Loading...
HomeMy WebLinkAboutAddendum No. 4Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 4 Page 1 of 4 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) ADDENDUM NO. 4 Federal Aid Number: STPUL-1615(005) TIB Number: 8-1-102(038)-1 City Project Number: TED4003813 CAG 22-163 DATE OF ADDENDUM ISSUE: October 12, 2022 DUE DATE FOR BIDS: October 18, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) DATE OF BID OPENING: October 20, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) NOTE TO ALL PLANHOLDERS: This Addendum No. 4, containing the following revisions, additions, deletions, and/or clarifications, is hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall acknowledge receipt and acceptance of this Addendum No. 4 in the space provided on the Proposal Signature Page or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s submittal. BID PROPOSAL 1. DELETE Proposal Schedule A (Pages 13-19) and REPLACE with attached Proposal (Pages 13-19). Revisions include:  Unit prices for all LS items updated to $_______ for consistency  Addition of new Bid item A48 7-04 Ductile Iron Storm Sewer Pipe 18 In. Diam, 130 LF  Revise schedule A Bid item numbers following new item A48 to renumber bid items for Schedule A.  Revise quantity, now Bid item A52 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam., 980 LF  Revise quant & unit, now Bid item A73 7-10 Bioretention Planter, 1 LS Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 4 Page 2 of 4  Revise quantity, now Bid item A125 Cement Conc. Curb Ramp, Type Perpendicular B, 1 EA  Revise quantity, now Bid item A128 Cement Conc. Curb Ramp, Type Combination, 4 EA 2. DELETE Proposal Schedule B (Pages 20-21) and REPLACE with attached Proposal (Pages 20-21). Revisions include:  Unit prices for all LS items updated to $_______ for consistency 3. DELETE Proposal Schedule C (Page 22) and REPLACE with attached Proposal (Page 22). Revisions include:  Unit prices for all LS items updated to $_______ for consistency  Addition of new bid item C13 7-21 Furnish and Install 12 In. Diam. CIPP for Sanitary Sewer, 2,040 LF  Revise schedule C bid item numbers following new item C13 to renumber bid items for Schedule C.  Revise quantity, now Bid item C14 7-21 Furnish and Install 12 In. Diam. CIPP for Sanitary Sewer, 450 LF 4. DELETE Proposal Schedule D (Pages 23-25) and REPLACE with attached Proposal (Pages 23-25). Revisions include:  Unit prices for all LS items updated to $_______ for consistency  Revise quantity Bid item D17 8-35 Install Diameter Conduit – PSE Power, 5700 LF  Addition of new bid item D19 8-35 Install 4” Fiber Optic Cable – PSE Power, 2300LF  Revise schedule D bid item numbers following new item D19 to renumber bid items for Schedule D. PLANS 5. DELETE Plan Sheets 82, 92, 100, 116-120, 132-134, 136-138 and REPLACE with attached Plan Sheets 82, 92, 100, 116-120, 132-134, 136-138. Revisions include:  Revisions to Drainage/Sewer/Water profile sheets for pipe profile clearances  Revisions to Water and Sewer Utility Clearances detail on sheet 120 6. DELETE Plan Sheets 251 and REPLACE with attached Plan Sheet 251. Revisions include:  Remove Tree Grate construction note #3 from Filterra unit. Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 4 Page 3 of 4 SPECIAL PROVISIONS 7. Revise the Special Provision Section 1-03.3 Execution of Contract (Page SP-16) as follows: Revise the third paragraph as follows in bold: Within 10 calendar days after the award date, the successful bidder shall return the signed Contracting Agency-prepared contract, an insurance certification as required by Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the Transfer of Coverage form for the Construction Stormwater General Permit with sections I, III, and VIII completed when provided. 