Loading...
HomeMy WebLinkAboutP_Construction_Plans_20221101_V2Vicinity Map Sheet Index 3000 NE 4th Street Renton, Washington 98056 425-235-2352 Contact: Jacob Jackson Owner: 901 Fifth Avenue #3100 Seattle, Washington 98164 206-682-8300 Contact: Ross Whitehead AIA Renton Technical College Architect: Schreiber Starling Whitehead Architects 1500 Jefferson Street SE Olympia, WA 98501 P.O. Box 41476 Olympia, WA 98504-1476 253-377-8390 Contact: Eric Lara Owner's Representative: State of Washington Department of Enterprise Services Engineering & Architectural Services Mechanical Engineer: Bogard Pascua Engineers, PS 22121 17th Ave SE # 111 Bothell, WA 98021 425-415-6100 Contact: Lee Bogard PE Electrical Engineer: Case Engineering 19515 North Creek Parkway, Suite 302 Bothell, Washington 98011 425-402-9400 Contact: Michael Case PE Scope of Work 1. Selectively demolish existing Lab 110 and its associated Office 110A, and Lab 111 and its associated office 111A, to extent indicated. Construct within the limits of these spaces new Offices 110A through 110J and Kitchenette 110K. Work includes limited slab-on-grade demolition and replacement to support plumbing modifications, new interior walls and doors, modifications to an exterior wall for the limited purpose of installing new storefront, replacement of finishes, plumbing modifications to support a new sink, modifications to the existing HVAC system to support new use, and modifications of the electrical systems to support new use. 2. If Alternate Bid Item No. 1 is approved by the Owner, selectively demolish existing Classroom 115 to extent indicated. Provide modifications to an exterior wall for the limited purpose of installing new storefront and door, replacement of finishes, modifications to the existing HVAC system to support new use, and modifications of the electrical systems to support new use. 3. If Alternate Bid Item No. 2 is approved by the Owner, selectively demolish existing Classroom 120 to extent indicated. Work includes replacement of finishes, modifications to the existing HVAC system to support new use, and modifications of the electrical systems to support new use. Location Map N PROJECT LOCATION PROJECT LOCATION N State Approvals Barry Baker, Capital Projects and Space Planning Director for Renton Technical College Eric Lara, Project Manager for DES Facility Professional Services Nancy Deakins, Assistant Program Manager for DES Facility Professional Services Date Date Date General Notes 1. These drawings are intended to provide a general description of the scope of work and must be reviewed for intent as well as specific information. It is the sole responsibility of the Contractor to execute the work with generally accepted standards of quality construction to provide a completed project for intended purpose. 2. Field-verify all relevant dimensions and existing conditions. 3. 2018 IBC with adopted local amendments governs. Verify with agency having jurisdiction prior to start of work. 4. Call for all inspections required by public officials and agencies having jurisdiction at the project site. 5. DO NOT SCALE DRAWINGS. 6. Contractor is responsible for building security at all times during the construction phase of this project. Units of Measure: AWG American wire gauge BTU British thermal unit CF cubic foot (feet) CU IN cubic inch(es) CY cubic yard FT foot, feet GA gauge GAL gallon(s) IN inch(es) LB pounds LF linear feet MIN minimum MAX maximum PSF pounds per square foot PSI pounds per square inch R VALUE thermal resistance SF square foot (feet) SQ IN square inches U VALUE thermal conductance (1/R) V volt(s) VAC volts, AC VDC volts, DC W watts YD yard Terminology: @ at & and AB anchor bolt ACOUST acoustic ACP asphalt concrete paving ACT acoustic ceiling tile ACM aluminum composite material ADA accessible per IBC chap. 11 ADJ adjacent, adjustable A/E architect/ engineer AESS architecturally exposed structural steel AFF above finish floor AHJ authority having jurisdiction ALUM aluminum ANCH anchor ANOD anodized APPROX approximate AVG average AWP acoustic wall panel B base cabinet BB bulletin board BD board BF braced frame BLDG building BLKG blocking BOT bottom BR brochure rack BRG bearing BTF beat to fit BTWN between CB catch basin CD ceiling diffuser CEM cement CFCI contractor furnished / contractor installed CG corner guard CIP cast-in-place CJ control joint CLG ceiling CLR clear CMU concrete masonry unit COL column CONC concrete CONT continuous CONT contractor COORD coordinate CPT carpet CR card reader CT ceramic tile CTR center CUST custodial CW cold water CWC continuous work-counter CWP composite aluminum wall panel DA door actuator DBL double DC recessed display cabinet DET detail DF drinking fountain DIAG diagonal DIM dimension DN down DS downspout DWG drawing E east EA each EF each face; exhaust fan EJ expansion joint ELEC electrical EQ equal EST estimated EUT extended utility tunnel EWC electric water cooler (E)/EX existing EXH exhaust EXP expansion; exposed EXT exterior FACP fire alarm control panel FCR future card reader FD floor drain FDC fire department connection FDN foundation FE fire extinguisher FEC fire extinguisher cabinet FH fire hydrant FHA fire hydrant assembly FIN finish(ed) FLG flooring FLR floor FOS face of stud FPA fall protection anchor FURN furnish FV field verify GA gauge GALV galvanized GEN generator, general GFR glass fiber reinforced GL glass GWB gypsum wallboard GYP gypsum HB hose bibb HDWR hardware HGT height, high HID high intensity discharge HM hollow metal HORIZ horizontal ID inside diameter INCL include(d) INSUL insulation INT interior INV invert JB junction box - electrical, AV, or communications JST joist JT joint LAM laminate LAV lavatory LB light bollard LF light fixture LIN linear LOCS locations LPS laptop storage area MACH machine MAS masonry MATL material MAX maximum MB marker board MDF medium density fiberboard MDO medium density overlay MECH mechanical MFR manufacturer MH manhole MIN minimum MISC miscellaneous MO masonry opening MT mount MTD mounted MWP manufactured wall panel N north NAT natural NIC not in contract NOM nominal NRC noise reduction coefficient NTS not to scale O/ over OC on center; overcurrent OD outside diameter OFCI owner furnished / contractor installed OFOI owner furnished / owner installed OH overhead OPNG opening OPP opposite PATT pattern PERF perforated PERM permanent PIV post indicator valve PLAM plastic laminate PLBG plumbing PT paint PR pair PT pressure treated PTD painted PTN partition PV photovoltaic PVC polyvinylchloride PVMT pavement PLYWD plywood RA relief angle RB resilient base RD roof drain REF reference, refer REIN reinforced REQ'D required REV revise, revision, reverse RFB recessed floor box RHP radiant heat panel RJ reveal joint RL rain leader RM room RO rough opening S sink cabinet SAN sanitary SB standing height base cabinet SCHED schedule SF supply fan SGL single SIM similar SJC siesmic joint cover SMB sliding marker board SP stand pipe SPEC specification SQ square SS stainless steel STD standard STL steel STRUCT structural SURF surface SUSP suspended T toilet TB tackboard TC tall cabinet TEMP temporary TESC temporary erosion & sediment control T/O top of TOC top of concrete TOS top of steel; top of structure TOW top of wall TP toilet partition TYP typical UH unit heater UNEX unexcavated UNFIN unfinished UON unless otherwise noted VB vapor barrier VEH vehicle VERT vertical VIF verify in field VOL volume W west; wall cabinet W/ with WC water closet WD wood WF wide flange WH water heater; wall hydrant WL wind load W/O without WP weatherproof / waterproof WWF welded wire fabric WWP welded wire partition Abbreviations: Terminology (SEE LEGENDS & NOTES FOR EACH DISCIPLINE FOR ADDITIONAL ABBREVIATIONS)Symbols Legend Structural Grid Building Section Wall Section Reference Elevation Interior Elevation New Construction Equipment Tag Louver/ Window/ Storefront/ Curtain wall Type Door Tag DETAIL NUMBER SHEET NUMBER DETAIL NUMBER SHEET NUMBER HT AB0VE DATUM ITEM 2 A8.41 DETAIL NUMBER SHEET NUMBER METAL STUDTA-X SIZE OR TYPE TT-1CPT-1 FLOOR FINISH TRANSITION LINE: EXAMPLE: CPT-1 INSTALLED LEFT OF TRANSITION LINE & TT-1 INSTALLED RIGHT OF LINE Floor Finish Transition 0 1 Ref Exterior Elevation A4.11 DETAIL NUMBER SHEET NUMBER NUMBER Detail Callout DETAIL NUMBER SHEET NUMBER Wall Type or Partition Type P1 Ceiling Type Tag ACT1 Floor Type Tag F2 Room Tag NUMBER ROOM NAME Casework Tag CASEWORK TYPE, BASED ON NWAAS 4.0 CASEWORK DESIGN SERIES "M" INDICATES TYPE HAS BEEN MODIFIED FROM STANDARD ITEM WIDTH (IN INCHES) ITEM HEIGHT (IN INCHES) ITEM DEPTH (IN INCHES) SEE NOTE 2 BELOW CASEWORK SPECIFICATION NOTES: 1. SYMBOL "AWC" INDICATES THAT CASEWORK IS SPECIFIED IN 06 4100 - ARCHITECTURAL WOOD CASEWORK. 2. SYMBOL WITHOUT "AWC" INDICATES THAT CASEWORK IS SPECIFIED IN 12 3550 INSTITUTIONAL CASEWORK. A5.01 1 1 A4.20 Office 101 S01 101A5.01 1 Third Floor EL: 32'-0" AWC 401M 24 2436 Existing Construction METAL STUD Client Project No: Date: SSW Architects Project No: G1.00 Title Sheet Permit Set Building J First Floor Remodel Phase 1 10/04/2022 2022-511 G (1-1) 22002 Building J First Floor Remodel Phase 1 Renton Technical College 3000 NE 4TH ST 98056 State Project No. 2022-511 G (1-1) Permit Set G1.00 Title Sheet R2.00 Code Compliance R2.10 Life Safety Diagrams A1.00 Site Plan A2.01 First Floor Demolition Plan A2.02 Existing Conditions Photographs A2.11 RCP Demolition Plan A3.01 First Floor Plan A3.02 Enlarged Floor Plans A4.01 Sections A6.01 Fenestration Assemblies & Exterior Details A7.00 Room & Door Schedules A7.10 Partition Types & Interior Details A7.40 Interior Door & Relite Details A9.00 Interior Elevations A9.01 Interior Elevations A10.10 First Floor Reflected Ceiling Plan M1.00 Mechanical Cover Sheet M1.01 Mechanical Equipment Schedules M1.02 Mechanical Calculations M2.01 First Floor Demolition Plan - Mechanical M3.01 First Floor Plan - Mechanical M4.01 First Floor Plan - Fire Protection E0.01 Symbol Legend, Abbreviations, Sheet List E0.02 Fixture Schedule and WSEC Compliance Forms ED2.01 First Floor Power Demolition Plan E2.01 First Floor Power Plan ED3.01 First Floor Lighting Demolition Plan E3.01 First Floor Lighting Plan E9.01 Partial Riser Diagram, Panel Schedules E10.01 Panel Schedules T0.01 Telecom and Low Voltage Legend and Drawing Index T0.02 Electrical and Abbreviations and General Notes T0.03 Telecom and Low-Voltage Rough-in Schedules T6.01 Telecom Floor Plan Level 1 - Area B T8.01 Telecom Details T8.02 Telecom Details TD6.01 Telecom Demo Plan Level 1 - Area B RECEIVED 10/05/2022 striplett BUILDING DIVISION B22005282_V1REVIEWED Rick Lee 11/01/2022 BUILDING DIVISION THIS SET OF APPROVED PLANS MUST BE ON THE JOB AT ALL TIMES DURING CONSTRUCTION. THIS BUILDING IS NOT TO BE OCCUPIED UNTIL AFTER FINAL INSPECTON BY THE RENTON BUILDING DIVISION AND RECEIPT OF CERTIFICATE OF OCCUPANCY. APPROVAL SHALL NOT BE CONSTRUCTED AS THE AUTHORITY TO VIOLATE OR CANCEL ANY PROVISIONS OF CODES, ORDINANCES, OR OTHER REGULATIONS Note: This approval is for the non structural review only. Building Code Analysis General Analysis: • There are no internal fire separations required per IBC. • See & for egress and life safety diagrams Occupancy Classification (IBC 508.1): Each portion of a building shall be individually classified in accordance with section 302.1. Where a building contains more than one occupancy group, the building shall comply with the applicable provisions of section 508.2, 508.3 or 508.4. B: (New & Existing spaces) Business Group containing use for office, professional service-type transactions, including storage of records and accounts (IBC 304.1) S-1: (Existing spaces only) Moderate hazard storage for uses not classified as Group S-2 (IBC 311.2) Egress Means of Egress (IBC 1004.5): Assembly - Unconcentrated (tables and chairs): 1 occupant per 15 net sf Business Areas (Offices): 1 occupant per 150 gross sf Educational (Classroom): 1 occupant per 20 net sf Educational (Shop): 1 occupant per 50 net sf Kitchen: 1 occupant per 200 gross sf Storage: 1 occupant per 300 gross sf Spaces with One Exit (IBC 1006.2.1) Occupancy Max Occupants Max Distance B 49 100' S 29 100' Max Travel Distance (IBC 1017.2): Occupancy Max Distance B 300' S-1 250' Egress Width (IBC 1005.3.2) The capacity, in inches, of means of egress components other than stairways shall be calculated by multiplying the occupant load served