SUBJECT: Parking Analysis for the proposed
Seattle Sounders FC Headquarters and Training Facility
PRE21-000410 / TENW Project No. 2022-073
This memorandum documents the parking analysis for the proposed Seattle Sounders FC Headquarters and
Training Facility located in and around Building 25-20 on a portion of the Longacres Office Park („LOP‰) in
the City of Renton (see Attachment A vicinity map). The purpose of this memo is to provide justification for
and request approval of the proposed parking supply to accommodate the proposed project. This parking
analysis includes a project description and parking supply summary, documentation of minimum code
required parking, and estimated peak parking demand forecasts based on code requirements and user
specific information provided by the owner.
Project Description
Based on information provided by the owner, the existing Building 25-20 on the LOP site consists of 284,044
square feet (SF) of net building floor area. The proposed Seattle Sounders FC Headquarters and Training
Facility project encompasses 52,990 square feet (SF) in the existing Building 25-20. The Sounders will retain
21,660 SF as office use while converting 31,330 SF of existing office use to indoor recreational facilities
use. The indoor recreational facilities will provide team services space, which is intended to be accessory to
the office and outdoor recreation facilities uses and would include locker rooms, training space, classrooms
and workspaces, and medical treatment rooms. The proposed project will also establish an outdoor
recreational facility use with five outdoor soccer fields, a goalkeeper training area, and a maintenance shed.
Vehicular access to the site would remain the same as existing conditions, with one signalized access and
one unsignalized access driveway on Oakesdale Ave SW that provide access to the main parking lot on the
south side of the building, and one unsignalized access roadway on the north side of the building that
provides access to a visitor parking lot. A preliminary conceptual site plan is provided in Attachment B.
Project buildout and occupancy is expected by 2024.
Parking Supply
As field verified by TENW in July 2022, there are a total of 929 existing on-site surface parking stalls at
Building 25-20 as follows (see also Attachment C):
· North Lot (north side of building) = 26 stalls
· Main Lot (south of building) = 748 stalls
· West Lot (southwest of building) = 155 stalls
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
TENW August 8, 2022
Page 2
The proposed outdoor improvements and parking lot improvements associated with the Seattle Sounders FC
Headquarters and Training Facility project will result in a decrease of 165 on-site surface parking stalls as
follows:
· The proposed outdoor soccer training facility will replace the existing West Lot (loss of 155 stalls)
· The existing westernmost drive aisle in the Main lot will be reconfigured to remove a total of 68
existing stalls but add 60 new stalls (net loss of 8 stalls)
Therefore, a total of 766 on-site surface parking stalls would be provided for Building 25-20 and the Seattle
Sounders FC Headquarters and Training Facility project.
City of Renton Code-Required Parking
The CityÊs requirements for off-street parking are based on Renton Municipal Code (RMC) section 4-4-
080.F.10.d (Parking Spaces Required Based on Land Use) depending on the specific land use category.
The minimum code-required off-street parking for the Building 25-20 office use is 2.0 stalls per 1,000 SF of
net building floor area based on the requirements for offices (general). Based on a total of 284,044 NSF of
building area (including the proposed Sounders FC office use), the minimum parking supply required for
Building 25-20 is 568 stalls (2.0 stalls/1,000 NSF X 284,044 NSF).
The outdoor soccer training facility proposed as part of the Seattle Sounders FC Headquarters and Training
Facility project is not consistent with any of the land uses included under the „recreational and entertainment‰
category in RMC 4-4-080.F.10.d. Therefore, the parking demand associated with the outdoor soccer
training facility was estimated based on the detailed project-specific trip generation data and forecasts
provided by the owner.
Parking Demand Estimate for Outdoor Soccer Training Facility
To estimate the peak parking demand of the outdoor soccer training facility on a typical weekday, the detailed
entering and exiting trip generation estimates provided by the owner were assigned to 15-minute periods
and the entering minus exiting volume was then used to estimate the weekday parking accumulation. The trip
generation estimates for the proposed project include players/field use trips, spectators trips (media and
public sessions), summer camp/clinic trips, and weekly soccer program trips. Assuming that the parking
demand associated with the fields is 0 vehicles at midnight, the estimated peak parking demand for the
outdoor soccer training facility use is 164 stalls on an average weekday (occurring from 9:45 AM to 12:00
PM). The trip generation memorandum prepared for the proposed project and the detailed user-specific trip
generation forecasts from the applicant are included in Attachment D.
