HomeMy WebLinkAboutS-419402rem
►�
ENO
►4
rr
O
U
w
I—
D
O
z
Q
U
L
/
/ mCT
3 Q
/ Q
Ln o
�El-
0
o
NQ
/
�Ln
C)�
0
o a;
U �
� N
0CD
N
Q�
00
W
LEGEND
ROADWAY CENTERLINE
PROJECT BOUNDARY LINE
PROPERTY BOUNDARY LINE
RIGHT-OF-WAY LINE
EASEMENT LINE
EDGE OF PAVEMENT LINE
10' CONTOUR LINE
2' CONTOUR LINE
SANITARY SEWER MAIN
WATER LINE
FIRE SUPPLY
STORM PIPE
GAS LINE
FENCE LINE
WOOD FENCE
POWER LINE
BURIED POWER LINE
UTILITY EASEMENT
TELEPHONE LINE
BURIED TELEPHONE LINE
SWALE
SILT FENCE
CONSTRUCTION FENCING
CLEARING LIMIT
SANITARY SEWER CLEAN OUT
SANITARY SEWER MANHOLE
STORM DRAIN CATCH BASIN - TYPE I
STORM DRAIN CATCH BASIN - TYPE II
YARD DRAIN
STORM DRAIN INLET (NO CATCH)
STORM DRAIN CULVERT
WATER CAP/PLUG
WATER COUPLING
GUARD POST
REDUCER
THRUST BLOCK
WA TER METER
2 NOZZLE FIRE HYDRANT
3 NOZZLE FIRE HYDRANT
FLANGE/BUND FL JOINT
MECHANICAL JOINT
PUSH-ON/HUB JOINT
THREAD JOINT
AIR RELIEF VALVE
BLOW -OFF VALVE
BUTTERFLY VALVE
CHECK VALVE
GATE/GENERAL VALVE
PLUG VALVE
GAS METER
GAS VALVE
PAD MOUNTED TRANSFORMER
POWER VAULT
TRANSMISSION TOWER (SCALEABLE)
UTILITY POLE
POWER POLE
UTILITY POLE ANCHOR
TELEPHONE RISER
TELEPHONE VAULT
BUS STOP
MAIL BOX
RIP RAP
ROCKERY
SHRUB
GENERAL SIGN
REGULA TOR Y SIGN
TREE (CONIFER)
TREE (DECIDUOUS)
YARD LIGHT
BRIDGE/TUNNEL
ASPHALT PAVEMENT
CONCRETE
C P ' H
CONSULTANTS
Site Planning • Civil Engineering
Landscape Architecture - Land Use Consulting
11321-B NE 120th Street
Kirkland, WA 98034 - (425) 285-2390
101 South Wenatchee Avenue, Suite C3
Wenatchee, WA 98801 - (509) 293-7731
www.cphconsuItants.cam
(D 2023 CPH Consultants. LLC. All Rights Reserved.
EXISTING
SS
PROPOSED
SS
W W W
F F F
SD
GAS GAS
X
OP
BP
T
BT
—X X X X X—
O
❑ 0
O
O
0
O
D ►
a
is
�� II
C C
C
I I
1
� ►L
N N
N N
❑o G
O ql
❑A 0
0
-0- }
E—
a
T
BUS I BUS
o �
i
)K
a
a
ABBREVIATIONS
AC
ASPHALT CONCRETE PAVEMENT
LCPE
AP
ANGLE POINT
LF
ASS'Y.
ASSEMBLY
LT
ATB
ASPHALT TREATED BASE
LUI
A VE
A VENUE
MAX.
BCR
BEGIN CURB RETURN
MFR.
BDRY
BOUNDARY
MH
BOC
BACK OF CURB
MIN.
BOW
BOTTOM OF WALL
MJ
CENTERLINE
N
CB
CATCH BASIN
NIC
CDF
CONTROLLED DENSITY FILL
O.C.
CMP
CORRUGATED METAL PIPE
PC
CONCRETE
CONC.
PE
CONN.
CONNECTION
PI
CON T.