by such component by means of egress factor of 0.2 inch per occupant *Sprinkler Exception = 0.15 Exit Separation (IBC 1007.1.1) Where two exits are required, they shall be placed a distance apart equal to not less than one half of the length of the maximum overall diagonal dimension of the building *Sprinkler Exception = one third Dead Ends (IBC 1020.4) Where more than one exit is required, the exit access shall be arranged such that there are no dead end corridors more than 20 feet in length *Sprinkler Exception = 50 feet Encroachment Doors (IBC 1005.7.1) Doors, when fully opened, shall not reduce the required (egress) width by more than 7 inches (178 mm). Doors in any position shall not reduce the required width by more than one-half. Fire Protection Systems Automatic Sprinkler System (IBC 903) The building will be equipped throughout with an automatic sprinkler system designed in accordance with IBC 903.1.1 & NFPA 13 Portable Fire Extinguishers Ordinary (Moderate) Hazard Occupancies (IBC 906.3) Min Rating: 2-A Max Floor Area: 11,250 sf Max Distance: 75 feet Fire Separations Separated Occupancies (IBC 508.4) B to S-1 = No separation requirement *All spaces are classified as B or S-1 and therefore no separations of occupancies are required Occupant Load Calculations (1004.1.2): No changes to existing occupant loads. Occupant loads are not increasing Plumbing Calculations (2902.1): No changes to existing plumbing required. Plumbing loads are not increasing Applicable Codes • 2018 International Building Code (IBC) • 2018 Washington State Building Code • 2018 International Existing Building Code (IEBC) • 2018 Washington State Existing Building Code • 2018 International Energy Conservation Code (IECC) • 2018 Washington State Energy Code (WSEC) - WAC-51-11C • 2018 International Mechanical Code (IMC) - WAC 51-52 • 2018 Washington State Mechanical Code • 2018 International Fire Code (IFC) • 2018 Washington State Fire Code • 2018 Uniform Plumbing Code (UPC) – WAC 51-56 • 2018 Washington State Plumbing Code • 2020 National Electrical Code (NFPA 70) • 2017 ICC A117.1 • 2010 DOJ ADA Standards for Accessible Design Municipal Code Analysis Construction Classification Occupancy Classification(s) Type II-B (Non-combustible, Fully Sprinklered) Ref. 2018 IBC 602.2 Mixed Occupancy including B, S-1 & U Parcel Number(s) 722780-0500 & 722780-0475 (existing building spans multiple parcels) Legal Description(s) PARCEL 722780-0500: RENTON HIGHLANDS # 2 CORRECT PLAT LESS ST & POR VAC STS ADJ PARCEL 722780-0475: RENTON HIGHLANDS # 2 CORRECT PLAT & POR VAC STS ADJ Address 3000 NE 4TH ST RENTON, WA 98056 General Analysis: • No Land Use permit anticipated • Parking for the existing building is provided on campus. The project does not modify the use of the building. No parking alterations are planned as part of the project Zoning CA Commercial Arterial /1 R2.10 /2 R2.10 Energy Code Analysis Building Envelope (WSEC C503.3) New building envelope assemblies that are part of the alteration shall comply with section C402.1 through C402.5 as applicable Exception: Air leakage testing is not required for alterations or r repairs, unless the project includes a change in space codnitioning according to section C503.2 or a chnage of occupancy or use according to Section C505.1 Envelope Insulation Min (WSEC C402.1.3): Assembly Min Required Provided Roof: R-38ci N/A Wall (Mass): R-9.5 ci N/A Wall (Steel): R-13 + R-10 ci *R-13 + R-10 ci Wall (Wood): R-21 int N/A Floor (SOG): R-10 for 24" below N/A *No new roof, wall or floor assemblies in project Vertical Fenstration (WSEC C503.3.2) The addition of vertical fenestration that resutls in total building vertical fenestration area less than or equal to that specirfied in C402.4.1 shall comply with section C402.4. Vertical Fenestration Max (WSEC C402.4): U-Factor Metal Framing (Fixed): 0.38 Metal Framing (Operable): 0.40 Metal Framing (Entrance): 0.60 SHGC SHGC SEW N PF < 0.2 0.38 0.51 0.2 < PF < 0.5 0.46 0.56 PF > 0.5 0.61 0.61 *See sheet A6.01 for analysis & calculations Maximum Fenestration (WSEC C402.4.1): The vertical fenestration area (not including opaque doors and opaque spandrel panels) shall not exceed 30 percent of the gross above-grade wall area. The skylight area shall not exceed 3 percent of the gross roof area * See for analysis & calculations/1 R2.00 WALL: 5,972 SF FENESTRATION: 394 SF TOTAL: 6,366 SF FENESTRATION %: 6.2% WALL: 3,394 SF (E) FENESTRATION: 257 SF (N) FENESTRATION: 93 SF TOTAL: 3,744 SF FENESTRATION %: 9.3% NEW STOREFRONT 35 ADDITIONAL SF COMPARED TO (E) WINDOW WALL: 5,879 SF (E) FENESTRATION: 419 SF (N) FENESTRATION: 35 SF TOTAL: 6,333 SF FENESTRATION %: 7.2% WALL: 3,496 SF FENESTRATION: 220 SF TOTAL: 3,716 SF FENESTRATION %: 5.9% WINDOWS NOT CONSTRUCTED WALL: 2,755 SF FENESTRATION: 45 SF TOTAL: 2,800 SF FENESTRATION %: 1.6% WALL: 3,110 SF FENESTRATION: 154 SF TOTAL: 3,264 SF FENESTRATION %: 4.7% NEW STOREFRONT 93 ADDITIONAL SF Client Project No: Date: SSW Architects Project No: R2.00 Code Compliance Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 1/16" = 1'-0"R2.00 Existing Elevations -Maximum Fenestration1 Fenestration Percentage Elevation Wall Fenestration Total Percentage East (North) 5,879 SF 454 SF 6,333 SF 7.2% East (South) 3,496 SF 220 SF 3,716 SF 5.9% North 2,775 SF 45 SF 2,800 SF 1.6% South 3,110 SF 154 SF 3,264 SF 4.7% West (North) 5,972 SF 394 SF 6,366 SF 6.2% West (South) 3,394 SF 350 SF 3,744 SF 9.3% 24,626 SF 1,617 SF 26,223 SF 6.2% Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION UP UP UP UP UP UP UP UP UP UP XXX XXX Required Exit Direction of Egress & Occupant Load Portable Fire Extinguisher in Cabinet B: Business Occupancy Room Area Occupant Load Factor Occupant Load 2-HR Fire Barrier FEC 1-HR Fire Barrier S-1: Storage U: Utility Space (No Occupancy) Room Tag 3-HR Fire Barrier Life Safety Diagram Legend XXX SF OL Factor: XXX OL: XXX B: Classroom Existing Area with No Work 105 SF OL: 1 OL Factor: 150 B: Office 103 SF OL: 1 OL Factor: 150 B: Office 104 SF OL: 1 OL Factor: 150 B: Office 104 SF OL: 1 OL Factor: 150 B: Office 103 SF OL: 1 OL Factor: 150 B: Office 105 SF OL: 1 OL Factor: 150 B: Office 104 SF OL: 1 OL Factor: 150 B: Office 105 SF OL: 1 OL Factor: 150 B: Office 104 SF OL: 1 OL Factor: 150 B: Office 49 SF OL: 1 OL Factor: 200 B: Kitchenette 104 SF OL: 1 OL Factor: 150 B: Office 1566 SF OL: 79 OL Factor: 20 B: Classroom 822 SF OL: 42 OL Factor: 20 B: Conference/ClubsOffice Suite39 40 42S-1: Mech.Men's Women's B: Conference B: Office B: Classroom S-1: Cust.S-1: Sprinckler ValveRoomB: Classroom B: Office S-1: Storage S-1: Boiler/Prop Maint. Asst.Elevator9 10 B: Computer Networking B: Emergency Dispatcher B: Ophthalmic Assistant B: Office S-1: Support B: Computer Networking B: Computer Networking S-1: StorageB: Office B: Office B: Computer Science Lab B: Office B: Computer LabS-1: Elect B: Computer Lab B: Copmuter Science Computer Lab B: Office B: Copmuter Lab B: Office DIA G O N AL DIST AN CE = 57'-9" DOOR SEPARATION = 31'-6"19'-3" MIN REQ'D (IBC 1007.1.1) 35 SF OL: 3 OL Factor: 15 B: Lounge 62 SF OL: 5 OL Factor: 15 B: Lounge S-1: Elec S-1: Storage Exterior Covered Corridor EGRESS UP STAIRS (ON LEVEL 2 TYP)79"36"DOOR FULLY OPENS TO NOT REDUCE THE REQUIRED WIDTH BY MORE THAN 7 INCHES (IBC 1005.7.1) DOOR SWING DOES NOT REDUCE THE REQUIRED WIDTH BY MORE THAN ONE- HALF (IBC 1005.7.1) PARTIAL HEIGHT RETAINING WALL TYPFEC Phase Function Existing Construction B: Business B: Business Occupant Load Factor Occupant Load Varies GSF Varies GSF Area 4,041 sf 3,548 sf 195 140 Level 1 Occupancy Load Analysis *Project reduces total building occupant load, & improves egress 75 39 39 741 SF OL: 38 OL Factor: 20 B: Classroom 741 SF OL: 38 OL Factor: 20 B: Classroom 1468 SF OL: 74 OL Factor: 20 B: Classroom 88 SF OL: 1 OL Factor: 150 B: Office 822 SF OL: 42 OL Factor: 20 B: Classroom 83 SF OL: 1 OL Factor: 150 B: Office 83 SF OL: 1 OL Factor: 150 B: Office 42 1 1 1 B: Computer Networking B: Emergency Dispatcher B: Ophthalmic Assistant B: Office B: Office S-1: StorageB: Office B: Computer Networking B: Computer Networking S-1: Support S-1: ElectB: Computer LabB: Office B: Computer Science Lab B: Computer Lab B: Computer Lab B: Office B: Office B: Computer Science Computer Lab S-1: MechMen's Women's ElevS-1: Boiler/ Prop Maint. Asst. S-1: Storage S-1: Storage B: Office B: Conference B: Office B: Classroom S-1: Sprinkler ValveRoomS-1: Cust S-1: Elec B: Classroom Exterior Covered Corridor EGRESS UP STAIRS (ON LEVEL 2 TYP) Client Project No: Date: SSW Architects Project No: R2.10 Life Safety Diagrams Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 NScale: 1/16" = 1'-0"R2.10 Construction Code Plan -Level 12 Room Occupancy Loads - Construction Number Name Area Occ Type Load Factor Occ Load 110A Office 105 SF B 150 1 110B Office 104 SF B 150 1 110C Office 103 SF B 150 1 110D Office 105 SF B 150 1 110E Office 104 SF B 150 1 110F Office 104 SF B 150 1 110G Office 104 SF B 150 1 110H Office 104 SF B 150 1 110I Office 103 SF B 150 1 110J Office 105 SF B 150 1 110K Kitchenette 49 SF B 200 1 110L Lounge 35 SF B 15 3 110M Lounge 62 SF B 15 5 115 Classroom 1566 SF B 20 79 120 Conference/Clubs 822 SF B 20 42 B: 15 3576 SF 140NScale: 1/16" = 1'-0"R2.10 Existing Code Plan -Level 11 Room Occupancy Loads - Existing Number Name Area Occ Type Load Factor Occ Load 110 Classroom 741 SF B 20 38 110A Office 83 SF B 150 1 111 Classroom 741 SF B 20 38 111A Office 83 SF B 150 1 115 Classroom 1468 SF B 20 74 115A Office 88 SF B 150 1 117 Classroom 822 SF B 20 42 B: 7 4027 SF 195 Permit Set 10/04/2022 UP UP 1566 SF OL: 79 OL Factor: 20 B: Classroom 822 SF OL: 42 OL Factor: 20 B: Classroom 39 40 42 n's B: Conference B: Office B: Classroom S-1: Cust.S-1: Sprinckler ValveRoomB: Classroom B: Office S-1: Storage S-1: Boiler/Prop Maint. Asst.ElevatorDIA G O N AL DIST AN CE = 57'-9" DOOR SEPARATION = 31'-6"19'-3" MIN REQ'D (IBC 1007.1.1) S-1: Elec S-1: Storage Exterior Covered Corridor 79" 36" DOOR FULLY OPENS TO NOT REDUCE THE REQUIRED WIDTH BY MORE THAN 7 INCHES (IBC 1005.7.1) DOOR SWING DOES NOT REDUCE THE REQUIRED WIDTH BY MORE THAN ONE- HALF (IBC 1005.7.1) PARTIAL HEIGHT RETAINING WALL TYP Phase Function Existing Construction B: Business B: Business Occupant Load Factor Occupant Load Varies GSF Varies GSF Area 4,041 sf 3,548 sf 195 140 Level 1 Occupancy Load Analysis *Project reduces total building occupant load, & improves egress Room Occupancy Loads - Construction Number Name Area Occ Type Load Factor Occ Load 110A Office 105 SF B 150 1 110B Office 104 SF B 150 1 110C Office 103 SF B 150 1 110D Office 105 SF B 150 1 110E Office 104 SF B 150 1 110F Office 104 SF B 150 1 110G Office 104 SF B 150 1 110H Office 104 SF B 150 1 110I Office 103 SF B 150 1 110J Office 105 SF B 150 1 110K Kitchenette 49 SF B 200 1 110L Lounge 35 SF B 15 3 110M Lounge 62 SF B 15 5 115 Classroom 1566 SF B 20 79 120 Classroom 822 SF B 20 42 B: 15 3576 SF 140 RECEIVED 11/01/2022 striplett BUILDING DIVISION B22005282_v2 0 25'50'100' Building J Building I Building H Building K1 Kirkland Ave NEJefferson Ave NE NE 6th St Monroe Ave NEP7 P8 P6 P5 P9 Project Location 313' - 6"138' - 5 7/8" Parcel 7227800475 Parcel 7227800500 Parcel 7227800425 Client Project No: Date: SSW Architects Project No: A1.00 Site Plan Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 N Scale: 1" = 50'-0"A1.00 Site Plan1 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 12 C A ROBOTICS LAB 110 OFFICE 111A OFFICE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D21 31 PSMB RW TB6MB RW TBRWRWRW MB MBMBPS PS PS RW RWRW MB MBMBMBTB TBMB MBMBMBMB 66 MBMB 1 24678 9 TB 10 1112537 8 4421' - 6"21' - 6"21' - 6"11' - 0"10' - 6"9' - 0"22' - 8"24' - 0"27' - 0" 24' - 0"30' - 0"30' - 0"24' - 0"7' - 1"6' - 3"6' - 3"4' - 8" 9' - 9" 5' - 6"1' - 4"6' - 11" 4' - 11"4' - 6"4"27' - 6 1/2"10' - 6" 2' - 2 1/2" 9 8' - 7 1/4"10 3/4"ALT. BID ITEM NO. 1 ALT. BID ITEM NO. 2 Demolition Notes 1. See Mechanical and Electrical drawings for additional demolition and salvage scope of work. 2. Remove demolished materials from site unless noted otherwise. 3. Keep Fire Lanes clear and accessible at all times. 4. Construction limits indicate the primary extent of the work area and are approximate. Coordinate all work outside these limits with Architect, to avoid impact to Owner's ongoing campus operations. 