HomeMy WebLinkAboutAddendum No. 7Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
Page 1 of 4
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
ADDENDUM NO. 7
Federal Aid Number: STPUL-1615(005)
TIB Number: 8-1-102(038)-1
City Project Number: TED4003813
CAG 22-163
DATE OF ADDENDUM ISSUE: October 26, 2022
DUE DATE FOR BIDS: November 1, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
DATE OF BID OPENING: November 3, 2022 (CHANGED FROM DATE IN CALL FOR BIDS)
NOTE TO ALL PLANHOLDERS:
This Addendum No. 7, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 7 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
PROJECT PROPOSAL
1.DELETE sheets 39-40 of the Proposal Signature Pages and replace with attached sheets 39-40
of the Proposal Signature pages Revisions include:
Update number of Addendum date of receipt signature lines.
BID PROPOSAL
2.DELETE Proposal Schedule A (Pages 13-19) and REPLACE with attached Proposal (Pages 13-19).
Revisions include:
Revise quantity Bid item A27 Crushed Surfacing Base Course, 9100 TON
Revise quantity Bid item A46 Ductile Iron Storm Sewer Pipe 8 In. Diam., 190 LF
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
Page 2 of 4
Revise quantity Bid item A56 Catch Basin Type 1, 41 EA
Addition of new Bid item A63 Shallow Concrete Inlet with Fluted Grate, 2 EA
Revise quantity now Bid item A65 Storm Rectangular Solid Metal Cover, 7 EA
Revise quantity now Bid item A76 Topsoil Type A, 1690 CY
Revise quantity now Bid item A77 Bark or Wood Chip Mulch, 340 CY
Revise quantity now Bid item A82 PS Quercus frainetto 'Schmidt'/ Forest Green Oak; 2.5" Cal.,
12'-14' Ht., 10 EA
Revise quantity now Bid item A94 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont., 127 EA
Revise quantity now Bid item A95 PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig Dogwood; 2 Gal.
Cont., 510 EA
Revise quantity now Bid item A99 PS Hemericalis 'Stella de Oro'/ Stella de Oro Daylily; 1 Gal.
Cont., 317 EA
Revise quantity now Bid item A103 PS Epimedium x perralchicum 'Frohnleiten'/ Frohnleiten
Barrenwort; 1 Gal. Con., 1250 EA
Addition of new Bid item A116 Cement Conc. Valley Gutter, 60 LF
Revise quantity now Bid item A118 Cement Conc. Driveway Entrance, 2170 SY
Revise quantity now Bid item A124 Cement Conc. Sidewalk, 5230 SY
Revise schedule A Bid item numbers following new items A63 and A116 to renumber bid items
for Schedule A.
3. DELETE Proposal Schedule D (Pages 23-25) and REPLACE with attached Proposal (Pages 23-25).
Revisions include:
Revise quantity Bid item D13 Sand Bedding Incl. Haul for Joint Utility Trench, 2000 TN
Revise quantity Bid item D14 Controlled Density Fill Incl. Haul, for Joint Utility Trench, 300 CY
Revise quantity Bid item D15 Install 2" Diameter Conduit - PSE Power, 350 LF
Revise quantity Bid item D16 Install 3" Diameter Conduit - PSE Power, 2600 LF
Revise quantity Bid item D17 Install 4” Diameter Conduit – PSE Power, 8000 LF
Revise quantity Bid item D18 Install 6" Diameter Conduit - PSE Power, 5500 LF
Revise bid item name D19 Install 4” Fiber Optic Conduit – PSE Power
Revise quantity Bid item D30 Install 2" Diameter Conduit - Comcast, 420 LF
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
Page 3 of 4
Revise quantity Bid item D31 Install 4" Diameter Conduit - Comcast, 8900 LF
Revise quantity Bid item D37 Install 4" Diameter Conduit - Centurylink, 22400 LF
PLANS
4. DELETE Plan Sheets 60, 82, 92, 105, 109, 123, 145, 146, 154, 160, 167, 188, 198, 200-210, 213,
221, 240, 248, 252, 265 and REPLACE with attached Plan Sheets 60, 82, 92, 105, 109, 123, 145,
146, 154, 160, 167, 188, 198, 200-210, 213, 221, 240, 248, 252, 265. Revisions include:
Driveway updates at Parcel 23
New Valley Gutter detail and Shallow Inlet Detail sheet 105 for Parcel 23 driveway revisions
JUT section revisions
Luminaire schedule revisions for foundation depths
SPECIAL PROVISIONS
5. Revise the Special Provision Section 7-05 MANHOLES, INLETS, CATCH BASINS, and
DRYWELLS (Page SP-161) as follows:
Revise the section 7-05.4 Measurement to add the following after the second paragraph:
Measurement for “Shallow Concrete Inlet with Fluted Grate” will be per each.
Revise the section 7-05.5 Payment to add the following after the eighth paragraph:
“Shallow Concrete Inlet with Fluted Grate”, per each.
6. Revise the Special Provision Section 8-04 CURBS, GUTTERS, AND SPILLWAYS (Page SP-
245 to SP-246) as follows:
Revise the section 8-04.1 Description as follows:
This Work shall also include installation of Cement Concrete Extruded Curb Type 6 and cement
concrete valley gutter per the detail shown and at the locations shown on the Plans.
Revise the section 8-04.4 Measurement to add the following after the last paragraph:
Cement Concrete Valley Gutter shall be measured per linear foot of installed curb, including rebar.
Revise the section 8-04.5 Payment to add the following after the last paragraph:
“Cement Conc. Valley Gutter” per linear foot.
The unit Contract price for “Modified Cement Concrete Extruded Curb, Type 6”, “Cement Conc.
