Loading...
HomeMy WebLinkAboutRE-NOTICE_Project_Acceptance_221005DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT Planning Division 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200, ext. 2 www.rentonwa.gov OF APPLICATION A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. A Notice of Application and proposed Determination of Non-significance – Mitigated (DNS-M) was issued for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of Application was intended to be issued as a standard Notice of Application without the optional DNS-M process. Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued. DATE OF RE-NOTICE OF APPLICATION: October 5, 2022 PROJECT NAME/NUMBER: PR22-000230 Southport West / LUA22-000284, SA-M, SA- H, ECF PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and - 9178) APPLICANT/PROJECT CONTACT PERSON: Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA 98034 / bhavik@urbancraftconsulting.com LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also https://cutt.ly/qZTm0x2 PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington Blvd N. The proposed expansion of Southport would be located on the 10.09-acre former Puget Sound Energy (PSE) Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are located in the Urban Center- 2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high-rise buildings with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The proposed first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July 2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031). Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet. The proposed nine- level development would be built at the same height and scale as the existing Southport offices with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provided by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road. The site is generally level and consists of gravel yard and asphalt, a Pu get Sound Energy switchgear, and an office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium dense silt, then medium dense to dense sand, very soft silt and clay, and finally dense to very dense silty sand. Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of excavation and 39,200 cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream A ssessment and Final Mitigation Plan with the application. RE-NOTICE Anyone that would like to be informed of future actions or would like to become a party of record on this proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057. Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF Name: ____________________________________ Email: _________________________ Phone#:__________________ Mailing Address: ____________________________________________ City/State/Zip: ___________________________ Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail  DATE OF APPLICATION: August 1, 2022 DATE OF INITIAL NOTICE OF COMPLETE APPLICATION: October 5, 2022 PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental (SEPA) Review OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit, Fire Permit, and Sign Permit REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and Final Mitigation Plan Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file number (LUA) or project address in your comments. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. This matter will also be presented before a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Project Planner below. A copy of the subsequent threshold determination is available upon request. CONTACT PROJECT PLANNER: Clark H. Close , Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov Lake Washington