Loading...
HomeMy WebLinkAboutAddendum No. 8Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 8 Page 1 of 2 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) ADDENDUM NO. 8 Federal Aid Number: STPUL-1615(005) TIB Number: 8-1-102(038)-1 City Project Number: TED4003813 CAG 22-163 DATE OF ADDENDUM ISSUE: October 28, 2022 DUE DATE FOR BIDS: November 1, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) DATE OF BID OPENING: November 3, 2022 (CHANGED FROM DATE IN CALL FOR BIDS) NOTE TO ALL PLANHOLDERS: This Addendum No. 8, containing the following revisions, additions, deletions, and/or clarifications, is hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named project. Bidders shall take this Addendum into consideration when preparing and submitting their bids. Bidders shall acknowledge receipt and acceptance of this Addendum No. 8 in the space provided on the Proposal Signature Page or by signing in the space provided below and submitting the signed addendum with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s submittal. CONTRACT PROVISIONS – VOLUME 1 1. Revise the Special Provision Section 8-13 MONUMENT CASES (Page SP-248) as follows: Section 8-13.3 Construction Requirements revise the last sentence of the first paragraph as follows: The materials and method of construction shall conform to the requirements of the Standard Plan and Renton Standard Plan H031 as approved by the Engineer. CONTRACT PROVISIONS – VOLUME 2 2. DELETE Appendix A - Wage Rates: David-Bacon Act Wage Determination (Pages 1-49) and REPLACE with attached Appendix A - Wage Rates: David-Bacon Act Wage Determination (Pages 1-49). Revisions include:  Federal Wage Rate update to current rates Rainier Ave S Corridor Improvements – Phase 4 Addendum No. 8 Page 2 of 2 3. Appendix B – City of Renton Standard Plans add the following attached Renton Standard Detail H031 – Monument Case & Cover to the end of Appendix B following Renton Standard Plan 407. PLANS 4.DELETE Plan Sheets 92, 93 and REPLACE with attached Plan Sheets 92, 93. Revisions include: a.Stormwater clearances crossing projections ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT. Sincerely, Robert M. Hanson, P.E. Transportation Design Manager City of Renton Receipt acknowledged, and conditions agreed to this _____ day of ________, 2022 Bidder _______________________________ Signature for CORRESPONDING SHEETS NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RDRAINAGE PROFILES 92 14087A JULY 2022 28592 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 18+25 TO STA 22+50 WEST SIDE PROFILE EAST SIDE PROFILE KDP KDP WRE STP(UL) -1615(005) CB 294 TO CB 446 PROFILE CB 412 TO CB 411 PROFILE ADDENDUM 4 - SEWER/STORM/WATER CLEARANCES JRW KPF 10/11/2022 CB 514 TO CB 513 PROFILE ADDENDUM 7 - DRIVEWAY UPDATES AT PARCEL 23 KDP KPF 10/24/2022 ADDENDUM 8 - STORM/WATER CLEARANCES KDP KPF 10/26/2022 CORRESPONDING SHEETS CB 146 TO CB 144 PROFILE NUMBER BY APP.REVISION DESCRIPTION DRAWN BY: DESIGN BY: CHECK BY: PROJ MGR: FILE:BY:DATE: APPROVED FOR CONSTRUCTION DATE DRAWING NO. PROJECT NO. FED AID NO. DATE: SHEET NO.OF SURVEYED: 14087A-SDPRF01.dwg BID DOCUMENT Public Works Department CITY OF RENTON Tacoma Wenatchee KPG.com Seattle 3131 Elliott Avenue, Suite 400 Seattle, WA 98121 206.286.1640 7 -13-2022R EGIST E R E D NOTGNI HSAWFOETAT SERN EPRFO E NNALIO E S IGS 46996NANDEZ MIL L E RDRAINAGE PROFILES 93 14087A JULY 2022 28593 RAINIER AVE S CORRIDOR IMPROVEMENTS - PHASE 4 (S 3RD ST TO NW 3RD PL) KPG JF STA 22+50 TO STA 27+00 EAST SIDE PROFILE KDP KDP WRE STP(UL) -1615(005) CB 119 TO CB 118 PROFILE WEST SIDE PROFILE WEST SIDE PROFILE CB 146 TO CB 144 PROFILE ADDENDUM 8 - STORM/WATER CLEARANCES KDP KPF 10/26/2022