Valley Gutter’’, shall be full compensation for all costs necessary and incidental to completely
install curbs to lines and grades specified on the Plans, including but not limited to forming, form
adjustments, procuring and pouring concrete, joint materials, finishing, curing, and stripping
forms.
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
Page 4 of 4
7.Revise the Special Provision Section 8-35.4 Measurement (Page SP-313) as follows:
Revise the following sixth paragraph:
“Install __” Diameter Fiber Optic Conduit – [Utility Owner]” shall be measured and paid per linear
foot of cable installed when the conduit is furnished by Others. The Contractor shall keep record
for which utility the installed conduit will be used by.
8.Revise the Special Provision Section 8-35.5 Payment (Page SP-313) as follows:
“Install __” Diameter Fiber Optic Conduit – [Utility Owner]” per linear foot.
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
Robert M. Hanson, P.E.
Transportation Design Manager
City of Renton
Receipt acknowledged, and conditions agreed to this _____ day of ________, 2022
Bidder _______________________________
Signature
for
Contract Documents Page 39
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
PROPOSAL SIGNATURE PAGE
By signing below, Bidder acknowledges receipt and understanding of the following Addenda to
the Bid Documents:
Addendum No.
Date of Receipt
Addendum
No.
Date of Receipt
1 6
2 7
3 8
4 9
5 10
NOTE: A Proposal may be considered irregular and may be rejected if the receipt of Addenda is not
acknowledged.
The Bidder is hereby advised that by signature of this proposal, he/she is deemed to have
acknowledged all requirements and signed all certificates contained herein.
_________________________________________ ____________________________________
[Signature of Authorized Official] * [Business Name]
_________________________________________ ____________________________________
[Printed Name] [Address Line 1]
_________________________________________ ____________________________________
[Title] [Address Line 2]
_________________________________________ ____________________________________
[Date] [Telephone Number]
*NOTE: Evidence of the signatory’s authority to sign the Proposal on behalf of the business entity shall
be submitted with the Bid. Otherwise, the submitted Bid will be considered irregular and non-
responsive and the Bid will be rejected.
NOTE: The address and phone number listed will be used for all communications regarding this Proposal.
Contract Documents Page 40
Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7
Type of business entity (e.g. corporation, partnership, etc.):
_________________________________________________________
State of Incorporation, or State where business entity was formed:
_________________________________________________________
WA State Contractor’s Registration # ____________________________________________
UBI # ____________________________________________
Industrial Insurance Account # ____________________________________________
Employment Security Department # ____________________________________________
State Excise Tax Registration # ____________________________________________
DUNS # ____________________________________________
The Surety Company which will furnish the required Contract Bond is:
_________________________________________ ____________________________________
[Surety] [Address Line 1]
_________________________________________ ____________________________________
[Telephone Number] [Address Line 2]
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$
A2 1-05 Roadway Surveying 1 LS $ $
A3 1-05 ADA Features Surveying 1 LS $ $
A4 1-05 Record Drawings (Minimum Bid $25,000) 1 LS $ $
A5 1-07 SPCC Plan 1 LS $ $
A6 1-07 Training 2400 HR $ $
A7 1-08 Type B Progress Schedule (Minimum Bid $15,000) 1 LS $ $
A8 1-09 Mobilization 1 LS $ $
A9 1-09 Field Office Building 1 LS $ $
A10 1-10 Project Temporary Traffic Control 1 LS $ $
A11 1-10 Business Access Signs 40 EA $ $
A12 1-10 Project Identification Signs 2 EA $ $
A13 1-10 Traffic Control Supervisor 1 LS $ $
A14 1-10 Flaggers 17600 HR $ $
A15 1-10 Other Traffic Control Labor 2000 HR $ $
A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $ $
A17 2-01 Clearing and Grubbing 1 LS $ $
A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$
A19 2-02 Removal of Structures and Obstructions 1 LS $ $
A20 2-03 Roadway Excavation Incl. Haul 14970 CY $ $
A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $ $
A22 2-03 Gravel Borrow Inc. Haul 2350 CY $ $
A23 2-05
Petroleum Contaminated Excavation and Disposal
Incl. Haul 1 EST 172,000.00$ 172,000.00$
A24 2-05
Contaminated Groundwater Treatment and
Disposal 1 EST 200,000.00$ 200,000.00$
A25 2-09 Controlled Density Fill 800 CY $ $
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 13
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A26 2-12 Construction Geotextile for Separation 16560 SY $ $
A27 4-04 Crushed Surfacing Base Course 9100 TON $ $
A28 5-04 Commercial HMA 960 TON $ $
A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $ $
A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $ $
A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $ $
A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $ $
A33 5-04 Planing Bituminous Pavement 23100 SY $ $
A34 5-04 Temporary Pavement 2860 TON $ $
A35 5-04 Asphalt Price Cost Adjustment 1 CALC 199,200.00$ 199,200.00$
A36 5-05 Reinforced Cement Concrete Pavement 110 CY $ $
A37 5-05 Cement Concrete Pavement for Driveway 50 CY $ $
A38 5-05 River Rock Treatment 360 SY $ $
A39 6-02 Cement Conc. Switchback Ramp 1 LS $ $
A40 6-11 Cement Concrete Fill Wall 10 CY $ $
A41 6-11 Concrete Cast in Place Wall 10 CY $ $
A42 6-13 Modular Block Wall 790 SF $ $
A43 6-21 Pedestrian Railing 80 LF $ $
A44 6-32 Handrail 100 LF $ $
A45 7-01 Underdrain Pipe 8 In. Diam. 140 LF $ $
A46 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 190 LF $ $
A47 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 680 LF $ $
A48 7-04 Ductile Iron Storm Sewer Pipe 18 In. Diam. 130 LF $ $
A49 7-04 PVC Storm Sewer Pipe 6 In. Diam. 280 LF $ $
A50 7-04 PVC Storm Sewer Pipe 8 In. Diam. 150 LF $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 14
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A51 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $ $
A52 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 980 LF $ $
A53 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $ $
A54 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $ $
A55 7-04 Temporary Stormwater Diversion 1 LS $ $
A56 7-05 Catch Basin Type 1 41 EA $ $
A57 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $ $
A58 7-05 Catch Basin Type 1L 9 EA $ $
A59 7-05 Catch Basin Type 2 48 In. Diam. 43 EA $ $
A60 7-05 Catch Basin Type 2 54 In. Diam. 2 EA $ $
A61 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ $
A62 7-05 Catch Basin Type 2 72 In. Diam. 2 EA $ $
A63 7-05 Shallow Concrete Inlet with Fluted Grate 2 EA $ $
A64 7-05 Storm Round Frame and Cover 26 EA $ $
A65 7-05 Storm Rectangular Solid Metal Cover 7 EA $ $
A66 7-05 Adjust Storm Drainage Structure 21 EA $ $
A67 7-05 Connect to Existing Drainage Structures 11 EA $ $
A68 7-06 Filterra Unit 12 EA $ $
A69 7-06 Filterra Unit with Internal Bypass 2 EA $ $
A70 7-06 Filterra Unit with Peak Diversion 1 EA $ $
A71 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $ $
A72 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$
A73 7-08 Television Inspection 1 LS $ $
A74 7-10 Bioretention Planter 1 LS $ $
A75 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 15
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A76 8-02 Topsoil Type A 1690 CY $ $
A77 8-02 Bark or Wood Chip Mulch 340 CY $ $
A78 8-02 Coarse Compost 40 CY $ $
A79 8-02 Bioretention Media 190 CY $ $
A80 8-02 Seeded Lawn Installation 2310 SY $ $
A81 8-02
PS Tilia tomentosa 'PNI 6051'/ Green Mountain
Linden; 2.5" Cal., 12'-14' Ht.13 EA $ $
A82 8-02
PS Quercus frainetto 'Schmidt'/ Forest Green Oak;
2.5" Cal., 12'-14' Ht.10 EA $ $
A83 8-02
PS Parrotia persica 'Inge's Ruby Vase'/ Ruby Vase
Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $ $
A84 8-02
PS Nyssa sylvatica 'David Odom'/ Afterburner
Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $ $
A85 8-02
PS Cercidiphyllum japonicum/ Katsura Tree; 2.5"
Cal., 12'-14' Ht.2 EA $ $
A86 8-02
PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'-
12' Ht. 1 EA $ $
A87 8-02
PS Malus 'Golden Raindrops'/ Golden Raindrops
Crabapple; 2" Cal., 10'-12' Ht. 6 EA $ $
A88 8-02 PS Calocedrus decurrens/ Incense Cedar; 7'-8' Ht. 3 EA $ $
A89 8-02
PS Cornus kousa x nuttallii ' KN4-43'/ Starlight
Dogwood; 2" Cal., 10'-12' Ht. 11 EA $ $
A90 8-02
PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak
Japanese Barberry; 2 Gal, Cont. 188 EA $ $
A91 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $ $
A92 8-02
PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2
Gal. Cont. 138 EA $ $
A93 8-02
PS Euonymus japonicus 'Microphyllus'/ Boxleaf
Euonymus; 2 Gal. Cont. 435 EA $ $
A94 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 127 EA $ $
A95 8-02
PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig
Dogwood; 2 Gal. Cont. 510 EA $ $
A96 8-02
PS Rosa x 'NOATRAUM'/ Flower Carpet Pink
Groundcover Rose; 2 Gal. Cont. 26 EA $ $
A97 8-02
PS Nassella tenuissima/ Mexican Feather Grass; 1
Gal Cont.554 EA $ $
A98 8-02
PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl
Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $ $
A99 8-02
PS Hemericalis 'Stella de Oro'/ Stella de Oro
Daylily; 1 Gal. Cont. 317 EA $ $
A100 8-02
PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal.
Cont. 413 EA $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 16
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A101 8-02
PS Polystichum munitum/ Western Sword Fern; 1
Gal. Cont. 192 EA $ $
A102 8-02
PS Cotoneaster dammeri 'Eichholz'/ Eichholz
Coteoneater; 1 Gal. Cont. 35 EA $ $
A103 8-02
PS Epimedium x perralchicum 'Frohnleiten'/
Frohnleiten Barrenwort; 1 Gal. Con. 1250 EA $ $
A104 8-02
PS Veronica peduncularis 'Georgia Blue'/ Georgia
Blue Speedwell; 1 Gal. Cont. 380 EA $ $
A105 8-02
PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal.
Cont. 210 EA $ $
A106 8-02
PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal.