8. Revise the Special Provision Section 7-10.4 Measurement (Page SP-191) as follows: Revise the first paragraph as follows: “Bioretention Planter” shall be measured per lump sum. 9. Revise the Special Provision Section 7-10.5 Payment (Page SP-191,192) as follows: Revise the first paragraph as follows: “Bioretention Planter”, per lump sum. Delete the 6th paragraph as follows: Top Soil A for bioretention planter shall be measured and paid under the “Top Soil A” bid item. 10. Revise the Special Provision Section 7-21.5 Payment (Page SP-225) as follows: Revise the bid items in the first paragraph to include: “Furnish and Install 8 In. Diam. CIPP for Sanitary Sewer”, per linear foot. Revise the second paragraph as follows: Payment for furnishing and installing 8-inch or 12-inch CIPP for Sanitary Sewer will be made at the amount bid per linear foot, which payment will be complete compensation for all labor, materials, equipment required to complete the work specified in the contract documents and plans, and shall include but not be limited to the following: Revise the fifth bullet point as follows:  Furnishing and installing 8” or 12” diameter CIPP sewer pipe. 11. Revise the Special Provision Section 8-35.4 Measurement (Page SP-313) as follows: Add the following after the fifth paragraph: “Install __” Diameter Fiber Optic Cable – [Utility Owner]” shall be measured and paid per linear foot of cable installed when the cable is furnished by Others. The Contractor shall keep record for which utility the installed cable will be used by. 12. Revise the Special Provision Section 8-35.5 Payment (Page SP-313) as follows: Add the following after “Install __” Diameter Conduit – [Utility Owner]” per linear foot: “Install __” Diameter Fiber Optic Cable – [Utility Owner]” per linear foot. Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 4 Page 4 of 4 13. Revise the Special Provision Section 8-14.3 Construction Requirements (Page SP-250) as follows: Remove Decorative Concrete Finish section paragraph 3 and replace with the following: Concrete acid stain shall be semi-transparent water-based stains penetrate into the concrete to attain a faux, layered appearance. The acid stain shall be DIY-friendly, ZERO VOC’s (Volatile Organic Compounds). Concrete stain shall be a penetrating, semi-transparent, water-based stain specifically formulated to color concrete, or other cement-based materials, by delivering ultra-fine pigment to the concrete surface, for exterior use. Color of stained concrete surface shall reveal a bluish-green color tone. Concrete stains shall have the following characteristics: • Low VOC water-based formulation • Stain application: pump sprayer, mop, stain/paint roller • Apply top coat sealer with superior adhesion to stained concrete surfaces, 25% solids, durable satin acrylic finish that is non-yellowing and UV resistant. Physical and Chemical Properties shall include the following: •Flash Point > 93.3ºC (200ºF) - TAG Closed Cup •Physical State Liquid •Solubility < 70% •Volatiles < 70% •VOC 0% • LVP-VOC 0% • Specific Gravity / Density ~ 1.11 • pH (± 0.3) 7.5 – 8.5 • Boiling Point >100°C / 212°F •Molecular Weight (g/mol) Varies ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. Sincerely, Robert M. Hanson, P.E. Transportation Design Manager City of Renton Receipt acknowledged, and conditions agreed to this _____ day of ________, 2022 Bidder _______________________________ Signature for ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$ A2 1-05 Roadway Surveying 1 LS $$ A3 1-05 ADA Features Surveying 1 LS $$ A4 1-05 Record Drawings (Minimum Bid $25,000)1 LS $$ A5 1-07 SPCC Plan 1 LS $$ A6 1-07 Training 2400 HR $$ A7 1-08 Type B Progress Schedule (Minimum Bid $15,000)1 LS $$ A8 1-09 Mobilization 1 LS $$ A9 1-09 Field Office Building 1 LS $$ A10 1-10 Project Temporary