HomeMy WebLinkAboutRC20221012000245 Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-1 of 8
Record Date:10/12/2022 10:02 AM
Electronically Recorded King County, WA
Return Address:
City Clerk's Office
City of Renton
1055 S Grady Way
Renton,WA 98057
DECLARATION OF COVENANT
FOR INSPECTION AND MAINTENANCE OF DRAINAGE FACILITIES AND
ON-SITE f3MPS
Grantor: TRI POINTE HOMES
Grantee: City of Renton,a Washin�ton municipal corporation
Legal Description: Proposed Lots 12 & 13 of Elliott Farms. PORTION OF SEC 22, TWP 23 N.,
RGE 05E W.M. CITY OF RENTON, KING COUNTY, WASHINGTON
Assessor's Tax Parcel ID#: 733093-0120
IN CONSIDERATION ofthe approved City of Renton (checkoneo}'thefollowing)
❑✓ Residential Building Permit �Commercial Building Permit
❑Clearing and Grading Permit �Civil Construction or Utility Permit
for Permit(s)B22004303 (construction/auildiny/utilityPermit#)relating to the real property
("Property") described above, the Grantor(s), the owner(s) in fee of that Property, hereby
covenants (covenant)with the City of Renton ("City of Renton" or"Cit�'), a municipal corporation
of the state of Washington,that he/she(they)will observe,consent to,and abide by the conditions
and obligations set forth and described in Paragraphs 1 through 9 below with regard to the
Property, and hereby grants (grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants (grant),covenants (covenant), and agrees (agree)as follows:
1. The Grantor(s)or his/her(their)successors in interest and assigns("Owners")shall at their own
cost,operate, maintain,and keep in good repair,the Property's drainage facilities constructed
as required in the approved construction plans and specifications R-4166 (Pro�ect
P�an#) on file with the City of Renton and submitted to the City of Renton for the review and
approval of permit(s) C20005641 (Construction/Building/UtilityPermit#).Tlle
Property's drainage facilities are shown and/or listed on Exhibit A—Site Plan. The Property's
drainage facilities shall be maintained in compliance with the operation and maintenance
schedule included and attached herein as Exhibit B—Operations and Maintenance. Drainage
facilities include pipes, channels, flow control facilities, water quality facilities, on-site best
management practices (BMPs) and other engineered structures designed to manage and/or
Page 1 of 8
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-2 of 8
Record Date:10/12/2022 10:02 AM King County, WA
treat stormwater on the Property. On-site BMPs include dispersion and infiltration devices,
bioretention, permeable pavements, rdinwdter hdrvesting systems, tree retention credit,
reduced impervious surface footprint,vegetdted roofs and other medsures designed to mimic
pre-developed hydrology dnd minimize stormwater runoff on the Property.
2. Ciiy oT Renion shall have ihe righi io ingress and egress over ihose poriions oT ihe Properiy
necessary to perform inspectiont of the stormwater facilitiec and BMPs and conduct
maintenance activitiet tpecified in this Declaration of Covenant and in accordance with the
�enton Municipal Code. City of�enton �hall provide at leatt thirty(30) days'written notice to
the Owners that entry on the Property i�planned for the in�pection of drainage facilities.After
the thirty(30) days,the Owners shall allow the City of�enton to enter for the sole purpose of
inspecting drainage facilities. In lieu of intpection by the City,the Ownerc may elect to engage
a licensed civil engineer registered in the state of Wathington who ha�expertise in drainage to
inspect the drainage facilities and provide a written report describing their condition. If the
engineer option is chosen,the Owners shall provide written notice to the City of P.enton within
fifteen(i5)days of receiving the City's notice of inspection.Within thirty(30)days of giving this
notice,the Ownerc,or engineer on behalf of the Ownerc,chall provide the engineer'c report to
the City of Renton. If the report is not provided in a timely manner as specified above,the City
of Renton may inspect the drainage facilities without further notice.
3. If City of Renton determines from its inspection, or from an engineer's report provided in
accordance with Paragraph 2,that maintenance, repair, restoration, and/or mitigation work is
required to be done to any of the drainage facilities, City of Renton shall notify the Owners of
the specific maintenance, repair, restoration, and/or mitigation work ("Work") required
pursuant to the Renton Municipal Code. The City shall also set a reasonable deadline for the
Owners to complete the Work, or to provide an engineer's report that verifies completion of
the Work. After the deadline has passed, the Owners shall allow the City access to re-inspect
the drainage facilities unless an engineer's report has been provided verifying completion of
the Work. If the Work is not completed within the time frame set by the City, the City may
initiate an enforcement action and/or perform the Work and hereby is given access to the
Property for such purposes. Written notice will be sent to the Owners stating the City's
intention to perform such Work.This Work will not commence until at least seven(7)days after
such notice is mailed. If, within the sole discretion of the City, there exists an imminent or
present danger, the seven (7) day notice period will be waived and Work will begin
immediately.
