HomeMy WebLinkAboutP_SRTC_Updated_Site_Plan_for_Additional_Demo_221020_v22022-07-22 N:\2022\20220055_Sound_Transit_Renton_Soil_RA\I_Graphics\I-1_GIS\Native_File.mxd ERRG-Martinez cimusSite Boundary
Parcel Boundary
Monitoring Well Location (July 2021)
Soil Sampling Location (July 2021)
Probe Designation and Approximate Location (Feb 2018)
Approximate Hotspot Excavation Area (20 x 20 foot area, not shown to scale)
Approximate Biostimulation Compound Injection Area
Approximate Excavation and Biostimulation Application Area
Remedial Action Designation
Surveyed Existing Monitoring Well Location
A B C Former Buildings
Approximate Extent of Additional Work Area
Modified extent of concrete/metal structures removal in Area 2 approved by Sound Transit via RFI #15
Proposed modified extent of concrete/metal structures removal near Area 1
Figure 1. Additional Work Figures
Sound Transit S Renton Transit Center Remediatioin Project750 Rainier Ave S, Renton, Washington
2
Sourced from: Sound Transit / Shannon & Wilson, Inc.