Traffic Control 1 LS $$ A11 1-10 Business Access Signs 40 EA $$ A12 1-10 Project Identification Signs 2 EA $$ A13 1-10 Traffic Control Supervisor 1 LS $$ A14 1-10 Flaggers 17600 HR $$ A15 1-10 Other Traffic Control Labor 2000 HR $$ A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $$ A17 2-01 Clearing and Grubbing 1 LS $$ A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$ A19 2-02 Removal of Structures and Obstructions 1 LS $$ A20 2-03 Roadway Excavation Incl. Haul 14970 CY $$ A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $$ A22 2-03 Gravel Borrow Inc. Haul 2350 CY $$ A23 2-05 Petroleum Contaminated Excavation and Disposal Incl. Haul 1 EST 172,000.00$ 172,000.00$ A24 2-05 Contaminated Groundwater Treatment and Disposal 1 EST 200,000.00$ 200,000.00$ A25 2-09 Controlled Density Fill 800 CY $$ Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 13 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A26 2-12 Construction Geotextile for Separation 16560 SY $$ A27 4-04 Crushed Surfacing Base Course 9070 TON $$ A28 5-04 Commercial HMA 960 TON $$ A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $$ A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $$ A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $$ A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $$ A33 5-04 Planing Bituminous Pavement 23100 SY $$ A34 5-04 Temporary Pavement 2860 TON $$ A35 5-04 Asphalt Price Cost Adjustment 1 CALC 199,200.00$ 199,200.00$ A36 5-05 Reinforced Cement Concrete Pavement 110 CY $$ A37 5-05 Cement Concrete Pavement for Driveway 50 CY $$ A38 5-05 River Rock Treatment 360 SY $$ A39 6-02 Cement Conc. Switchback Ramp 1 LS $$ A40 6-11 Cement Concrete Fill Wall 10 CY $$ A41 6-11 Concrete Cast in Place Wall 10 CY $$ A42 6-13 Modular Block Wall 790 SF $$ A43 6-21 Pedestrian Railing 80 LF $$ A44 6-32 Handrail 100 LF $$ A45 7-01 Underdrain Pipe 8 In. Diam.140 LF $$ A46 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam.110 LF $$ A47 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam.680 LF $$ A48 7-04 Ductile Iron Storm Sewer Pipe 18 In. Diam.130 LF $$ A49 7-04 PVC Storm Sewer Pipe 6 In. Diam.280 LF $$ A50 7-04 PVC Storm Sewer Pipe 8 In. Diam.150 LF $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 14 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A51 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $$ A52 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 980 LF $$ A53 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $$ A54 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $$ A55 7-04 Temporary Stormwater Diversion 1 LS $$ A56 7-05 Catch Basin Type 1 40 EA $$ A57 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $$ A58 7-05 Catch Basin Type 1L 9 EA $$ A59 7-05 Catch Basin Type 2 48 In. Diam.43 EA $$ A60 7-05 Catch Basin Type 2 54 In. Diam.2 EA $$ A61 7-05 Catch Basin Type 2 60 In. Diam.1 EA $$ A62 7-05 Catch Basin Type 2 72 In. Diam.2 EA $$ A63 7-05 Storm Round Frame and Cover 26 EA $$ A64 7-05 Storm Rectangular Solid Metal Cover 6 EA $$ A65 7-05 Adjust Storm Drainage Structure 21 EA $$ A66 7-05 Connect to Existing Drainage Structures 11 EA $$ A67 7-06 Filterra Unit 12 EA $$ A68 7-06 Filterra Unit with Internal Bypass 2 EA $$ A69 7-06 Filterra Unit with Peak Diversion 1 EA $$ A70 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $$ A71 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$ A72 7-08 Television Inspection 1 LS $$ A73 7-10 Bioretention Planter 1 LS $$ A74 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$ A75 8-02 Topsoil Type A 1710 CY $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 15 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A76 8-02 Bark or Wood Chip Mulch 340 CY $$ A77 8-02 Coarse Compost 40 CY $$ A78 8-02 Bioretention Media 190 CY $$ A79 8-02 Seeded Lawn Installation 