Cont. 210 EA $ $
A107 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $ $
A108 8-02 Protection of Private Property and Tree Protection 1 LS $ $
A109 8-02 Root Barrier 950 LF $ $
A110 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$
A111 8-02 Plant Establishment - 1 Year 1 LS $ $
A112 8-03 Automatic Irrigation System, Complete 1 LS $ $
A113 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $ $
A114 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $ $
A115 8-04 Extruded Curb 2420 LF $ $
A116 8-04 Cement Conc. Valley Gutter 60 LF $ $
A117 8-05 Wheel Stop 44 EA $ $
A118 8-06 Cement Conc. Driveway Entrance 2170 SY $ $
A119 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $ $
A120 8-09 Raised Pavement Marker Type 1 42 HUND $ $
A121 8-09 Raised Pavement Marker Type 2 11 HUND $ $
A122 8-10 Curb Mounted Delineator Post 330 LF $ $
A123 8-13 Adjust Monument Case and Cover 6 EA $ $
A124 8-14 Cement Conc. Sidewalk 5230 SY $ $
A125 8-14 Thickened Edge Sidewalk 320 LF $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 17
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A126 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $ $
A127 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 1 EA $ $
A128 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $ $
A129 8-14
Cement Conc. Curb Ramp, Type Single Direction
A 1 EA $ $
A130 8-14 Cement Conc. Curb Ramp, Type Combination 4 EA $ $
A131 8-14 Detectable Warning Surface 460 SF $ $
A132 8-14 Decorative Concrete Finish 400 SY $ $
A133 8-14 Smooth Cement Conc. Band 80 LF $ $
A134 8-14 Bus Shelter Foundation 2 EA $ $
A135 8-19 Adjust Gas Valve 11 EA $ $
A136 8-20
Modification of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 3rd
Street Intersection, Complete
1 LS $ $
A137 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & S 2nd
Street Intersection, Complete
1 LS $ $
A138 8-20
Portable Temporary Traffic Signal System with
Mast Arm 1 LS $ $
A139 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue S & SW
Victoria Street, Complete
1 LS $ $
A140 8-20
Replacement of Existing Traffic Signal and
Illumination System at Rainier Avenue S & Airport
Way Intersection, Complete
1 LS $ $
A141 8-20
Pedestrian Hybrid Beacon Traffic Signal and
Illumination System at Rainier Avenue N & NW 3rd
Place, Complete
1 LS $ $
A142 8-20 Decorative Illumination System, Complete 1 LS $ $
A143 8-20 Fiber Optic Interconnect System, Complete 1 LS $ $
A144 8-20 5G Small Cell Network Conduit System, Complete 1 LS $ $
A145 8-20 PTZ Camera Systems, Complete 1 LS $ $
A146 8-21 Permanent Signing 1 LS $ $
A147 8-22 Plastic Stop Line 90 LF $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 18
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
A148 8-22 Plastic Crosswalk Line 3250 SF $ $
A149 8-22 Plastic Traffic Arrow 72 EA $ $
A150 8-22 Plastic Traffic Letter 12 EA $ $
A151 8-22 Bicycle Lane Symbol 6 EA $ $
A152 8-22 Plastic Line, 4 In.1250 LF $ $
A153 8-22 Paint Line, 4 In.5680 LF $ $
A154 8-22 Removing Existing Pavement Markings 1 LS $ $
A155 8-23 Temporary Pavement Marking 59000 LF $ $
A156 8-24 Rock Wall 60 SF $ $
A157 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$
A158 8-26 Utility Potholing 220 EA $ $
A159 8-27 Gateway Trellis Relocation 1 LS $ $
A160 8-28 Tree Grate 3 EA $ $
A161 8-30 Waste Receptacle 3 EA $ $
A162 8-31 Bench 2 EA $ $
A163 8-32 Gateway Wall A & B 1 LS $ $
A164 8-33 Bollard 7 EA $ $
Total Schedule A (Roadway Improvements)*$
* All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 19
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
B1 1-04 Minor Change for Water Trench 1 EST 68,000.00$ 68,000.00$
B2 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 54,000.00$ 54,000.00$
B3 2-09 Controlled Density Fill 10 CY $ $
B4 7-08 Shoring or Extra Excavation Class B for Water 1 LS $ $
B5 7-09 Abandon Existing Water System 1 LS $ $
B6 7-09
Ductile Iron Pipe,Class 52, 6-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
50 LF $ $
B7 7-09
Ductile Iron Pipe,Class 52, 8-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
350 LF $ $
B8 7-09
Ductile Iron Pipe,Class 52, 10-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
100 LF $ $
B9 7-09
Ductile Iron Pipe,Class 52, 12-inch Diam. Water
Pipe and Restrained-Joint Fittings and
Polyethylene Encasement
5160 LF $ $
B10 7-09 Bank Run Gravel for Trench Backfill Water 6140 TON $ $
B11 7-09
Removal and Replacement of Unsuitable
Foundation Material 770 TON $ $
B12 7-09 Connection to Existing Water Main, 6 In. 1 EA $ $
B13 7-09 Connection to Existing Water Main, 8 In. 5 EA $ $
B14 7-09 Connection to Existing Water Main, 10 In. 4 EA $ $
B15 7-09 Connection to Existing Water Main, 12 In. 5 EA $ $
B16 7-09
Concrete for Thrust Blocking and Dead-Man
Anchor Block 90 CY $ $
B17 7-11
Corrosion Protection, Pipe Joint-Bonding, Anodes,
Test Stations 1 LS $ $
B18 7-12 Furnish and Install 6 In. Gate Valve Assembly 1 EA $ $
B19 7-12 Furnish and Install 8 In. Gate Valve Assembly 8 EA $ $
B20 7-12 Furnish and Install 10 In. Gate Valve Assembly 4 EA $ $
PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4 Page 20