4. The Owners shall assume all responsibility for the cost of any Work, or any measures taken by
the City to address conditions as described in Paragraph 3. Such responsibility shall include
reimbursement to the City within thirty(30)days of the receipt of the invoice for any such Work
performed. Overdue payments will require payment of interest at the maximum legal rate
allowed by RCW 19.52.020 (currently twelve percent(12%)). If the City initiates legal action to
enforce this agreement, the prevailing party in such action is entitled to recover reasonable
litigation costs and attorney's fees.
5. The Owners are required to obtain written approval from City of Renton prior to filling, piping,
cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any
alterations or modifications to the drainage facilities referenced in this Declaration of Covenant.
Page 2 of $
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-3 of 8
Record Date:10/12/2022 10:02 AM King County, WA
6. Any notice ar cansent required to be gi�en or otherwise pra�ided for by the prouisions of this
Agreement shall be effective upon personal delivery,ar three(3}days after mailing by Certified
Mail, returr� r�e�ipt requested.
7. With regard to the matters addressed herein,this agr�ement constitutes the entire agreement
between the �aarties, and supersedes all prior discussians, negotiations, and �II a�reements
whatsoeVer whether oral or written�
8. 7his Declara�ion of Covenant is intended to protect the value and desirability and promote
efficient and effecti�e management of surface water drainage of the real pro�aerty describec�
abave, and shall inure to the benefit af afl the citiz�ns vf the City af Rentan and its successors
and assigns. This Decfaration of Covenant shall run with the land and be bind�n� �pon
Grantor(s), and Grantor's(s'J successars in interest, and assigns.
9. Th�s Declara"tion of Covenant may be terminated by ex�cution of a written agreem�nt by the
�wners and the City that is recorded f�y King County in its real proper�y recards�
IN WITNE55 W�iEREOF, this Reclara �on af CoVenant far the Inspection and Maintenance of
Drainage Facilities is executed this day of " _ _ ,20_____
�._.,_. .. �_�.�w., ---�--� -
GRA TOR, owner of the C���ap�r�� GRAfVTOR, awner af the Property
STAT� OF WASHINGTON �
COUfVTY(�F KING )ss.
C)n this day personally appeared before me:
� to me Ecnown to be the indivicEual(s)
described in and who executed the within and foregoing instrument and acknowledged that they
signed t�e same as their free and�oluntary act and deed,far the uses and purposes therein stated.
Given under my I�and and afficial s�al this day of�, �..� _____ ___, 20
������r� ��������f�
, �...�_____ __._�
���.,,.wlurtEtrat �` '�� r
,m �a ��31�AY�y. rt��r y� �'
�w ��.^-'�� Q�.� �"O.Pif''/. � �'� __._..
�~ -° �` ��" �°° p�ted name
�% ;� 59��1 �� �
; ��, ,� � "�(V�tary Puf�Iic in and farthe 5tate of
s V �
� ��`�,, ,� ��` �w= C�V,�shin ton, residing at
� � rr� �,p�:��"' � .�,
�/ �° �°�ktdtee�+.,<�`�` C� �;
'P���g��������������M a aintment ex ires {
Y NN N �
Page 3 of�
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-4 of 8
Record Date:10/12/2022 10:02 AM King County, WA
EXHIBIT A - ON-SITE BMP SITE PLAN
TOTAL LOT/SITE AREA: 4580 SF PERMIT #: B22004303
ADDRESS: 14176 8� 14180 SE 153rd PI PARCEL NUMBER: 733093-0120/ 733093-0130
NEW/REPLACED IMPERV. AREA: 3380 SF MAX. IMPERV.SURFACE ALLOWED: 3664SF
ON-SITE BMP S USED: D ell for limited filtration, erforated i e connection
2x10' Trench w/6" � �'"'
. � . ' � Perforated Pipe ^a �
_• , • O• a;a '^ ' .., . (Detail G2.2.C) � s� �._.�
.� . .,�..
a�`.
��� ' :,,•' . � . . . .. '��,� . .
.,,, : :�;: .
Storm � . . . �� . . � . ..
��" . ' N01' 0'49"W 32.08' 96'
96' '�4 � .
`____� •�.. _-------�-a �_ :•.
IO�FRONT BSBL �� � . • - � .
.° o0-—--_- � � _--—_ .. ,
PROPOSED r, PATIO `p �.
