HomeMy WebLinkAboutRe-Notice_Southport_Mailer_221005DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
723059001 LUA22-000284
Current Resident
1060 Nishiwaki Ln
Renton WA 98057
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information R eport, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A101
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A102
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigati on Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A103
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A104
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A105
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A106
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A107
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A109
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A110
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A201
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A203
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A204
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A205
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A206
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A207
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A208
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A209
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A210
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A301
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A302
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A303
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A304
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A305
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A306
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A307
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A308
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A309
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A310
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A401
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A402
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A403
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A404
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A405
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A406
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A407
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A408
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A409
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT A410
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B101
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B102
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B103
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B104
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B105
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B106
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B107
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B108
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B109
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B110
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B201
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B202
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B203
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B204
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B205
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B207
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B208
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B209
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B301
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B302
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B303
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B304
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B305
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B306
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B307
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B308
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B309
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B401
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B402
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B403
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B404
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B406
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B407
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B408
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B409
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT B410
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C101
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C102
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C103
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C104
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C105
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C106
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C107
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C108
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C109
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C110
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C111
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C201
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C202
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C203
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C204
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C205
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C206
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C207
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C208
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C209
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C211
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Enviro nmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C302
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C303
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C304
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C305
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C306
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C307
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C308
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C309
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C310
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C311
Renton WA 98056
RE-NOTICE
Anyone that would like to be informed of future actions or would like to become a party of record on this
proposal must fill out our online form at https://cutt.ly/SQvBak4 or complete this form and return to: City of
Renton, CED Planning Division, 1055 So. Grady Way, Renton, WA 98057.
Name/File No.: PR22-000230 Southport West / LUA22-000284, SA-M, SA-H, ECF
Name: ____________________________________ Email: _________________________ Phone#:__________________
Mailing Address: ____________________________________________ City/State/Zip: ___________________________
Notice will be sent via email, unless a hard copy is specifically requested. Check box to receive via US Mail
proposing to plant 115 new trees along with a variety of shrubs and perennials. The applicant has submitted a
Preliminary Geotechnical Report, Technical Information Report, Traffic Impact Analysis, and Stream Assessment and
Final Mitigation Plan with the application.
DATE OF APPLICATION: August 1, 2022
DATE OF INITIAL NOTICE OF
COMPLETE APPLICATION:
October 5, 2022
PERMITS/REVIEW REQUESTED: Master Plan Review, Hearing Examiner Site Plan Review, and Environmental
(SEPA) Review
OTHER PERMITS WHICH MAY BE
REQUIRED:
Building Permit, Construction Permit, Fire Permit, and Sign Permit
REQUESTED STUDIES: Preliminary Geotechnical Report, Technical Information Report, Traffic
Impact Analysis, and Stream Assessment and Final Mitigation Plan
Comments on the above application must be submitted in writing by 5:00 PM on October 19, 2022. Please submit
comments online at https://cutt.ly/SQvBak4. Alternatively, you may physically mail your comments to: City of
Renton, CED, Attn: Planning Division, 1055 South Grady Way, Renton, WA 98057. Please include the Land Use file
number (LUA) or project address in your comments. Anyone who submits written com ments will automatically
become a party of record and will be notified of any decision on this project. This matter will also be presented before
a Public Hearing at a date that is to be determined. For more information about this proposal, contact the Pro ject
Planner below. A copy of the subsequent threshold determination is available upon request.
CONTACT PROJECT PLANNER: Clark H. Close, Principal Planner; Tel: (425) 430-7289; Email: cclose@rentonwa.gov
DEPARTMENT OF COMMUNITY & ECONOMIC DEVELOPMENT
Planning Division
1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425 -430-7200, ext. 2
www.rentonwa.gov
OF APPLICATION
A Master Application has been filed and accepted with the Department of Community & Economic Development (CED)
– Planning Division of the City of Renton. The following briefly describes the application and the necessary Public
Approvals. A Notice of Application and proposed Determination of Non -significance – Mitigated (DNS-M) was issued
for Southport West on August 15, 2022 and included a two (2) week public comment period. The initial Notice of
Application was intended to be issued as a standard Notice of Applicat ion without the optional DNS-M process.
