Loading...
HomeMy WebLinkAboutC_POR_Public_Comment_Porter_221027_v31 Clark Close From:Sophia Porter <sophiaporter7@gmail.com> Sent:Thursday, October 27, 2022 2:16 PM To:Clark Close Subject:Re: Party of Record/Public Comments 2022-08-25 06:38 PM(PST) Submission Notification Dear Clark, Thank you for your thorough explanation and the relevant link. I look forward to seeing that project completed in 2023 and believe it will benefit current and future residents. Best wishes, Sophia On Thu, Oct 27, 2022 at 11:44 AM Clark Close <CClose@rentonwa.gov> wrote: Sophia, Thank you for your comments related to the Southport West project (LUA22-000284) wherein you raised a concern about how the proposed project plans to mitigate additional traffic and avoid substantial inconvenience to commuters and residents. A copy of the Traffic Impact Analysis for Southport West is available online by clicking here. A new access into Southport will be provided by constructing the Park Ave N Extension Project. This project will extend Park Ave N to the north of Logan Ave N to provide access to Southport and the Boeing Company. Improvements include the construction of a railroad crossing, signal improvements, utility improvements, and illumination. Per the current Park Ave N Extension Project schedule, substantial completion is anticipated on October 13, 2023. Your comments will be added to the public record for consideration by the reviewing official and you have been added as a party of record. Thank you for your interest in this project and if you have any further questions or comments, please feel free to contact me. Regards, CLARK CLOSE, Principal Planner City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 2 Virtual Permit Center | Online Applications and Inspections (425) 430-7289 | cclose@rentonwa.gov From: notification@civiclive.com <notification@civiclive.com> Sent: Thursday, October 13, 2022 10:40 PM To: Party of Record <POR@rentonwa.gov> Subject: Party of Record/Public Comments 2022-10-13 10:39 PM(PST) Submission Notification Party of Record/Public Comments 2022-10-13 10:39 PM(PST) was submitted by Guest on 10/14/2022 1:39:56 AM (GMT-08:00) Canada/Pacific Name Value NameFile: LUA22000284 Gender Ms. Name Sophia Porter Address: 1085 Lake Washington Blvd N.Apt C202 Apt C202 CityState: Renton WA Email sophiaporter7@gmail.com Phone 9136086635 Party of Record Only Comments Hello, With already-bad traffic at the intersections of Lake Washington Blvd N. With itself, Southport Drive, and Southport Drive with I-405, and with thousands of new parking spaces planned, how does this building project plan to mitigate additional traffic and avoid substantial inconvenience to commuters and residents? Thanks for your time, Sophia Porter Current Southport resident Prefer US Mail To view this form submission online, please follow the link below: https://rentonwa.gov/form/one.aspx?objectId=19023449&contextId=17174246&returnto=submissions CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. 3 From: notification@civiclive.com <notification@civiclive.com> Sent: Thursday, August 25, 2022 6:39 PM To: Party of Record <POR@rentonwa.gov> Subject: Party of Record/Public Comments 2022-08-25 06:38 PM(PST) Submission Notification Party of Record/Public Comments 2022-08-25 06:38 PM(PST) was submitted by Guest on 8/25/2022 9:38:58 PM (GMT-08:00) Canada/Pacific Name Value NameFile: 22000284 Gender Ms. Name Sophia Porter Address: 1085 Lake Washington Blvd N. Apt C202 CityState: Renton, WA Email sophiaporter7@gmail.com Phone 19136086635 Party of Record Only Comments Hello, Thank you for providing notice of upcoming construction. I am writing because, as a resident of the Bristol Apartments, I know the intersections of Lake Washington Blvd N. with both N. Southport Dr. and the Bristol/Gene Coulon access road can get very congested at rush hour. Are there plans in place to mitigate traffic given the additional 2,000+ parking spaces that will be added to the area per the proposal? Best wishes, Sophia Prefer US Mail To view this form submission online, please follow the link below: https://rentonwa.gov/form/one.aspx?objectId=18838773&contextId=17174246&returnto=submissions CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe.