Loading...
HomeMy WebLinkAboutAddendum No. 7Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7 Page 1 of 4 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) ADDENDUM NO. 7 Federal Aid Number: STPUL-1615(005) TIB Number: 8-1-102(038)-1 City Project Number: TED4003813 CAG 22-163 DATE OF ADDENDUM ISSUE: October 26, 2022 DUE DATE FOR BIDS: November 1, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) DATE OF BID OPENING: November 3, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) NOTE TO ALL PLANHOLDERS: This Addendum No. 7, containing the following revisions, additions, deletions, and/or clarifications, is hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall acknowledge receipt and acceptance of this Addendum No. 7 in the space provided on the Proposal Signature Page or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s submittal. PROJECT PROPOSAL 1.DELETE sheets 39-40 of the Proposal Signature Pages and replace with attached sheets 39-40 of the Proposal Signature pages Revisions include: Update number of Addendum date of receipt signature lines. BID PROPOSAL 2.DELETE Proposal Schedule A (Pages 13-19) and REPLACE with attached Proposal (Pages 13-19). Revisions include: Revise quantity Bid item A27 Crushed Surfacing Base Course, 9100 TON Revise quantity Bid item A46 Ductile Iron Storm Sewer Pipe 8 In. Diam., 190 LF Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7 Page 2 of 4  Revise quantity Bid item A56 Catch Basin Type 1, 41 EA  Addition of new Bid item A63 Shallow Concrete Inlet with Fluted Grate, 2 EA  Revise quantity now Bid item A65 Storm Rectangular Solid Metal Cover, 7 EA  Revise quantity now Bid item A76 Topsoil Type A, 1690 CY  Revise quantity now Bid item A77 Bark or Wood Chip Mulch, 340 CY  Revise quantity now Bid item A82 PS Quercus frainetto 'Schmidt'/ Forest Green Oak; 2.5" Cal., 12'-14' Ht., 10 EA  Revise quantity now Bid item A94 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont., 127 EA  Revise quantity now Bid item A95 PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig Dogwood; 2 Gal. Cont., 510 EA  Revise quantity now Bid item A99 PS Hemericalis 'Stella de Oro'/ Stella de Oro Daylily; 1 Gal. Cont., 317 EA  Revise quantity now Bid item A103 PS Epimedium x perralchicum 'Frohnleiten'/ Frohnleiten Barrenwort; 1 Gal. Con., 1250 EA  Addition of new Bid item A116 Cement Conc. Valley Gutter, 60 LF  Revise quantity now Bid item A118 Cement Conc. Driveway Entrance, 2170 SY  Revise quantity now Bid item A124 Cement Conc. Sidewalk, 5230 SY  Revise schedule A Bid item numbers following new items A63 and A116 to renumber bid items for Schedule A. 3. DELETE Proposal Schedule D (Pages 23-25) and REPLACE with attached Proposal (Pages 23-25). Revisions include:  Revise quantity Bid item D13 Sand Bedding Incl. Haul for Joint Utility Trench, 2000 TN  Revise quantity Bid item D14 Controlled Density Fill Incl. Haul, for Joint Utility Trench, 300 CY  Revise quantity Bid item D15 Install 2" Diameter Conduit - PSE Power, 350 LF  Revise quantity Bid item D16 Install 3" Diameter Conduit - PSE Power, 2600 LF  Revise quantity Bid item D17 Install 4” Diameter Conduit – PSE Power, 8000 LF  Revise quantity Bid item D18 Install 6" Diameter Conduit - PSE Power, 5500 LF  Revise bid item name D19 Install 4” Fiber Optic Conduit – PSE Power  Revise quantity Bid item D30 Install 2" Diameter Conduit - Comcast, 420 LF Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7 Page 3 of 4  Revise quantity Bid item D31 Install 4" Diameter Conduit - Comcast, 8900 LF  Revise quantity Bid item D37 Install 4" Diameter Conduit - Centurylink, 22400 LF PLANS 4. DELETE Plan Sheets 60, 82, 92, 105, 109, 123, 145, 146, 154, 160, 167, 188, 198, 200-210, 213, 221, 240, 248, 252, 265 and REPLACE with attached Plan Sheets 60, 82, 92, 105, 109, 123, 145, 146, 154, 160, 167, 188, 198, 200-210, 213, 221, 240, 248, 252, 265. Revisions include:  Driveway updates at Parcel 23  New Valley Gutter detail and Shallow Inlet Detail sheet 105 for Parcel 23 driveway revisions  JUT section revisions  Luminaire schedule revisions for foundation depths SPECIAL PROVISIONS 5. Revise the Special Provision Section 7-05 MANHOLES, INLETS, CATCH BASINS, and DRYWELLS (Page SP-161) as follows: Revise the section 7-05.4 Measurement to add the following after the second paragraph: Measurement for “Shallow Concrete Inlet with Fluted Grate” will be per each. Revise the section 7-05.5 Payment to add the following after the eighth paragraph: “Shallow Concrete Inlet with Fluted Grate”, per each. 6. Revise the Special Provision Section 8-04 CURBS, GUTTERS, AND SPILLWAYS (Page SP- 245 to SP-246) as follows: Revise the section 8-04.1 Description as follows: This Work shall also include installation of Cement Concrete Extruded Curb Type 6 and cement concrete valley gutter per the detail shown and at the locations shown on the Plans. Revise the section 8-04.4 Measurement to add the following after the last paragraph: Cement Concrete Valley Gutter shall be measured per linear foot of installed curb, including rebar. Revise the section 8-04.5 Payment to add the following after the last paragraph: “Cement Conc. Valley Gutter” per linear foot. The unit Contract price for “Modified Cement Concrete Extruded Curb, Type 6”, “Cement Conc. Valley Gutter’’, shall be full compensation for all costs necessary and incidental to completely install curbs to lines and grades specified on the Plans, including but not limited to forming, form adjustments, procuring and pouring concrete, joint materials, finishing, curing, and stripping forms. Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7 Page 4 of 4 7.Revise the Special Provision Section 8-35.4 Measurement (Page SP-313) as follows: Revise the following sixth paragraph: “Install __” Diameter Fiber Optic Conduit – [Utility Owner]” shall be measured and paid per linear foot of cable installed when the conduit is furnished by Others. The Contractor shall keep record for which utility the installed conduit will be used by. 8.Revise the Special Provision Section 8-35.5 Payment (Page SP-313) as follows: “Install __” Diameter Fiber Optic Conduit – [Utility Owner]” per linear foot. ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. Sincerely, Robert M. Hanson, P.E. Transportation Design Manager City of Renton Receipt acknowledged, and conditions agreed to this _____ day of ________, 2022 Bidder _______________________________ Signature for Contract Documents Page 39 Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7           PROPOSAL SIGNATURE PAGE By signing below, Bidder acknowledges receipt and understanding of the following Addenda to the Bid Documents: Addendum No. Date of Receipt Addendum No. Date of Receipt 1 6 2 7 3 8 4 9 5 10 NOTE: A Proposal may be considered irregular and may be rejected if the receipt of Addenda is not acknowledged. The Bidder is hereby advised that by signature of this proposal, he/she is deemed to have acknowledged all requirements and signed all certificates contained herein.       _________________________________________      ____________________________________  [Signature of Authorized Official] * [Business Name]     _________________________________________      ____________________________________  [Printed Name] [Address Line 1]     _________________________________________      ____________________________________   [Title] [Address Line 2]     _________________________________________      ____________________________________   [Date] [Telephone Number] *NOTE: Evidence of the signatory’s authority to sign the Proposal on behalf of the business entity shall be submitted with the Bid. Otherwise, the submitted Bid will be considered irregular and non- responsive and the Bid will be rejected. NOTE: The address and phone number listed will be used for all communications regarding this Proposal. Contract Documents Page 40 Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 7     Type of business entity (e.g. corporation, partnership, etc.): _________________________________________________________  State of Incorporation, or State where business entity was formed: _________________________________________________________  WA State Contractor’s Registration # ____________________________________________ UBI # ____________________________________________ Industrial Insurance Account # ____________________________________________ Employment Security Department # ____________________________________________ State Excise Tax Registration # ____________________________________________ DUNS # ____________________________________________     The Surety Company which will furnish the required Contract Bond is:   _________________________________________      ____________________________________  [Surety] [Address Line 1]     _________________________________________      ____________________________________  [Telephone Number] [Address Line 2]    ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount A1 1-04 Minor Change 1 EST 200,000.00$ 200,000.00$ A2 1-05 Roadway Surveying 1 LS $ $ A3 1-05 ADA Features Surveying 1 LS $ $ A4 1-05 Record Drawings (Minimum Bid $25,000) 1 LS $ $ A5 1-07 SPCC Plan 1 LS $ $ A6 1-07 Training 2400 HR $ $ A7 1-08 Type B Progress Schedule (Minimum Bid $15,000) 1 LS $ $ A8 1-09 Mobilization 1 LS $ $ A9 1-09 Field Office Building 1 LS $ $ A10 1-10 Project Temporary Traffic Control 1 LS $ $ A11 1-10 Business Access Signs 40 EA $ $ A12 1-10 Project Identification Signs 2 EA $ $ A13 1-10 Traffic Control Supervisor 1 LS $ $ A14 1-10 Flaggers 17600 HR $ $ A15 1-10 Other Traffic Control Labor 2000 HR $ $ A16 1-10 Off-Duty Uniformed Police Officer 2300 HR $ $ A17 2-01 Clearing and Grubbing 1 LS $ $ A18 2-01 Roadside Cleanup 1 EST 30,000.00$ 30,000.00$ A19 2-02 Removal of Structures and Obstructions 1 LS $ $ A20 2-03 Roadway Excavation Incl. Haul 14970 CY $ $ A21 2-03 Unsuitable Foundation Excavation Incl. Haul 800 CY $ $ A22 2-03 Gravel Borrow Inc. Haul 2350 CY $ $ A23 2-05 Petroleum Contaminated Excavation and Disposal Incl. Haul 1 EST 172,000.00$ 172,000.00$ A24 2-05 Contaminated Groundwater Treatment and Disposal 1 EST 200,000.00$ 200,000.00$ A25 2-09 Controlled Density Fill 800 CY $ $ Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 13 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A26 2-12 