Therefore, a correction Re-Notice of Application with a new fourteen (14) day public comment period is being issued.
DATE OF RE-NOTICE OF APPLICATION: October 5, 2022
PROJECT NAME/NUMBER: PR22-000230 Southport West/LUA22-000284, SA-M, SA-H, ECF
PROJECT LOCATION: 9XX Lake Washington Blvd N (APNs 082305-9191 and -9178)
APPLICANT/PROJECT CONTACT
PERSON:
Bhavik Rao, Urbancraft Consulting LLC / 12322 94th Ave NE, Kirkland, WA
98034 / bhavik@urbancraftconsulting.com
LOCATION WHERE APPLICATION MAY
BE REVIEWED:
Applicant documents are available online through the City of Renton
Document Center website. See also https://cutt.ly/qZTm0x2
PROJECT DESCRIPTION: The applicant, Southport West LLC, is requesting Master Plan Review, Hearing
Examiner Site Plan Review and Environmental (SEPA) Review for the construction of Southport West. Southport West
is the completion of the southerly portion of the Southport Development located at the south end of Lake Washington
Blvd N. The proposed expansion of Southport would be located on the 10.09 -acre former Puget Sound Energy (PSE)
Substation and PSE utility parcels (APNs 082305-9191 and -9178). The two (2) parcels are lo cated in the Urban Center-
2 (UC-2) zone and the Urban Design District ‘C’. The site is proposed to be developed as five (5) high -rise buildings
with approximately 1,200,000 square feet of office and 50,000 of retail development in multiple phases. The prop osed
first three phases would be developed as follows: Phase I – Towers 1 and 2 with the garage podium (July 2023 – July
2027), Phase II – Towers 3 and 4 with garage podium (July 2027 – July 2031), and Phase III – Tower 5 (post July 2031).
Phases 1-3 would start on the southwest side of the site (closer to Boeing) and would develop to the northeast side
of the lot (closer to Gene Coulon Memorial Beach Park). A fourth and final phase is being considered for a sixth tower
with 130,000 square feet for office and retail at the southwest corner of the development near the intersection of
Park Ave N and 757th Ave NE. The phased development project could reach as high as 1.6 million gross square feet.
The proposed nine-level development would be built at the same height and scale as the existing Southport offices
with an overall height of approximately 154 feet above average grade. Parking for 2,207 vehicles would be provided
in a shared 4- and 5-level parking garage and 57 spaces are proposed as on-street parking. In addition, the applicant
is proposing to work closely with PSE for the engineering and capacity needs of the development in order to relocate
the powerlines and utility switchgear adjacent to Johns Creek. Vehicular access to Southport West would be provi ded
by Park Ave N, Lake Washington Blvd N, and the addition of an internal center road and frontage road.
The site is generally level and consists of gravel yard and asphalt, a Puget Sound Energy switchgear, and an
office/warehouse building. The site contains high seismic hazard areas and the northeast corner of the site contains
Johns Creek and regulated slopes. The soils consist of a loose to medium dense sand, underlain by soft to medium
dense silt, then medium dense to dense sand, very soft silt and cla y, and finally dense to very dense silty sand.
Groundwater was observed in the historical exploration at Southport at depths ranging from 3 to 10 feet below
existing grade. Preliminary estimates of cut and fill include approximately 25,000 cubic yards of e xcavation and 39,200
cubic yards of fill from an approved source. The depth of excavation is anticipated to not exceed approximately two
feet (2’) below ground level, except for building cores where excavation would be deeper. Stormwater runoff from
pollution generating surfaces would be captured by catch basins and treated in cartridge filter facilities prior to
connection into three (3) existing drainage systems. No significant trees are proposed to be removed. Southport is
523059076 LUA22-000284
Current Resident
1083 Lake Washington Blvd N APT C401
Renton WA 98056
RE-NOTICE