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
B21 7-12 Furnish and Install 12 In. Gate Valve Assembly 22 EA $ $
B22 7-12 Adjust Existing Water Valve Box 16 EA $ $
B23 7-12 Adjust Existing Water Manhole 1 EA $ $
B24 7-12
Furnish and Install Comb. Air/Vacuum Valve
Assembly 2 In.2 EA $ $
B25 7-14 Furnish and Install Fire Hydrant Assembly 25 EA $ $
B26 7-14 Remove and Salvage Hydrant 21 EA $ $
B27 7-15 Furnish and Install 1" Water Service Connection 25 EA $ $
B28 7-15 Furnish and Install 1.5" Water Service Connection 4 EA $ $
B29 7-15 Furnish and Install 2" Water Service Connection 2 EA $ $
B30 7-16 Temporary Water Bypass System, Complete 1 LS $ $
B31 8-26
Resolution of Utility Conflicts with New Water
Mains 1 EST 45,000.00$ 45,000.00$
Schedule B Subtotal $
Schedule B Sales Tax (10.1%)$
Schedule B (Water Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule B Contract price per Section 1-
07.2(2) and WAC 458-20-170.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4 Page 21
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
C1 1-04 Minor Change for Sewer Trench 1 EST 30,000.00$ 30,000.00$
C2 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 24,000.00$ 24,000.00$
C3 7-05 Sanitary Sewer Manhole 18 EA $ $
C4 7-05 Drop Manhole Connection 1 EA $ $
C5 7-05 Adjust Sewer Manhole 3 EA $ $
C6 7-08 Shoring or Extra Excavation Class B for Sewer 1 LS $ $
C7 7-17 PVC Sanitary Sewer Pipe 6 In. Diam. 106 LF $ $
C8 7-17 PVC Sanitary Sewer Pipe 8 In. Diam. 1160 LF $ $
C9 7-17 PVC Sanitary Sewer Pipe 12 In. Diam. 70 LF $ $
C10 7-17 Bank Run Gravel for Trench Backfill Sewer 4020 TON $ $
C11 7-17
Removal and Replacement of Unsuitable Foundation
Material 550 TON $ $
C12 7-19 Sewer Cleanout 6 EA $ $
C13 7-21
Furnish and Install 8 In. Diam. CIPP for Sanitary
Sewer 2040 LF $ $
C14 7-21
Furnish and Install 12 In. Diam. CIPP for Sanitary
Sewer 450 LF $ $
C15 8-26 Resolution of Utility Conflicts for Sewer 1 EST 20,000.00$ 20,000.00$
Schedule C Subtotal $
Schedule C Sales Tax (10.1%)$
Schedule C (Sewer Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule C Contract price per Section 1-
07.2(2) and WAC 458-20-170.
PROPOSAL (BID SCHEDULE C - SEWER IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform
thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 22
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
D1 1-04 Minor Change for Joint Utility Trench 1 EST 64,000.00$ 64,000.00$
D2 1-05 Roadway Surveying 1 LS $ $
D3 1-09 Mobilization 1 LS $ $
D4 2-02 Remove/Abandon Existing Gas Main 960 LF $ $
D5 2-03 Unsuitable Foundation Excavation Incl. Haul 110 CY $ $
D6 2-03 Gravel Borrow Incl. Haul 2700 CY $ $
D7 2-05
Petroleum Contaminated Excavation and Disposal
Including Haul 1 EST 53,000.00$ 53,000.00$
D8 2-09
Structure Excavation Class B Incl. Haul for Joint
Utility Trench 4110 CY $ $
D9 7-08
Shoring or Extra Excavation Class B for Joint Utility
Trench 1 LS $ $
D10 8-26 Resolution of Utility Conflicts for Joint Utility Trench 1 EST 42,000.00$ 42,000.00$
D11 8-35 Removal of Structure and Obstruction 1 LS $ $
D12 8-35 Franchise Utility Coordination 1 LS $ $
D13 8-35 Sand Bedding Incl. Haul for Joint Utility Trench 2000 TN $ $
D14 8-35
Controlled Density Fill Incl. Haul, for Joint Utility
Trench 300 CY $ $
D15 8-35 Install 2" Diameter Conduit - PSE Power 350 LF $ $
D16 8-35 Install 3" Diameter Conduit - PSE Power 2600 LF $ $
D17 8-35 Install 4" Diameter Conduit - PSE Power 8000 LF $ $
D18 8-35 Install 6" Diameter Conduit - PSE Power 5500 LF $ $
D19 8-35 Install 4" Fiber Optic Conduit - PSE Power 2300 LF $ $
D20 8-35 Install Handhole (32"x44") - PSE 4 EA $ $
D21 8-35 Install Handhole (30"x30") - PSE 1 EA $ $
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 23
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
D22 8-35 Install Handhole (23.25"X32.75") - PSE 3 EA $ $
D23 8-35 Install Minipad Transformer (48"x42") - PSE 2 EA $ $
D24 8-35 Install Three Phase Transformer (70"X136") - PSE 4 EA $ $
D25 8-35 Install Three Phase Transformer (56"X66") - PSE 1 EA $ $
D26 8-35 Install Three Phase Junction Box - PSE 9 EA $ $
D27 8-35 Install Three Phase Underground Transformer 1 EA $ $
D28 8-35 Install Pull Vault - PSE 4 EA $ $
D29 8-35 Install Fiber Vault (27"X62.5") - PSE 3 EA $ $
D30 8-35 Install 2" Diameter Conduit - Comcast 420 LF $ $
D31 8-35 Install 4" Diameter Conduit - Comcast 8900 LF $ $
D32 8-35 Install Handhole - Comcast 1 EA $ $
D33 8-35 Install 14"x21" Vault - Comcast 1 EA $ $
D34 8-35 Install 17"x30" Vault - Comcast 7 EA $ $
D35 8-35 Install 24"x36" Vault - Comcast 17 EA $ $
D36 8-35 Install 24"x24" Pedestal - Comcast 1 EA $ $
D37 8-35 Install 4" Diameter Conduit - Century Link 22400 LF $ $
D38 8-35 Install 3048 Handhole - Century Link 2 EA $ $
D39 8-35 Install 25-TA Vault - Century Link 5 EA $ $
D40 8-35 Install 264-TA Vault - Century Link 3 EA $ $
D41 8-35 Install 467-TA Vault - Century Link 5 EA $ $
D42 8-35 Install 38Y-612 Base-Military Vault - Century Link 1 EA $ $
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 24
October 2022
ADDENDUM NO. 7
Item
No.