It should be noted that the project-specific trip generation forecasts provided in Attachment D for the soccer
training facility on a typical weekday are reflective of the peak summer period (June through August) when
summer camps/clinics are anticipated to be conducted at the site. The peak parking demand for the soccer
training facility is expected to be less than 164 stalls during non-summer months.
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
TENW August 8, 2022
Page 3
Conclusion
Based on results of this parking analysis, the total proposed future on-site parking supply of 766 stalls for
Building 25-20 and the Seattle Sounders FC outdoor soccer training facility would accommodate the
estimated weekday peak parking demand of 732 stalls (568 code-required stalls for the Building 25-20
office use + 164 stalls for the outdoor soccer training facility use).
If you have any questions regarding the information presented in this memo, please contact me at (425) 466-
7072 or amy@tenw.com.
Attachments: A. Vicinity Map
B. Conceptual Site Plan
C. Existing Parking Supply
D. Seattle Sounders FC Headquarters and Training Facility Trip Generation Memo
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT A
Vicinity Map
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT B
Conceptual Site Plan
UPSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxWxWxWxWxWxWxWxWxWxWxWxWxWx WxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx
C:\Users\Jared Hagedorn\Desktop\21032_SoundersFC-wheelchair_symbol_clip_art_17750-4428995.jpg
AS111
A1
75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
P9 P10 P11 P12
P1 P2
P3P4P5P6
T1T2
T3
P8
T4
P7
A2 A1
12
3
FIELD 1
NATURAL GRASS
97,360 SF
FIELD 2
NATURAL GRASS
97,360 SF
FIELD 3
SYNTHETIC TURF
97,360 SF
12'x12' BULK
STORAGE (2)4 FIELD 4
SYNTHETIC TURF
97,360 SF
5FUTURE FIELD 5
SYNTHETIC TURF
97,360 SF
WASH
RACK
CONDITIONING / UTILITY SPACE
NATURAL GRASS
51,492 SF
20
18
19
21
201718192120
19
21
21032
© 2022 GENERATOR STUDIO LLC
ISSUE DATE:
PROJECT NO.
DRAWN BY:
CHK'D BY:
SHEET TITLE
1
SEAL
D
2345
C
B
A
4/4/2022 5:40:59 PM
21032
SEATTLE
SOUNDERS FC
HEADQUARTERS &
TRAINING CENTER
1901 OAKESDALE
AVENUE SW
RENTON, WA 98057
REV DESCRIPTION DATE
SEATTLE SOUNDERS FC
159 S. JACKSON STREET, #200
SEATTLE, WA 98104
SOUNDERSFC.COM
TENANT
GENERATOR STUDIO LLC
1615 BALTIMORE AVE
KANSAS CITY, MO 64108
816.333.6527
GENERATORSTUDIO.COM
ARCHITECT
ARCHITECT:
LICENSE NO.
MICHAEL J. KRESS
12779
D.A. HOGAN & ASSOCIATES, INC.
1450 114TH AVE SE, SUITE 225
BELLEVUE, WA 98004
206.285.0400
DAHOGAN.COM
LANDSCAPE ENGINEER
COUGHLIN PORTER LUNDEEN (CPL)
801 SECOND AVENUE, SUITE 900
SEATTLE, WA 98104
206.343.0460
CPLINC.COM
STRUCTURAL & CIVIL ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, #300
LENEXA, KS 66214
816.663.8700
HENDERSONENGINEERS.COM
MEP ENGINEER
UNICO PROPERTIES LLC
1215 FOURTH AVENUE, SUITE 600
SEATTLE, WA 98161
UNICOPROP.COM
OWNER / DEVELOPER
E R I C J . GOL
D
NO. 6
90 EX P . 1 0 /2 3 /2022STATE O F W A SHI
N
GTONLANDSC
A P E A R C H ITECTF100
REF
EJG
COLOR LAYOUT PLAN
07.22.2022
CONDITIONAL USE PERMIT
0
SCALE: 1" =
100'
50'
50'
NORTH
COLOR LAYOUT LEGEND
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT C
Existing Parking Supply
Parking Analysis
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT D
Seattle Sounders FC Headquarters and Training Facility
Trip Generation Memo
TENW
Transportation Engineering NorthWest
Transportation Planning | Design | Traffic Impact & Operations
11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747
MEMORANDUM
DATE: June 27, 2022
TO: Nathan Janders
City of Renton
FROM: Amy Wasserman
TENW
SUBJECT: Trip Generation Memo for the proposed
Seattle Sounders FC Headquarters and Training Facility
PRE21-000410
TENW Project #2022-073
This memorandum summarizes the preliminary traffic information for the proposed Seattle Sounders FC
Headquarters and Training Facility located in and around Building 25-20 on a portion of the Longacres
Office Park („LOP‰) property in the City of Renton (see Attachment A vicinity map). This memo includes a
project description and trip generation estimate. We are requesting your review and approval of this
information.