CONTINUOUS
PL.
COR
CITY OF RENTON
PT
CPP
CORRUGATED POLYETHYLENE PIPE
PVI
(W/SMOOTH INTERIOR WALLS)
PVMT
CSBC
CRUSHED SURFACING BASE COURSE
PUE
CSTC
CRUSHED SURFACING TOP COURSE
REQ'D.
DIAM.
DIAMETER
RP
DI
DUCTILE IRON
RR
DW
DRI VEWA Y
RRE
E
EAST
ROW
ECR
END CURB RETURN
RT
ELEV.
ELEVATION
S
EOP
EDGE OF PAVEMENT
SD
ESC
EROSION AND SEDIMENT CONTROL
SP.
ESD
ENTERING SIGHT DISTANCE
SS
ESMT.
EASEMENT
SSD
EVA
EMERGENCY VEHICLE ACCESS
STA
EXIST.
EXISTING
TESC
FL
FLOW LINE
TOC
FL.
FLANGE
TYP.
FOC
FACE OF CURB
TB
HORIZ.
HORIZONTAL
TOW
IE
INVERT ELEVATION
UNO
IN T.
INTERSECTION
VERT.
IN
INVERT
WSDOT
w�
WS
0 CONSTRUCTION PERMIT SUBMITTAL PCE
1 RECORD DRAWINGS PCE
� o
V
Know what's below.
Call before you dig. NO. REVISION BY
LINED CORRUGATED POLYETHYLENE PIPE
LINEAL FEET
LEFT
LAND USE INSPECTOR
MAXIMUM
MANUFACTURER
MANHOLE
MINIMUM
MECHANICAL JOINT
NORTH
NOT IN CONTRACT
ON CENTER
POINT OF CURVATURE
PLAIN END
POINT OF INTERSECTION
PLACE
POINT OF TANGENCY
POINT OF VERTICAL INTERSECTION
PAVEMENT
PUBLIC UTILITY EASEMENT
REQUIRED
RADIUS POINT
REDMOND RIDGE
REDMOND RIDGE EAST UPD
RIGHT-OF-WAY
RIGHT
SOUTH
STORM DRAIN
SPACE
SANITARY SEWER
STOPPING SIGHT DISTANCE
STATION
TEMPORARY EROSION AND SEDIMENT CONTROL
TOP OF CURB
TYPICAL
TOP BACK OF WALK
TOP OF WALL
UNLESS NOTED OTHERWISE
VER TI CAL
WASHINGTON DEPT. OF TRANSPORTATION
WI TH
WEST
WATER SERVICE
22
MJH
SURVEYED:
CSB
SCALE:
23
MJH
DESIGNED:
JBS
DRAWN:
PCE
CHECKED:
MJH
APPROVED:
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
PROJECT SPECIAL PROVISIONS
1. ALL WORKMANSHIP, METHODS AND MATERIALS FOR THIS PROJECT SHALL CONFORM TO THE 2021 EDITION OF THE STANDARD
SPECIFICATIONS FOR ROAD, BRIDGE, AND MUNICIPAL CONSTRUCTION AS PRODUCED BY WSDOT AND THE WASHINGTON STATE CHAPTER OF
THE APWA; APPLICABLE KING COUNTY CODE AND PUBLIC WORKS AND DEVELOPMENT STANDARDS, KING COUNTY WATER DISTRICT #90
(KCWD#90) DEVELOPMENT STANDARDS FOR WATER SYSTEMS, CITY OF RENTON DEVELOPMENT STANDARDS FOR SANITARY SEWER SYSTEMS,
AND ANY SPECIAL PROVISIONS PROVIDED BY THESE PLANS OR OTHER CONTRACT DOCUMENTS FOR THE PROJECT.
