HomeMy WebLinkAbout300.4t-T- EXISTING WATER LINE
TESTING DETAIL
Jm�
PLAN VIEW
EXISTING WATER LINE
FINAL CONNECTION DETAIL
LINE
VERTICAL CROSS(MJxFL) FOR POLYPIGGING
ONE BLIND FLANGE ON TOP WITH 2'TAP & 2'PLUG
ONE BLIND FLANGE ON BOTTOM
ONE (MJ) PLUG WITH 2' TAP & 2' TEMPORARY BLOW -OFF
TEMPORARY BLOCK
COUPLINGS
A/ -OFF
-XISTING WATER LINE
+ ZY e� �+ PUBLIC WORKS CONNECTION TO WATER MAIN STD. PLAN — 300.4
�O DEPARTMENT CUT IN—LINE TEE & THREE VALVES
N,yp MARCH 2010
AFTER ALL TESTING, CLEANING BY POLYPIG, AND DISINFECTION,
REMOVE TEMP, BLOCK &BLOW -OFF & CONNECT
WITH SLEEVE (MJ) & D,I. SPOOLS
FINAL CONNECTION BY CITY FORCES
-XISTING WATER LINE
+ ZY e� �+ PUBLIC WORKS CONNECTION TO WATER MAIN STD. PLAN — 300.4
�O DEPARTMENT CUT IN—LINE TEE & THREE VALVES
N,yp MARCH 2010