Construction Geotextile for Separation 16560 SY $ $ A27 4-04 Crushed Surfacing Base Course 9100 TON $ $ A28 5-04 Commercial HMA 960 TON $ $ A29 5-04 Fiber Reinforced HMA Cl. 1/2" PG 64-22 8650 TON $ $ A30 5-04 HMA for Shared-Use Path Cl. 1/2" PG 64-22 250 TON $ $ A31 5-04 HMA Cl. 1/2" PG 70-22 6300 TON $ $ A32 5-04 HMA for Preleveling Cl. 1/2" PG 70-22 1200 TON $ $ A33 5-04 Planing Bituminous Pavement 23100 SY $ $ A34 5-04 Temporary Pavement 2860 TON $ $ A35 5-04 Asphalt Price Cost Adjustment 1 CALC 199,200.00$ 199,200.00$ A36 5-05 Reinforced Cement Concrete Pavement 110 CY $ $ A37 5-05 Cement Concrete Pavement for Driveway 50 CY $ $ A38 5-05 River Rock Treatment 360 SY $ $ A39 6-02 Cement Conc. Switchback Ramp 1 LS $ $ A40 6-11 Cement Concrete Fill Wall 10 CY $ $ A41 6-11 Concrete Cast in Place Wall 10 CY $ $ A42 6-13 Modular Block Wall 790 SF $ $ A43 6-21 Pedestrian Railing 80 LF $ $ A44 6-32 Handrail 100 LF $ $ A45 7-01 Underdrain Pipe 8 In. Diam. 140 LF $ $ A46 7-04 Ductile Iron Storm Sewer Pipe 8 In. Diam. 190 LF $ $ A47 7-04 Ductile Iron Storm Sewer Pipe 12 In. Diam. 680 LF $ $ A48 7-04 Ductile Iron Storm Sewer Pipe 18 In. Diam. 130 LF $ $ A49 7-04 PVC Storm Sewer Pipe 6 In. Diam. 280 LF $ $ A50 7-04 PVC Storm Sewer Pipe 8 In. Diam. 150 LF $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 14 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A51 7-04 Polypropylene Storm Sewer Pipe 12 In. Diam. 3570 LF $ $ A52 7-04 Polypropylene Storm Sewer Pipe 18 In. Diam. 980 LF $ $ A53 7-04 Polypropylene Storm Sewer Pipe 24 In. Diam. 360 LF $ $ A54 7-04 Bank Run Gravel for Trench Backfill Storm 7970 TON $ $ A55 7-04 Temporary Stormwater Diversion 1 LS $ $ A56 7-05 Catch Basin Type 1 41 EA $ $ A57 7-05 Catch Basin Type 1 With Beehive Grate 2 EA $ $ A58 7-05 Catch Basin Type 1L 9 EA $ $ A59 7-05 Catch Basin Type 2 48 In. Diam. 43 EA $ $ A60 7-05 Catch Basin Type 2 54 In. Diam. 2 EA $ $ A61 7-05 Catch Basin Type 2 60 In. Diam. 1 EA $ $ A62 7-05 Catch Basin Type 2 72 In. Diam. 2 EA $ $ A63 7-05 Shallow Concrete Inlet with Fluted Grate 2 EA $ $ A64 7-05 Storm Round Frame and Cover 26 EA $ $ A65 7-05 Storm Rectangular Solid Metal Cover 7 EA $ $ A66 7-05 Adjust Storm Drainage Structure 21 EA $ $ A67 7-05 Connect to Existing Drainage Structures 11 EA $ $ A68 7-06 Filterra Unit 12 EA $ $ A69 7-06 Filterra Unit with Internal Bypass 2 EA $ $ A70 7-06 Filterra Unit with Peak Diversion 1 EA $ $ A71 7-08 Shoring or Extra Excavation Class B for Storm 1 LS $ $ A72 7-08 Dewatering 1 EST 800,000.00$ 800,000.00$ A73 7-08 Television Inspection 1 LS $ $ A74 7-10 Bioretention Planter 1 LS $ $ A75 8-01 Erosion/Water Pollution Control 1 EST 120,000.00$ 120,000.00$ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 15 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A76 8-02 Topsoil Type A 1690 CY $ $ A77 8-02 Bark or Wood Chip Mulch 340 CY $ $ A78 8-02 Coarse Compost 40 CY $ $ A79 8-02 Bioretention Media 190 CY $ $ A80 8-02 Seeded Lawn Installation 2310 SY $ $ A81 8-02 PS Tilia tomentosa 'PNI 6051'/ Green Mountain Linden; 2.5" Cal., 12'-14' Ht.13 EA $ $ A82 8-02 PS Quercus frainetto 'Schmidt'/ Forest Green Oak; 2.5" Cal., 12'-14' Ht.10 EA $ $ A83 8-02 PS Parrotia persica 'Inge's Ruby Vase'/ Ruby Vase Persian Ironwood; 2.5" Cal., 12'-14' Ht.11 EA $ $ A84 8-02 PS Nyssa sylvatica 'David Odom'/ Afterburner Tupelo; 2.5" Cal., 12'-14' Ht.21 EA $ $ A85 8-02 PS Cercidiphyllum japonicum/ Katsura Tree; 2.5" Cal., 12'-14' Ht.2 EA $ $ A86 8-02 PS Acer Triflorum/ Foughbark Maple; 2" Cal., 10'- 12' Ht. 1 EA $ $ A87 8-02 PS Malus 'Golden Raindrops'/ Golden Raindrops Crabapple; 2" Cal., 10'-12' Ht. 6 EA $ $ A88 8-02 PS Calocedrus decurrens/ Incense Cedar; 7'-8' Ht. 3 EA $ $ A89 8-02 PS Cornus kousa x nuttallii ' KN4-43'/ Starlight Dogwood; 2" Cal., 10'-12' Ht. 11 EA $ $ A90 8-02 PS Berberis thunbergii 'Royal Cloak'/ Royal Cloak Japanese Barberry; 2 Gal, Cont. 188 EA $ $ A91 8-02 PS Cistus hybridus/ White Rockrose; 2 Gal. Cont. 176 EA $ $ A92 8-02 PS Spiraea betulifolia 'Tor'/ Tor Birchleaf Spirea; 2 Gal. Cont. 138 EA $ $ A93 8-02 PS Euonymus japonicus 'Microphyllus'/ Boxleaf Euonymus; 2 Gal. Cont. 435 EA $ $ A94 8-02 PS Ilex crenata 'Helleri''/ Helleri Holly; 2 Gal. Cont. 127 EA $ $ A95 8-02 PS Cornus sericea 'Kelseyii'/ Dwarf Redtwig Dogwood; 2 Gal. Cont. 510 EA $ $ A96 8-02 PS Rosa x 'NOATRAUM'/ Flower Carpet Pink Groundcover Rose; 2 Gal. Cont. 26 EA $ $ A97 8-02 PS Nassella tenuissima/ Mexican Feather Grass; 1 Gal Cont.554 EA $ $ A98 8-02 PS Calamagrostis x acutiflora 'Karl Foerster'/ Karl Foerster Feather Reed Grass; 1 Gal. Cont. 39 EA $ $ A99 8-02 PS Hemericalis 'Stella de Oro'/ Stella de Oro Daylily; 1 Gal. Cont. 317 EA $ $ A100 8-02 PS Mahonia nervosa/ Dwarf Oregon Grape; 1 Gal. Cont. 413 EA $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 16 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A101 8-02 PS Polystichum munitum/ Western Sword Fern; 1 Gal. Cont. 192 EA $ $ A102 8-02 PS Cotoneaster dammeri 'Eichholz'/ Eichholz Coteoneater; 1 Gal. Cont. 35 EA $ $ A103 8-02 PS Epimedium x perralchicum 'Frohnleiten'/ Frohnleiten Barrenwort; 1 Gal. Con. 1250 EA $ $ A104 8-02 PS Veronica peduncularis 'Georgia Blue'/ Georgia Blue Speedwell; 1 Gal. Cont. 380 EA $ $ A105 8-02 PS Juncus ensifolius/ Dagger-Leaf Rush; 1 Gal. Cont. 210 EA $ $ A106 8-02 PS Juncus 'Blue Dart'/ Blue Dart Rush; 1 Gal. Cont. 210 EA $ $ A107 8-02 PS Iris douglasiana/ Douglas Iris; 1 Gal. Cont. 50 EA $ $ A108 8-02 Protection of Private Property and Tree Protection 1 LS $ $ A109 8-02 Root Barrier 950 LF $ $ A110 8-02 Property Restoration 1 EST 50,000.00$ 50,000.00$ A111 8-02 Plant Establishment - 1 Year 1 LS $ $ A112 8-03 Automatic Irrigation System, Complete 1 LS $ $ A113 8-04 Cement Conc. Traffic Curb and Gutter 7550 LF $ $ A114 8-04 Modified Cement Concrete Extruded Curb, Type 6 3980 LF $ $ A115 8-04 Extruded Curb 2420 LF $ $ A116 8-04 Cement Conc. Valley Gutter 60 LF $ $ A117 8-05 Wheel Stop 44 EA $ $ A118 8-06 Cement Conc. Driveway Entrance 2170 SY $ $ A119 8-07 Precast Dual Faced Sloped Mountable Curb 1220 LF $ $ A120 8-09 Raised Pavement Marker Type 1 42 HUND $ $ A121 8-09 Raised Pavement Marker Type 2 11 HUND $ $ A122 8-10 Curb Mounted Delineator Post 330 LF $ $ A123 8-13 Adjust Monument Case and Cover 6 EA $ $ A124 8-14 Cement Conc. Sidewalk 5230 SY $ $ A125 8-14 Thickened Edge Sidewalk 320 LF $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 17 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A126 8-14 Cement Conc. Curb Ramp, Type Perpendicular A 17 EA $ $ A127 8-14 Cement Conc. Curb Ramp, Type Perpendicular B 1 EA $ $ A128 8-14 Cement Conc. Curb Ramp, Type Parallel A 2 EA $ $ A129 8-14 Cement Conc. Curb Ramp, Type Single Direction A 1 EA $ $ A130 8-14 Cement Conc. Curb Ramp, Type Combination 4 EA $ $ A131 8-14 Detectable Warning Surface 460 SF $ $ A132 8-14 Decorative Concrete Finish 400 SY $ $ A133 8-14 Smooth Cement Conc. Band 80 LF $ $ A134 8-14 Bus Shelter Foundation 2 EA $ $ A135 8-19 Adjust Gas Valve 11 EA $ $ A136 8-20 Modification of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 3rd Street Intersection, Complete 1 LS $ $ A137 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & S 2nd Street Intersection, Complete 1 LS $ $ A138 8-20 Portable Temporary Traffic Signal System with Mast Arm 1 LS $ $ A139 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue S & SW Victoria Street, Complete 1 LS $ $ A140 8-20 Replacement of Existing Traffic Signal and Illumination System at Rainier Avenue S & Airport Way Intersection, Complete 1 LS $ $ A141 8-20 Pedestrian Hybrid Beacon Traffic Signal and Illumination System at Rainier Avenue N & NW 3rd Place, Complete 1 LS $ $ A142 8-20 Decorative Illumination System, Complete 1 LS $ $ A143 8-20 Fiber Optic Interconnect System, Complete 1 LS $ $ A144 8-20 5G Small Cell Network Conduit System, Complete 1 LS $ $ A145 8-20 PTZ Camera Systems, Complete 1 LS $ $ A146 8-21 Permanent Signing 1 LS $ $ A147 8-22 Plastic Stop Line 90 LF $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 18 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. PROPOSAL (BID SCHEDULE A - ROADWAY IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID A148 8-22 Plastic Crosswalk Line 3250 SF $ $ A149 8-22 Plastic Traffic Arrow 72 EA $ $ A150 8-22 Plastic Traffic Letter 12 EA $ $ A151 8-22 Bicycle Lane Symbol 6 EA $ $ A152 8-22 Plastic Line, 4 In.1250 LF $ $ A153 8-22 Paint Line, 4 In.5680 LF $ $ A154 8-22 Removing Existing Pavement Markings 1 LS $ $ A155 8-23 Temporary Pavement Marking 59000 LF $ $ A156 8-24 Rock Wall 60 SF $ $ A157 8-26 Resolution of Utility Conflicts for Storm Drainage 1 EST 145,000.00$ 145,000.00$ A158 8-26 Utility Potholing 220 EA $ $ A159 8-27 Gateway Trellis Relocation 1 LS $ $ A160 8-28 Tree Grate 3 EA $ $ A161 8-30 Waste Receptacle 3 EA $ $ A162 8-31 Bench 2 EA $ $ A163 8-32 Gateway Wall A & B 1 LS $ $ A164 8-33 Bollard 7 EA $ $ Total Schedule A (Roadway Improvements)*$ * All applicable sales tax shall be included in the unit and lump sum Bid price per Section 1-07.2(1) and WAC 458-20-171. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 19 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount B1 1-04 Minor Change for Water Trench 1 EST 68,000.00$ 68,000.00$ B2 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 54,000.00$ 54,000.00$ B3 2-09 Controlled Density Fill 10 CY $ $ B4 7-08 Shoring or Extra Excavation Class B for Water 1 LS $ $ B5 7-09 Abandon Existing Water System 1 LS $ $ B6 7-09 Ductile Iron Pipe,Class 52, 6-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 50 LF $ $ B7 7-09 Ductile Iron Pipe,Class 52, 8-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 350 LF $ $ B8 7-09 Ductile Iron Pipe,Class 52, 10-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 100 LF $ $ B9 7-09 Ductile Iron Pipe,Class 52, 12-inch Diam. Water Pipe and Restrained-Joint Fittings and Polyethylene Encasement 5160 LF $ $ B10 7-09 Bank Run Gravel for Trench Backfill Water 6140 TON $ $ B11 7-09 Removal and Replacement of Unsuitable Foundation Material 770 TON $ $ B12 7-09 Connection to Existing Water Main, 6 In. 1 EA $ $ B13 7-09 Connection to Existing Water Main, 8 In. 5 EA $ $ B14 7-09 Connection to Existing Water Main, 10 In. 4 EA $ $ B15 7-09 Connection to Existing Water Main, 12 In. 5 EA $ $ B16 7-09 Concrete for Thrust Blocking and Dead-Man Anchor