5. Protect existing site structures, components, and appurtenances to remain from any damage. Contractor to repair any damage caused by demolition activities to the satisfaction of the Owner. 6. Floor finishes to remain unless noted otherwise. New flooring to go directly over existing flooring. Demolition Legend Demolition flag noteX Existing wall to remain Existing wall to be demolished Existing door to remain Existing door to be demolished Existing window to remain Existing window to be demolished Existing acoustic ceiling tile system to be demolished. Salvage ceiling tiles Existing acoustic ceiling tile system to remain Existing plaster ceiling to remain Existing light fixtures to be demolished Supply and return diffusers to be demolishedExisting Area with No Work #Reference Photo Tag Client Project No: Date: SSW Architects Project No: A2.01 First Floor Demolition Plan Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 NScale: 1/8" = 1'-0"A2.01 Demolition Plan -Level 11 NKey Plan Demolition Flag Notes Number Note 1 Demolish partition wall, typical 2 Demolish window and / or exterior wall for new fenestration. See Construction Plans & Details. Existing concrete curb to remain 3 Demolish exterior wall for new door. See Construction Plans. Sawcut existing 6" concrete curb and finish level to floor slab. 4 Demolish HM door and frame, infill opening 5 Demolish ceiling grid and salvage ceiling tiles, typ. 6 Demolish tall storage cabinets 7 Demolish wall mounted data box 8 Demolish condensate drain pipe. Reroute drain per Mechanical 9 Demolish 4" thick concrete floor slab to connect waste pipe to new sink. See Construction and Plumbing drawings MB Remove and salvage markerboards PS Remove and salvage projector and screen RW Demolish existing wall mounted electrical and data raceway TB Remove and salvage tackboard Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION Client Project No: Date: SSW Architects Project No: A2.02 Existing Conditions Photographs Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Demolition Photo - Computer Science 1111 Demolition Photo - Computer Science 1112 Demolition Photo - Robotics Lab 1103 Demolition Photo - Robotics Lab 1104 Demolition Photo - Office 111A5 Demolition Photo - Classroom 1156 Demolition Photo - Classroom 1157 Demolition Photo - Classroom 1158 Demolition Photo - Classroom 1159 Demolition Photo - Nursing 11710 Demolition Photo - Nursing 11711 Demolition Photo - Exterior12 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 12 C A ROBOTICS LAB 110 SERVER/OFFICE 111A STORAGE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D 5 5 5 PS PS PS PS 3 A4.01 2 A4.01 ALT. BID ITEM NO. 1 ALT. BID ITEM NO. 2 Demolition Notes 1. See Mechanical and Electrical drawings for additional demolition and salvage scope of work. 2. Remove demolished materials from site unless noted otherwise. 3. Keep Fire Lanes clear and accessible at all times. 4. Construction limits indicate the primary extent of the work area and are approximate. Coordinate all work outside these limits with Architect, to avoid impact to Owner's ongoing campus operations. 5. Protect existing site structures, components, and appurtenances to remain from any damage. Contractor to repair any damage caused by demolition activities to the satisfaction of the Owner. 6. Floor finishes to remain unless noted otherwise. New flooring to go directly over existing flooring. Demolition Legend Demolition flag noteX Existing wall to remain Existing wall to be demolished Existing door to remain Existing door to be demolished Existing window to remain Existing window to be demolished Existing acoustic ceiling tile system to be demolished. Salvage ceiling tiles Existing acoustic ceiling tile system to remain Existing plaster ceiling to remain Existing light fixtures to be demolished Supply and return diffusers to be demolishedExisting Area with No Work #Reference Photo Tag Client Project No: Date: SSW Architects Project No: A2.11 RCP Demolition Plan Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 NScale: 1/8" = 1'-0"A2.11 Level 1 RCP Demo1 NKey Plan Demolition Flag Notes Number Note 1 Demolish partition wall, typical 2 Demolish window and / or exterior wall for new fenestration. See Construction Plans & Details. Existing concrete curb to remain 3 Demolish exterior wall for new door. See Construction Plans. Sawcut existing 6" concrete curb and finish level to floor slab. 4 Demolish HM door and frame, infill opening 5 Demolish ceiling grid and salvage ceiling tiles, typ. 6 Demolish tall storage cabinets 7 Demolish wall mounted data box 8 Demolish condensate drain pipe. Reroute drain per Mechanical 9 Demolish 4" thick concrete floor slab to connect waste pipe to new sink. See Construction and Plumbing drawings MB Remove and salvage markerboards PS Remove and salvage projector and screen RW Demolish existing wall mounted electrical and data raceway TB Remove and salvage tackboard Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 12 C A Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Classroom 115 120Office Suite110ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E 4 A4.01 4 A4.01 110.2 110J 110I 110H 110G 110F 110E 110D 110B 110C 110A 110.1 115.1 MENS MECH. 100B 100C 100D 1 A4.01 1 A4.01 113A.1 MB8 TB6 MB6MB12 A9.01 1 A9.01 6 5 TB6 FS FS MB8 473' - 6" CLR (FIELD VERIFY)3 A4.01 21' - 6"21' - 6"21' - 6"11' - 0"10' - 6"24' - 0"27' - 0" 24' - 0"30' - 0"30' - 0"24' - 0"SF-1 115.2A1 4' - 6"4"MB8MB82 3 A1 2 A4.01 2 A4.01 9' - 0"22' - 8"7 FS 117 SF-2 7' - 6 1/2"10' - 6" 2' - 2 1/2" 4' - 11" TB6 1122A3.02 1 8' - 7 1/4"10 3/4" (FIELD VERIFY) 23' - 6" CLR 44 4ALT. BID ITEM NO. 1 ALT. BID ITEM NO. 2 FEC MB5 Floor Plan Notes 1. Refer to Sheet T1.00 for Floor Plan Legend 2. Refer to A7.01 for Finish Schedule and floor finish transition details and typical corridor finishes. 3. See Sheet A7.10 for partition types. Partitions are type A1 UON. 4. Existing metal stud walls are aligned with center of wall on Gridline unless noted otherwise. Existing metal stud walls are dimensioned to center of stud unless noted otherwise. 5. New metal stud walls are dimensioned from face of stud unless noted otherwise. New metal studs walls dimensioned to centerline of stud are marked ("CL"). 6. Dimensions noted as clear ("CLR") are from final finished surface to final finished surface. 7. At sound retardant walls, provide batt insulation across full extent of partition, including returns, jogs, and corners, whether indicated or not, for complete isolation of space. 8. Mechanical, and electrical components identified on architectural plans are for general information and are not intended to fully describe such features. For full descriptions, see respective drawings. 9. All conduit, piping, and ductwork to be concealed UON. Where exposed it shall be routed tight to deck or wall where indicated, it may span or attach tight to bottom of structure. 10. Coordinate with Electrical for floor boxes for power and data. 11. Provide blocking and backing for all wall-mounted materials, accessories, equipment, and furnishings Including these indicated as owner furnished and/or owner installed. (OF/OI, OF/CI) - Coordinate with all other disciplines. 12. Patch & repair GWB wall finish where damaged during demolition Floor Plan Legend Construction flag noteX Existing wall MBXX Marker board - See Specifications for types and sizes TBXX Tack board - See Specifications for types and sizes FS 86" Flat screen - OFOI (See G1.00 for additional floor plan symbols) New wall Infill patch at concrete slab on grade Infill finish underlayment Existing - No Work Area of Work Fire Extinguisher CabinetFEC Client Project No: Date: SSW Architects Project No: A3.01 First Floor Plan Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 NScale: 1/8" = 1'-0"A3.01 First Floor1 NKey Plan Construction Flag Notes Number Note 1 Where walls were demolished, infill floor with self-drying cement based finish underlayment. Finish to the level of existing VCT (+/- 1/8") 2 At wall infills, match existing wall construction. Wall tag shown on plans is estimate of exsiting construction. Patch & repair GWB to tie new wall finish into existing. Paint entire wall from corner to corner on both sides per schedule or to match existing. 3 Infill 4" thick concrete floor slab where demolished to connect waste line. Cooridnate with Demolition and Plumbing drawings. See 6/A7.10 4 Patch & Repair GWB wall where casework was demolished 5 Typical at under-floor electrical raceway access. Install carpet overaccess panel and cut along edge to maintain access. Permit Set 10/04/2022 Classroom B22005282_v2RECEIVED 11/01/2022 striplett BUILDING DIVISION NOT TO BE USED AS A LOUNGE Floor Plan Notes 1. Refer to Sheet T1.00 for Floor Plan Legend 2. Refer to A7.01 for Finish Schedule and floor finish transition details and typical corridor finishes. 3. See Sheet A7.10 for partition types. Partitions are type A1 UON. 4. Existing metal stud walls are aligned with center of wall on Gridline unless noted otherwise. Existing metal stud walls are dimensioned to center of stud unless noted otherwise. 5. New metal stud walls are dimensioned from face of stud unless noted otherwise. New metal studs walls dimensioned to centerline of stud are marked ("CL"). 6. Dimensions noted as clear ("CLR") are from final finished surface to final finished surface. 7. At sound retardant walls, provide batt insulation across full extent of partition, including returns, jogs, and corners, whether indicated or not, for complete isolation of space. 8. Mechanical, and electrical components identified on architectural plans are for general information and are not intended to fully describe such features. For full descriptions, see respective drawings. 9. All conduit, piping, and ductwork to be concealed UON. Where exposed it shall be routed tight to deck or wall where indicated, it may span or attach tight to bottom of structure. 10. Coordinate with Electrical for floor boxes for power and data. 11. Provide blocking and backing for all wall-mounted materials, accessories, equipment, and furnishings Including these indicated as owner furnished and/or owner installed. (OF/OI, OF/CI) - Coordinate with all other disciplines. 12. Patch & repair GWB wall finish where damaged during demolition F G H I 6 7 1 A4.01 A9.00 1 A9.00 2 A9.004 5 3 A4.01 3 2 A4.01 24' - 0" 110J 110I 110H 110F 110G 110D 110E 110C 110B 110A Office Suite 110 Office 110F Office 110H Office 110I Office 110G Office 110E Office 110D Office 110B Office 110C Office 110A Kitchenette 110K21' - 6"21' - 6"11' - 0"A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A1 A2 SF-1 110.2 4' - 0"11' - 6"11' - 11 3/4"9' - 6 1/4"2' - 6"12' - 7 1/2"6' - 4 1/2"5' - 7 3/4"5' - 4 1/4"6"4' - 0"111Office 110J 11ALIGN FINISH F/O WALL W/ F/O (E) COLUMN 9' - 1"5' - 10"9' - 1"12' - 2 1/2"3' - 3 1/2"9' - 4"12' - 2"12' - 2"9' - 4"3' - 3 1/2"7' - 8 1/2"CL CL CL CLR+/- 10 3/4"21' - 6"21' - 6"11' - 0"5' - 6"1' - 3"7' - 0"1' - 2" (E) COLUMN TYP (E) WALL TYP ALIGN SF JAMB W/ (E) WINDOW JAMB 110.1 3 RF-1 CPT-1 CL CL CL FEC 5' - 0"A7.10 18 Floor Plan Legend Construction flag noteX Existing wall MBXX Marker board - See Specifications for types and sizes TBXX Tack board - See Specifications for types and sizes FS 86" Flat screen - OFOI (See G1.00 for additional floor plan symbols) New wall Infill patch at concrete slab on grade Infill finish underlayment Existing - No Work Area of Work Fire Extinguisher CabinetFEC Client Project No: Date: SSW Architects Project No: A3.02 Enlarged Floor Plans Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Construction Flag Notes Number Note 1 Where walls were demolished, infill floor with self-drying cement based finish underlayment. Finish to the level of existing VCT (+/- 1/8") 2 At wall infills, match existing wall construction. Wall tag shown on plans is estimate of exsiting construction. Patch & repair GWB to tie new wall finish into existing. Paint entire wall from corner to corner on both sides per schedule or to match existing. 