HomeMy WebLinkAboutPN_Lindahl, Kevin (Beck Byus) Pile Repair Estimate (Renton)_8.4.22_v1PROJECT PROPOSAL PREPARED FOR: KEVIN LINDAHL PROJECT DESCRIPTION: SLEEVE RESTORE EXISTING WOOD MOORAGE PILING(S). PROJECT LOCATED ON LAKE WASHINGTON (CITY OF RENTON). ALL REQUIRED CITY/STATE PERMITS WILL BE PROVIDED. PROJECT CONTACT/LOCATION: MR. KEVIN LINDAHL/BECKY BYUS 3719 LAKE WASHINGTON BLVD N RENTON, WA 98056 RABYUS@COMCAST.NET (425) 260-1979 SUBMITTED: JUNE 27, 2021 COMPANY INFORMATION BUSINESS NAME: LAKESIDE CONSTRUCTION, INC. BUSINESS ADDRESS: P.O. BOX 525 ISSAQUAH, WA 98027 (206) 850-0250 CONTRACTORS INFORMATION: #LAKESC*911MT COMPANY UBI NUMBER: #602-126-641 BOND/INSURANCE CARRIER: RYEN MARINE INSURANCE GROUP, INC. 221 S OCEAN DRIVE, SUITE C FORT PIERCE, FL 34949 TEL: 772-242-1045 FAX: 772-934-3712 2. RECOMMENDATIONS LCI recommends that the damaged piling(s) be permanently restored with an extremely long lasting sleeve method. The upper section of the pile will be removed and a high-density polyethylene (HDPE) tube will be fitted in place. The tube extends from near the lakebed to the support beam underneath the dock. It is then reinforced, the water is drained, and it is then filled with concrete (see photo and diagram). This repair method is very attractive, environmentally friendly, and will last for decades. 3. PROJECT PHASES PHASE I: Permit Preparation and Submittal START DATE: Upon receipt of signed proposal DURATION: 7 days (off-site) 1. Conduct site visit to gather all property, structure, and habitat data. 2. Prepare drawings and submit city and state permit application forms. Included: City/County Shoreline Exemption and a formal Building Permit; and a Dept. of Fish & Wildlife Hydraulic Project Approval (HPA). 3. Monitor permit status and fulfill any additional agency requests. 4. Brief employees and schedule project review. 5. Schedule and attend pre-construction inspection. 6. Order any custom and/or special order material. 4. PHASE II: Demolition and Piling Restoration START DATE: Within two weeks of permit issuance DURATION: 5 days 1. Mobilize, position, and secure portable barge and support vessels at project site. 2. Remove any subsurface debris, framing, etc. that may interfere with the pile restoration process. 3. Sleeve restore damaged moorage piles using 32.5 wall HDPE (EPA approved) tubing, galvanized hardware, and quick-set mortar. 4. Install conical cap and moorage cleats (if desired). 6. Thoroughly hose and clean project site. 7. Remove all tools and equipment. 8. Schedule final building permit sign-off. 5. PROJECT TOTALS ON-SITE PROJECT DURATION: 1-2 days PILE SLEEVING (2):$ 5,775.00 PERMITS: $ Client PAYMENT SCHEDULE PAYMENT 1: 50% construction deposit at signing. PAYMENT 2: Balance upon construction completion. Please note that some variables may affect the total overall cost of the project. Although unlikely, unforeseen conditions such as variations in the lakebed, subsurface debris, addition or removal of accessories, electrical outlet and lighting options, design alterations, and permitting requirements can possibly raise the final cost of the project. Any changes will be brought to the attention and approved by the owners. Customer Approval: ____________ Date:_____ Lakeside Construction: ____________ Date: _____ 6.