Background
The approximately 108-acre LOP is composed of 18 parcels located west of Oakesdale Ave SW in Renton,
Washington. The Sounders „Site‰ is located within seven of these parcels.
Building 25-20 is an existing five-story office building located within the LOP at on parcel no. 088670-
02220 and is approximately 237,532 square feet (net). Building 25-20 has an established headquarters
office use with 2,100 average daily trips approved and fully mitigated.1 As background, the City of Renton
has conducted extensive environmental review, including traffic analysis for the full buildout of LOP. The
Environmental Impacts Statement („EIS‰) Mitigation Document for the LOP was issued in May 1995 and
included a Transportation Mitigation Conditions Agreement that, among other conditions, required Boeing to
pay the City transportation mitigation fee based on 27,000 average daily trips to be generated by full
development of the LOP. The City and the former site owner later established a Reserved Account that contains
„Prepaid Trips‰ for future development at LOP. This memorandum supplements the previous LOP transportation
review.
1 King County Recording No. 20060420001031, Recital D.
Trip Generation Memorandum
Seattle Sounders FC Headquarters and Training Facility (Renton)
TENW June 27, 2022
Page 2
Project Description
The proposed Seattle Sounders FC Headquarters and Training Facility project encompasses 52,990 square
feet (SF) in the existing Building 25-20. The Sounders will retain 21,660 SF as office use while converting
31,330 SF of existing office use to Recreation Facilities, Indoor use. The indoor recreational facilities will
provide team services space, which is intended to be accessory to the office and outdoor recreation facilities
uses and would include locker rooms, training space, classrooms and workspaces, and medical treatment
rooms. The proposed project will also establish an outdoor recreational facility use with five outdoor soccer
fields, a goalkeeper training area, and a maintenance shed. The proposed outdoor improvements and
parking realignment associated with Sounders secure parking will remove 166 parking stalls. A supplemental
parking study will be provided.
Vehicular access to the site would remain the same as existing conditions, with one signalized access and
one unsignalized access driveway on Oakesdale Ave SW that provide access to the main parking lot on the
south side of the building, and one unsignalized access roadway that provides access to a visitor parking lot
on the north side of the building. Secondary vehicular access will be provided via an existing full access
driveway on 384th Ave SE. A preliminary conceptual site plan is provided in Attachment B. Project buildout
and occupancy is expected by 2024.
Trip Generation
The weekday trip generation estimates for the proposed and existing office use were based on methodology
documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition for Land
Use Code (LUC) 710 (General Office Building).
Based on information provided by the applicant and preliminary discussions with the City of Renton, the
proposed outdoor soccer training facility is not consistent with a specific land use category established in the
Institute of Transportation Engineers (ITE) Trip Generation manual. ITE LUC 488 (Soccer Complex) was
considered, but was determined to not be appropriate to forecast trip generation for the proposed Seattle
Sounders soccer training facility. As such, project-specific information was used for the average weekday
trip generation estimates.
To estimate trip generation for the proposed Sounders training facility, the owner provided detailed forecasts
of trips anticipated to occur on a typical weekday based on their operational plan. These weekday trip
estimates are provided in Attachment C and described in the following categories:
Players/Field Use Trips – The fields are anticipated to be used daily from approximately 8:00 AM
to 10:00 PM, however not all fields will be used at the same time. The peak usage of the fields and
training facility is anticipated to occur between 10:00 AM and 1:00 PM.
Spectators Trips (Media and Public Session) – On a daily basis, it is anticipated that media and a
select number of visitors may view team practices on an invitation only basis.
Summer Camp/Clinic Trips – Summer camps run June through August and would consist of a
maximum attendance of 120 students per week, with camp/clinic hours generally between 9:30
AM and 4 PM Monday through Thursday and between 9:30 AM and 12:00 PM on Friday.
Trip Generation Memorandum
Seattle Sounders FC Headquarters and Training Facility (Renton)
TENW June 27, 2022
Page 3
Weekly Soccer Program Trips – The weekly soccer program consists of a skills class that would have
a maximum attendance of 50 students attending class 3 times per week during off peak hours (i.e.
5:30 PM to 7:00 PM).
It should be noted that the project-specific trip generation forecasts for the soccer training facility on a typical
weekday are reflective of the peak summer period (June through August) when summer camps/clinics are
anticipated to be conducted at the site.
The resulting new weekday daily, AM peak hour, and PM peak hour trip generation estimates associated
with the proposed Seattle Sounders FC Headquarters and Training Facility development are summarized
below in Table 1. The detailed trip generation estimates are included in Attachment C.
Table 1
Project Trip Generation Summary
Net New Trips Generated
Time Period In Out Total
Weekday Daily 73 74 147
Weekday AM Peak Hour -2 -7 -9
Weekday PM Peak Hour 56 -42 14
It should be noted that trips associated with the proposed 31,330 SF of building area for team services
space are assumed to be included in either the office use or outdoor recreation facility use trip generation
estimates and were therefore not estimated separately.
Next Steps
The proposed Seattle Sounders FC Headquarters and Training Facility project would generate less than 20
net new trips during the AM and PM peak hours, therefore we believe no additional traffic analysis is required
for this development pursuant to the CityÊs direction in PRE21-000398 (Transportation, Item #5). We look
forward to your review and approval of our trip generation estimates and consensus that no additional traffic
analysis is necessary.
Please contact me at (425) 466-7072 or mailto:amy@tenw.com if you have any questions regarding the
information included in this memorandum.
Attachments: A. Vicinity Map
B. Preliminary Site Plan
C. Trip Generation Forecasts and Calculations
Trip Generation Memorandum
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT A
Vicinity Map
Trip Generation Memorandum
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT B
Preliminary Site Plan
XXXSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDx
SDx
SDx
SDx
SDx
SDx
SDx
SDx
SDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWxWx WxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSDxSD
x
SDx SDx SDx SDxSDxSDx
SDx SDxSDxSDxSDxSDxSDxSDx
SDxSDxSDxSDx75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
75x116
(225x348)
P9 P10 P11 P12
P1 P2
P3P4P5P6
T1T2
T3
P8
T4
P7
A2 A1
NEW OPENING INEXISTING CURTAINWALLFOR OH SECTIONAL DOORNEW DOORS IN EXISTINGCURTAINWALLNEW DOORS IN EXISTINGCURTAINWALL42" DRINK RAIL30" DRINK RAIL (ADA)30" DRINK RAILEXISTING CARPORT CANOPY CUT BACKTO ALIGN WITH WEST BUILDING EDGEUPUPUP12
3
FIELD 1
NATURAL GRASS
97,360 SF
FIELD 2
NATURAL GRASS
97,360 SF
FIELD 3
SYNTHETIC TURF
97,360 SF
12'x12' BULK
STORAGE (2)4 FIELD 4
SYNTHETIC TURF
97,360 SF
5FUTURE FIELD 5
SYNTHETIC TURF
97,360 SF
WASH
RACK
FUTURE
RESTROOM
CONDITIONING / UTILITY SPACE
NATURAL GRASS
51,492 SF
21032
© 2022 GENERATOR STUDIO LLC
ISSUE DATE:
PROJECT NO.
DRAWN BY:
CHK'D BY:
SHEET TITLE
1
SEAL
D
2345
C
B
A
4/4/2022 5:40:59 PM
21032
SEATTLE
SOUNDERS FC
HEADQUARTERS &
TRAINING CENTER
1901 OAKESDALE
AVENUE SW
RENTON, WA 98057
REV DESCRIPTION DATE
SEATTLE SOUNDERS FC
159 S. JACKSON STREET, #200
SEATTLE, WA 98104
SOUNDERSFC.COM
TENANT
GENERATOR STUDIO LLC
1615 BALTIMORE AVE
KANSAS CITY, MO 64108
816.333.6527
GENERATORSTUDIO.COM
ARCHITECT
ARCHITECT:
LICENSE NO.