PORCH i �
56' X 50.00' � I �II 30 SF 56' 24 SF II I� • e. �
2800 SF 4 �I �i; i �^
ROOF=2805 SF o r �I II z
o I�i� LOT 12(Plan 3) L OT 1 3(Pl an 4) i� , n �
��� I 4-1 � �
i�o LOT: 2249 SF LOT: 2331 SF i l '". ,
� ���� � .
Z��i i .�a .
i�C ncrete Drive Concrete Drive i �
--Tightline (typ.)�'li� 300 SF 321 SF i I :�.
--Footing Drain (typ.)—I-'�; , _ -� --, �_�=.;= i��
� �� �.�a.. :� . �`� :
Roof Overhang g ��� ����— ��=a:� -i' i� �•.�
li; � .-. . max.3%. i .
Silt Fence �� _ � .�: � �� �� .�.
. a,.
Sanitary I � Q � � �° � �E � I/ ,p. .''
_ = REA;T:B�B ��—:�.� /�
_ ' d... . • ��. •
N01'40'49'E 31.23' R—4 5.p .� �..° . �� ��
, � -
_ O �` . ..j .
o CL of Tract C 2S �gs,� . R� .00' L=12.12'
— r� �� •:
a � � .�
Water � Lot Number � 12 13
No�s: � � �: ot Size 2249 SF 2331 SF
1. The limits of clearing and . . 4'.' ` R f Overhang 1402 SF 1403 SF
groding ore the lot lines. POV Areas 289 SF 286 SF
2 No existing bu�dings or "
construction (only new Total pervious 1691 SF 1689 SF
��g��t��). Impervious 75% 72%
3. Areas that have been
cleQed and graded must have
tne�a moisture hdding Lot Size 2249 SF 2331 SF
capacity restored per City Std. FOOtpflflt 1219 SF 1216 SF
Plan 264.00 Porch/Deck 30 SF 24 SF
ELLIOTT FARMS- LOT 12/13 Total Coverage 1249 SF 1240 SF
SECTION/TOWNSHIP/RANGE:22-23N-05E Lot Coverage 56°Io 53�
City of Renton APPROVED BY: SCALE: 1"=20'
TITLE: DATE:
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-5 of 8
Record Date:10/12/2022 10:02 AM King County, WA
SECTION C.2 ON-SITE BMPS
Future updates to the instructions will be posted on City of Renton's Surface Water Design Manual
website.
A reprociucible copy of the instructions,prepareci for inclusion with the cieclaration of covenant,is locateci
in Reference Section 8-M.
FTG[1"RE�,Z.11.A SCHEMAT�C P�E�'PES�N'TA.TI�N UF A P��UP,�1'��D�IPE Ct}NIYECTI4N Ft'1�A
` STNGLE�A�`II�Y,It�SID�NCE
RANDOM FILL
6"MIN. , o 0
18"MIN� o FILTER FAERIC
I
� 6"PERFORATED PIPE
�1 z"-4" WASHED ROCK
�24"MIN.�
TRENCH X-SECTION
NTS
SLOPE
TO ROAD
DRAINAGE SYSTEM
�2'x 10'LEVEL TRENCH
w/PERFORATED PIPE
PLAN VIEW OF ROOF
NTS
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-6 of 8
Record Date:10/12/2022 10:02 AM King County, WA
MAINTENANCE INSTRUCTIONS FOR A PERFORATED PIPE
CONNECTION
Your property contains an on-site BMP(bPst managPment practice)called a"perforated pipe
connection,"wliicli was i��stalled to reduce tlie stoi���water iu��off i����acts of so���e oi all of tlie
impervious surface on your property.
A perforateu pipe connection is a length of urainage conveyance pipe with holes in the bottom,
designed to"leak"runoff, convPyPd by thP pipP,into a gravel filled trPnch whPre it can be soakPd into
the surrounding soil. The connection is intended to provide opportunity for infiltration of any runoff
that is being conve_yed from an impervious surface(usually a roo fl to a local drai�age system such as a
ditch or roadway pipe system. This on-site BMP shall be maintained per AppendiaL A of the City of
Renton's S»rface Water Design Man»al.
MAINTENANCE RESTRICTIONS
• The size anci composition of the perforateu pipe connection as uepicteu b_y the site plan anu
design details must be maintained and may not be changed without written approval iifrom the
City of Renton or through a future development permit from the City of Renton.
• The soil overtop of the perforated portion of the system must not be compacted or covered
with impervious materials.
RECORDING REQUIREMENT
These perforated pipe connection on-site BMP maintenance and operation instructions must be
recorded as an attachment to the required declaration of covenant and grant of easement per
Requirement 3 of Section C.13.4 of the City of Renton Surface Water Design Manual.The intent of
these instructions is to explain to future property owners,the purpose of the BMP and how it must be
maintained and operated. These instructions are intended to be a minimum; the City of Renton may
require additional instructions based on site-specific conditions. See the City of Renton's Surface
Water Design Manual website for additional information and updates.