3 Infill 4" thick concrete floor slab where demolished to connect waste line. Cooridnate with Demolition and Plumbing drawings. See 6/A7.10 4 Patch & Repair GWB wall where casework was demolished 5 Typical at under-floor electrical raceway access. Install carpet overaccess panel and cut along edge to maintain access.NScale: 1/4" = 1'-0"A3.02 Enlarged Plan @ Office Suite1 NKey Plan Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION First Floor EL: 0' - 0" ED Second Floor EL: 12' - 6" FC 12' - 6"9' - 0"Classroom 115 A6.01 3 A6.01 7 5 A6.01 OPP OPP First Floor EL: 0' - 0" Second Floor EL: 12' - 6" 6 7 1 A4.01 Office 110H Office Suite 110 Office 110I 2 A4.01 First Floor EL: 0' - 0" E Second Floor EL: 12' - 6" FGHIJ 3 A4.01 Office Suite 110 Office 110B Office 110D Office 110F Office 110H Office Suite 110 A7.10 20OPP A7.10 20 110B 110D 110F 110H 110J RS-1 RS-1 RS-1 RS-1 First Floor EL: 0' - 0" E Second Floor EL: 12' - 6" F G H I J 3 A4.01 Office 110J Office 110I Office 110G Office 110E Office 110C Office 110A 110J 110I 110G 110E 110C 110A A7.10 20 A7.10 19 RS-1 RS-1 RS-1 RS-1 RS-1 RS-1 Client Project No: Date: SSW Architects Project No: A4.01 Sections Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 1/4" = 1'-0"A4.01 Section -Grid 10 (Alt. Bid Item No. 1)4 Scale: 1/4" = 1'-0"A4.01 Section -Grid F3 Scale: 1/4" = 1'-0"A4.01 Section -Grid 61 Scale: 1/4" = 1'-0"A4.01 Section -Grid 72 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION Fenestration Notes 1. Fenestration types starting with "SF" are storefront. 2. Overall dimensions shown are for rough openings UON. Manufacturer to coordinate tolerances required to accommodate expansion and contraction, backer rod and sealant, hardware, and to allow full movement of operable sashes. 3. Frame depth and sight line dimensions indicated are nominal UON. Referenced fenestration details use generic profiles with specific sizes. Contractor shall provide detail revisions resulting from specific manufacturer's profiles for Architect's approval at no additional cost to the Owner. 4. See glazing specifications for all glazing types. Provide (insulating) glazing units in all windows, storefront, entrances, and curtain walls UON. 5. Provide tempered glazing where indicated by "T". Whether indicated or not, provide tempered glazing where required by applicable codes / authorities having jurisdiction. 6. Field-verify all rough openings prior to fabrication. 7. Dam ends at all sill flashings. 8. Provide all closure plates, mullion covers, etc. indicated at storefronts and curtain walls. 9. Provide continuous backer rod and sealant between all window, storefront, louver, entrance and curtain wall frames and adjacent construction, in color as selected by Architect. All joint widths shall be 3/8" wide UON. 10. Where jamb detail is only called out on one side, the other side is similar and opposite unless noted otherwise. 11. NFRC label certificates are required for the storefront glazing, curtain walls and other site-fabricated fenestration. See Exterior Fenestration schedule for required U-factor & Solar Heat Gain Coefficient (SHGC) values. See specifications for submittal requirements. The NFRC certificates are required to be available to inspectors on-site before any portion of the fenestration assembly is installed. Fenestration Legend Glass panel T SF-1 2 CHARACTER FENESTRATION TYPE NUMBER IDENTIFIER FENESTRATION SCHEDULE IDENTIFIER TAG T T T Tempered Glass PanelFV+/- 2"8' - 10"2' - 4"4' - 7"1' - 11"7' - 0" EQ EQ SF-12 A6.01 6 A6.01 4 A6.01 4 A6.01 SIM (E) CJ IN STUCCO NEW CJ FV & ALIGN W/ (E) HORIZONTAL MULLIONS ON ADJ WINDOWS (E) EXTERIOR SOFFIT Fenestration Permit Notes 1. Storefront Basis of Design: Kawneer Trifab 451 UT with Vitro Solarban 60 Starphire + Starphire 1" insulated glazing unit 2. All units meet SHGC requirements of 2018 WSEC based on orientation and projection factor. See sheet R2.00 3. All fixed units meet U-Value requirement of 0.38 max per 2018 WSEC (E) INTERIOR CONCRETE SLAB 8" ALUM SADDLE THRESHOLD - SET IN FULL BED OF SEALANT INSULATED HM DOOR (R-4 MIN) (E) EXTERIOR CONCRETE PAVING SAWCUT (E) CONCRETE CURB FLUSH W/ FINISH FLOOR HM JAMB BEYOND DOOR SWEEP - SEE HARDWARE SCHEDULE +/- 6 3/4"FRAME DEPTH PER (E) WALL ASSEMBLY - FIELD VERIFY (E) CONCRETE CURB (E) EXTERIOR CONCRETE PAVING STOREFRONT SILL +/- 5/8" PT PLYWOOD - MATCH GWB THICKNESS ON ADJACENT WALL CONT SEALANT & BACKER ROD EACH SIDE PER SF MFR CONT PREFINISHED METAL PAN W/ 2" BACK DAM, 2" END DAMS & DRIP EDGE - BED IN SEALANT - SOLDER WATERTIGHT GLAZING FIELD VERIFY +/- 3 1/2"FV+/- 2"CONT WATERPROOF COATING O/ CURBCONT PREFINISHED METAL FLASHING W/ HEMMED EDGE- FASTEN TO CURB & ADHERE TO PLYWOOD STOREFRONT JAMB - ALIGN EXTERIOR FACE W/ (E) GYPSUM SHEATHING ON ADJACENT WALL GLAZING CONT VAPOR RETARDER - LAP O/ EXISTING VAPOR RETARDER & LAP O/ WRB IN JAMB PATCH & REPAIR GWB AS NEEDED PATCH LATHE & STUCCO FINISH AS NEEDED - RECOAT ENTIRE WALL FROM CORNER TO CORNER - ADD VERTICAL CONTROL JOINTS ALIGNED W/ STOREFRONT JAMBS (E) WALL ASSEMBLY (FV) SEE CONT SEALANT & BACKER ROD EACH SIDE PER SF MFR CONT 2" x 2" PREFINISHED METAL JAMB FLASHING +/- 3-1/2" METAL JAMB STUD - MATCH EXISTING STUDS - (E) JAMB STUDS TO REMAIN @ SIM CONDITION CONT WEATHER RESISTIVE BARRIER (WRB) SYSTEM - LAP O/ EXISTING WRB & WRAP INTO JAMB PATCH & REPAIR GYP SHEATHING AS NEEDED /9 A6.01 STOREFRONT HEAD GLAZING CONT VAPOR RETARDER - LAP O/ EXISTING VAPOR RETARDER & LAP O/ WRB IN HEAD PATCH & REPAIR GWB AS NEEDED PATCH LATHE & STUCCO FINISH AS NEEDED - RECOAT ENTIRE WALL (E) WALL ASSEMBLY (FV) SEE CONT SEALANT & BACKER ROD EACH SIDE PER SF MFR CONT PREFINISHED METAL DRIP FLASHING W/ 2" LEG CONT WEATHER RESISTIVE BARRIER (WRB) SYSTEM - LAP O/ EXISTING WRB & WRAP INTO HEAD CONT PREFINISHED METAL COUNTER FLASHING ACT CEILING /9 A6.01 2"CONT VAPOR RETARDER - LAP O/ EXISTING VAPOR RETARDER & LAP O/ WRB IN HEAD PATCH & REPAIR GWB AS NEEDED (E) WALL ASSEMBLY (FV) SEE PATCH LATHE & STUCCO FINISH AS NEEDED - RECOAT ENTIRE WALL CONT WEATHER RESISTIVE BARRIER (WRB) SYSTEM - LAP O/ EXISTING WRB & WRAP INTO HEAD CONT PREFINISHED METAL DRIP FLASHING W/ 2" LEG HM FRAME - GROUT & WELD WATERTIGHT INSULATED HM DOORHM JAMB FRAME BEYOND ROLLER SHADE @ RELITE BEYOND /9 A6.01 PATCH & REPAIR SHEATHING AS NEEDED 2"PATCH & REPAIR GWB AS NEEDED CONT VAPOR RETARDER - LAP O/ EXISTING VAPOR RETARDER & LAP O/ WRB IN JAMB +/- 3-1/2" METAL JAMB STUD - MATCH (E) STUDS (E) WALL ASSEMBLY (FV) SEE PATCH LATHE & STUCCO FINISH AS NEEDED - RECOAT ENTIRE WALL FROM NEAREST CONTROL JOINT EACH WAY CONT WEATHER RESISTIVE BARRIER (WRB) SYSTEM - LAP O/ EXISTING WRB & WRAP INTO JAMB HM FRAME - GROUT & WELD WATERTIGHT INSULATED HM DOOR THRESHOLD BELOW 6 3/4"1 1/4" /9 A6.01 PATCH & REPAIR SHEATHING AS NEEDED 1' - 11"4' - 7"2' - 4"8' - 10"FV+/- 2"10' - 6" SF-22 A6.01 4 A6.01 4 A6.01 NEW CJ IN STUCCO EACH SIDE FV & ALIGN W/ (E) HORIZONTAL MULLIONS ON ADJ WINDOWS EQ EQ EQ 8 A6.01 ALT. BID ITEM NO. 1 FOR NOTES SEE SEISMIC PERIMETER POCKET W/ ACOUSTIC FLANGE & END PANELS PER ACT MFR ACT CEILING /6 A6.01ROLLER SHADE (RS-2) METAL LATHE BUILDING PAPER 3-1/2" MTL STUDS AT 16" OC 1/2 GLASSMAT GYP SHEATHING TYPE 'X' BATT INSULATION 5/8" GWB TYPE 'X' VAPOR BARRIER 5/8"3 1/2"1/2" 4 5/8" CEMENT PLASTER BASE ACRYLIC FINISH Client Project No: Date: SSW Architects Project No: A6.01 Fenestration Assemblies & Exterior Details Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 1/4" = 1'-0"A6.01 Fenestration Types1 Scale: 3" = 1'-0"A6.01 HM Door Sill3 Scale: 3" = 1'-0"A6.01 Storefront Sill2 Scale: 3" = 1'-0"A6.01 Storefront Jamb4 Scale: 3" = 1'-0"A6.01 Storefront Head6 Fenestration Schedule Type Frame Depth Width Height Area Orientation Projection Factor SHGC U-Value SF-1 4 1/2" 7' - 0" 8' - 10" 62 SF East 0.76 0.368 0.37 SF-2 4 1/2" 10' - 6" 8' - 10" 93 SF West 0.76 0.368 0.37 Scale: 3" = 1'-0"A6.01 HM Door Head7 Scale: 3" = 1'-0"A6.01 HM Door Jamb5 Scale: 3" = 1'-0"A6.01 Storefront Head w/ Roller Shade8 Scale: 3" = 1'-0"A6.01 Existing Exterior Wall Assembly9 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION Finish Schedule Notes 1. Conceal all conduits, piping, and mechanical ductwork. Where ceiling is exposed, paint structure and devices to match color of adjacent surface. Paint all exposed conduits, piping, and mechanical ductwork, unless noted otherwise. 2. Do Not paint pre-finished metal items. 3. Finish edges with manufacturer's standard moldings and trim pieces. 4. Finishes shall extend without interruption across full surface of spaces, including recesses, jogs, corners, wings, and columns, whether indicated or not. Finish Schedule Legend Symbol Description CPT-1 Carpet - Color/Style 1 FLOORS BASE WALL/WAINSCOT GWB Gypsum Wall Board - Paint colored noted CEILING ACT-1 24" x 24" Acoustical Ceiling Tile - Type 1 PAINT PT-B1 Paint - Base Color 1 PT-A1 Paint - Accent Color 1 PT-S1 Paint - Specialty Color 1 - Interior Hollow Metal Door & Frames PT-S2 Paint - Specialty Color 2 - Exterior Hollow Metal Door & Frames RB -1 Resilient Base - Type 1 GWB Gypsum Wall Board - Paint colored noted CPT-2 Carpet - Color/Style 2 CPT-3 Carpet - Color/Style 3 RF-1 Resilient Flooring - Color/Style 1 PT-E1 Paint - Exterior Plaster CT-1 Ceramic Wall Tile D1Not UsedDoor Types AS SCHEDULED AS SCHEDULEDAS SCHEDULED AS SCHEDULED1' - 0"8"4"4" F1 AS SCHEDULED AS SCHEDULEDF3 AS SCHEDULED AS SCHEDULED4"2" Not UsedAS SCHEDULEDSCHED AS SCHED AS 1' - 0" 2"2"2"Door & Relite Frame Types 2"2"2"2"2"2"ROLLER SHADE (RS-1) 12 A7.40 7 A7.40 6 A7.40 A7.40 11 2 A7.40 1 A7.40 12 A7.40 7 A7.40 2 A7.40 Door Schedule Notes 1. See Section 08 71 00 for finish hardware and hardware schedule. 2. See Section 08 80 00 for glazing types. 3. Provide continuous sealant between door frames and adjacent surfaces, both sides. 4. Provide all exterior doors with weatherstripping at heads, jambs, and sills. See Sheet A6.01 and Section 08 71 00 for full description. 5. Grout all exterior hollow metal door frame perimeters solid. See Section 08 11 13 for full description. 6. Fill all interior hollow metal door frames with mineral fiber insulation. 7. All exit doors shall be operable from the inside without the use of keys or any special knowledge or effort. 8. For all doors indicated to receive electrically-powered hardware, coordinate all work with electrical for a complete and operating system. Door & Relite Schedules Key Symbol Description Acoust Sound control door assembly - Refer to Specification Section 08 3473 ALUM Aluminum ANOD Anodized CW Curtain Wall DA Door Actuator HM Hollow Metal PT-# Paint Type STL Steel SS Stainless Steel SV Stain & Varnish T Fully Tempered Glazing WD Wood SF Storefront FF Factory Finish G-1 1/4" Float G-2 1/4" Tempered G-3 1" Insulated G-4 1" Insulated Tempered Hollow Metal Notes 1. See Glazing specification for all glazing types. Provide G-2 glazing in all borrowed lites UON. 2. Provide tempered glazing where indicated by "T". Whether indicated or not, provide tempered glazing where required by applicable codes / authorities having jurisdiction. 3. See Door Schedule on Sheet A7.00 for detail references and additional requirements for hollow metal doors and frames. 