MICHAEL J. KRESS
12779
D.A. HOGAN & ASSOCIATES, INC.
1450 114TH AVE SE, SUITE 225
BELLEVUE, WA 98004
206.285.0400
DAHOGAN.COM
LANDSCAPE ENGINEER
COUGHLIN PORTER LUNDEEN (CPL)
801 SECOND AVENUE, SUITE 900
SEATTLE, WA 98104
206.343.0460
CPLINC.COM
STRUCTURAL & CIVIL ENGINEER
HENDERSON ENGINEERS
8345 LENEXA DRIVE, #300
LENEXA, KS 66214
816.663.8700
HENDERSONENGINEERS.COM
MEP ENGINEER
UNICO PROPERTIES LLC
1215 FOURTH AVENUE, SUITE 600
SEATTLE, WA 98161
UNICOPROP.COM
OWNER / DEVELOPER
F110
REF
EJG
LAYOUT PLAN
05.23.2022
SCHEMATIC DESIGN 50%
NORTH
0
SCALE: 1" =
80'
40'
40'
Trip Generation Memorandum
Seattle Sounders FC Headquarters and Training Facility (Renton)
ATTACHMENT C
Trip Generation Calculations
Land Use Size / Units ITE LUC 1 Trip Rate or Equation 1 Enter Exit Enter Exit Total
DAILY
Proposed:
General Office Building 21,660 SF 710 Ln(T) = 0.87 Ln(X) + 3.05 50%50%153 154 307
Soccer Training Facility 2 ------50%50%254 254 508
Less Existing:
General Office Building 52,990 SF 710 Ln(T) = 0.87 Ln(X) + 3.05 50%50%-334 -334 -668
Proposed Gross Daily Trips Generated =407 408 815
Less Existing Trips =-334 -334 -668
Total Proposed New Daily Trips =73 74 147
AM PEAK HOUR
Proposed:
General Office Building 21,660 SF 710 Ln(T) = 0.86 Ln(X) + 1.16 88%12%40 5 45
Soccer Training Facility 2 ------100%0%43 0 43
Less Existing:
General Office Building 52,990 SF 710 Ln(T) = 0.86 Ln(X) + 1.16 88%12%-85 -12 -97
Proposed Gross AM Peak Hour Trips Generated =83 5 88
Less Existing Trips =-85 -12 -97
Total Proposed New AM Peak Hour Trips =-2 -7 -9
PM PEAK HOUR
Proposed:
General Office Building 21,660 SF 710 Ln(T) = 0.83 Ln(X) + 1.29 17%83%8 39 47
Soccer Training Facility 2 ------100%0%65 0 65
Less Existing:
General Office Building 52,990 SF 710 Ln(T) = 0.83 Ln(X) + 1.29 17%83%-17 -81 -98
Proposed Gross PM Peak Hour Trips Generated =73 39 112
Less Existing Trips =-17 -81 -98
Total Proposed New PM Peak Hour Trips =56 -42 14
Notes:
1. Land Use Codes, trip rates, and directional splits from Institute of Transportation Engineers (ITE) Trip Generation Manual (11th Edition, 2021) unless otherwise noted.
2. Trip generation for the soccer training facility/team services based on user-specific trip generation forecasts provided by the Client.
