RFI #292: ROW Trenching for the added communication conduit in CCD#004.1 &
Street lighting conduit.
Status Open
To Taylor VanderKley (Hargis Engineers, Inc.)
Ingrida Sanders (Hutteball + Oremus Architecture)
From Jeremiah Tovrea (Sare Electric)
Date Initiated Oct 4, 2022 Due Date Oct 11, 2022
Location Project Stage Course of Construction
Cost Impact TBD Schedule Impact TBD
Spec Section 26 0543 - Underground Vaults and Raceways Cost Code
Drawing Number E1.00 Updated in CCD#004.1 Reference
Linked Drawings
Received From Jeremiah Tovrea (Sare Electric)Sub Job
Copies To Kyle Cundy (Cornerstone General Contractors), Jason Lickert (Sare Electric), Katie Pond (Hutteball + Oremus Architecture), Ed
Thomson (Renton School District)
Activity
Question Question from Jeremiah Tovrea Sare Electric on Thursday, Sep 29, 2022 at 04:39 PM PDT
Per flag note 8 on E1.00 CCD#004.1 the added communications conduit is supposed to be run in the landscape buffer on the
Duvall side of the sidewalk. Street Lighting Note 7 on E1.00 calls to have our pole bases 3' from the edge of the side and 7'
from the edge of Duvall Ave. We prefer to use a common trench for these scopes. Is it acceptable to run the street lighting
and 2" spare communication conduit under the east edge of the sidewalk? Light pole base and existing utilities block routing
on the edge of the landscape buffer. This will leave a small channel in the direct center of the landscape buffer where trees
will be planted.
Attachments
streetltg.PNG
Awaiting an Official Response
All Replies Response from Ingrida Sanders Hutteball + Oremus Architecture on Wednesday, Oct 5, 2022 at 07:05 AM PDT
See the response from Electrical Engineer.
Response from Taylor VanderKley Hargis Engineers, Inc. on Tuesday, Oct 4, 2022 at 04:58 PM PDT
FLAG NOTE 8 INDICATES THE REQUIREMENT TO ROUTE WITHIN EXISTING LANDSCAPE BUFFERS
ON THE NORTH AND SOUTH ENDS OF THE ROW BEYOND THE SCHOOL'S PARCEL. THE
REQUIREMENT IS TO ELIMINATE IMPACTS TO EXISTING HARDSCAPE TO REMAIN. IT IS
ACCEPTABLE TO COMBINE THE LIGHTING AND SPARE COMMUNCATION CONDUITS AS INDICATED
PENDING APPROVAL FROM THE CITY OF RENTON.
Attachments
2113-Renton_ES_16-292-
ROW_Trenching_for_the_added_communication_conduit_in_CCD_004.1_amp_Street_lighting_co_2022-10-04_HEI
Review.pdf
Cornerstone General Contractors Page 1 of 1 Printed On: Oct 6, 2022 11:32 AM PDT