Block 90 CY $ $ B17 7-11 Corrosion Protection, Pipe Joint-Bonding, Anodes, Test Stations 1 LS $ $ B18 7-12 Furnish and Install 6 In. Gate Valve Assembly 1 EA $ $ B19 7-12 Furnish and Install 8 In. Gate Valve Assembly 8 EA $ $ B20 7-12 Furnish and Install 10 In. Gate Valve Assembly 4 EA $ $ PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 20 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE B - WATER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. B21 7-12 Furnish and Install 12 In. Gate Valve Assembly 22 EA $ $ B22 7-12 Adjust Existing Water Valve Box 16 EA $ $ B23 7-12 Adjust Existing Water Manhole 1 EA $ $ B24 7-12 Furnish and Install Comb. Air/Vacuum Valve Assembly 2 In.2 EA $ $ B25 7-14 Furnish and Install Fire Hydrant Assembly 25 EA $ $ B26 7-14 Remove and Salvage Hydrant 21 EA $ $ B27 7-15 Furnish and Install 1" Water Service Connection 25 EA $ $ B28 7-15 Furnish and Install 1.5" Water Service Connection 4 EA $ $ B29 7-15 Furnish and Install 2" Water Service Connection 2 EA $ $ B30 7-16 Temporary Water Bypass System, Complete 1 LS $ $ B31 8-26 Resolution of Utility Conflicts with New Water Mains 1 EST 45,000.00$ 45,000.00$ Schedule B Subtotal $ Schedule B Sales Tax (10.1%)$ Schedule B (Water Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule B Contract price per Section 1- 07.2(2) and WAC 458-20-170. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 21 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount C1 1-04 Minor Change for Sewer Trench 1 EST 30,000.00$ 30,000.00$ C2 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 24,000.00$ 24,000.00$ C3 7-05 Sanitary Sewer Manhole 18 EA $ $ C4 7-05 Drop Manhole Connection 1 EA $ $ C5 7-05 Adjust Sewer Manhole 3 EA $ $ C6 7-08 Shoring or Extra Excavation Class B for Sewer 1 LS $ $ C7 7-17 PVC Sanitary Sewer Pipe 6 In. Diam. 106 LF $ $ C8 7-17 PVC Sanitary Sewer Pipe 8 In. Diam. 1160 LF $ $ C9 7-17 PVC Sanitary Sewer Pipe 12 In. Diam. 70 LF $ $ C10 7-17 Bank Run Gravel for Trench Backfill Sewer 4020 TON $ $ C11 7-17 Removal and Replacement of Unsuitable Foundation Material 550 TON $ $ C12 7-19 Sewer Cleanout 6 EA $ $ C13 7-21 Furnish and Install 8 In. Diam. CIPP for Sanitary Sewer 2040 LF $ $ C14 7-21 Furnish and Install 12 In. Diam. CIPP for Sanitary Sewer 450 LF $ $ C15 8-26 Resolution of Utility Conflicts for Sewer 1 EST 20,000.00$ 20,000.00$ Schedule C Subtotal $ Schedule C Sales Tax (10.1%)$ Schedule C (Sewer Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule C Contract price per Section 1- 07.2(2) and WAC 458-20-170. PROPOSAL (BID SCHEDULE C - SEWER IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 22 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount D1 1-04 Minor Change for Joint Utility Trench 1 EST 64,000.00$ 64,000.00$ D2 1-05 Roadway Surveying 1 LS $ $ D3 1-09 Mobilization 1 LS $ $ D4 2-02 Remove/Abandon Existing Gas Main 960 LF $ $ D5 2-03 Unsuitable Foundation Excavation Incl. Haul 110 CY $ $ D6 2-03 Gravel Borrow Incl. Haul 2700 CY $ $ D7 2-05 Petroleum Contaminated Excavation and Disposal Including Haul 1 EST 53,000.00$ 53,000.00$ D8 2-09 Structure Excavation Class B Incl. Haul for Joint Utility Trench 4110 CY $ $ D9 7-08 Shoring or Extra Excavation Class B for Joint Utility Trench 1 LS $ $ D10 8-26 Resolution of Utility Conflicts for Joint Utility Trench 1 EST 42,000.00$ 42,000.00$ D11 8-35 Removal of Structure and Obstruction 1 LS $ $ D12 8-35 Franchise Utility Coordination 1 LS $ $ D13 8-35 Sand Bedding Incl. Haul for Joint Utility Trench 2000 TN $ $ D14 8-35 Controlled Density Fill Incl. Haul, for Joint Utility Trench 300 CY $ $ D15 8-35 Install 2" Diameter Conduit - PSE Power 350 LF $ $ D16 8-35 Install 3" Diameter Conduit - PSE Power 2600 LF $ $ D17 8-35 Install 4" Diameter Conduit - PSE Power 8000 LF $ $ D18 8-35 Install 6" Diameter Conduit - PSE Power 5500 LF $ $ D19 8-35 Install 4" Fiber Optic Conduit - PSE Power 2300 LF $ $ D20 8-35 Install Handhole (32"x44") - PSE 4 EA $ $ D21 8-35 Install Handhole (30"x30") - PSE 1 EA $ $ PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 23 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. D22 8-35 Install Handhole (23.25"X32.75") - PSE 3 EA $ $ D23 8-35 Install Minipad Transformer (48"x42") - PSE 2 EA $ $ D24 8-35 Install Three Phase Transformer (70"X136") - PSE 4 EA $ $ D25 8-35 Install Three Phase Transformer (56"X66") - PSE 1 EA $ $ D26 8-35 Install Three Phase Junction Box - PSE 9 EA $ $ D27 8-35 Install Three Phase Underground Transformer 1 EA $ $ D28 8-35 Install Pull Vault - PSE 4 EA $ $ D29 8-35 Install Fiber Vault (27"X62.5") - PSE 3 EA $ $ D30 8-35 Install 2" Diameter Conduit - Comcast 420 LF $ $ D31 8-35 Install 4" Diameter Conduit - Comcast 8900 LF $ $ D32 8-35 Install Handhole - Comcast 1 EA $ $ D33 8-35 Install 14"x21" Vault - Comcast 1 EA $ $ D34 8-35 Install 17"x30" Vault - Comcast 7 EA $ $ D35 8-35 Install 24"x36" Vault - Comcast 17 EA $ $ D36 8-35 Install 24"x24" Pedestal - Comcast 1 EA $ $ D37 8-35 Install 4" Diameter Conduit - Century Link 22400 LF $ $ D38 8-35 Install 3048 Handhole - Century Link 2 EA $ $ D39 8-35 Install 25-TA Vault - Century Link 5 EA $ $ D40 8-35 Install 264-TA Vault - Century