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE). 3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR. TRENCH EXCAVATION AND BACKFILL 1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS. 2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS. UTILITY DUCT 1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A MINIMUM SLOPE OF 1/2 % TO VAULT. 2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE, DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION. 3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION PLUGS SEALING THE CONDUITS AROUND THE CABLE. 4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED. CEMENT CONCRETE PAVEMENT 1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF EACH JURISDICTION. ASPHALT CONCRETE PAVEMENT 1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION. GRAVEL AREAS 1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE WITH THE REQUIREMENTS OF EACH JURISDICTION. SITE RESTORATION 1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO PLACEMENT OF THE CONDUIT AND STRUCTURES. 2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND WATERED IN TO ENSURE ITS SURVIVAL. 3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO CONSTRUCTION. WATER QUALITY 1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S WATER QUALITY STANDARDS 2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE. DIRECTIONAL BORING 1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS. 2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES. FIRE PROTECTION 1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT. 2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR REPLACED UPON DUCT OR CABLE PLACEMENT. AERIAL INSTALLATION 1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS. 2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION. 3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN WHERE APPLICABLE. 4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION. / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB000111369178 WILLIAMS AVE S APT ARENTON, WA 98057PLANT REPAIRS17-050 9/14/2022 Z. ROLLINS A. BONGOT GENERAL NOTES 2 5 SCALE: NO SCALE MFP22004957 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB000111369178 WILLIAMS AVE S APT ARENTON, WA 98057PLANT REPAIRS17-050 9/14/2022 Z. ROLLINS A. BONGOT LEGEND 3 5 SCALE: NO SCALE MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS LANE LINE CENTER LINE / STATION LINE FOG LINE EDGE OF PAVEMENT RIGHT OF WAY SIDEWALK FENCE GUARD RAIL POWER TRAFFIC SIGNAL COMMUNICATION TELECOMMUNICATION SEWER MAIN SIDE SEWER DRAIN MAIN DRAINAGE DITCH GAS OIL STEAM WATER UNKNOWN UTILITY STRAW WATTLES TRAFFIC CONES PROPOSED NEW CONDUIT PROPOSED NEW STRUCTURE PROPOSED NEW AERIAL STRAND FL FL EOP EOP ROW ROW S/W S/W U U U U P P TS TS C C T T S S SS SS D D DD DD G G OIL OIL ST ST W W UNK UNK EXISTING CONDUIT/INFRASTRUCTURE EXISTING AERIAL UTILITY POLE (EXIST / NEW) STREET LIGHT CROSS WALK SIGNAL SHRUBBERY TREE CATCH BASIN CATCH BASIN W/ SOCK MANHOLE UTILITY VALVE WATER METER UTILITY RISER (EXIST / NEW) CB CB V M CW SL R FIRE HYDRANTFH MH 17X30 VAULT 24X36 VAULT 36X48 VAULT 4X4 VAULT 25-TA VAULT 233-LA 444-LA 253-TA VAULT 35-TA VAULT UNK VAULT (SIZE MAY VARY) DH TH DOG HOUSE TIGER HOUSE P PEDESTAL EXISTING SPLICE CASE DISTANCE STATIONSTA 0+00 CONSTRUCTION NOTE CALLOUT# DISTANCE DIMENSION A # CROSS SECTION SYMBOL CROSS SECTION NAME CROSS SECTION PAGE WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT PHOTO LOCATOR/ORIENTATION CONCRETE ASPHALT CONCRETE PANELS LANDSCAPE LIMITS OF RESTORATION # NEW SPLICE CASE NEW STORAGE FOOTAGE NOTE FOOTAGE NOTE OVER(339') 339' MULTIPLE SHEETS CALLOUT GRAVEL BRICK/COBBLE 200' PARCEL LINES BOREPIT BOREPIT (SIZE MAY VARY) N S EW BUILDING OUTLINE UTILITY POTHOLE STREET SIGN NORTH ARROW LANE DIRECTION INDICATOR # POLE ANCHOR/GUY PROPOSED CROSSWALK R POLE # CALLOUT# CAB CABINET NEW COAX TAP BUS STOP LOCATION MFP22004957 17"x30" VAULT STANDARD DETAIL 17 1/2" 30 1/2" 33 3/8"21 3/4" 2" LIFT PIN FOR HANDHOLD COVER LOGO LOCATION CABLE RACK (2 ON EACH SIDE) HDPE BODY CHANNELL SHIELD COVER 24" 1 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001113691123-ABC78 WILLIAMS AVE S APT ARENTON, WA 98057PLANT REPAIRS17-050 MM/DD/YY PM YOUR NAME DETAILS 4 5 SCALE: NO SCALE MFP22004957 PPPPPPPPPPCCCCCCCCCCROWROWROWROWROWROWROWROWDDDDDDDDDDWWWWWWW W W W W W W M M M MMV 74 82 78 GGGGGGGGGSTA 11+00 STA 11+50 EOPEOPEOPEOPEOPEOPEOPEOPGGGGGGGGGCCCCCCCCCCCCCCCCCCEOPEOPEOPEOPEOPEOPEOPEOPV FHLANDSCAPING LANDSCAPINGDWYDWYDWYSIDEWALKSIDEWALKDWYLANDSCAPINGLANDSCAPING10' 14' 1 2 1R 6'NEW G MWILLIAMS AVE SSTA 11+43 CONSTRUCTION NOTES: REPLACE DAMAGED VAULT WITH LOAD BEARING TRAFFIC RATED 17X30 VAULT MISSILE BORE (1) 2" CONDUIT & PULL (1) .625 COAX THROUGH 1 2 RESTORATION NOTES: RESTORE CONCRETE DRIVEWAY PANEL PER CITY OF RENTON SPECIFICATIONS 1R UTILITY LOCATION DISCLAIMER ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE. LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION CENTER AT 1-800-424-5555 / DATE: DRAWN BY: PROJECT MANAGER: CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB000111369178 WILLIAMS AVE S APT ARENTON, WA 98057PLANT REPAIRS17-050 9/14/2022 Z. ROLLINS A. BONGOT CONSTRUCTION PLAN 5 5 PROPOSED PATH DISCLAIMERS 1. PROPOSED PATHWAY MAY CHANGE AT TIME OF CONSTRUCTION DUE TO UTILITY LOCATIONS AND INSPECTOR REQUIREMENTS 2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD DURING TIME OF CONSTRUCTION WHEN TRENCHING DRAINAGE SYSTEM DISCLAIMER EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.) SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES, THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS. UTILITY NOTE WHEN CROSSING EXISTING SEWER, STORM MAIN, WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE OUTSIDE EDGE WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5' HORIZONTAL CLEARANCE. POTHOLE DISCLAIMER POTHOLING WILL BE PERFORMED IN SOFT SURFACES WHEN APPLICABLE TO REDUCE HARD SURFACE RESTORATION. PATCH POTHOLE LOCATIONS PER LOCAL JURISDICTION SPECIFICATIONS LOCATION STATION START STATIONING STARTS AT THE INTERSECTION OF10+00 S TOBIN ST & WILLIAMS AVE S SCALE: 0'5'10' N S EW MFP22004957