Loading...
HomeMy WebLinkAbout350.2w 120 VOLT ELECTRICAL OUTLET FOR z HEAT TAPE. INSTALL HEAT TAPE FOR FREEZE PROTECTION CENTER BACKFLOW ry PREVENTER IN LJ 0 o REDUCED PRESSURE ENCLOSURE Of BACKFLOW ASSEMBLY Of (RPBA) 3" MIN. � o 3" MIN, INSULATED ENCLOSURE 3" MIN. "HOT BOX" OR EQUAL 3/8" X 4" ANCHOR BOLTS PER MANUFACTURER 0 3" MIN. CONCRETE SLAB z UNION FINISHED =N GRADE FINISHED `V GRADE � � 2 a DRAIN z SEE NOTE 4 6" MINIMUM SLEEVE FREE DRAINING (TYP.) GRAVEL z CONNECT TO N WATER METER IMMEDIATELY ADJACENT TO RPBA FLOW INSTALLED W/ APP'D. TO OWNERS ELECTRICAL PANEL. FRONT VIEW MATERIAL PER UPC DIRECT BURIAL OR IN RIGID METER SIDE (SIZE AS REQ.) CONDUIT PER ELECTRICAL SIDE VIEW PERMIT REQUIREMENTS. NOTES: 1. ALL REDUCED PRESSURE BACKFLOW ASSEMBLIES (RPBA's) MUST BE LISTED ON LATEST LIST OF "BACKFLOW PREVENTION ASSEMBLIES APPROVED FOR INSTALLATION IN WASHINGTON STATE", PUBLISHED BY STATE OF WASHINGTON DEPARTMENT OF HEALTH. 2. THE OWNER/APPLICANT MUST OBTAIN A SEPARATE CITY OF RENTON PLUMBING PERMIT FOR THE INSPECTION OF THE INSTALLATION OF THE RPBA AND PIPING. THE OWNER SHALL FURNISH, INSTALL AND MAINTAIN THE RPBA AND ALL PIPING AND APPURTENANCES SHOWN ON THIS PLAN. 3. THE RPBA MUST BE TESTED BY A STATE CERTIFIED BACKFLOW ASSEMBLY TESTER AFTER ITS INITIAL INSTALLATION, AFTER REPAIRS AND ANNUALLY THEREAFTER AT OWNER'S EXPENSE. A COPY OF THE TEST REPORT SHALL BE SENT OR FAXED TO CITY OF RENTON WATER UTILITY ENGINEERING DEPT., ATTN: WATER UTILITY CROSS—CONNECTION CONTROL SPECIALSIT, FAX NO. 425-430-7241. 4. DRAIN SHALL BE SIZED IN ACCORDANCE WITH AWWA CROSS CONNECTION CONTROL MANUAL STANDARDS 3" DRAIN FOR 1" OR SMALLER RPBA's, 4" DRAIN FOR 1.5" TO 2" RPBA's, 6" FOR 3" RPBA's. 5. RPBA AND ENCLOSURE SHALL BE LOCATED ON PRIVATE PROPERTY AND AS NEAR AS POSSIBLE TO THE WATER METER. ZY STD. PLAN — 350.2 + e� �+ PUBLIC WORKS REDUCED PRESSURE BACKFLOW � y DEPARTMENT ASSEMBLY IN HOT BOX �,N,�p MARCH 2010