4. Provide sealant all around frame perimeters, both sides. Client Project No: Date: SSW Architects Project No: A7.00 Room & Door Schedules Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Room Finish Schedule - First Floor Room Number Room Name Floor Base North Wall East Wall South Wall West Wall Ceiling Soffit Remarks Room NumberMaterial Finish Material Finish Material Finish Material Finish Material Finish Material Finish 110 Office Suite CPT-1 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110 110A Office CPT-2 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-A1 ACT-1 N/A N/A N/A 110A 110B Office CPT-2 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-A1 ACT-1 N/A N/A N/A 110B 110C Office CPT-2 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110C 110D Office CPT-2 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110D 110E Office CPT-2 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-A1 ACT-1 N/A N/A N/A 110E 110F Office CPT-2 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-A1 ACT-1 N/A N/A N/A 110F 110G Office CPT-2 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110G 110H Office CPT-2 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110H 110I Office CPT-2 RB-1 GWB PT-B1 GWB PT-B1 GWB PT-B1 GWB PT-A1 ACT-1 N/A N/A N/A 110I 110J Office CPT-2 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110J 110K Kitchenette RF-1 RB-1 GWB PT-B1 GWB/CT-1 PT-B1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 110K 115 Classroom CPT-3 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 115 120 CPT-3 RB-1 GWB PT-B1 GWB PT-A1 GWB PT-B1 GWB PT-B1 ACT-1 N/A N/A N/A 120 Door Schedule Number Leaf Qty. Door Size Door Frame Head Jamb Sill Fire Rating Elec Reqs RemarksWidth Height Thickness Type Matl Fin Glazing Type Matl Fin Glazing 110.1 1 3' - 0" 7' - 0" 1 3/4" D1 HM PT N/A F1 HM PT N/A N/A X Existing Door, Exterior 110.2 1 3' - 0" 7' - 0" 1 3/4" D1 MH PT N/A F1 HM PT N/A N/A X Existing Door, Exterior 110A 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110B 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110C 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110D 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110E 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110F 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110G 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110H 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110I 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 110J 1 3' - 0" 8' - 0" 1 3/4" D1 WD SV GL-2 F3 HM PT GL-2 12/A7.40 7/A7.40 2/A7.40 N/A 113A.1 1 3' - 0" 7' - 0" 1 3/4" D1 HM PT N/A F1 HM PT N/A N/A Existing Door 115.1 1 3' - 0" 7' - 0" 1 3/4" D1 HM PT N/A F1 HM PT N/A N/A X Existing Door, Exterior 115.2 1 3' - 0" 7' - 0" 1 3/4" D1 HM PT GL-2 F3 HM PT GL-3 7/A6.01 5/A6.01 3/A6.01 N/A X Exterior 117 1 3' - 0" 7' - 0" 1 3/4" D1 HM PT N/A F1 HM PT N/A N/A X Existing Door, Exterior Roller Shade Schedule Type Mark Count Length Height Depth Comments RS-1 11 1' - 2" 0' - 3" 0' - 3" Manual at HM Door Relites RS-2 1 10' - 8" 0' - 5" 0' - 5" Manual at Storefront Permit Set 10/04/2022 Classroom B22005282_v2RECEIVED 11/01/2022 striplett BUILDING DIVISION ACOUSTIC SEALANT EACH SIDE FASTEN STUD RUNNER TO STRUCTURE CUT/ATTACH STUDS TO ALLOW DEFLECTION OF TOP TRACK 5/8" TYPE 'X' GWB EA SIDE - FINISH AS SCHEDULED 3-5/8" MTL STUDS @ 16" OC BATT INSULATION BASE AS SCHEDULED FLOOR STRUCTURE ACOUSTIC SEALANT EACH SIDE A1 sound retardant 4 7/8" ACOUSTIC SEALANT EACH SIDE FASTEN STUD RUNNER TO STRUCTURE CUT/ATTACH STUDS TO ALLOW DEFLECTION OF TOP TRACK 5/8" TYPE 'X' GWB EA SIDE - FINISH AS SCHEDULED 6" MTL STUDS @ 16" OC BATT INSULATION BASE AS SCHEDULED FLOOR STRUCTURE ACOUSTIC SEALANT EACH SIDE A2 sound retardant 7 1/4" 6" Interior Partition Notes 1. All interior partitions to be full-height, slab-to under side of steel deck, UON. 2. Brace partitions, in concealed locations, as necessary to sustain imposed loads without excessive deflection. 3. All rated partitions shall comply with UL-tested and approved assemblies. 4. All penetrations (of pipes, conduit, ducts, beams, joists, bracing) through rated partitions shall be firestopped. All firestopping shall comply with UL-tested and approved assemblies. 5. For sound-retardant partitions, see Sound Retardant Partition Notes, also on this sheet. 6. All GWB shall be Type X, UON. 2" MAX SUPPORT STRUT: HANGER WIRE IN 1/2" CONDUITMAIN RUNNER LIGHT FIXTURE MAX. TO CEILING PLANE 45º Notes: 1. Provide grid & fixture installation in accordance with IBC 2506.2.1, ASTM C 635, Section 13.5.6 of ASCE 7 & UL fire resistance directory. 2. Support strut and splay wire assembly to be spaced no more than 12' on center and 6 feet max. from wall. Center at corridors. 3. In lieu of 2" wall angle, install BERC2 clips and 7/8" edge molding per manufacturer's instructions. 4. Install additional hanger wires @ all members within 8" of the ceiling perimeter. CROSS TEE SPLAY BTWN WIRES 90º Sound Retardant Partition Notes For partitions designated as sound-retardant, comply with the following: 1. Provide Type X GWB. 2. Stagger joints on multiple layers of GWB. 3. On walls taller than 10 feet with multiple layers of GWB, apply one GWB layer horizontally and the second layer vertically. The order of layers shall be determined by the contractor. 4. Attach multiple layers of GWB with screws. Do not use adhesive. 5. Seal perimeter on both sides of partition with non-hardening silicon mastic. 6. Offset electrical boxes on opposite sides of a common partition a minimum of 18 inches, with at least one stud between boxes. Do not install electrical outlets back-to-back. Seal all openings around electrical boxes with Code-approved sound-insulating materials. 7. Where a sound-retardant partition abuts a continuously framed partition, interrupt GWB at the point of intersection and seal joint liberally. Do not continue GWB behind the intersecting stud. 8. Seal gaps around partitions with non-hardening silicone mastic. 9. Batt insulation thickness shall match stud depth. STUD, TYP - REFER TO PARTITION TYPES FOR SIZE BOTTOM TRACK GWB - FINISH PER SCHED, TYP BOTTOM TRACK MTL STUD FOR STUD CONNECTION GWB - FINISH PER SCHED, TYP 6" LONG STUD SPLICE BLOCK W/ (2) #8 SCREWS @ EACH LEG OF EACH TRACK STUD RUNNER/TRACK STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING STUD RUNNER/TRACK #8 SCREWS EA FLANGE 3" X 3" CLIP ANGLE 1" LESS THAN STUD WIDTH ATTACHED TO JAMB STUD W/ (4) #8 SCREWS. ATTACH TO SLAB W/ (2) 0.145 DIA POWDER ACTUATED FASTENER, 5/8" EMBED TYP 1 1/2" FROM EDGE OF SLAB CONNECT STUDS W/ RUNNER TRACK BLOCKS @ 16" OC (2) JAMB STUDS, TYP STUD RUNNER/TRACK #8 SCREWS EA FLANGE CONNECT STUDS W/ RUNNER TRACK BLOCKS @ 16" OC (4) 0.145 DIA POWDER ACTUATED FASTENERS - EMBED 5/8" TYP (2) JAMB STUDS, TYP - (1) 18GA STUD MAY BE SUBSTITUTED @ CONTRACTORS DIRECTION STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING BOTTOM TRACK (1) #8 SCREW @ EA FLANGE MIN, TYP #8 SCREW EA SIDE @ EA STUD HEAD TRACK L2 X 2 X 0'-4" TOP & BOT W/ (3) #8 SCREW INTO STUD & TRACK DOUBLE JAMB STUDS TOP TRACK CRIPPLE STUD DOUBLE JAMB STUDS 6" HEADER STUDS COPE FLANGES TO ALLOW EXTENSION OF WEBS FOR CONNECTION TO JAMB STUD TOP TRACK CRIPPLE STUD SILL TRACK (2) #8 SCREWS EA FLANGE CUT TRACK FLANGES & FORM TO ALLOW CONNECTION STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING INTERSECTION CLIP W/ (2) #8 SCREWS PER TRACK TYP TOP TRACK FIRE TREATED WOOD BLOCKING - COORD LOCATION W/ FIXTURES, EQUIP & DEVICES AS NECESSARY FOR SECURE ANCHORAGE FIRE TREATED WOOD BLOCKING TO FILL STUD VOID SECURE TO STUDS W/ #8 SCREWS STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING STUD - REFER TO PARTITION TYPES FOR SIZE AND SPACING 20 GA STUD - COPE FLANGES & SECURE W/ (2) #8 SCREWS @ EA STUD - COORD LOCATIONS W/ CASEWORK 20 GA STRAP - SECURE TO EA STUD W/ (2) #8 SCREWS; COORD LOCATIONS W/ CASEWORK AND WALL- MOUNTED SHELVES STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING CLIP ANCHOR W/ #8 SCREWS STUD - REFER TO PARTITION TYPES FOR SIZE & SPACING (4) #8 SCREWS 2" X 2" X 16 GA CLIP ANGLE 1/4" LESS THAN STUD WIDTH 1 1/2" X 1/2" COLD ROLLED CHANNEL STUD, TYP - REFER TO PARTITION TYPES FOR SIZE #8 SCREW THROUGH TRACK & INTO NESTED STUD @ 12" OC EA SIDE NESTED STUD CRIPPLE STUD SOLID MTL STUD BACKING Corner FramingWall Intersection Framing Top and Bottom Track Splice Door Jamb Anchorage Window Jamb Anchorage Header at Opening 48" Wide or LessHeader Beam for Wide Opening (>48")Sill Connection at JambTop Plate Intersection Backing at Fixture, Equipment, & Device Backing at Cabinets Solid Blocking Lateral Bracing Attachment 1"1"1" 1" 1" #8 SCREW EA SIDE @ EA STUD L2 X 2 X 0'-4" TOP & BOT W/ (3) #8 SCREW INTO STUD & TRACK HEAD TRACK STUD TRACK Stud-to-Track Connection (Sim @ Top Track CONT FIRESTOPPING SYSTEM CAULKING STL RUNNER CHANNEL- ATTACH PER STRUCT FILL VOIDS W/ CONT FIRESTOPPING SYSTEM PACKING MATERIAL (E) METAL DECK FIRE-RATED ASSEMBLY- REFER TO PARTITION TYPES & FLOOR PLANS CUT GWB TO DECK PROFILE SEALANT BOTH SIDES Through-Penetration, 1-hour rated: UL-Rated Through Penetration System: XHEZ.W-L 1001 FLEXIBLE CONDUIT FIRESTOPPING CAULK- FILL ANULAR SPACE & PROVIDE 5/8" MIN THICKNESS ALL AROUND BOTH SIDES OF WALL PIPE OR CONDUIT 1" - 12" NOMINAL FIRESTOPPING CAULK- FILL ANULAR SPACE & PROVIDE MIN 1/4" DIA BEAD ALL AROUND PENETRATION, BOTH SIDES OF WALL CABLE FIRESTOPPING CAULK- FILL ANULAR SPACE & PROVIDE MIN 1/4" DIA BEAD ALL AROUND PENETRATION, BOTH SIDES OF WALL STL SLEEVE - MIN 28 GA GALV- 1" LONGER THAN WALL THICKNESS FIRESTOPPING CAULK- FILL ANULAR SPACE & PROVIDE MIN 1" THICKNESS, BOTH SIDES OF WALL FIRESTOPPING CAULK- MIN 1/4" DIA BEAD ALL AROUND STL SLEEVE, BOTH SIDES OF WALL CABLE BASE PER SCHED SEE PLAN RATED ASSEMBLY SEE PLAN RATED ASSEMBLY 1/2" Partition Parallel to Deck Flutes UL-Rated Joint System: XHBN.HW-D-0048 Partition Perpendicular to Deck Flutes UL-Rated Joint System: XHBN.HW-D-0048 Through-Penetration, 1-hour rated: UL-Rated Through Penetration System: XHEZ.W-L 3031 Through-Penetration, 1-hour rated: UL-Rated Through Penetration System: XHEZ.W-L 1017 Through-Penetration, 1-hour rated: UL-Rated Through Penetration System: XHEZ.W-L 3001 WALL TYPE PER PLAN (E) LH BAR JOIST (E) COMPOSITE FLOOR DECKING GWB EXPANSION JOINT WELD 1/4" STEEL PLATE TO UNDER SIDE OF JOIST; ATTACH STUD RUNNER CUT/ATTACH STUDS TO ALLOW DEFLECTION OF TOP TRACK 5/8" TYPE 'X' GWB EA SIDE CONTINUOUS SEALANT, CUT GWB TO PROFILE OF DECK EA SIDE BATT INSULATION TYP. 1-5/8" TOP DEFLECTION TRACK EA SIDE 1-5/8" METAL STUDS @ 18" OC 1-5/8" METAL STUD RUNNER WALL TYPE PER PLAN (E) LH BAR JOIST (E) COMPOSITE FLOOR DECKING ACOUSTIC SEALANT EA SIDE WELD STUD RUNNER TO UNDER SIDE OF JOIST CUT/ATTACH STUDS TO ALLOW DEFLECTION OF TOP TRACK 5/8" TYPE 'X' GWB EA SIDE CONTINUOUS SEALANT, CUT GWB TO PROFILE OF DECK EA SIDE BATT INSULATION TYP. 1-5/8" TOP DEFLECTION TRACK EA SIDE 1-5/8" METAL STUDS @ 18" OC 1-5/8" METAL STUD RUNNER ROUGHEN CUT IN (E) CONCRETE - CLEAN & ROUGHEN SURFACE TO 1/4" AMPLITUDE (E) 4" CONCRETE SLAB ON GRADE (SOG) O/ UNDERSLAB VAPOR BARRIER #4 REBAR @ 16" OC MAX EACH WAY - DRILL & EPOXY INTO (E) CONCRETE SLAB EACH SIDE UNDERSLAB VAPOR BARRIER - LAP O/ (E) EACH SIDE WASTE LINE - SIZE & LOCATE PER MECH FEC MANUFACTURER OPENING AS REQUIRED BY RECESSED FIRE EXTINGUISHER CABINET, TYP -COORD W/ WALL TYPE MTL STUD FRAMING EA SIDEWALL TYPE PER PLAN Client Project No: Date: SSW Architects Project No: A7.10 Partition Types & Interior Details Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 3" = 1'-0"A7.10 Interior Partition Types3 Scale: 1 1/2" = 1'-0"A7.10 Typical Seismic Brace at ACT Ceilings4 Scale: 3" = 1'-0"A7.10 Typical Non-Load Bearing Metal Stud Partition Details1 Scale: 1 1/2" = 1'-0"A7.10 Typical Interior Firestopping Details2 Scale: 3" = 1'-0"A7.10 Partition Offset From Bar Joist20 Scale: 3" = 1'-0"A7.10 Partition Centered With Bar Joist19 Scale: 1 1/2" = 1'-0"A7.10 Patching @ Concrete SOG6 Scale: 1 1/2" = 1'-0"A7.10 Interior -Typical Fire Extinguisher Cabinet18 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION FLOOR FINISH PER SCHED. SEE DETAIL FOR SPECIFIC FLOOR TRANSITIONS CONC SLAB DOOR PER SCHED CHANGE IN FINISH FLOOR MATERIAL (WHERE INDICATED) CENTERED ON DOOR LEAF CONT SEALANT EA SIDE, TYP DOOR PER SCHED MTL STUD TRACK & HEADER; WIDTH PER WALL TYPES HM FRAME PARTITION TYPE PER PLAN INSULATION CONT SEALANT EA SIDE, TYP DOOR PER SCHED DOUBLE STUD - SIZE PER PARTITION TYPE HM FRAME PARTITION TYPE PER PLAN INSULATION TYPE, TYP PER PARTITION HM FRAME INSULATION GLAZING AT RELITE, TYPE AS INDICATED GLAZING STOP WITH VANDAL- RESISTANT SCREWS ROLLER SHADE WHERE INDICATED 5/8"2"5/8"1 9/16"VARIES 1 15/16" DOOR PER SCHED HM FRAME, EXPANSION ANCHOR AND INSULATION GLAZING AT RELITE, TYPE AS INDICATED GLAZING STOP WITH VANDAL- RESISTANT SCREWS ROLLER SHADE WHERE INDICATED 4"1 9/16"VARIES 1 15/16" CONT SEALANT BOTH SIDES FLOORING PER FINISH SCHED SHIM CONC SLAB CONT SEALANT EA SIDE, TYP MTL STUD TRACK & HEADER; WIDTH PER WALL TYPES HM FRAME PARTITION TYPE PER PLAN INSULATION GLAZING AT RELITE, TYPE AS INDICATED GLAZING STOP WITH VANDAL- RESISTANT SCREWS MOUNT ROLLER SHADE TO HM FRAME HEAD PER SCHEDULE THROAT VARIES - COORD W/ PARTITION TYPE 1 9/16"1 15/16"VARIES 1/2"1/2"2"4" MIN, UNO1' - 0" MIN 1' - 6" MIN DOOR LEAF WHERE APPLICABLE (E) CONC FLOOR SLAB Resilient Floor (RF) to Carpet Tile (CPT) RESILIENT FLOORING OVER (E) TILE (E) VC TILE CARPET OVER (E) TILE RESILIENT FLOOR TRANSITION STRIP DOOR LEAF WHERE APPLICABLE (E) CONC FLOOR SLAB (E) VC Tile to Carpet Tile (CPT) (E) VC TILE CARPET OVER (E) TILE CARPET TRANSITION STRIP Client Project No: Date: SSW Architects Project No: A7.40 Interior Door & Relite Details Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 3" = 1'-0"A7.40 HM Frame -Typical Door Sill2 Scale: 3" = 1'-0"A7.40 HM Frame -Typical Head12 Scale: 3" = 1'-0"A7.40 HM Frame -Typical Jamb7 Scale: 3" = 1'-0"A7.40 HM Relite Frame -Intermediate Mullion6 Scale: 3" = 1'-0"A7.40 HM Relite Frame -Sill At Floor1 Scale: 3" = 1'-0"A7.40 HM Relite Frame -Typical Head11 Scale: 3" = 1'-0"A7.40 Typical Frame Profile17 Scale: 1/2" = 1'-0"A7.40 Typical Jamb Setback16 