Sounders FC Office & Training Facility
Weekday Trip Generation Estimates
Directional Split 1 Vehicle Trip Generation
6/17/2022
Sounders FC Office & Training Facility
Trip Generation Forecasts - Average Weekday during Summer
Outdoor Recreational Facility Use
Time Period Entering Exiting Comment Entering Exiting Comment Entering Exiting Comment Entering Exiting Comment Entering Exiting Comment Entering Exiting Total Hour Entering Exiting Total
12:00 - 1:00 AM 0 0 0 0 0 0 0 0 0 0 0 0 0 12:00-1:00 AM 0 0 0
1:00 - 2:00 0 0 0 0 0 0 0 0 0 0 0 0 0 1:00-2:00 AM 0 0 0
2:00 - 3:00 0 0 0 0 0 0 0 0 0 0 0 0 0 2:00-3:00 AM 0 0 0
3:00 - 4:00 0 0 0 0 0 0 0 0 0 0 0 0 0 3:00-4:00 AM 0 0 0
4:00 - 5:00 0 0 0 0 0 0 0 0 0 0 0 0 0 4:00-5:00 AM 0 0 0
5:00 - 6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 5:00-6:00 AM 0 0 0
6:00 - 6:30 0 0 0 0 0 0 0 0 0 0 0 0 0 6:00-7:00 AM 0 0 0
6:30 - 7:00 0 0 0 0 0 0 0 0 0 0 0 0 0 6:30-7:30 AM 0 0 0
7:00 - 7:30 0 0 0 0 0 0 0 0 0 0 0 0 0 7:00-8:00 AM 0 0 0
7:30 - 8:00 0 0 0 0 0 0 0 0 0 0 0 0 0 7:30-8:30 AM 4 0 4
8:00 - 8:30 4 0 0 0 0 0 0 0 0 0 4 0 4 8:00-9:00 AM 43 0 43
8:30 - 9:00 4 0 0 0 0 0 35 0 0 0 39 0 39 8:30-9:30 AM 98 0 98
9:00 - 9:30 9 0 0 0 0 0 50 0 0 0 59 0 59 9:00-10:00 AM 121 0 121
9:30 - 10:00 20 0 12 0 30 0 0 0 0 0 62 0 62
10:00 - 11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00-11:00 AM 0 0 0
11:00 - Noon 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00-12:00 PM 0 0 0
12:00 - 1:00 0 0 0 12 0 30 0 0 0 0 0 42 42 12:00-1:00 PM 0 42 42
1:00 - 2:00 0 20 0 0 0 0 0 0 0 0 0 20 20 1:00-2:00 PM 0 20 20
2:00 - 3:00 0 17 0 0 0 0 0 0 0 0 0 17 17 2:00-3:00 PM 0 17 17
3:00 - 3:30 10 0 0 0 0 0 0 20 0 0 10 20 30 3:00-4:00 PM 20 85 105
3:30 - 4:00 10 0 0 0 0 0 0 65 0 0 10 65 75 3:30-4:30 PM 15 65 80
4:00 - 4:30 5 0 0 0 0 0 0 0 0 0 5 0 5 4:00-5:00 PM 10 0 10
4:30 - 5:00 5 0 0 0 0 0 0 0 0 0 5 0 5 4:30-5:30 PM 65 0 65
5:00 - 5:30 10 0 0 0 0 0 0 0 50 0 5:30-7 camp 60 0 60 5:00-6:00 PM 60 0 60
5:30 - 6:00 0 0 0 0 0 0 0 0 0 0 0 0 0 5:30-6:30 PM 0 15 15
6:00 - 6:30 0 15 0 0 0 0 0 0 0 0 0 15 15 6:00-7:00 PM 0 20 20
6:30 - 7:00 0 5 0 0 0 0 0 0 0 0 0 5 5
7:00 - 8:00 0 5 0 0 0 0 0 0 0 50 0 55 55 7:00 -8:00 PM 0 55 55
8:00 - 9:00 0 15 0 0 0 0 0 0 0 0 0 15 15 8:00-9:00 PM 0 15 15
9:00 - 10:00 0 0 0 0 0 0 0 0 0 0 0 0 0 9:00-10:00 PM 0 0 0
10:00 - 11:00 0 0 0 0 0 0 0 0 0 0 0 0 0 10:00-11:00 PM 0 0 0
11:00 - 12:00 0 0 0 0 0 0 0 0 0 0 0 0 0 11:00 PM - 12:00 AM 0 0 0
TOTAL TRIPS 77 77 12 12 30 30 85 85 50 50 254 254 508
TRIP GENERATION SUMMARY
Entering Exiting Total
Daily Trip Generation 254 254 508
AM Peak Hour 43 0 43
8:00-9:00 AM
PM Peak Hour 65 0 65
4:30-5:30 PM
Hourly Trip Totals Trip Totals
Summer Camps (June - August)
120 max attendance
Soccer Program - Weekly Class
50 max attendance 3x/week - 24
weeksField Use (Players/Coaches)
Spectators - Media
100 max attendance Spectators - Public Session
6/17/2022