2310 SY $$ A80 8-02 PS Tilia tomentosa 'PNI 6051'/ Green Mountain Linden; 2.5" Cal., 12'-14' Ht.13 EA $$ A81 8-02 PS Quercus frainetto 'Schmidt'/ Forest Green Oak; 2.5" Cal., 12'-14' Ht.11 EA $$ A82 8-02 PS Parrotia persica 'Inge's Ruby Vase'/ Ruby Vase Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $$ A83 8-02 PS Nyssa sylvatica 'David Odom'/ Afterburner Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $$ A84 8-02 PS Cercidiphyllum japonicum/ Katsura Tree; 2.5" Cal., 12'-14' Ht.2 EA $$ A85 8-02 PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'- 12' Ht. 1 EA $$ A86 8-02 PS Malus 'Golden Raindrops'/ Golden Raindrops Crabapple; 2" Cal., 10'-12' Ht. 6 EA $$ A87 8-02 PS Calocedrus decurrens/ Incense Cedar; 7'-8' Ht.3 EA $$ A88 8-02 PS Cornus kousa x nuttallii ' KN4-43'/ Starlight Dogwood; 2" Cal., 10'-12' Ht. 11 EA $$ A89 8-02 PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak Japanese Barberry; 2 Gal, Cont. 188 EA $$ A90 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $$ A91 8-02 PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2 Gal. Cont. 138 EA $ $ A92 8-02 PS Euonymus japonicus 'Microphyllus'/ Boxleaf Euonymus; 2 Gal. Cont. 435 EA $ $ A93 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 147 EA $$ A94 8-02 PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig Dogwood; 2 Gal. Cont. 539 EA $$ A95 8-02 PS Rosa x 'NOATRAUM'/ Flower Carpet Pink Groundcover Rose; 2 Gal. Cont. 26 EA $$ A96 8-02 PS Nassella tenuissima/ Mexican Feather Grass; 1 Gal Cont.554 EA $$ A97 8-02 PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $$ A98 8-02 PS Hemericalis 'Stella de Oro'/ Stella de Oro Daylily; 1 Gal. Cont. 341 EA $$ A99 8-02 PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal. Cont. 413 EA $ $ A100 8-02 PS Polystichum munitum/ Western Sword Fern; 1 Gal. Cont. 192 EA $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 16 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A101 8-02 PS Cotoneaster dammeri 'Eichholz'/ Eichholz Coteoneater; 1 Gal. Cont. 35 EA $ $ A102 8-02 PS Epimedium x perralchicum 'Frohnleiten'/ Frohnleiten Barrenwort; 1 Gal. Con. 1285 EA $$ A103 8-02 PS Veronica peduncularis 'Georgia Blue'/ Georgia Blue Speedwell; 1 Gal. Cont. 380 EA $$ A104 8-02 PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal. Cont. 210 EA $$ A105 8-02 PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal. Cont. 210 EA $$ A106 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $$ A107 8-02 Protection of Private Property and Tree Protection 1 LS $$ A108 8-02 Root Barrier 950 LF $$ A109 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$ A110 8-02 Plant Establishment - 1 Year 1 LS $$ A111 8-03 Automatic Irrigation System, Complete 1 LS $$ A112 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $$ A113 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $$ A114 8-04 Extruded Curb 2420 LF $$ A115 8-05 Wheel Stop 44 EA $$ A116 8-06 Cement Conc. Driveway Entrance 2060 SY $$ A117 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $$ A118 8-09 Raised Pavement Marker Type 1 42 HUND $$ A119 8-09 Raised Pavement Marker Type 2 11 HUND $$ A120 8-10 Curb Mounted Delineator Post 330 LF $$ A121 8-13 Adjust Monument Case and Cover 6 EA $$ A122 8-14 Cement Conc. Sidewalk 5260 SY $$ A123 8-14 Thickened Edge Sidewalk 320 LF $$ A124 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $$ A125 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 1 EA $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 17 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A126 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $$ A127 8-14 Cement Conc. Curb Ramp, Type Single Direction A 1 EA $$ A128 8-14 Cement Conc. Curb Ramp, Type Combination 4 EA $$ A129 8-14 Detectable Warning Surface 460 SF $$ A130 8-14 Decorative Concrete Finish 400 