Scale: 3" = 1'-0"A7.40 Typical Flooring Transitions3 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION 110.2 (E) WINDOW GWB WALL WALL BASE PER SCHED PENDANT LIGHT FIXTURE - SEE ELECT (E) DOOR 2 A6.01 6 A6.01 4 A6.01 4 A6.01 SIM SF-1 (E) DOOR WALL BASE PER SCHED GWB WALL F G H I 110H 110F 110D 110B PENDANT LIGHT FIXTURE TYP - SEE ELECT CABINETS WALL EDGE GWB WALL WALL BASE PER SCHED WALL EDGE FGHI 110A 110C 110E 110G 110I 110J GWB WALL PENDANT LIGHT FIXTURE TYP - SEE ELECT WALL BASE PER SCHED CABINET PULL4' - 0"CL15442 2434 454M30 2496 302M242 1242 302M136 1224 1' - 0"2' - 0"6' - 0"3' - 6"1' - 9 1/2"2' - 8 1/2"OPEN HALLWAY BEYOND APPLIANCE OPENING WITH OPEN BACK PANEL FOR RECEPTACLE ACCESS. SEE ELECTRICAL PLAN REFRIGERATOR / FREEZER ALCOVE TILE BACKSPLASH SINK3' - 6"1' - 8"2' - 10"3' - 8"6 A9.00 BACKSPLASH - SCRIBE TO WALL & SEAL FLOORING AND BASE PER FINISH SCHEDULE BASE CABINET PER ELEVATION PLAM COUNTERTOP 1"2' - 10"4"1 1/2"LINE OF BACKSPLASH BEYOND 2' - 1" TILE OVER WATER-RESISTANT GYPSUM BACKING BOARD Client Project No: Date: SSW Architects Project No: A9.00 Interior Elevations Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 1/4" = 1'-0"A9.00 110 Office Suite -West Elevation1 Scale: 1/4" = 1'-0"A9.00 110 Office Suite -East Elevation2 Casework Types Key Series #Description 154 Base Cabinet w/o Drawers 302M1 Wall Hung Double Door, no shelf 302M2 Wall Hung Double Door, 2 adjustable shleves 454M Tall Storage Cabinet w/ appliance opening, double door, 2 adjustable shleves above and 1 shelf below opening for microwave Scale: 1/4" = 1'-0"A9.00 110 Office Suite -North Elevation4 Scale: 1/4" = 1'-0"A9.00 110 Office Suite -South Elevation5 Scale: 1/4" = 1'-0"A9.00 110K Kitchenette -North Elevation3 Scale: 1" = 1'-0"A9.00 Typical Countetop Over Casework6 Permit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION 9 10 MB12 MB6 FS FS 4' - 10"10' - 2"10' - 2"4' - 10"EQEQ GWB WALL INFILL @ DEMOLISHED DOOR PENDANT LIGHT FIXTURE TYP - SEE ELECT WALL BASE PER SCHED 3' - 0"3' - 0"(E) COLUMN (E) COLUMN 6' - 0"POWER AND AV CONNECTION TYP. - SEE ELECTRICAL 6' - 0"DASHED LINE OF FLAT SCREEN - OFOI. TYP. ED MB8 3' - 0"7' - 0" (E) DOOR GWB WALL INFILL AT DEMOLISHED DOOR (E) DOOR TB6 WALL BASE PER SCHED PENDANT LIGHT FIXTURE TYP - SEE ELECT E D MB8 3' - 0"(E) ELECTRICAL PANEL 7' - 0" PENDANT LIGHT FIXTURE TYP - SEE ELECTRICAL WALL BASE PER SCHEDULE 910 5 A6.01 115.2 TB6 3 A6.01 7 A6.01 EQEQ TB6 EQ EQ 3' - 0"3' - 0"SF-2 (E) WINDOW (E) WINDOW RS-1 8 A6.01 2 A6.01 RS-2 WALL BASE PER SCHED PENDANT LIGHT FIXTURE TYP - SEE ELECT FS EQEQ WALL BASE PER SCHED GWB WALL PENDANT LIGHT FIXTURE TYP - SEE ELECT MB8 6' - 0"POWER OUTLET - SEE ELECTRICAL DASHED LINE OF FLAT SCREEN - OFOI. TYP. ED TB6 MB8 MB8 2' - 0"6' - 0"8' - 0"8' - 0"3' - 0"FS (E) DOOR WALL BASE PER SCHED PENDANT LIGHT FIXTURE TYP - SEE ELECT GWB WALL E D EXISTING WINDOW TYP WALL BASE PER SCHED PENDANT LIGHT FIXTURE TYP - SEE ELECT GWB WALL Client Project No: Date: SSW Architects Project No: A9.01 Interior Elevations Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Scale: 1/4" = 1'-0"A9.01 115 Classroom/Lab -East Elevation (Alt. Bid Item No. 1)1 Scale: 1/4" = 1'-0"A9.01 115 Classroom/Lab -North Elevation (Alt. Bid Item No. 1)2 Scale: 1/4" = 1'-0"A9.01 115 Classroom/Lab -South Elevation (Alt. Bid Item No. 1)3 Scale: 1/4" = 1'-0"A9.01 115 Classroom/Lab -West Elevation (Alt. Bid Item No. 1)4 Scale: 1/4" = 1'-0"A9.01 120 Conference/Clubs -East Elevation (Alt. Bid Item No. 2)6 Scale: 1/4" = 1'-0"A9.01 120 Conference/Clubs -NorthElevation (Alt. Bid Item No. 2)5 Scale: 1/4" = 1'-0"A9.01 120 Conference/Clubs -South Elevation (Alt. Bid Item No. 2)7 Permit Set 10/04/2022 Scale: 1/4" = 1'-0"A9.01 120 Classroom -East Elevation (Alt. Bid Item No. 3)6 Scale: 1/4" = 1'-0"A9.01 120 Classroom -NorthElevation (Alt. Bid Item No. 3)5 Scale: 1/4" = 1'-0"A9.01 120 Classroom -South Elevation (Alt. Bid Item No. 3)7 RECEIVED 11/01/2022 striplett BUILDING DIVISION B22005282_v2 Reflected Ceiling Plan Notes 1. Center ceiling grids and light fixtures each way within rooms unless otherwise indicated. Align similar fixtures, diffusers, and grilles each way within rooms unless otherwise indicated. 2. Bottom of pendant light fixtures to be 18" below ACT ceilings unless otherwise noted. See Electrical 3. Architectural Reflected Ceiling Plans indicate general light fixture location and orientation with respect to architectural elements. Fixtures not related to architectural elements may not be depicted. See Electrical lighting plans for fixture types, any fixture locations not depicted herein, and mounting conditions. 4. Architectural Reflected Ceiling Plans indicate general mechanical diffuser and grille locations and orientation. See Mechanical drawings for types and mounting conditions. 5. Contractor shall coordinate light fixture locations to assure adequate clearance with mechanical equipment and architectural/structural elements. 6. Access doors for mechanical and electrical equipment are typically not indicated. Refer to specifications for general requirements and provide to full extent necessary. Coordinate locations and sizes with Architect prior to installation. 7. Refer to Floor Plans for additional wall section call-outs. Reflected Ceiling Plan Legend (See G1.00 for additional floor plan symbols) Existing - No Work Area of Work Gypsum Board Ceiling Supply Grille (See Mech) Return Grille (See Mech) Light Fixture - Strip Pendant (See Elect) Ceiling Tag Roller Shade RS-XX Suspended Ceiling Grid with Acoustic Ceiling Tiles (ACT) 102 12'-0" Room Number Ceiling Height Light Fixture - Linear Recessed (See Elect) Client Project No: Date: SSW Architects Project No: A10.10 First Floor Reflected Ceiling Plan Construction Documents Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 N Scale: 1/8" = 1'-0"A10.10 Level 1 RCP -Area A1 NKey Plan Permit Set 10/04/2022 PS VS Photocell Light Sensor (See Elect) Vacancy Sensor (See Elect) OS Occupancy Sensor (See Elect) E F G H I J K L 6 7 8 9 10 11 12 C A 4 A4.01 1 A4.01 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 3 A4.01 2 A4.01 21' - 6"21' - 6"21' - 6"11' - 0"10' - 6"24' - 0"27' - 0" 24' - 0"30' - 0"30' - 0"24' - 0"9' - 0"22' - 8"RS-28' - 7 1/4"10 3/4"120 110E 110 110D 110F 110H 110I 110G 110J 110C 110A 110B ALT. BID ITEM NO. 1 ALT. BID ITEM NO. 3 115 VS VS PS VS PS VS VS VS VS PS VS VS VS VS VS VS VS VS VS PS OS OS OS OS RS-2 B22005282_v2RECEIVED 11/01/2022 striplett BUILDING DIVISION NOTICE: ELECTRICAL WORK UNDER SEPARATE PERMIT AND PER FIELD INSPECTOR. M-1 T S O L20x12 L12x10 20"ø 20x12 OCCUPANCY OR CO2 SENSOR SENSOR THERMOSTAT BACKDRAFT DAMPER DUCT SMOKE DAMPER COMBINATION SMOKE/FIRE DAMPER MOTORIZED DAMPER VOLUME DAMPER RETURN / EXHAUST / TRANSFER GRILLE OR REGISTER CEILING DIFFUSER TURNING VANE FLEXIBLE DUCT 90° CONICAL SPIN-IN FITTING LINED DUCT (INSIDE DIMENSION) LINED DUCT (INSIDE DIMENSION) FLEX CONNECTION ROUND DUCT RECTANGULAR DUCT (INSIDE DIMENSION) DUCT SECTION - RETURN DUCT SECTION - SUPPLY #DESCRIPTION M1.00 MECHANICAL COVER SHEET M1.01 MECHANICAL EQUIPMENT SCHEDULES M1.02 MECHANICAL CALCULATIONS M2.01 FIRST FLOOR DEMOLITION PLAN - MECHANICAL M3.01 FIRST FLOOR PLAN - MECHANICAL M4.01 FIRST FLOOR PLAN - FIRE PROTECTION GENERAL SYMBOLS DUCTWORK SYMBOLS X TYPE (SEE SCHEDULE) DESIGN CFM AIR TERMINAL MARK K-1 PLUMBING FIXTURE IDENTIFICATION P-E-PIPEM-DETM-HNGRP-VENTP-WASTE-AGM-HWRM-TEXT-LM-TEXT-MM-HATCHM-OSAM-GASP-E-FIXM-EQPMM-E-DUCTM-SMBLP-FIREP-EQPMM-ANNTEXTM-DUCT-2P-DHWRM-MATCHM-CWRM-CONTRLP-SMBLM-STAMP-DATEM-CLOUDM-STMM-DIFF-SM-HWSM-ARCH-DEMOM-DIFF-RM-DUCTM-ARCH-GRIDM-DUCT-LM-E-DUCT-2P-DEMOP-DCWM-AIRM-E-EQPMM-CHRM-CHSM-CWSM-FLEXM-REFER-LIQM-RCPM-REVP-FIXM-CONDENSATEP-DHWM-ARCH-BKGRNDM-REFER-SUCM-TEXT-SM-TTBLKM-DEMO3127767128124715168645641178677441777150303150111614337214240213714402824114327HID-2HWC-SCENTER 2CONTCENTER 2HID2CW-SCONTCONTHID 2TRACKSCONTCONTCONTCONTHW-SCONTHID 2TEXT/SPCL/SMCONTDEMOCONTCONTCONTCONTCONTCONTCONTCONTHID 2HID 2CONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTCONTDEMOCONTCONTREG-48REG-96ZERODEFPOINTS752CONTCONT44TEXT/LEADERTEXT/LEADERStyle: REGULARFade3Fade4Fade2Fade114151312CONTCONTCONTCONTV SpecNote:This block layering systemto be used together with"M-STD .ctb"M-EXTR-HID191HID 2X-TBLK-LOGO-MEDMX-TBLK-LOGO-PATT4214CONTCONTP-WASTE-UG1CONTA 1 N I F 1101644210Alternate Colors for 11 (CTB lineweight .0080)165220JTKTEXT/SPCL/LRGTEXT/SPCL/MED 1.MECHANICAL SYSTEMS HAVE BEEN DESIGNED PER THE REQUIREMENTS OF THE FOLLOWING CODES: ·2018 WASHINGTON STATE ENERGY CODE (WASHINGTON ADMINISTRATIVE CODE (WAC) CHAPTER 51-11C) ·2018 INTERNATIONAL BUILDING CODE WITH WASHINGTON STATE AMENDMENTS (WAC CHAPTER 51-50) ·2018 INTERNATIONAL MECHANICAL CODE WITH WASHINGTON STATE AMENDMENTS (WAC CHAPTER 51-52) ·2018 UNIFORM PLUMBING CODE WITH WASHINGTON STATE AMENDMENTS (WAC CHAPTER 51-56) ·2018 INTERNATIONAL FUEL GAS CODE WITH WASHINGTON STATE AMENDMENTS (WAC CHAPTER 51-52) ·2009 ICC-A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES 2.HEATING AND COOLING SYSTEMS HAVE BEEN SIZED IN ACCORDANCE WITH STANDARD ENGINEERING PRACTICES AND AS REQUIRED BY 2018 WSEC SECTIONS C403.1.2. HVAC SYSTEMS HAVE BEEN DESIGNEDTO COMPLY WITH 2018 WSEC SECTION C302.1 AND TO MAINTAIN 72 DEGREES F MAX IN HEATING MODE AND 75 DEGREES F MIN IN COOLING MODE. HEATING AND COOLING LOAD CALCULATIONS USE THE FOLLOWING BUILDING THERMAL INSULATION VALUES AND DESIGN TEMPERATURES IN ACCORDANCE WITH THE ASHRAE RECOMMENDED OUTDOOR DESIGN TEMPERATURES FOR RENTON: ·SUMMER OSA: 86°F DB/67°F WB ·SA HEATING: 95°F MAX EXISTING WALLS: U = 0.089 BTU/HR/SF/°F ·SA COOLING: 55°F MIN WINDOWS: U = 0.65 BTU/HR/SF/°F SHGC = 0.70 ·WINTER OSA: 24°F 3.OUTSIDE AIR VENTILATION AND EXHAUST SHALL BE PROVIDED IN ACCORDANCE WITH 2018 IMC TABLE C403.3.1.1 FOR MINIMUM REQUIRED RATES AND NO MORE THAN 150% OF THE MINIMUM RATES PER 2018 WSEC SECTION C403.2.2. 4.HEAT PUMP CONTROLS SHALL BE CONFIGURED TO PROVIDE A MINIMUM 5 DEGREE DEAD BAND AS REQUIRED BY 2018 WSEC SECTION C403.4.1.2. HEAT PUMP CONTROLS SHALL BE CAPABLE OF MINIMIZINGOR PREVENTING THE USE OF SUPPLEMENTAL ELECTRIC HEAT. 5.CONTROLS FOR SYSTEMS THAT DO NOT OPERATE CONTINUOUSLY SHALL BE CAPABLE OF PROVIDING SEVEN DAY PROGRAMMABLE TEMPERATURE SETTINGS, AUTOMATIC SETBACK AND SHUTOFF AND OPTIMUM START AS REQUIRED BY 2018 WSEC SECTION C403.4.2. 6.DUCT WORK SHALL BE SEALED, INSULATED AND PROVIDED WITH A VAPOR BARRIER AS REQUIRED BY 2018 WSEC SECTION C403.10 AND AS FOLLOWS: o REFER TO TABLE PROVIDED. 7.MECHANICAL PIPING, IF EXPOSED TO THE ENVIRONMENT, SHALL BE PROTECTED AND ALL MECHANICAL PIPING SHALL BE INSULATED AS REQUIRED BY 2018 WSEC SECTION C403.10.3 AND AS FOLLOWS: o REFER TO TABLE PROVIDED. 8.HVAC DISTRIBUTION SYSTEMS SHALL BE AIR AND WATER BALANCED TO MINIMIZE THROTTLING LOSSES AS REQUIRED BY 2018 WSEC SECTION C408.2.2. 9.PROVIDE WITH AT LEAST 70% EFFICIENT OR ELECTRONICALLY COMMUTATED MOTOR AS REQUIRED BY 2018WSEC SECTION C405.8 FOR FRACTIONAL HORSEPOWER FAN MOTORS THAT ARE 1/12 HORSEPOWER AND LARGER AND ARE NOT OTHERWISE SPECIFIED BY THE CODE. 10.CONDITIONED SPACES THAT HAVE AN EXTERIOR DOOR (THAT MAY BE LEFT OPEN) SHALL BE PROVIDED WITH A SWITCH TO DISABLE THE SPACE CONDITIONING SYSTEMS OR TO RESET THE CONDITIONING SETPOINTS AS DESCRIBED IN 2018 WSEC SECTION C403.4.16. 11.A PRELIMINARY COMMISSIONING PLAN INCLUDING INFORMATION REGARDING EQUIPMENT TO BECOMMISSIONED, FUNCTIONS TO BE TESTED, CONDITIONS OF TESTING AND MEASURABLE CRITERIA SHALL BE PROVIDED TO THE OWNER'S APPOINTED CERTIFIED COMMISSIONING PROFESSIONAL PRIOR TO THE AHJ'S FIRST MECHANICAL INSPECTION AS REQUIRED BY 2018 WSEC SECTION C408.1.2. 12.FUNCTIONAL TESTING OF MECHANICAL SYSTEMS SHALL BE PROVIDED TO ENSURE PROPER OPERATION IN ALL SEQUENCES OF OPERATIONS INCLUDING POWER FAILURE AS REQUIRED BY 2018 WSEC SECTION C408.1.2.2. 13.COPIES OF ALL APPLICABLE SERVICE AND EQUIPMENT DATA, AND PROJECT DOCUMENTATION THAT RELATES, SHALL BE PROVIDED TO THE OWNER AND MADE AVAILABLE TO THE AUTHORITIES HAVING JURISDICTION (AHJ'S) WITHIN 180 DAYS OF RECEIPT OF THE CERTIFICATE OF OCCUPANCY AS REQUIRED BY 2018 WSEC SECTION C103.6 INCLUDING: ·RECORD DRAWINGS DEPICTING FINAL INSTALLATION CONFIGURATIONS OF SYSTEMS AND EQUIPMENT ·OPERATION AND MAINTENANCE EQUIPMENT MANUALS INCLUDING: MANUFACTURER'S INFORMATION ON SPECIFIC MODEL NUMBERS AND OPTIONS INSTALLED, CONTROLS DATA INCLUDING CALIBRATION AND DESIGN SETPOINT INFORMATION, AND RECOMMENDED MAINTENANCE SCHEDULE WITH A REPUTABLE SERVICE CONTRACTOR'S CONTACT INFORMATION. ·REPORTS SUCH AS AIR AND WATER BALANCING, START-UP AND/OR PRESSURE TESTING DATA AS APPLICABLE. ·TRAINING OF THE MAINTENANCE STAFF SHALL BE PROVIDED, INCLUDING REVIEW OF DOCUMENTATION, HANDS-ON DEMONSTRATION OF OPERATION AND START-UP PROCEDURES AS WELL AS A TRAININGCOMPLETION REPORT. 