Loading...
HomeMy WebLinkAbout102.1NOTES' 1. Not used. 2. All ramp and landing edges shall be separately formed. & Utilities structures that must remain are to be made non -slip or non-skid. 4. Utilities structures such as vaults and junction boxes shall not be located in the Pedestrian Access Route (PAR) of the Pedestrian Circulation Route, 5. Drainage appurtenances, such as manholes, catch basins, eic. shall not be located in the PAR. These should be located in the street or the buffer strip. 6. Accessible pedestrian access shall be provided for during construction. ,• '\ PUBLIC IVORKr I UTILITY PLACEMENT IN AN �) DEPAR?6!E\�! CEMENT CONCRETE SIDEWALK STD. PLAN — L02.1 Gregg Lmmerman, PuGlk Warts Adminbvator