2. EXISTING UTILITIES ARE SHOWN IN THESE PLANS PER THE LATEST AVAILABLE INFORMATION. THE CONTRACTOR SHALL VERIFY THE
LOCATIONS OF ALL UTILITIES AND RELATED SURFACE FEATURES WITHIN THE PROJECT AREA AND NOTIFY THE ENGINEER OF ANY
DISCREPANCIES WITH THE PLAN INFORMATION PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL, AT MINIMUM, CONTACT THE
UNDERGROUND UTILITIES LOCATE CENTER (1-800-424-5555) TO HAVE UTILITIES VERIFIED ON THE GROUND PRIOR TO CONSTRUCTION.
3. THE TEMPORARY EROSION AND SEDIMENTATION CONTROL (TESC) MEASURES SHOWN IN THESE PLANS SHALL BE CONSIDERED A
MINIMUM. THE CONTRACTOR SHALL PROVIDE ANY REASONABLE ADDITIONAL MEASURES AS MAY BE REQUIRED TO FACILITATE ACTUAL SITE
RUNOFF CONDITIONS AT THE TIME OF CONSTRUCTION. ALL NECESSARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE
IN -PLACE PRIOR TO ANY DEMOLITION OR CONSTRUCTION ACTIVITIES.
4. ALL NEW PAVEMENT, SIDEWALKS, AND CURB AND GUTTER INSTALLED BY THIS PROJECT SHALL BEAR ON SUITABLE, COMPACT
FOUNDATION SOILS IN ACCORDANCE WITH THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND PROJECT CONTRACT DOCUMENTS.
SIMILAR EXISTING FACILITIES TO REMAIN, WHICH ARE DISTURBED OR DAMAGED DURING CONSTRUCTION, SHALL BE REPLACED IN -KIND TO
THE SAME STANDARDS OF NEW FACILITIES.
5. ALL PAVEMENT MARKINGS SHALL CONFORM TO THE WSDOT STANDARD PLANS AND SPECIFICATIONS AS AMENDED OR SUPPLEMENTED BY
THE PROJECT PLANS, DETAILS, AND SPECIFICATIONS AS PROVIDED IN THE CONTRACT DOCUMENTS.
6. ALL EXISTING ON -SITE DOMESTIC WATER WELLS AND/OR SEWER SEPTIC TANKS SHALL BE PROPERLY ABANDONED BY A LICENSED
CONTRACTOR, CERTIFIED TO PERFORM SUCH WORK, AND WRITTEN VERIFICATION OF ABANDONMENT SHALL BE PROVIDED TO THE OWNER,
WASHINGTON STATE DEPARTMENT OF ECOLOGY, AND KING COUNTY HEALTH DEPARTMENT IN ACCORDANCE WITH APPLICABLE AGENCY
REGULA TIONS.
7. THE MATERIALS AND METHODS OF INSTALLATION FOR ALL PUBLIC DOMESTIC POTABLE AND FIRE WATER SUPPLY SYSTEMS SHALL BE IN
ACCORDANCE WITH APPLICABLE STANDARDS OF KING COUNTY WATER DISTRICT #90.
8. THE MATERIALS AND METHODS OF INSTALLATION FOR ALL PUBLIC SANITARY SEWER SYSTEMS SHALL BE IN ACCORDANCE WITH
APPLICABLE STANDARDS OF CITY OF RENTON.
9. AT LEAST TWO COPIES OF THESE PLANS SHALL BE ON THE JOB SITE WHEN CONSTRUCTION IS IN PROGRESS. THE CONTRACTOR SHALL
ALSO HAVE COPIES OF THE APPLICABLE REGULATORY AGENCY STANDARDS AVAILABLE AT THE JOB SITE DURING THE RELATED
CONSTRUCTION OPERATIONS. ALL APPLICABLE PERMITS SHALL BE OBTAINED PRIOR TO ANY CONSTRUCTION ACTIVITY. ONE COMPLETE SET
OF PROJECT PLANS WITH RECORDS OF AS -BUILT INFORMATION SHALL BE PROVIDED TO THE PROJECT ENGINEER AT THE END OF THE
PROJECT.