14.COMMISSIONING OF MECHANICAL SYSTEMS AND CONTROLS SHALL BE PROVIDED AS REQUIRED FOR ALL SYSTEMS IN BUILDINGS WITH A TOTAL COOLING CAPACITY OVER 240 MBH AND/OR A TOTAL HEATING CAPACITY OVER 300 MBH IN ACCORDANCE WITH 2018 WSEC SECTION C408.1. ALL SYSTEMS, EQUIPMENT AND CONTROLS THAT ARE REGULATED BY THE 2018 WSEC SHALL BE INCLUDED IN THE SCOPE OF COMMISSIONING. 1.THE FOLLOWING NOTES APPLY TO ALL MECHANICAL DRAWINGS. ADDITIONAL MECHANICAL NOTES MAY BE INDICATED ON EACH MECHANICAL, PLUMBING AND FIRE PROTECTION DRAWING. REFER TO THE PROJECT SPECIFICATIONS FOR ADDITIONAL DETAILS. 2.REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. 3.INSTALL ALL PIPING ON ROOM SIDE OF BUILDING INSULATION. 4.ENGINEERED DRAWINGS ARE DIAGRAMMATIC IN NATURE AND DO NOT NECESSARILY REFLECT EVERY REQUIRED OFFSET, FITTING OR ACCESSORY. REFER TO SYSTEM SCHEMATIC DIAGRAMS FOR ADDITIONAL DESIGN INFORMATION INCLUDING VALVE SIZES AND LOCATIONS. 5.THE CONTRACTOR SHALL VISIT THE JOB SITE PRIOR TO BEGINNING WORK IN ORDER TO OBSERVE EXISTING CONDITIONS. VERIFY EXACT SIZE, LOCATION AND CONDITION OF ALL EXISTING SYSTEMS, DUCTS, PIPES, UTILITIES AND BUILDING STRUCTURE. VERIFY VOLTAGES AT THE SITE PRIOR TO ORDERING ANY EQUIPMENT. 6.ARRANGE MECHANICAL EQUIPMENT SO THAT NO LESS THAN THE MINIMUM OPERATING AND SERVICE CLEARANCES ARE PROVIDED AS REQUIRED BY CODE AND/OR THE EQUIPMENT MANUFACTURER'S INSTALLATION INSTRUCTIONS. 7.REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR GENERAL CONSTRUCTION INCLUDING LOUVERS, CONCRETE EQUIPMENT PADS, FLASHING DETAILS, ETC. 8.MECHANICAL DRAWINGS SHOW RECOMMENDED LOCATIONS FOR GRILLES AND DIFFUSERS. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATIONS FOR EXACT LOCATIONS. 9.REFER TO ARCHITECTURAL DRAWINGS FOR ROOM ELEVATIONS AND PLUMBING FIXTURE MOUNTING HEIGHTS. LOCATE MECHANICAL DEVICES SUCH AS THERMOSTATS, PANELS, ETC. SO THAT THEY DO NOT CONFLICT WITH GENERAL CONSTRUCTION, OR ELECTRICAL SYSTEM (LIGHT SWITCHES, PANELS, OUTLETS, ETC.). 10.PROVIDE A VOLUME DAMPER FOR EACH SUPPLY, RETURN AND EXHAUST OPENING, IN SUPPLY BRANCH WHERE THREE OR MORE OPENINGS ARE ASSOCIATED WITH THE BRANCH, AND ELSEWHERE AS NOTED ON DRAWINGS OR IN SPECIFICATIONS. 11.SUPPLY AND RETURN AIR DUCTWORK SHALL BE LINED WITH 1" SOUND LINER WITHIN 10' OF EQUIPMENT. 12.MAXIMUM FLEXIBLE DUCT LENGTH SHALL BE 8'-0". GENERAL NOTES DRAWING INDEX DRAWING ON WHICH DETAIL IS LOCATED DETAIL NUMBER SECTION NUMBER FLAG NOTE REVISION IDENTIFICATION DRAWING ON WHICH SECTION IS LOCATED 1 M2 A M-2 M 1 00 200 DETAIL REFERENCE SECTION REFERENCE MECHANICAL EQUIPMENT IDENTIFICATION AMERICANS WITH DISABILITIES ACTADA AFF ABOVE FINISHED FLOOR ARCH ARCHITECT / ARCHITECTURAL CEILING DIFFUSERCD CG CEILING GRILLE CLEANOUTCO CONTINUATIONCONT DWG DRAWING EXISTING ITEMS(E) EA EXHAUST AIR ENTERING AIR TEMPERATUREEAT EER ENERGY EFFICIENCY RATING EFFICIENCY / EFFICIENTEFF ELECT ELECTRICAL FLOOR CLEANOUTFCO MBH 1,000 BTUS MECHANICALMECH NP NON POTABLE OUTSIDE AIROSA POC POINT OF CONNECTION SA SUPPLY AIR SENSOR OR SENSIBLESENS SFD COMBINATION SMOKE/FIRE DAMPER THERMOSTATTSTAT TYP TYPICAL UNLESS NOTED OTHERWISEUNO V VENT VOLUME DAMPERVD W WASTE ABBREVIATIONS MOTORIZED DAMPERMD RS REFRIGERANT SUCTION CFM CUBIC FEET PER MINUTE BACKDRAFT DAMPERBDD CL CENTER LINE COEFFICIENT OF PERFORMANCE COP DOMESTIC COLD WATERCW DOWNDN DWV DOMESTIC WASTE AND VENT FIRE DAMPER OR FLOOR DRAINFD FIRE DEPARTMENTFD FLUSH VALVEFV NATURAL GASNG GAUGEGA DOMESTIC HOT WATERHW DOMESTIC HOT WATER RETURNHWC DOMESTIC WATER HEATERDWH INVERT ELEVATIONIE LAVATORYLV, LAV LEAVING AIR TEMPERATURELAT LINEAR FOOTLF GATE VALVEGV RETURN / RELIEF GRILLERG RPBP REDUCED PRESSURE BACKFLOW PREVENTER RETURN AIRRA RAIN LEADER OR REFRIGERANT LIQUID RL SMOKE DETECTORSD SG SUPPLY GRILLE SK SINK TP TRAP PRIMER TD TRENCH DRAIN VA VALVE VENT THROUGH ROOFVTR WATER CLOSETWC WALL CLEANOUTWCO WATER GAUGEWG PSI POUNDS PER SQUARE INCH GALLONS PER MINUTEGPM DEGREES IN FAHRENHEITDEG F BRITISH THERMAL UNITSBTU TEMPERATURE RISE OR DROPDELTA T KILOWATTSKW GALLONS PER HOURGPH MCA MINIMUM CIRCUIT AMPS MINIMUM OVER CURRENT PROTECTION MOCP INCHESIN GALLONSGAL GALLONS PER FLUSHGPF PRV PRESSURE REDUCING VALVE MAX MAXIMUM MIN MINUTES OR MINIMUM FIXTURE UNITSFU DRAINAGE FIXTURE UNITSDFU WATER HAMMER ARRESTORWHA POUNDSLBS HORSEPOWERHP EXTERNAL STATIC PRESSUREESP PIPING SYMBOLS SPRINKLER HEAD - PENDANT SPRINKLER HEAD - UPRIGHT REDUCED PRESSURE - BACKFLOW PREVENTER RPBP BALL VALVE BALANCING VALVE GATE VALVE CHECK VALVE CONTROL VALVE - 2 WAY CONTROL VALVE - 3 WAY FLEX CONNECTION PRESSURE REDUCING VALVE PRESSURE RELIEF VALVE THERMOMETER WASTE COLD WATER (DOMESTIC) HOT WATER (DOMESTIC) HOT WATER RECIRCULATED HYDRONIC WATER SUPPLY HYDRONIC WATER RETURN INDIRECT OR CONDENSATE DRAIN LIQUID REFRIGERANT SUCTION REFRIGERANT FIRE SPRINKLER PIPE RAIN LEADER OVERFLOW RAIN LEADERORL RL F RS RL ID HWR HWS UNION BUTTERFLY VALVE NATURAL GAS PIPE DOWN PIPE UP HOSE BIBB / WALL HYDRANT HOSE DRAIN VALVE VENT THROUGH ROOF FLOOR DRAIN FLOOR SINK CLEAN OUT DEMOLISHED ITEM VENT G HEAT TRACE VARIABLE FREQUENCY DRIVEVFD C CO AND NO2 TOXIC GAS SENSOR DIAMETERØ FIRE ALARM CONTROL PANELFACP FIRE DEPARTMENT CONNECTIONFDC AHJ AUTHORITY HAVING JURISDICTION NOT APPLICABLEN/A FEET OF WATER GAGE PRESSUREFT WG FOOT OR FEETFT MECHANICAL ENERGY CODE NOTES OTHER CODE NOTES AMERICANS WITH DISABILITIES ACT ·ROOM THERMOSTATS, SENSORS AND SWITCHES SHALL BE MOUNTED ON WALLS NO MORE THAN 48" ABOVE FINISHED FLOOR FOR ADA ACCESSIBILITY. INTERNATIONAL BUILDING CODE ·PROVIDE SEISMIC BRACING AND SUPPORTS IN ACCORDANCE WITH THE 2018 IBC FOR SEISMIC DESIGN CATEGORY D AND BASED ON A SEISMIC IMPORTANCE FACTOR OF 1.0 FOR ALL SYSTEMS, EXCEPT THE GAS PIPING SHALL USE AN IMPORTANCE FACTOR OF 1.5. ·THROUGH PENETRATIONS OF FIRE-RESISTANCE RATED ASSEMBLIES SHALL COMPLY WITH 2018 IBC SECTION 714.4.1 AND 714.5.1; REFER TO THE ARCHITECTURAL DRAWINGS FOR LOCATIONS. MEMBRANE PENETRATIONS OF FIRE RESISTANCE RATED WALLS AND ASSEMBLIES SHALL COMPLY WITH 2018 IBC SECTIONS 714.4.2 AND 714.5.2. ·PROTECT ALL DUCT OPENINGS OF FIRE RATED ASSEMBLIES PERIBC 716. INTERNATIONAL MECHANICAL CODE ·MAINTAIN 10'-0" MINIMUM DISTANCE BETWEEN OSA INTAKES AND PLUMBING VENTS, EXHAUST AND COMBUSTION AIR OUTLETS. ·ALL DUCT WORK SHALL BE CLASSIFIED AS LOW PRESSURE AND SHALL BE MANUFACTURED AND INSTALLED IN ACCORDANCE WITH 2018 IMC REQUIREMENTS AND CURRENT SMACNA STANDARDS FOR 2” WG, UNLESS HIGHER STATIC PRESSURES ARE INDICATED ON THE DRAWINGS. ·PROVIDE EACH INDIVIDUAL GRILLE, REGISTER, DIFFUSER AND OUTSIDE AIR CONNECTION WITH A VOLUME DAMPER OR OTHER MEANS OF ADJUSTMENT AS REQUIRED BY 2018 IMC SECTION 603.18. UNIFORM PLUMBING CODE ·CLEANOUTS SHALL BE LOCATED IN HORIZONTAL WASTE PIPING AS REQUIRED BY 2018 UPC SECTION 707.4, INCLUDING ONE AT EACH UPPER TERMINAL, EACH CHANGE OF DIRECTION THAT IS GREATER THAN 135° AND IN RUNS GREATER THAN 100 FEET IN LENGTH. ·DOMESTIC WATER PIPE SIZING IS BASED ON THE CODE REQUIRED MAXIMUM VELOCITIES PER 2018 UPC SECTION 610.12.1 OF 8 FEET PER SECOND FOR COLD AND 5 FEET PER SECOND FOR HOT WATER PIPING AND ASSUMING COPPER PIPE SIZES. THE USE OF ALTERNATE MATERIALS SHALL BE COORDINATED WITH THE SPECIFIC MANUFACTURER'S INSTRUCTIONS FOR RECOMMENDED SIZING PRACTICES AND SIZING SHALL BE INCREASED AS NEEDED. PLANS PROVIDE MINIMUM PIPE SIZES, REGARDLESS OF MATERIALS. ·SANITARY WASTE PIPING SHALL BE INSTALLED AT 1/4" PER FOOT SLOPE AWAY FROM FIXTURES UNLESS NOTED OTHERWISE ON THE FLOOR PLANS. ·PIPING IN CONNECTION WITH A PLUMBING SYSTEM SHALL BE SO INSTALLED THAT PIPING OR CONNECTIONS WILL NOT BE SUBJECT TO UNDUE STRAINS OR STRESSES, AND PROVISIONSSHALL BE MADE FOR EXPANSION, CONTRACTION, AND STRUCTURAL SETTLEMENT. VOIDS AROUND PIPING PASSING THROUGH CONCRETE FLOORS ON THE GROUND SHALL BE SEALED PER UPC 312.1. Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI TGNIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M1.00 MECHANICAL COVER SHEET J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M100.dwg, 9/29/2022 11:41:33 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION MECHANICAL WORK UNDER SEPARATE PERMIT AND PER FIELD INSPECTOR 50HORIZ.V-1 950 0.5 0.7 233/4 450 60 2" PLEATED 30 0.3400 0.670 50HORIZ.V-2 1,095 0.5 0.5 233/4 450 2" PLEATED 30 0.3400 0.670 50HORIZ.V-3 700 0.5 0.3 231/2 450 2" PLEATED 30 0.3400 0.670 50HORIZ.V-4 720 0.5 0.3 231/2 450 2" PLEATED 30 0.3400 0.670 50HORIZ.V-5 900 0.5 0.7 233/4 450 2" PLEATED 30 0.3400 0.670 HORIZ.V-6 HORIZ.V-7 HORIZ.V-9 HORIZ.V-8 HORIZ.V-10 HORIZ.V-11 HORIZ.V-12 HORIZ.V-13 HORIZ.V-14 HORIZ.V-15 5015700.5 1.3 231-1/2 450 2" PLEATED 3070 0.3400 0.6 509550.5 0.4 231/2 450 2" PLEATED 3070 0.3400 0.6 5020200.5 1.8 232 450 2" PLEATED 3070 0.3400 0.6 5015150.5 .0.9 231 450 2" PLEATED 3070 0.3400 0.6 507000.5 0.3 231/2 450 2" PLEATED 30 0.3400 0.670 508400.5 0.3 231/3 450 2" PLEATED 30 0.3400 0.670 509450.5 0.7 233/4 450 2" PLEATED 30 0.3400 0.670 507900.5 0.6 233/4 450 2" PLEATED 30 0.3400 0.670 507000.5 0.3 231/2 450 2" PLEATED 30 0.3400 0.670 507900.5 0.6 233/4 450 2" PLEATED 30 0.3400 0.670 60 60 60 60 60 60 60 60 60 60 60 60 60 60 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 6.0 5.5 6.4 4.1 4.2 5.2 4.1 4.9 5.5 4.6 4.1 4.6 8.8 9.2 5.6 11.8 GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC GREENHECK LFC EQUIP. NO. ARRGT/ DISCHARGE FAN SECTION HOT WATER COIL (EXISTING) VENTILATING UNIT SCHEDULE FILTER MFR / MODELAIRFLOW CFM EXT SP IN WG(1)MAX BHP MOTOR HP LAT DEG. F EAT DEG. F MAX FV FPM MAX AIR PD IN WG H2O FLOW GPM EWT DEG. F LWT DEG. F MAX H2O PD FT HD TYPE EFF%MAX FV FPM PD IN WG CLEAN FINAL(2) HP-37 * HP-38 HP-39 HP-40 HP-41 HP-42 HP-43 HP-44 HP-45 * HP-46 * HP-47 * HP-48 HP-49 HP-50 208 1GCH024400RMS. 135, 137 520 .40400 208 1GCH024400RMS. 135, 136 520 .40400 208 3GCH060400RMS. 218-224 1790 .50400 208 3GCH060400RMS. 218-224 1790 .50400 208 1GCH030400LAB 126 850 .50400 208 3GCH030400LAB 130 800 .55400 208 3GCH060400LAB 122 1700 .45400 208 3GCH060400NETWORKING 110 1750 .60400 208 3COMPUTER SCIENCE 108 3 208 3COMPUTER LAB 109 3 208 3GCH060400COMPUTER LAB 107 1620 .55400 208 3GCH060400COMPUTER SCIENCE 106 1635 .50400 208 3GCH030400COMPUTER LAB 107B 800 .55400 208 3GCH060400COMPUTER SCIENCE 103 1640 .50400 GCH0604001800.55400 GCH0604001800.50400 1,680 1,680 5,610 5,610 2,340 1,880 5,680 5,630 5,420 5,610 5,710 5,490 2,280 5,690 22,100 22,100 76,900 76,900 33,700 29,800 76,200 76,600 78,000 76,900 75,900 77,300 34,000 76,100 1,560 1,560 5,050 5,050 2,330 1,990 4,990 5,030 5,040 5,050 4.960 4,970 2,310 4,970 17,800 17,800 55,600 55,600 26,100 23,600 55,200 55,400 55,500 55,600 54,900 55,100 26,000 55,100 3.8 3.8 12.5 12.5 6.3 5.0 12.5 6.3 12.5 12.5 12.5 12.5 12.5 12.5 7.6 7.6 19.7 19.7 10.4 19.7 7.4 19.7 19.7 19.7 19.7 19.7 19.7 7.4 1/2 1/2 1 1 3/4 3/4 1 1 1 1 1 1 3/4 1 2.7 2.7 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 5.2 2.7 2.7 2.7 3.86 3.86 4.02 4.02 4.21 4.65 3.94 3.99 4.21 4.02 3.89 4.12 4.38 3.92 11.37 11.37 11.00 11.00 11.21 11.84 11.05 11.02 11.01 11.00 11.08 11.07 11.25 11.07 CONDENSATE PUMP ADDED CONDENSATE PUMP ADDED CONDENSATE PUMP ADDED CONDENSATE PUMP ADDED CWS / CWR CONNS. WATER PD FTGPMTOTAL CAP. BTUH PWR WATTS COOLING CAP.HEATING CAP. TOTAL CAP. (BTUH)PWR. (WATTS) EXT. STATIC PRESSURE MIN. O.S.A.CFMAREA SERVEDEQUIP. NO. (EXISTING) HEAT PUMP SCHEDULE REMARKSCONFIGURATIONPHASEVOLTSMANUF. & MODEL NO.EERCOPFILTER AREA SQ.FT. M CEILING O.A. DAMPER DIFFUSER FLAT FILTER SECTION VENTILATION SUPPLY FAN FIRE DAMPERS FILTER RETURN AIR GRILLE DIFFUSER RETURN AIR GRILLE OUTSIDE AIR OUTSIDE CORRIDOR OUTSIDE CORRIDOR SCALE:M101 1 EXISTING VENTILATION SYSTEM SCHEMATIC NONE FD FILTER HEAT PUMPHEAT PUMP CEILING PLUMBING FIXTURE SCHEDULE TAG ITEM DESCRIPTION W V CW HW SK-1 KITCHEN SINK 1/2"1 1/2"2"1/2" Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI TGNIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M1.01 MECHANICAL EQUIPMENT SCHEDULES J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M101.dwg, 9/29/2022 11:56:03 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI TGNIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M1.02 MECHANICAL CALCULATIONS J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M102.dwg, 9/29/2022 