TYPICAL 1'��'ORA�'EII Ptl'E Ct)I�fiNEGTION Ft3R A SINGLE F�MTLI'RESIDEI�I�E `'
�,,.�,.a����rAuF
���c� � ���.��
__ -_._._. .m�����y '�����`{���"�"��„ �r�c�r�--~��
�r��i����mr�t�rr ��� r����`"y���M��,�m��`"
� � ��`' �` �� �
1�°°q��a� *` v�� '�� ro� ��2°.�t�r"vr�
r� � � ��
� _�"«�",�C�' a"°� w �e� �'� � M �Yu�r�i�ruu�
�' �a'3J�'��Y�M"Y�3fl'V �aaa ���mP �,�� o-"�`�e
Wr�'f�G�l�� ���°�c.,„�, ao^,'�m��4�&��..
,� �a w
""�" I � ���q""�dmt__.._��
I�'����'�������
��
TF��19p��1"J�-���'1'Y'[D�
___���w____._.w
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-7 of 8
Record Date:10/12/2022 10:02 AM King County, WA
SOIL AMENDMENT - SITE PLAN
AMENDED SOIL AREA: 1365 SF ADDRESS: 14176 & 14180 SE 153rd PI
TOTAL LOT/SITE AREA: 4580 SF PARCEL NUMBER: 733093-0120/ 733093-0130
�A�
. � ' . ' �•:
— - ' , ��• "a '• . • . _ :�•�
, e� . .� .
'� :t� • ' . � . • �. e t�..
.i� . . .�'a . . • • . .i.
.��.
. . . . . . . . . . . . . ' . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . • .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . � . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ..
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . ,.a
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
�.��.
4580 SF LOT SF ,� ��
��'�.
..�.
- a
' .�
'.�. :
1365 SF-AMENDED SOIL ����� '''•,
. :� �: �
a � .e�
� : ;`.
. �.,� .
�4 ` . .` .
5 15
0 10 20 40
ELLIOTT FARMS - LOTS 12/13
SEC.22,TWP 23N, RGE 05E
City of Renton APPROVED BY: SCALE: 1"=20'
TITLE: DATE:
Instrument Number: 20221012000245 Document:COV Rec: $210.50 Page-8 of 8
Record Date:10/12/2022 10:02 AM King County, WA
MAINTENANCE INSTRUCTIONS FOR SOIL AMENDMENT
Your property contains an on-site BMP(best management practice)called"soil amendment,"which
was installeu to mitigate the stormwater quantit_y anu qualit_y impacts of some or all of the pervious
surfaces on your property.
Soil amendment is a method of regaining greater stormwater iunctions in the post development
latidsca�e by iticreasitig t-reat-iiietit of�ollutaiits atid sediiiieiits, a��d ir�i«iir,izi��g tlie��eed for so���e
landscaping chemicals. To be successful,the soil condition must be able to soak water into the ground
for a reasonable nt?mber of years. This on-site BMP shall be maintained per Appendix A of the City of
RPnton's Surface Water DPsign Manual.
MAINTENANCE RESTRICTIONS
ThP size;placPment; and composition of thPse devices as dPpictPd by the sitP plan and design details
must be maintained and may not be changed without written approval from the City of Renton or
through a future development per_mit from the Cityo uf Renton.
INSPECTION FREQUENCY AND MAINTENANCE GUIDELINES
To be successful,the soil must be able to soak water into the ground for a reasonable number of years.
• Retum leaf fall and shredded woody materials from the landscape to the site when possible in
order to replenish soil nutrients and structure.
• On turf areas, "grasscycle"(mulch-mow or leave the clippings)to build turf health.
• Maintain 2 to 3 inches of mulch over bare areas in landscape beds.
• Re-seed bare turf areas until the vegetation fully covers the ground surface.
• Avoid using pesticides(bug and weed killers)which damage the soil.
• Where fertilization is needed(mainly turf and annual flower beds),a moderate fertilization
program should be used which relies on compost,natural fertilizers,or slow-release synthetic
balanced fertilizers.
RECORDING REQUIREMENT
These on-site BMP maintenance and operation instructions must be recorded as an attachment to the
required declaration of covenant and grant of easement per Requirement 3 of Section C.1.3.4 of the
City of Renton Surface Water Design Manual. The intent of these instructions is to explain to future
property owners,the purpose of the BMP and how it must be maintained and operated.These
instructions are intended to be a minimum; the City of Renton may require additional instructions
based on site-specific conditions. See the City of Renton's Surface Water Design Manual website for
additional information and updates.