Spec.
Section Description Quantity Unit Unit Price* Amount
PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS)
Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL)
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly
legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs
between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected
to conform thereto.
D43 8-35 Install 96-612-7-TA Vault - Century Link 1 EA $ $
D44 8-35 Install Pro 6 Pedestal - Century Link 1 EA $ $
Schedule D Subtotal $
Schedule D Sales Tax (10.1%)$
Schedule D (Joint Utility Trench Improvements)*$
* The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule D Contract price per Section 1-
07.2(2) and WAC 458-20-170.
Contract Documents
Rainier Ave S Corridor Improvements - Phase 4
Page 25
October 2022
RAINIER AVE S
S 2ND STBIG ISLAND POKE
TACO
TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
CITY OF
SEATTLE
TWENTY X LLC
CITY OF
SEATTLE
METRO PCS AUTOZONESOUTH LAKE
EUROPEAN
GENERAL CONSTRUCTION NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETS
LEGEND
FLOW LINE POINTS
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-RD01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
60 285
JULY 2022
14087A
60
STA 18+25 TO STA 22+50
ROADWAY PLAN
PLAN
KPF
KPF
DPY
STP(UL) -1615(005)
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S
BIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN AUTOZONE
TACO TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
S 2ND ST CONSTRUCTION NOTES
CORRESPONDING SHEETS LEGEND
GENERAL DRAINAGE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SDPLN01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
46996NANDEZ MIL
L
E
RJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
82 285
JULY 2022
14087A
82
STA 18+25 TO STA 22+50
DRAINAGE PLAN
PLAN
WRE
KDP
KDP
STP(UL) -1615(005)
ADDENDUM 4 - STORM PIPE MATERIAL CHANGE FOR CLEARANCE JRW KPF 10/11/2022
ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 KDP KPF 10/24/2022
CORRESPONDING SHEETS
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SDPRF01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
46996NANDEZ MIL
L
E
RDRAINAGE PROFILES
92
14087A
JULY 2022
28592
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF STA 18+25 TO STA 22+50
WEST SIDE PROFILE
EAST SIDE PROFILE
KDP
KDP
WRE
STP(UL) -1615(005)
CB 294 TO CB 446 PROFILE
CB 412 TO CB 411 PROFILE
ADDENDUM 4 - SEWER/STORM/WATER CLEARANCES JRW KPF 10/11/2022
CB 514 TO CB 513 PROFILE
ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 KDP KPF 10/24/2022
14+19 15+16 23+84 25+35
POINT TABLE FOR BIORETENTION BOTTOM AREA
TO
POINT TABLE FOR BIORETENTION BOTTOM AREA
TO
OUTFALL PROTECTION DETAIL VALLEY GUTTER DETAIL
SECTION A-APLAN VIEW
SQUARE CURB INLET
DESIGNATION AVAIL-
ABILITY
MEDIA
BAY
SIZE
VAULT
SIZE
(L x W)
MAX.
OUTLET/BY
PASS
PIPE DIA.
MAX.
BYPASS
FLOW
(CFS)
UNDER-
DRAIN
PIPE DIA.
(PERF)
TREE GRATE
QTY. & SIZE
6 X 4
N/A = NOT AVAILABLE
SHALLOW INLET DETAIL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SDDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
46996NANDEZ MIL
L
E
R105
14087A
JULY 2022
285105
KPG
JF
KTS
KTS
WRE
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
DRAINAGE DETAILS
STP(UL) -1615(005)
BIORETENTION STA. 14+19 TO STA. 15+16 PLAN VIEW BIORETENTION STA. 23+84 TO STA. 25+35 PLAN VIEW
STRUCTURE 56 AND 57 - FILTERRA INTERNAL
BYPASS CURB (FTIBC) CONFIGURATION DETAIL
KDP KPF 10/24/2022ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23
RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS
SOUTH LAKE
EUROPEAN
AUTOZONE
TACO TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
CONSTRUCTION NOTES
CORRESPONDING SHEETS
LEGEND
GENERAL SEWER NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SWR01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
46996NANDEZ MIL
L
E
RJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
109 285
JULY 2022
14087A
109
STA 18+25 TO STA 22+50
SEWER PLAN
PLAN
JRW
WRE
WRE
NOTE
STP(UL) -1615(005)
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S
BIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN
AUTOZONE
TACO TIME VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
S 2ND STGENE MEYER
TOWING
GENERAL WATER NOTES
CONSTRUCTION NOTES
CORRESPONDING SHEETSLEGEND
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-WTR01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
21036793JUSTIN R A YMO
N
D WUJF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
123 285
JULY 2022
14087A
123
STA 18+25 TO STA 22+50
WATER PLAN
PLAN
JRW
WRE
WRE
NOTE
STP(UL) -1615(005)
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S
WALGREENS MIDAS SANSONINA
HERTZ/LYFT WENDY'S
TACO TIME
SAFEWAY
CORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
145 285
JULY 2022
14087A
145
STA 15+00 TO STA 18+25
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
ADDENDUM #7 - JUT REVISIONS DPY KPF 10/24/2022
RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN
AUTOZONE
TACO
TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
CORRESPONDING SHEETS
FRANCHISE UTILITY STRUCTURE SCHEDULE
FRANCHISE UTILITY STRUCTURE SCHEDULE
GENERAL NOTES
