HomeMy WebLinkAbout126.2Shin to loom
S. Nota 3
Sha to plump 4 heap.
See Note
2
•-1
—
Li
FROM NEW
3/9" duchater platin "rash (lee per cMicat) - -
a' "
J - Fa P.enlo¢hp Sor (ea'+a apses)
1�0' allplastic Brae (core per cabM.Q - /�
r—$a. Now 5
So. Nob 7
3/9' dale". pa!¢ dm. -
Se. Not. 5 —
— e ,
V
V i
Ir Nb{calalJ
a o
COMBINED FOUNDATION
KEINE. BM DIAGRAM
6 Prtco
3 - N Renforceq Bar 11 1 14 hoops
(eau! scow) I
Conwcler CyyMnr t.,
CMlat
COO
PLAN
10 Kohl
PLAN NEW
COMBINED CONTROLI EER/BBS/CONTACTOR FOUNDATION
PUBLIC WORKSI CABINET FOUNDATION DETAILS SM' PLAN — 126.2
DEPARTMENT RPI?OVEfL
/4
NOTES
1. MIMlt foundation pled, N local" Mthin a siawalk, cw.tr.0 had
lap push with sidewalk grade. amittirg "molar More lop and
sidawak abut. Mount tap Mall a Mtanad by a concrete
contractor ad Map meet the reaukemMlo of loathes 8-14 3 n
the WSDOT Standard Specilicatioes.
2 Pod mount deagn Is typical
3. place a aNcon....I bet.— the wundution and cabinet.
4. Anchor, bats chat their spacing to be wMisul by cabinet
manufacwra and submitted to Me Mgihser for approlm
5. Canduit dm/quatltles for We cabWm anal collector cabineb
Mal a MManed per the contract pars, plus one Y ware
upped out past Me faundetch.
d Concrete Mal be Close 3000.
Sim Ile plumb
). r coodult Mol be placed born Me contactor to the cambined
catral.r/BgS cabinet
— Sea Nall 1
It Each cabinet Mal nava a g3' alamater calla draM pipe
9 Locale conduit. cenlroly within Me cabinets.
A
10 Won all Irete cabinete ere to be Metaled we apace Wlo.s,
coMbh.d laurd.Mon .ran be uvs0.
a' "
J - Fa P.enlo¢hp Sor (ea'+a apses)
1�0' allplastic Brae (core per cabM.Q - /�
r—$a. Now 5
So. Nob 7
3/9' dale". pa!¢ dm. -
Se. Not. 5 —
— e ,
V
V i
Ir Nb{calalJ
a o
COMBINED FOUNDATION
KEINE. BM DIAGRAM
6 Prtco
3 - N Renforceq Bar 11 1 14 hoops
(eau! scow) I
Conwcler CyyMnr t.,
CMlat
COO
PLAN
10 Kohl
PLAN NEW
COMBINED CONTROLI EER/BBS/CONTACTOR FOUNDATION
PUBLIC WORKSI CABINET FOUNDATION DETAILS SM' PLAN — 126.2
DEPARTMENT RPI?OVEfL
/4