Link 3 EA $ $ D41 8-35 Install 467-TA Vault - Century Link 5 EA $ $ D42 8-35 Install 38Y-612 Base-Military Vault - Century Link 1 EA $ $ Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 24 October 2022 ADDENDUM NO. 7 Item No. Spec. Section Description Quantity Unit Unit Price* Amount PROPOSAL (BID SCHEDULE D - JOINT UTILITY TRENCH IMPROVEMENTS) Rainier Ave S Corridor Improvements - Phase 4 (S 3rd St to NW 3rd PL) ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID Note: Unit prices for all items, all extensions, and total amount of Bid shall be shown. Enter unit prices in numerical figures only in dollars and cents, i.e. to two (2) decimal places (including for whole dollar amounts). All figures must be clearly legible. Bids with illegible figures in the Unit Price column will be rejected as unresponsive. Where conflict occurs between the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to conform thereto. D43 8-35 Install 96-612-7-TA Vault - Century Link 1 EA $ $ D44 8-35 Install Pro 6 Pedestal - Century Link 1 EA $ $ Schedule D Subtotal $ Schedule D Sales Tax (10.1%)$ Schedule D (Joint Utility Trench Improvements)*$ * The Contractor shall collect from the Contracting Agency retail sales tax on the Schedule D Contract price per Section 1- 07.2(2) and WAC 458-20-170. Contract Documents Rainier Ave S Corridor Improvements - Phase 4 Page 25 October 2022 RAINIER AVE S S 2ND STBIG ISLAND POKE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS CITY OF SEATTLE TWENTY X LLC CITY OF SEATTLE METRO PCS AUTOZONESOUTH LAKE EUROPEAN GENERAL CONSTRUCTION NOTES CONSTRUCTION NOTES CORRESPONDING SHEETS LEGEND FLOW LINE POINTS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-RD01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 60 285 JULY 2022 14087A 60 STA 18+25 TO STA 22+50 ROADWAY PLAN PLAN KPF KPF DPY STP(UL) -1615(005) ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S BIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS S 2ND ST CONSTRUCTION NOTES CORRESPONDING SHEETS LEGEND GENERAL DRAINAGE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPLN01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 82 285 JULY 2022 14087A 82 STA 18+25 TO STA 22+50 DRAINAGE PLAN PLAN WRE KDP KDP STP(UL) -1615(005) ADDENDUM 4 - STORM PIPE MATERIAL CHANGE FOR CLEARANCE JRW KPF 10/11/2022 ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 KDP KPF 10/24/2022 CORRESPONDING SHEETS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RDRAINAGE PROFILES 92 14087A JULY 2022 28592 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 18+25 TO STA 22+50 WEST SIDE PROFILE EAST SIDE PROFILE KDP KDP WRE STP(UL) -1615(005) CB 294 TO CB 446 PROFILE CB 412 TO CB 411 PROFILE ADDENDUM 4 - SEWER/STORM/WATER CLEARANCES JRW KPF 10/11/2022 CB 514 TO CB 513 PROFILE ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 KDP KPF 10/24/2022 14+19 15+16 23+84 25+35 POINT TABLE FOR BIORETENTION BOTTOM AREA TO POINT TABLE FOR BIORETENTION BOTTOM AREA TO OUTFALL PROTECTION DETAIL VALLEY GUTTER DETAIL SECTION A-APLAN VIEW SQUARE CURB INLET DESIGNATION AVAIL- ABILITY MEDIA BAY SIZE VAULT SIZE (L x W) MAX. OUTLET/BY PASS PIPE DIA. MAX. BYPASS FLOW (CFS) UNDER- DRAIN PIPE DIA. (PERF) TREE GRATE QTY. & SIZE 6 X 4 N/A = NOT AVAILABLE SHALLOW INLET DETAIL NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 46996NANDEZ MIL L E R105 14087A JULY 2022 285105 KPG JF KTS KTS WRE (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 DRAINAGE DETAILS STP(UL) -1615(005) BIORETENTION STA. 14+19 TO STA. 15+16 PLAN VIEW BIORETENTION STA. 23+84 TO STA. 25+35 PLAN VIEW STRUCTURE 56 AND 57 - FILTERRA INTERNAL BYPASS CURB (FTIBC) CONFIGURATION DETAIL KDP KPF 10/24/2022ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 RAINIER AVE S S 2ND STBIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS CONSTRUCTION NOTES CORRESPONDING SHEETS LEGEND GENERAL SEWER NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SWR01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 109 285 JULY 2022 14087A 109 STA 18+25 TO STA 22+50 SEWER PLAN PLAN JRW WRE WRE NOTE STP(UL) -1615(005) ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S BIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS S 2ND STGENE MEYER TOWING GENERAL WATER NOTES CONSTRUCTION NOTES CORRESPONDING SHEETSLEGEND NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WTR01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 21036793JUSTIN R A YMO N D WUJF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 123 285 JULY 2022 14087A 123 STA 18+25 TO STA 22+50 WATER PLAN PLAN JRW WRE WRE NOTE STP(UL) -1615(005) ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S WALGREENS MIDAS SANSONINA HERTZ/LYFT WENDY'S TACO TIME SAFEWAY CORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 145 285 JULY 2022 14087A 145 STA 15+00 TO STA 18+25 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005) ADDENDUM #7 - JUT REVISIONS DPY KPF 10/24/2022 RAINIER AVE S S 2ND STBIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS CORRESPONDING SHEETS FRANCHISE UTILITY STRUCTURE SCHEDULE FRANCHISE UTILITY STRUCTURE SCHEDULE GENERAL NOTES CONSTRUCTION NOTES CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUT01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 146 285 JULY 2022 14087A 146 STA 18+25 TO STA 22+50 JOINT UTILITY TRENCH PLAN PLAN DPY KPF KPF STP(UL) -1615(005) ADDENDUM #3 - JUT SCHEDULE JC 9/27/22KPF ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S S 2ND STBIG ISLAND POKE METRO PCS SOUTH LAKE EUROPEAN AUTOZONE TACO TIME VACANT BUDDY'S HOME FURNISHING RENTON VETERINARY HOSPITAL GRAVITY SPORTS CORRESPONDING SHEETS PSE LEGEND CENTURYLINK LEGEND COMCAST LEGEND PSE (GAS) LEGEND GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUTSCHEM01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 154 285 JULY 2022 14087A 154 STA 18+25 TO STA 22+50 JOINT UTILITY TRENCH SCHEMATICS PLAN DPY KPF KPF STP(UL) -1615(005) ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 TRENCH SECTION A TRENCH SECTION B TRENCH SECTION C TRENCH SECTION D TRENCH SECTION E TRENCH SECTION F TRENCH SECTION G TRENCH SECTION H TRENCH SECTION I TRENCH SECTION J TRENCH SECTION K TRENCH SECTION L TRENCH SECTION N TRENCH SECTION O TRENCH SECTION P TRENCH SECTION Q TRENCH SECTION R TRENCH SECTION S TRENCH SECTION T TRENCH SECTION M NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-JUTSEC.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JOINT UTILITY TRENCH SECTIONS 160 14087A JULY 2022 285160 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF KPF KPF DPY STP(UL) -1615(005) ADDENDUM #7 - JUT REVISIONS DPY KPF 10/24/2022 MODULAR BLOCK WALL AT LUMINAIRE / UTILITY POLE WITH THICKENED EDGE SIDEWALK MODULAR BLOCK FILL WALL CEMENT CONCRETE FILL WALL REVEAL LIMITS OF CONCRETE FILL WALL NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-WALLDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022167 14087A JULY 2022 285167 KPG AEH KPF KPF JF STP(UL) -1615(005) 14087A JULY 2022 285167 KPG AEH KPF KPF JF WALL DETAILS 14087A JULY 2022 285167 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG AEH KPF KPF JF ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S DW39 STA 0+00 TO STA 0+65 DW40 STA 0+00 TO STA 0+65 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 188 285 JULY 2022 14087A 188 RBD RBD KPF STP(UL) -1615(005) 14087A-DWY01.DWG SEE DRIVEWAY SCHEDULE, NOTES & DETAILS, SHEETS 198 - 199 DRIVEWAY PLANS & PROFILES D39 & D40 PLAN PROFILE PROFILE D39 AND D40 ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE DRIVEWAY SCHEDULE RAINIER AVE DRIVEWAY SCHEDULE PARKING AND DRIVEWAY PAVEMENT DETAIL NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-DWYDET01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERNEPRFO E NNALIO E S IGS 47649KARINA P . FRA N ADATacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022VALUE VALUE DRIVEWAY SCHEDULE & DETAILS 198 14087A STP(UL) -1615(005) JULY 2022 285198 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG RBD RBD KPF JF ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 DPY KPF 10/24/2022 RAINIER AVE S SW SUNSET BLVDS 3RD ST GENERAL NOTES CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE WIRE NOTES PLAN NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022ILLUMINATION AND INTERCONNECT PLAN STA 11+00 TO STA 15+00 200 14087A JULY 2022 285200 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF EH DE JC STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF JC 10/24/22KPFADDENDUM #7 - LUMINAIRE FOUNDATIONS RAINIER AVE S GENERAL NOTES CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 201 285 JULY 2022 14087A 201 STA 15+00 TO STA 18+25 ILLUMINATION AND INTERCONNECT PLANJC PLAN STP(UL) -1615(005) EH DE ADDENDUM #2 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE S S 2ND ST CONSTRUCTION NOTES LUMINAIRE SCHEDULE GENERAL NOTES LEGEND WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 202 285 JULY 2022 14087A 202 STA 18+25 TO STA 22+50 ILLUMINATION AND INTERCONNECT PLANJC PLAN STP(UL) -1615(005) EH DE ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23, LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE S SW VICTORIA STHAY E S PL S W LEGEND LUMINAIRE SCHEDULE GENERAL NOTES WIRE NOTES CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 203 285 JULY 2022 14087A 203 STA 22+50 TO STA 27+00 ILLUMINATION AND INTERCONNECT PLAN PLAN JC DE EH STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE S S TOBIN ST CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN ILLUMINATION AND INTERCONNECT PLAN STA 27+00 TO STA 31+00 204 14087A JULY 2022 285204 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF EH DE JC STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RENTON AVENUE EXT RAINIER AVE N AIRPORT WAYRAINIER AVE S CONSTRUCTION NOTES LUMINAIRE SCHEDULE LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 205 285 JULY 2022 14087A 205 STA 31+00 TO STA 35+50 ILLUMINATION AND INTERCONNECT PLANJC DE EH FOR LEGEND AND GENERAL NOTES, SEE SHEET 204 STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE N CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 206 285 JULY 2022 14087A 206 STA 35+50 TO STA 39+00 ILLUMINATION AND INTERCONNECT PLANJC DE EH STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE NNW 3RD PLNE L S O N P L N W CONSTRUCTION NOTES LEGEND GENERAL NOTES LUMINAIRE SCHEDULE WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL02.