CONSTRUCTION NOTES
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUT01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
146 285
JULY 2022
14087A
146
STA 18+25 TO STA 22+50
JOINT UTILITY TRENCH PLAN
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
ADDENDUM #3 - JUT SCHEDULE JC 9/27/22KPF
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S
S 2ND STBIG ISLAND POKE
METRO PCS SOUTH LAKE
EUROPEAN
AUTOZONE
TACO TIME
VACANT
BUDDY'S HOME
FURNISHING
RENTON
VETERINARY
HOSPITAL
GRAVITY
SPORTS
CORRESPONDING SHEETS
PSE LEGEND
CENTURYLINK LEGEND
COMCAST LEGEND
PSE (GAS) LEGEND
GENERAL NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUTSCHEM01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
154 285
JULY 2022
14087A
154
STA 18+25 TO STA 22+50
JOINT UTILITY TRENCH SCHEMATICS
PLAN
DPY
KPF
KPF
STP(UL) -1615(005)
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
TRENCH SECTION A TRENCH SECTION B TRENCH SECTION C TRENCH SECTION D TRENCH SECTION E
TRENCH SECTION F TRENCH SECTION G TRENCH SECTION H TRENCH SECTION I TRENCH SECTION J
TRENCH SECTION K TRENCH SECTION L TRENCH SECTION N TRENCH SECTION O
TRENCH SECTION P TRENCH SECTION Q TRENCH SECTION R TRENCH SECTION S TRENCH SECTION T
TRENCH SECTION M
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-JUTSEC.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JOINT UTILITY TRENCH SECTIONS
160
14087A
JULY 2022
285160
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
KPF
KPF
DPY
STP(UL) -1615(005)
ADDENDUM #7 - JUT REVISIONS DPY KPF 10/24/2022
MODULAR BLOCK WALL AT LUMINAIRE / UTILITY POLE
WITH THICKENED EDGE SIDEWALK
MODULAR BLOCK FILL WALL
CEMENT CONCRETE FILL WALL
REVEAL
LIMITS OF CONCRETE FILL WALL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-WALLDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022167
14087A
JULY 2022
285167
KPG
AEH
KPF
KPF
JF
STP(UL) -1615(005)
14087A
JULY 2022
285167
KPG
AEH
KPF
KPF
JF
WALL DETAILS
14087A
JULY 2022
285167
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
AEH
KPF
KPF
JF
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S
DW39
STA 0+00 TO STA 0+65
DW40
STA 0+00 TO STA 0+65
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
188 285
JULY 2022
14087A
188
RBD
RBD
KPF
STP(UL) -1615(005)
14087A-DWY01.DWG
SEE DRIVEWAY SCHEDULE,
NOTES & DETAILS, SHEETS 198 - 199
DRIVEWAY PLANS & PROFILES
D39 & D40
PLAN
PROFILE PROFILE
D39 AND D40
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE DRIVEWAY SCHEDULE RAINIER AVE DRIVEWAY SCHEDULE
PARKING AND DRIVEWAY PAVEMENT DETAIL
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-DWYDET01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERNEPRFO
E NNALIO
E
S IGS
47649KARINA P . FRA
N
ADATacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022VALUE VALUE DRIVEWAY SCHEDULE & DETAILS
198
14087A
STP(UL) -1615(005)
JULY 2022
285198
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
RBD
RBD
KPF
JF
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022
RAINIER AVE S SW SUNSET BLVDS 3RD ST GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
WIRE NOTES
PLAN
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022ILLUMINATION AND INTERCONNECT PLAN
STA 11+00 TO STA 15+00
200
14087A
JULY 2022
285200
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
JC 10/24/22KPFADDENDUM #7 - LUMINAIRE FOUNDATIONS
RAINIER AVE S
GENERAL NOTES CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
201 285
JULY 2022
14087A
201
STA 15+00 TO STA 18+25
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
ADDENDUM #2 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE S
S 2ND ST CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
GENERAL NOTES
LEGEND
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
202 285
JULY 2022
14087A
202
STA 18+25 TO STA 22+50
ILLUMINATION AND INTERCONNECT PLANJC
PLAN
STP(UL) -1615(005)
EH
DE
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23, LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE S SW VICTORIA STHAY
E
S
PL
S
W
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
203 285
JULY 2022
14087A
203
STA 22+50 TO STA 27+00
ILLUMINATION AND INTERCONNECT PLAN
PLAN
JC
DE
EH
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE S
S TOBIN ST CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
ILLUMINATION AND INTERCONNECT PLAN
STA 27+00 TO STA 31+00
204
14087A
JULY 2022
285204
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
JF
EH
DE
JC
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RENTON AVENUE
EXT
RAINIER AVE N
AIRPORT WAYRAINIER AVE S
CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
205 285
JULY 2022
14087A
205
STA 31+00 TO STA 35+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
FOR LEGEND AND
GENERAL NOTES, SEE
SHEET 204
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE N
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
206 285
JULY 2022
14087A
206
STA 35+50 TO STA 39+00
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE NNW 3RD PLNE
L
S
O
N
P
L
N
W
CONSTRUCTION NOTES
LEGEND
GENERAL NOTES
LUMINAIRE SCHEDULE
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL02.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