SY $$ A131 8-14 Smooth Cement Conc. Band 80 LF $$ A132 8-14 Bus Shelter Foundation 2 EA $$ A133 8-19 Adjust Gas Valve 11 EA $$ A134 8-20 Modification of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 3rd Street Intersection, Complete 1 LS $$ A135 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 2nd Street Intersection, Complete 1 LS $$ A136 8-20 Portable Temporary Traffic Signal System with Mast Arm 1 LS $$ A137 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue S & SW Victoria Street, Complete 1 LS $$ A138 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & Airport Way Intersection, Complete 1 LS $$ A139 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue N & NW 3rd Place, Complete 1 LS $$ A140 8-20 Decorative Illumination System, Complete 1 LS $$ A141 8-20 Fiber Optic Interconnect System, Complete 1 LS $$ A142 8-20 5G Small Cell Network Conduit System, Complete 1 LS $$ A143 8-20 PTZ Camera Systems, Complete 1 LS $$ A144 8-21 Permanent Signing 1 LS $$ A145 8-22 Plastic Stop Line 90 LF $$ A146 8-22 Plastic Crosswalk Line 3250 SF $$ A147 8-22 Plastic Traffic Arrow 72 EA $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 18 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A148 8-22 Plastic Traffic Letter 12 EA $$ A149 8-22 Bicycle Lane Symbol 6 EA $$ A150 8-22 Plastic Line, 4 In.1250 LF $$ A151 8-22 Paint Line, 4 In.5680 LF $$ A152 8-22 Removing Existing Pavement Markings 1 LS $$ A153 8-23 Temporary Pavement Marking 59000 LF $$ A154 8-24 Rock Wall 60 SF $$ A155 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$ A156 8-26 Utility Potholing 220 EA $$ A157 8-27 Gateway Trellis Relocation 1 LS $$ A158 8-28 Tree Grate 3 EA $$ A159 8-30 Waste Receptacle 3 EA $$ A160 8-31 Bench 2 EA $$ A161 8-32 Gateway Wall A & B 1 LS $$ A162 8-33 Bollard 7 EA $$ Total Schedule A (Roadway Improvements)*$ * All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 19 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount B1 1-04 Minor Change for Water Trench 1 EST 68,000.00$ 68,000.00$ B2 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 54,000.00$ 54,000.00$ B3 2-09 Controlled Density Fill 10 CY $$ B4 7-08 Shoring or Extra Excavation Class B for Water 1 LS $$ B5 7-09 Abandon Existing Water System 1 LS $$ B6 7-09 Ductile Iron Pipe,Class 52, 6-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 50 LF $$ B7 7-09 Ductile Iron Pipe,Class 52, 8-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 350 LF $$ B8 7-09 Ductile Iron Pipe,Class 52, 10-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 100 LF $$ B9 7-09 Ductile Iron Pipe,Class 52, 12-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 5160 LF $$ B10 7-09 Bank Run Gravel for Trench Backfill Water 6140 TON $$ B11 7-09 Removal and Replacement of Unsuitable Foundation Material 770 TON $$ B12 7-09 Connection to Existing Water Main, 6 In.1 EA $$ B13 7-09 Connection to Existing Water Main, 8 In.5 EA $$ B14 7-09 Connection to Existing Water Main, 10 In.4 EA $$ B15 7-09 Connection to Existing Water Main, 12 In.5 EA $$ B16 7-09 Concrete for Thrust Blocking and Dead-Man Anchor Block 90 CY $$ B17 7-11 Corrosion Protection, Pipe Joint-Bonding, Anodes, Test Stations 1 LS $$ B18 7-12 Furnish and Install 6 In. Gate Valve Assembly 1 EA $$ B19 7-12 Furnish and Install 8 In. Gate Valve Assembly 8 EA $$ B20 7-12 Furnish and Install 10 In. Gate Valve Assembly 4 EA $$ PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 20 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. B21 7-12 Furnish and Install 12 In. Gate Valve Assembly 22 EA $$ B22 7-12 Adjust Existing Water Valve Box 16 EA $$ B23 7-12 Adjust Existing Water Manhole 1 EA $$ B24 7-12 Furnish and Install Comb. Air/Vacuum Valve Assembly 2 In.2 EA $$ B25 7-14 Furnish and Install Fire Hydrant Assembly 25 EA $$ B26 7-14 Remove and Salvage Hydrant 21 EA $$ B27 7-15 Furnish and Install 1" Water Service Connection 25 EA $$ B28 7-15 Furnish and Install 1.5" Water Service Connection 4 EA $$ B29 7-15 Furnish and Install 2" Water Service Connection 2 EA $$ B30 7-16 Temporary Water Bypass System, Complete 1 LS $$ B31 8-26 Resolution of Utility Conflicts with New Water Mains 1 EST 45,000.00$ 45,000.00$ Schedule B Subtotal $ Schedule B Sales Tax (10.1%)$ Schedule B (Water Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule B Contract price per Section 1- 07.2(2) and WAC 458-20-170. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 21 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount C1 1-04 Minor Change for Sewer Trench 1 EST 30,000.00$ 30,000.00$ C2 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 24,000.00$ 24,000.00$ C3 7-05 Sanitary Sewer Manhole 18 EA $$ C4 7-05 Drop Manhole Connection 1 EA $$ C5 7-05 Adjust Sewer Manhole 3 EA $$ C6 7-08 Shoring or Extra Excavation Class B for Sewer 1 LS $$ C7 7-17 PVC Sanitary Sewer Pipe 6 In. Diam.106 LF $$ C8 7-17 PVC Sanitary Sewer Pipe 8 In. Diam.1160 LF $$ C9 7-17 PVC Sanitary Sewer Pipe 12 In. Diam.70 LF $$ C10 7-17 Bank Run Gravel for Trench Backfill Sewer 4020 TON $$ C11 7-17 Removal and Replacement of Unsuitable Foundation Material 550 TON $$ C12 7-19 Sewer Cleanout 6 EA $$ C13 7-21 Furnish and Install 8 In. Diam. CIPP for Sanitary Sewer 2040 LF $$ C14 7-21 Furnish and Install 12 In. Diam. CIPP for Sanitary Sewer 450 LF $$ C15 8-26 Resolution of Utility Conflicts for Sewer 1 EST 20,000.00$ 20,000.00$ Schedule C Subtotal $ Schedule C Sales Tax (10.1%)$ Schedule C (Sewer Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule C Contract price per Section 1- 07.2(2) and WAC 458-20-170. PROPOSAL (BID SCHEDULE C - SEWER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 22 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount D1 1-04 Minor Change for Joint Utility Trench 1 EST 64,000.00$ 64,000.00$ D2 1-05 Roadway Surveying 1 LS $$ D3 1-09 Mobilization 1 LS $$ D4 2-02 Remove/Abandon Existing Gas Main 960 LF $$ D5 2-03 Unsuitable Foundation Excavation Incl. Haul 110 CY $$ D6 2-03 Gravel Borrow Incl. Haul 2700 CY $$ D7 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 53,000.00$ 53,000.00$ D8 2-09 Structure Excavation Class B Incl. Haul for Joint Utility Trench 4110 CY $$ D9 7-08 Shoring or Extra Excavation Class B for Joint Utility Trench 1 LS $ $ D10 8-26 Resolution of Utility Conflicts for Joint Utility Trench 1 EST 42,000.00$ 42,000.00$ D11 8-35 Removal of Structure and Obstruction 1 LS $ $ D12 8-35 Franchise Utility Coordination 1 LS $$ D13 8-35 Sand Bedding Incl. Haul for Joint Utility Trench 1900 TN $$ D14 8-35 Controlled Density Fill Incl. Haul, for Joint Utility Trench 290 CY $$ D15 8-35 Install 2" Diameter Conduit - PSE Power 210 LF $$ D16 8-35 Install 3" Diameter Conduit - PSE Power 1700 LF $$ D17 8-35 Description 5700 LF $$ D18 8-35 Install 6" Diameter Conduit - PSE Power 5200 LF $$ D19 8-35 Install 4" Fiber Optic Cable - PSE Power 2300 LF $$ D20 8-35 Install Handhole (32"x44") - PSE 4 EA $$ D21 8-35 Install Handhole (30"x30") - PSE 1 EA $$ PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 23 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. D22 8-35 Install Handhole (23.25"X32.75") - PSE 3 EA $$ D23 8-35 Install Minipad Transformer (48"x42") - PSE 2 EA $$ D24 8-35 Install Three Phase Transformer (70"X136") - PSE 4 EA $$ D25 8-35 Install Three Phase Transformer (56"X66") - PSE 1 EA $$ D26 8-35 Install Three Phase Junction Box - PSE 9 EA $$ D27 8-35 Install Three Phase Underground Transformer 1 EA $$ D28 8-35 Install Pull Vault - PSE 4 EA $$ D29 8-35 Install Fiber Vault (27"X62.5") - PSE 3 EA $$ D30 8-35 Install 2" Diameter Conduit - Comcast 970 LF $$ D31 8-35 Install 4" Diameter Conduit - Comcast 