Loading...
HomeMy WebLinkAboutM_Hazardous_Materials_Statement_221010_v1 There will be refilling of vehicles on site in amounts greater than 20 gallons. Refueling of equipment will be from mobile tank trucks. Portable secondary containment equipment will be used during mobile fueling. The containment equipment will be positioned to catch any fuel spills due to overfilling of equipment and any other spills that may occur at or near the fuel filler port to that equipment. The positioning of containment equipment will consider all the drip points associated with the fuel filling port and the hose from the fuel delivery truck. Personnel will attend to the fueling process to ensure that any spills will be of limited volume. Additionally, full spill response kit will be maintained onsite in case of any accident. Inventory of hazardous materials will be project specific and would/could be required as part of the project’s hazardous communications plan. All construction, site demolition and clearing/grubbing debris will be removed from site and properly disposed and will not be used at site or structural fill material unless specifically approved by the engineer of record. Hazardous Materials Management Statement 1901 Oaksdale Ave SW, Renton WA 98057