207 285
JULY 2022
14087A
STA 39+00 TO STA 43+50
ILLUMINATION AND INTERCONNECT PLAN
207
JC
DE
EH
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
S 3RD ST
CONSTRUCTION NOTES
LEGEND
LUMINAIRE SCHEDULE
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
208 285
JULY 2022
14087A
208
STA 201+50 TO STA 205+00
ILLUMINATION AND INTERCONNECT PLAN
EH
DE
JC
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
AIRPORT WAY
LAKE AVE S CONSTRUCTION NOTES
LUMINAIRE SCHEDULE
LEGEND
GENERAL NOTES
WIRE NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILL03.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022PLAN
JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
209 285
JULY 2022
14087A
209
STA 601+50 TO STA 605+50
ILLUMINATION AND INTERCONNECT PLANJC
DE
EH
STP(UL) -1615(005)
ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF
ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-ILLDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022210
14087A
JULY 2022
285210
KPG
JF
JC
DE (S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
ILLUMINATION DETAILS
PANEL SCHEDULE
S1
RAINIER AVE S RAINIER AVE S RAINIER AVE S
S 3RD STSW SUNSET BLVDS 2ND STSW VICTORIA STPANEL SCHEDULE
S2 S3
PANEL SCHEDULE
ONE-LINE DIAGRAM
STP(UL) -1615(005)
EH
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23, LUMINAIRE FOUNDATIONS JC KPF 10/24/22
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022VALUE VALUE
SIGNALIZATION PLAN
RAINIER AVE S & S 3RD ST NOTES
213
14087A
JULY 2022
285213
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
(S 3RD ST TO NW 3RD PL)
KPG
EH
DE
JC
JF
CONSTRUCTION NOTESGENERAL NOTES
STP(UL) -1615(005)
WIRE NOTES
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
SIGN SCHEDULE
Rainier Ave S
ADDENDUM #2 - INSTALLATION OF FIBER OPTIC CABLING JC 09/27/22KF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-SIG04_PHASECHANGE.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
R
EGIST E R E D NOTGNI
HSAWFOETAT
SERN EPRFO
E NNALIO
E
S IGS
39324JAN C I GANI
K
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022SIGN SCHEDULE
CONSTRUCTION NOTESWIRE NOTES
900
RAINIER AVE S & AIRPORT WAY NOTESVALUE
221
14087A
VALUE
SIGNALIZATION PLAN
JULY 2022
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
285221
(S 3RD ST TO NW 3RD PL)DE
EH
JC
JF
STP(UL) -1615(005)
SIGNAL POLE EQUIPMENT SCHEDULE
PUSH BUTTON SCHEDULE
GENERAL NOTES
LEGEND
CONCURRENT PHASE SCHEDULE
EVPE SCHEDULE SCHEDULE
VIDEO DETECTION
Rainier Ave S Renton Ave ExtAirport Way
Airport WayRenton Ave Ext
ADDENDUM #2 - INSTALLATION OF FIBER OPTIC CABLING JC 09/27/22KF
ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF
RAINIER AVE S
S 2ND STCORRESPONDING SHEETS
CONSTRUCTION NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-LS01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640COREEN E L I Z A BETH S
CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECT7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
240 285
JULY 2022
14087A
240
STA 18+25 TO STA 22+50
LANDSCAPE PLAN
PLAN
JS
JS
CS
STP(UL) -1615(005)
SEE SHEETS 248 & 249 FOR
LANDSCAPE SCHEDULE, DETAILS
AND GENERAL NOTES
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 JS CS 10/24/2022
GENERAL NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-LSDET.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTON
Tacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640COREEN E L I Z A BETH S
CHMI
DTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECT7 -13-2022248
14087A
JULY 2022
285248
KPG
JF
JS
JS
CS
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
LANDSCAPE NOTES & SCHEDULE
STP(UL) -1615(005)
TREE SCHEDULE PLANTING SCHEDULE
ADDENDUM #7- DRIVEWAY UPDATES AT PARCEL 23 JS CS 10/24/2022
RAINIER AVE S
S 2ND STCORRESPONDING SHEETS
CONSTRUCTION NOTES CONSTRUCTION NOTES
GENERAL NOTES GENERAL NOTES
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-URB01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONPHUONG N. NG
U
Y
E
NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTTacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
252 285
JULY 2022
14087A
252
STA 18+25 TO STA 22+50
URBAN DESIGN PLAN
PLAN
HF
PN
PN
STP(UL) -1615(005)
ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 JS PN 10/24/2022
RAINIER AVE S
S 2ND STCORRESPONDING SHEETS
IRRIGATION LEGEND * PIPE SIZE CHART
NUMBER BY APP.REVISION DESCRIPTION
DRAWN BY:
DESIGN BY:
CHECK BY:
PROJ MGR:
FILE:BY:DATE:
APPROVED FOR CONSTRUCTION
DATE
DRAWING NO.
PROJECT NO.
FED AID NO.
DATE:
SHEET NO.OF
SURVEYED:
14087A-IRR01.dwg
BID
DOCUMENT
Public Works Department
CITY OF RENTONELIZABETH GIB
S
O
NNO. 538 EXP. 0 8 /1 6 /2022STATE O F W A SHI
N
GTONLAND
S
CA P E A R C H ITECTTacoma Wenatchee KPG.com
Seattle
3131 Elliott Avenue, Suite 400
Seattle, WA 98121 206.286.1640
7 -13-2022JF
KPG
(S 3RD ST TO NW 3RD PL)
RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4
265 285
JULY 2022
14087A
265
STA 18+25 TO STA 22+50
IRRIGATION PLAN
PLAN
HF
EG
EG
SEE SHEETS 272 AND 273 FOR
IRRIGATION SCHEDULE, DETAILS
AND GENERAL NOTES
STP(UL) -1615(005)
CONSTRUCTION NOTES
ADDENDUM #7- DRIVEWAY UPDATES AT PARCEL 23 JS LG 10/24/2022