HomeMy WebLinkAboutCM_Construction_Mitigation_Description_220920_v1 Pending building permit issuance, construction is planned to begin Q4 2022 and complete Q1 2024. Standard working hours for the project will be 7PM-4PM, Monday- Friday. Materials being hauled to the project site will enter Renton on Northbound SR167, exit SR167 and head West on SW43rd Street, then turn North on Oaksdale Ave SW, and make a left turn into the project site. Materials leaving the project site will head South on Oaksdale Ave SW, turn West on SW 41st Street, and merge on to SR167 Heading South to Puyallup. Temporary controls including wheel wash stations, clean crushed rock construction entrances, street sweeping, and existing impervious surface parking lots for loading will be utilized to minimize dust and maintain clean roadways. To minimize erosion on site, all work will be performed in accordance with the approved TESC plans and will utilize a variety of BMPs to protect our waterways and health of our soils. Given the location of the project and the absence of any dwelling units in the proximity, to minimize the projects impact on local traffic, we propose to perform all major trucking activities during non- peak traffic hours(7PM-3AM). Please see the attached draft traffic control plan, in addition to this, we may propose using a lane closure of the Westernmost South bound lane along the project site, which will minimize potential accidents as trucks would be entering the ROW in a closed lane. Preliminary Construction Mitigation Plan 1901 Oaksdale Ave SW, Renton WA 98057 OAKESDALE AVE SWTRUCKSENTERINGROADWAY AHEADTRUCK STAGING AREA TRUCKSENTERINGROADWAYTRUCK ROUTE NOTES: 1.PCMS BOARD WILL BE UP ON SB OAKESDALE AVE SW INFORMING PUBLIC OF TRUCKS ENTERING ROADWAY FOR IMPORT/EXPORT. 2.ROADWAY WILL BE KEPT CLEAR OF ALL DEBRIS. SEATTLE SOUNDERS FC TRUCK EXPORT PLAN www.invarion.com