8200 LF $$ D32 8-35 Install Handhole - Comcast 1 EA $$ D33 8-35 Install 14"x21" Vault - Comcast 1 EA $$ D34 8-35 Install 17"x30" Vault - Comcast 7 EA $$ D35 8-35 Install 24"x36" Vault - Comcast 17 EA $$ D36 8-35 Install 24"x24" Pedestal - Comcast 1 EA $$ D37 8-35 Install 4" Diameter Conduit - Century Link 24200 LF $$ D38 8-35 Install 3048 Handhole - Century Link 2 EA $$ D39 8-35 Install 25-TA Vault - Century Link 5 EA $$ D40 8-35 Install 264-TA Vault - Century Link 3 EA $$ D41 8-35 Install 467-TA Vault - Century Link 5 EA $$ D42 8-35 Install 38Y-612 Base-Military Vault - Century Link 1 EA $$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 24 October 2022 ADDENDUM NO. 4 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. D43 8-35 Install 96-612-7-TA Vault - Century Link 1 EA $$ D44 8-35 Install Pro 6 Pedestal - Century Link 1 EA $$ Schedule D Subtotal $ Schedule D Sales Tax (10.1%)$ Schedule D (Joint Utility Trench Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule D Contract price per Section 1- 07.2(2) and WAC 458-20-170. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 25 October 2022 RAINIER AVE S BIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS S 2ND ST CONSTRUCTION NOTES CORRESPONDING SHEETS LEGEND GENERAL DRAINAGE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPLN01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 82 285 JULY 2022 14087A 82 STA 18+25 TO STA 22+50 DRAINAGE PLAN PLAN WRE KDP KDP STP(UL) -1615(005) ADDENDUM 4 - STORM PIPE MATERIAL CHANGE FOR CLEARANCE JRW KPF 10/11/2022 CORRESPONDING SHEETS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RDRAINAGE PROFILES 92 14087A JULY 2022 28592 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 18+25 TO STA 22+50 WEST SIDE PROFILE EAST SIDE PROFILE KDP KDP WRE STP(UL) -1615(005) CB 294 TO CB 446 PROFILE CB 412 TO CB 411 PROFILE ADDENDUM 4 - SEWER/STORM/WATER CLEARANCES JRW KPF 10/11/2022 CORRESPONDING SHEETS CB 159 TO CB 20 PROFILE CB 43 TO 33 PROFILE CB 44 TO CB 294 PROFILECB 203 TO CB 202 PROFILE CB 202 TO CB 201 PROFILE CB 440 TO CB 441 PROFILE S 2ND STREET CB 438 TO CB 36 PROFILE VALUE VALUE DRAINAGE PROFILES DRAINAGE CROSSING PROFILES 100 14087A JULY 2022 285100 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG KDP KDP WRE JF NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RSTP(UL) -1615(005) ADDENDUM 4 - SEWER/STORM/WATER CLEARANCES JRW KPF 10/11/2022 CORRESPONDING SHEETS GENERAL SEWER NOTESSIDE SEWER TABLE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RSEWER PROFILE 116 14087A JULY 2022 285116 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF WRE WRE JRW STA 15+00 TO STA 23+00 STP(UL) -1615(005) MH2145 TO MH6345 CROSSING PROFILE 15+00 TO 18+50 PROFILE 19+50 TO 23+00 ADDENDUM 4 - SEWER PROFILE CLEARANCES JRW KPF 10/11/22 CORRESPONDING SHEETS GENERAL SEWER NOTES STA 23+00 TO STA 28+00 SIDE SEWER TABLE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RSEWER PROFILE 117 14087A JULY 2022 285117 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 23+00 TO STA 28+00 JRW WRE WRE STP(UL) -1615(005) PROFILE 24+50 TO 29+00 MH2138 TO MH8 CROSSING ADDENDUM 4 - SEWER PROFILE CLEARANCES JRW KPF 10/11/22 CORRESPONDING SHEETS GENERAL SEWER NOTES STA 596+50 TO STA 600+00 STA 28+00 TO STA 33+50 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RSEWER PROFILE 118 14087A JULY 2022 285118 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 28+00 TO STA 33+50 JRW WRE WRE STP(UL) -1615(005) RENTON AVE EXT PROFILE 598+50 TO 600+00MH11 TO MH10 CROSSING RAINIER AVE PROFILE 28+00 TO 33+50 ADDENDUM 4 - SEWER PROFILE CLEARANCES JRW KPF 10/11/22 CORRESPONDING SHEETS GENERAL SEWER NOTES STA 33+50 TO STA 38+00 STA 0+00 TO STA 0+41 STA 38+00 TO STA 43+00 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RSEWER PROFILE 119 14087A JULY 2022 