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 207 285 JULY 2022 14087A STA 39+00 TO STA 43+50 ILLUMINATION AND INTERCONNECT PLAN 207 JC DE EH STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF S 3RD ST CONSTRUCTION NOTES LEGEND LUMINAIRE SCHEDULE GENERAL NOTES WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL03.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 208 285 JULY 2022 14087A 208 STA 201+50 TO STA 205+00 ILLUMINATION AND INTERCONNECT PLAN EH DE JC STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF AIRPORT WAY LAKE AVE S CONSTRUCTION NOTES LUMINAIRE SCHEDULE LEGEND GENERAL NOTES WIRE NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILL03.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022PLAN JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 209 285 JULY 2022 14087A 209 STA 601+50 TO STA 605+50 ILLUMINATION AND INTERCONNECT PLANJC DE EH STP(UL) -1615(005) ADDENDUM #2 - LUMINAIRE SCHEDULES JC 9/27/22KPF ADDENDUM #3 - LUMINAIRE SCHEDULES & ILLUMINATION NOTES JC 9/28/22KPF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-ILLDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022210 14087A JULY 2022 285210 KPG JF JC DE (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 ILLUMINATION DETAILS PANEL SCHEDULE S1 RAINIER AVE S RAINIER AVE S RAINIER AVE S S 3RD STSW SUNSET BLVDS 2ND STSW VICTORIA STPANEL SCHEDULE S2 S3 PANEL SCHEDULE ONE-LINE DIAGRAM STP(UL) -1615(005) EH ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23, LUMINAIRE FOUNDATIONS JC KPF 10/24/22 NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG01.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022VALUE VALUE SIGNALIZATION PLAN RAINIER AVE S & S 3RD ST NOTES 213 14087A JULY 2022 285213 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG EH DE JC JF CONSTRUCTION NOTESGENERAL NOTES STP(UL) -1615(005) WIRE NOTES SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE SIGN SCHEDULE Rainier Ave S ADDENDUM #2 - INSTALLATION OF FIBER OPTIC CABLING JC 09/27/22KF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SIG04_PHASECHANGE.dwg BID DOCUMENT Public Works Department CITY OF RENTON R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 39324JAN C I GANI K Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022SIGN SCHEDULE CONSTRUCTION NOTESWIRE NOTES 900 RAINIER AVE S & AIRPORT WAY NOTESVALUE 221 14087A VALUE SIGNALIZATION PLAN JULY 2022 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 285221 (S 3RD ST TO NW 3RD PL)DE EH JC JF STP(UL) -1615(005) SIGNAL POLE EQUIPMENT SCHEDULE PUSH BUTTON SCHEDULE GENERAL NOTES LEGEND CONCURRENT PHASE SCHEDULE EVPE SCHEDULE SCHEDULE VIDEO DETECTION Rainier Ave S Renton Ave ExtAirport Way Airport WayRenton Ave Ext ADDENDUM #2 - INSTALLATION OF FIBER OPTIC CABLING JC 09/27/22KF ADDENDUM #7 - LUMINAIRE FOUNDATIONS JC 10/24/22KPF RAINIER AVE S S 2ND STCORRESPONDING SHEETS CONSTRUCTION NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LS01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L I Z A BETH S CHMIDTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI N GTONLAND S CA P E A R C H ITECT7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 240 285 JULY 2022 14087A 240 STA 18+25 TO STA 22+50 LANDSCAPE PLAN PLAN JS JS CS STP(UL) -1615(005) SEE SHEETS 248 & 249 FOR LANDSCAPE SCHEDULE, DETAILS AND GENERAL NOTES ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 JS CS 10/24/2022 GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-LSDET.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640COREEN E L I Z A BETH S CHMI DTNO. 1 377 EXP. 0 5 /2 4 /2024STATE O F W A SHI N GTONLAND S CA P E A R C H ITECT7 -13-2022248 14087A JULY 2022 285248 KPG JF JS JS CS (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 LANDSCAPE NOTES & SCHEDULE STP(UL) -1615(005) TREE SCHEDULE PLANTING SCHEDULE ADDENDUM #7- DRIVEWAY UPDATES AT PARCEL 23 JS CS 10/24/2022 RAINIER AVE S S 2ND STCORRESPONDING SHEETS CONSTRUCTION NOTES CONSTRUCTION NOTES GENERAL NOTES GENERAL NOTES NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-URB01.dwg BID DOCUMENT Public Works Department CITY OF RENTONPHUONG N. NG U Y E NNO. 1 493 EXP. 0 9 /1 6 /2022STATE O F W A SHI N GTONLAND S CA P E A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 252 285 JULY 2022 14087A 252 STA 18+25 TO STA 22+50 URBAN DESIGN PLAN PLAN HF PN PN STP(UL) -1615(005) ADDENDUM #7 - DRIVEWAY UPDATES AT PARCEL 23 JS PN 10/24/2022 RAINIER AVE S S 2ND STCORRESPONDING SHEETS IRRIGATION LEGEND * PIPE SIZE CHART NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-IRR01.dwg BID DOCUMENT Public Works Department CITY OF RENTONELIZABETH GIB S O NNO. 538 EXP. 0 8 /1 6 /2022STATE O F W A SHI N GTONLAND S CA P E A R C H ITECTTacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022JF KPG (S 3RD ST TO NW 3RD PL) RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 265 285 JULY 2022 14087A 265 STA 18+25 TO STA 22+50 IRRIGATION PLAN PLAN HF EG EG SEE SHEETS 272 AND 273 FOR IRRIGATION SCHEDULE, DETAILS AND GENERAL NOTES STP(UL) -1615(005) CONSTRUCTION NOTES ADDENDUM #7- DRIVEWAY UPDATES AT PARCEL 23 JS LG 10/24/2022