10. THE CONTRACTOR SHALL COORDINATE ACTIVITIES OF ALL UTILITY PURVEYORS IMPACTED BY WORK FOR THIS PROJECT AND SHALL
CONTACT THEM PRIOR TO CONSTRUCTION TO SCHEDULE WORK FOR PROVISIONS FOR AND BE RESPONSIBLE TO SUPPORT, MAINTAIN, OR
OTHERWISE PROTECT AND KEEP IN SERVICE ALL EXISTING UTILITIES WHETHER SHOWN OR NOT SHOWN ON THESE PLANS DURING
CONSTRUCTION.
11. UTILITIES, OR INTERFERING PORTIONS OF UTILITIES, THAT ARE ABANDONED IN PLACE SHALL BE REMOVED BY THE CONTRACTOR TO
THE EXTENT NECESSARY TO COMPLETE THE PROPOSED WORK. THE CONTRACTOR SHALL PLUG THE REMAINING EXPOSED ENDS OF
ABANDONED UTILITIES. CUTTING AND PLUGGING OF LINES TO BE ABANDONED SHALL BE CONSIDERED INCIDENTAL TO OTHER WORK
PERFORMED.
12. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE THAT ALL PROVISIONS OF THE SOILS REPORT FOR THE SITE BE
OBSERVED AND COMPLIED WITH DURING ALL PHASES OF SITE PREPARATION, GRADING OPERATIONS, FOUNDATION, SLAB AND PAVING
CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE PROJECT ENGINEER IMMEDIATELY OF ANY PROVISION OF THE SOIL REPORT WHICH
CONFLICT WITH INFORMATION SHOWN ELSEWHERE ON THESE DRAWINGS, OR WHICH REQUIRES FURTHER CLARIFICATION.
13. THE CONTRACTOR OR OWNER SHALL OBTAIN THE SERVICES OF A QUALIFIED SOILS ENGINEER AND/OR TESTING AGENCY TO
PERFORM SUBGRADE/BACKFILL DENSITY TESTS OR TO DIRECT THE REMOVAL AND REPLACEMENT OF ANY UNSUITABLE MATERIALS DURING
CONSTRUCTION. A REPRESENTATIVE OF THE SOILS ENGINEER AND/OR TESTING AGENCY SHALL BE AVAILABLE TO OBSERVE AND TO
VERIFY FIELD CONDITIONS AS WORK PROCEEDS. THE SOILS ENGINEER SHALL SUBMIT FIELD REPORTS AS REQUIRED TO CERTIFY THE
METHODS AND MATERIALS ARE IN ACCORDANCE WITH PROJECT SPECIFICATIONS. THE CONTRACTOR SHALL COORDINATE THE APPROPRIATE
SOILS INSPECTIONS AND TESTING.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE TRAFFIC CONTROL DURING CONSTRUCTION ADJACENT TO OR
WITHIN ALL PUBLIC ROADWAYS. TRAFFIC CONTROL MEASURES SHALL BE IN PLACE PRIOR TO ANY CONSTRUCTION ACTIVITY. THE
CONTRACTOR SHALL MAINTAIN ACCESS TO ALL PRIVATE PROPERTY DRIVEWAYS DURING CONSTRUCTION.
15. ALL WORK PERTAINING TO THIS PROJECT SHALL BE SUBJECT TO INSPECTION BY THE
REPRESENTATIVE. PRIOR TO ANY SITE WORK, THE CONTRACTOR SHALL CONTACT
SCHEDULE A PRE -CONSTRUCTION CONFERENCE.
ICY
i,
THE AS -BUILT INFORMATION SHOWN ON
THIS PLAN IS PER A FIELD SURVEY
PERFORMED BY MEAD GILMAN
A SSOCIA TES AND/OR RECORD DATA
PROVIDED BY THE CONTRACTOR.
INSPECTOR OR HIS DESIGNATED
AT ( ---- )---------- TO
S-419402
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
I—
O
U
W
DATE:
CARNOUSTIE COURT 7/25/23 Cn
FlELDBOOK: Z)
SANITARY SEWER IMPROVEMENTS PAGE, O
DRAWING NO: z
LEGEND ABBREVIATIONS AND GENERAL NOTES C0.01
SHEEP: 2 OF: 10
U