285119 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 33+50 TO STA 43+00 JRW WRE WRE STP(UL) -1615(005) PROFILE 38+00 TO 43+00 MH4 STUB CONNECTION PROFILE 33+50 TO 38+00 ADDENDUM 4 - SEWER PROFILE CLEARANCES JRW KPF 10/11/22 WATER & SEWER UTILITY CLEARANCES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWRDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 46996NANDEZ MIL L E R120 14087A JULY 2022 285120 KPG JF WRE WRE JRW (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 SEWER DETAILS STP(UL) -1615(005) CORRESPONDING SHEETS STA 18+25 TO STA 22+50 STA 18+25 TO STA 22+50 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 132 14087A JULY 2022 285132 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 18+25 TO STA 22+50 WEST SIDE WATER LINE EAST SIDE WATER LINE JRW WRE WRE STP(UL) -1615(005) ADDENDUM 4 - SEWER/STORM CLEARANCES JRW KPF 10/11/2022 CORRESPONDING SHEETS STA 22+50 TO STA 27+00 STA 22+50 TO STA 27+00 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 133 14087A JULY 2022 285133 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 22+50 TO STA 27+00 WEST SIDE WATER LINE EAST SIDE WATER LINE JRW WRE WRE STP(UL) -1615(005) ADDENDUM 4 - SEWER/STORM CLEARANCES JRW KPF 10/11/2022 STA 27+00 TO STA 31+00 STA 27+00 TO STA 29+00 STA 0+00 TO STA 1+59 CORRESPONDING SHEETS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 134 14087A JULY 2022 285134 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 27+00 TO STA 31+00 WEST SIDE WATER LINE EAST SIDE WATER LINE JRW WRE WRE STP(UL) -1615(005) S TOBIN ST - CROSSING PROFILE ADDENDUM 4 - SEWER/STORM PIPE PROFILE CLEARANCES JRW KPF 10/11/2022 STA 39+00 TO STA 42+15 STA 0+00 TO STA 0+56 STA 0+00 TO STA 1+49STA 0+00 TO STA 0+60 STA 0+00 TO STA 0+75 CORRESPONDING SHEETS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 136 14087A JULY 2022 285136 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 39+00 TO STA 42+50 & CROSSINGS WEST SIDE WATER LINE JRW WRE WRE STP(UL) -1615(005) STA 18+40 - CROSSING PROFILE S 2ND ST - CROSSING PROFILE SW VICTORIA ST - CONNECTION PROFILE WEST SIDE WATER LINE - CONNECTION PROFILE ADDENDUM 4 - SEWER/STORM PIPE PROFILE CLEARANCES JRW KPF 10/11/2022 STA 0+00 TO STA 4+28 STA 0+00 TO STA 1+26 STA 0+00 TO STA 0+40 STA 0+00 TO STA 0+39 STA 0+00 TO STA 0+43 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 137 14087A JULY 2022 285137 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF CROSSINGS JRW WRE WRE STP(UL) -1615(005) AIRPORT WAY AND RAINIER AVE S - SOUTHEAST CORNER CONNECTION PROFILE HAYES PL SW - CONNECTION PROFILE STA 14+40 - CONNECTION PROFILE STA 15+20 - CONNECTION PROFILE STA 21+00 - CONNECTION PROFILE ADDENDUM 4 - SEWER/STORM PIPE PROFILE CLEARANCES JRW KPF 10/11/2022 STA 0+00 TO STA 0+88STA 0+00 TO STA 0+90STA 0+00 TO STA 1+47 STA 0+00 TO STA 0+38 STA 0+00 TO STA 0+65 STA 0+00 TO STA 0+51STA 0+00 TO STA 0+60 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTRPRF02.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A Y MO N D WUWATER PROFILE 138 14087A JULY 2022 285138 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF CROSSINGS JRW WRE WRE STP(UL) -1615(005) RENTON AVE EXT - CONNECTION PROFILE STA 34+30 - CONNECTION PROFILE NW 3RD PL - CONNECTION PROFILE STA 21+55 - CONNECTION PROFILE STA 30+50 - CONNECTION PROFILE STA 36+95 - CONNECTION PROFILESTA 20+25 - CONNECTION PROFILE ADDENDUM 4 - SEWER/STORM PIPE PROFILE CLEARANCES JRW KPF 10/11/2022 RAINIER AVE S CORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES TREE GRATE SCHEDULE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NGU Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHI N GTONLAND S CAP E A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 251 285 JULY 2022 14087A 251 STA 15+00 TO STA 18+25 URBAN DESIGN PLAN PLAN HF PN PN STP(UL) -1615(005)