10:50:53 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 C A 12 ROBOTICS LAB 110 OFFICE 111A OFFICE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D SCALE:M2.01 1 FIRST FLOOR DEMOLITION PLAN - MECHANICAL 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0 2 4 8 16 32 feet N T T HCS HCR MM S T T T T T 12"ø HCS HCR T M MM MS S S S 24x24 SOFFIT GRILLES W/SHEET METAL PLENUM 24x24 SOFFITGRILLE (E)12"ø 12"ø THROUGHEXTERIOR WALL 24x24 TG 12"ø THROUGH EXTERIOR WALL BDD 24x24 TG (E) CD 375 CFM (E) CD375 CFM 14"ø 24x24 SOFFITGRILLE (E)12"ø 1-1/4"(E)20"x12CWSCWR(E) CD 375 CFM 6-6 CD 80 CFM (E) CD 375 CFM 12-10 275 CFM 10"ø 12"ø 6"ø (E) CD150 CFM 12-12 CD400 CFM10"ø 9"ø 4"ø (E) CD375 CFM(E)20"x12(E) CD375 CFM (E)12"ø 12"ø (E) CD 150 CFM14"ø UP 14"ø 12"ø 10"ø 12-12 CD 300 CFM(E) CD375 CFM 24x24 TG 6-6 CD100 CFM BDD 24x24 TG 6-6 CD 100 CFM M M 24x24 SOFFIT GRILLES W/SHEET METAL PLENUM 12"ø THROUGHEXTERIOR WALL 12"ø THROUGH EXTERIOR WALL 24x24 TG BDD 24x24 TG (E) CD360 CFM 24-8 CD200 CFM (E) CD260 CFM (E) CD 360 CFM(E) CD150 CFM (E) CD 375 CFM CWSCWR1-1/4" (E) CD 375 CFM 10-10 CD325 CFM 14"ø10"ø 20"x12(E) CD 360 CFM 8"ø (E) CD 260 CFM 12"ø 420 CFM (E) CD410 CFM 20"x12(E) CD160 CFM 8"ø (E) CD410 CFM (E) CD160 CFM (E) CD410 CFM14"ø(E) CD410 CFM (E) CD150 CFM (E) CD325 CFM (E) CD 325 CFM 6"ø BDD 24x24 TG (E) CD200 CFM 4" HCR UP TOSECOND FLOOR (E) CD360 CFM 24x24 TG 12"ø THROUGHEXTERIOR WALL 12"ø THROUGH EXTERIOR WALL HP-40(E)HP-38 HP-37HP-39 HP-42 HP-41 V-12 HP-43 HP-44 V-13 (E)(E) (E)(E) (E) (E) (E) (E) (E) EXISTING 3 TON HEAT PUMPWITH OUTSIDE AIR CONNECTIONTO REMAIN TEMPORARILY CAP EXISTING DUCT & HVAC UNIT CONNECTIONS AND PREPARE FOR RECONNECTION IN THE NEW WORK (TYPICAL). REMOVE EXISTING GRILLES, REGISTERS AND DIFFUSERS, THERMOSTATS AND ASSOCIATED DUCTWORK IN AREAS OF NEW WORK (TYPICAL) RETAIN EXISTING MECHANICAL UNITS AND PROTECT DURING DEMOLITION AND CONSTRUCTION (TYPICAL) 420 CFM 420 CFM 420 CFM PHASE 1 AREA OF WORK (3 TYPICAL) T (E) RELIEF LOUVER (E) OUTSIDEAIR LOUVER ALTERNATE 1 PHASE 1 AREA OF WORK BASE BID PHASE 1 AREA OF WORK ALTERNATE 2 PHASE 1 AREA OF WORK ROBOTICS LAB 110 OFFICE 111A OFFICE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S MENS MECH. 100B 100C 100D (E)3/4" HW (E)4" W BELOW FLOOR (E)4" W BELOW FLOOR (E)1" HW (E)3/4" HW UP (E)3/4" HW UP (E)1" HW (E)2" CW UP (E)4" W BELOW FLOOR (E)2" W BELOW FLOOR (E)2" VENT (E)FLOOR DRAIN FOR CONDENSATE (E)2" V UP DEMOLISH EXISTING FLOOR DRAIN AND EXISTING COPPER CONDENSATE PIPING . PERMANENTLY CAP AND SEAL EXISTING WASTE AND VENT PIPES BELOW GRADE. TEMPORARILY CAP AND PREPARE FOR RECONNECTION THE CONDENSATE DRAINS ABOVE THE CEILING. 1 FLAG NOTES (THIS SHEET ONLY): 1 6 7 Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI T G NIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M2.01 FIRST FLOOR DEMOLITION PLAN - MECHANICAL N Key Plan SCALE:M2.01 2 PARTIAL DEMOLITION PLAN - PLUMBING 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0 2 4 8 16 32 feet J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M201.dwg, 10/3/2022 8:54:59 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION SCALE:M3.01 1 FIRST FLOOR PLAN - MECHANICAL 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0 2 4 8 16 32 feet N E F G H I J K L 6 7 8 9 10 11 C A 12 Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Classroom 115 ub 120 Office Suite 110 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D HCS HCR MM S T T T T 12"ø HCS HCR T M MM MS S S S 24x24 SOFFIT GRILLES W/SHEET METAL PLENUM 24x24 SOFFITGRILLE (E)12"ø 12"ø THROUGH EXTERIOR WALL 24x24 TG 12"ø THROUGH EXTERIOR WALL BDD 14"ø 24x24 SOFFITGRILLE (E)12"ø 1-1/4"CWSCWR12-10 275 CFM 10"ø 12"ø 6"ø (E) CD150 CFM 12-12 CD400 CFM10"ø 9"ø 12"ø (E) CD 150 CFM14"ø UP 14"ø 12"ø 10"ø 12-12 CD 300 CFM 6-6 CD100 CFM BDD 24x24 TG 6-6 CD 100 CFM M M 24x24 SOFFIT GRILLES W/SHEET METAL PLENUM 12"ø THROUGHEXTERIOR WALL 12"ø THROUGH EXTERIOR WALL 24x24 TG BDD 24x24 TG (E) CD360 CFM 24-8 CD200 CFM (E) CD260 CFM (E) CD 360 CFM(E) CD150 CFM (E) CD 375 CFM CWSCWR1-1/4" (E) CD 375 CFM 10-10 CD325 CFM 14"ø10"ø 20"x12(E) CD 360 CFM 8"ø (E) CD 260 CFM 12"ø 420 CFM (E) CD160 CFM 8"ø (E) CD160 CFM (E) CD325 CFM (E) CD 325 CFM BDD 24x24 TG (E) CD200 CFM 4" HCR UP TOSECOND FLOOR (E) CD360 CFM 12"ø THROUGHEXTERIOR WALL 12"ø THROUGH EXTERIOR WALL HP-40(E)HP-38 HP-37HP-39 HP-42 HP-41 V-12 HP-43 HP-44 V-13 (E)(E) (E)(E) (E) (E) (E) (E) (E) EXISTING HEAT PUMP TO REMAIN POC POC POCPOC POC POC POC POC POC CD2 150 CD2 150 CD2 150 CD2 240 CD2 240 CD2 240 CD2 240 CD2 240 CD2 100 CD2 100 100 CD2 100 CD2 100 CD2 100 CD2 100 CD2 100 CD2 100 CD2 100 CD2 100 CD2 100 12"Ø 12"Ø 20x12 CD2 150 RG1 EF-10 8"Ø 12"ØRG1 12"Ø 20x1214"Ø10"Ø 10"Ø CD2 240 T T $ T T POC POC RG1 10"Ø 10"Ø 10"Ø 12"Ø8"Ø 8"Ø 8"Ø20x12PROVIDE A NEW BACKDRAFT DAMPER TO PREVENT EXHAUST AIR FROM ENTERING SPACE THROUGH RELIEF GRILLE. 10"Ø20x1210"ØCD210"Ø 6"Ø(6 TYP) RG1 RG1 RG1 RG1 RELOCATE EXISTING WALL MOUNTEDTHERMOSTATS (4 TYPICAL) 10"Ø RG1 210 CFM OSA 420 CFM 210 CFM OSA REDUCE FAN SPEEDS AT EXISTING HVAC EQUIPMENT INTHIS AREA TO PROVIDE THE LESSER CAPACITIES NEEDED FOR THE NEW OFFICE SPACES (TYPICAL) SCALE:M3.01 2 NEW AND EXSTING RETURN AIR TO PLENUM DETAIL N/A 1/2" SOUND LINING CEILING CEILING RETURN GRILLE MIN. 12"3"12"PHASE 1 AREA OF WORK (3 TYPICAL) (E) RELIEF LOUVER (E) OUTSIDE AIRLOUVER8"Ø RG2 RG2 RG2 RG2 RG2 RG2 RG2 RG2 RG2 RG2 6"Ø (8 TYP)12"Ø(E) CONTROLS12"ØALTERNATE 1 PHASE 1 AREA OF WORK BASE BID PHASE 1 AREA OF WORK ALTERNATE 2 PHASE 1 AREA OF WORK Office 110C Office 110E Office 110G Office 110I Office 110J Office 110D Office 110H Kitchenette 110K Office 110F ELEV. WOMEN'S MENS MECH. 100B 100C 100D NEW SINK, CONNECT TO NEAREST EXISTING PLUMBING PIPING AS SHOWN. PROVIDE NEW AIR GAP FITTING IN WALL AT (E) WASTE PIPING. 2" WASTE AND 1-1/2" VENT SHALL BE CONNECTED TO EXISTING. PROVIDE WITH A TRAP PRIMER AND ROUTE NEW CONDENSATE PIPING FROM EXISTING HVAC UNITS TO TERMINATE INDIRECTLY. PROVIDE ACCESS FOR SERVICEABILITY. 1 FLAG NOTES (THIS SHEET ONLY): (E)3/4" HW (E)4" W BELOW FLOOR (E)4" W BELOW FLOOR (E)1" HW (E)3/4" HW UP (E)3/4" HW UP (E)1" HW (E)2" CW UP (E)4" W BELOW FLOOR (E)2" W BELOW FLOOR (E)2" VENT (E)2" V UP 1 POC 2"W TO (E)4" W BELOWFLOOR POC 1-1/2"V TO (E)2"V 1/2"HW AND 1/2"CW FROM A POC AT THE RESTROOMS 2 2 SK-1 6 7 Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI T G NIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M3.01 FIRST FLOOR PLAN - MECHANICAL N Key Plan SCALE:M3.01 3 PARTIAL PLAN - PLUMBING 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0 2 4 8 16 32 feet J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M301.dwg, 10/3/2022 8:55:18 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 Classroom RECEIVED 11/01/2022 striplett BUILDING DIVISION B22005282_v2 SCALE:M4.01 1 FIRST FLOOR PLAN - FIRE PROTECTION 1/8" = 1'-0"SCALE: 1/8" = 1'-0" 0 2 4 8 16 32 feet N E F G H I J K L 6 7 8 9 10 11 C A 12 Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Classroom 115 120 Office Suite 110 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D 1.FIRE SPRINKLER SYSTEMS ARE EXISTING TO REMAIN. 1.REVISE EXISTING WET PIPE SPRINKLER SYSTEM TO ACCOMMODATE THE NEW FLOOR PLANS AND WALL LOCATIONS. REPOSITION AND/OR ADD NEW HEADS AS NEEDED TO MAINTAIN FULL COVERAGE IN ALL AREAS OF NEW WORK AS REQUIRED BY NFPA 13 AND TO MAINTAIN A FULLY SPRINKLERED BUILDING. 2.PROVIDE NEW HEADS TO MATCH THE EXISTING AND NEW FLEXIBLE PIPE CONNECTION AT EACH NEW HEAD. 3.CENTER SPRINKLER HEADS IN LAY-IN TILES WHERE POSSIBLE, OR CENTER IN HALF TILES WHERE NEEDED. 4.PROVIDE SEISMIC BRACING AND SUPPORTS IN ACCORDANCE WITH THE 2018 IBC FOR SEISMIC DESIGN CATEGORY D. PROVIDE WITH ADEQUATE SUPPORTS, HANGERS, FLEXIBLE COUPLINGS AND SWAY BRACING AS REQUIRED BY CODES AND TO ACCOUNT FOR ALL EXPECTED SYSTEM MOVEMENT INCLUDING BUT NOT LIMITED TO: SEISMIC, SETTLEMENT, SHIFTING AND EXPANSION AND CONTRACTION. 5.A SUPPLY OF AT LEAST 6 SPARE SPRINKLERS SHALL BE MAINTAINED ON THE PREMISES SO THAT ANY SPRINKLERS THAT HAVE OPERATED OR BEEN DAMAGED IN ANY WAY CAN BE PROMPTLY REPLACED. A CABINET WITH SPARE HEADS, WRENCH AND OTHER REQUIRED AND PERTINENT INFORMATION SHALL BE PROVIDED AND LOCATED IN THE RISER ROOM. 6.THE CONTRACTOR SHALL PRE-TEST THE SYSTEM(S) TO VERIFY PROPER PERFORMANCE PRIOR TO AHJ INSPECTION. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO PERFORM ALL ACCEPTANCE TESTS AND PROVIDE THE NECESSARY EQUIPMENT FOR THE TESTS. THE CONTRACTOR MAY BE REQUIRED TO CALL THE AHJ IN ADVANCE TO SCHEDULE THE FOLLOWING: a.HYDROSTATIC TEST AND PIPE FLUSHING b.INSPECTION OF UNDERGROUND PIPING PRIOR TO CONCEALMENT c.INSPECTION OF OVERHEAD PIPING BEFORE CONCEALMENT AND TO WITNESS HYDROSTATIC TEST d.FUNCTIONAL TEST e.FINAL ACCEPTANCE FIRE PROTECTION GENERAL SHEET NOTES PHASE 1 AREA OF WORK (3 TYPICAL) ALTERNATE 1 PHASE 1 AREA OF WORK BASE BID PHASE 1 AREA OF WORK ALTERNATE 2 PHASE 1 AREA OF WORK Client Project No.: SSW Architects Project No.: Date : Bid Documents Building J First Floor Remodel Phase 1 09/30/2022 2022-02 G(2-2) 22022 37622 STE R E DI T G NIHSAW AL E N G IOB E FO SI G ON ERRRO E PELTATSF E R E S DNOG N EA W CONSULTING ENGINEERS BOGARD | PASCUA ENGINEERS, PS 22121 17th Avenue SE, Suite 111 Bothell, Washington 98021 425-415-6100 M4.01 FIRST FLOOR PLAN - FIRE PROTECTION N Key Plan J:\2022 Jobs\22040 RTC Building J\Mech Dwgs\M401.dwg, 10/3/2022 8:55:30 AMPermit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 Classroom B22005282_v2RECEIVED 11/01/2022 striplett BUILDING DIVISION ABBREVIATIONS E1.1 3 POWER RECEPTACLES & OUTLETS EQUIPMENT CONNECTIONS & CONTROLS SERVICE GEAR - AS SHOWN ON PLANS CONDUITS AND CIRCUITING LIGHT FIXTURES & CONTROLS NOTES AND MISCELLANEOUS SYMBOLS 3 ELECTRICAL LEGEND NOTE: E0.01 Symbol Legend, Abbreviations, Sheet list PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:20 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E0.02 Fixture Schedule and WSEC Compliance forms PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 12 C A ROBOTICS LAB 110 OFFICE 111A OFFICE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D Demolition Notes 1.2.3.4. 5. See Mechanical, and Electrical drawings for additional demolitionand salvage scope of work.Remove demolished materials from site, unless noted otherwise.Keep Fire Lanes clear and accessible at all times.Construction limits indicate the primary extent of the work areaand are approximate. Coordinate all work outside these limits withArchitect, to avoid impact to Owner's ongoing campus operations.Protect existing site structures, components, and appurtenancesto remain from any damage. Contractor to repair any damagecaused by demolition activities to the satisfaction of the Owner. GENERAL NOTES FLAG NOTES ED2.01NScale: 1/8" = 1'-0"ED2.01 First Floor Power Demolition Plan1 PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 First Floor Power Demolition Plan NKey Plan Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E F G H I J K L 6 7 8 9 10 11 12 C A ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D CL CL CL CL CL CL CL CL ALIGN F/O WALL W/ F/O (E) COLUMN INFILL WALL - SEE NOTE 11 INFILL WALL - SEE NOTE 11 ALIGN SF JAMB W/ (E) CJ UP UP MB8FS MB12 FS MB6 MB8TB6 FS MB8MB8TB6Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Office Suite 110 120 Classroom/Lab 115 Floor Plan Notes1.2.3.4.5.6.7.8.9.10.11.Refer to Sheet T1.00 for Floor Plan LegendRefer to A7.01 for Finish Schedule and floor finish transitiondetails and typical corridor finishes.See Sheet A7.10 for partition types. Partitions are type A1 UON.Metal stud walls are dimensioned either from face of stud orcenterline of stud UON.Dimensions noted as clear ("CLR") are from final finished surfaceto final finished surface.At sound retardant walls, provide batt insulation across full extentof partition, including returns, jogs, and corners, whether indicatedor not, for complete isolation of space.Mechanical, and electrical components identified on architecturalplans are for general information and are not intended to fullydescribe such features. For full descriptions, see respectivedrawings.All conduit, piping, and ductwork to be concealed UON.whereexposed it shall be routed tight to deck or wall where indicated, itmay span or attach tight to bottom of structure.Coordinate with Electrical for floor boxes for power and data.Provide blocking and backing for all wall-mounted materials,accessories, equipment, and furnishings Including these indicatedas owner furnished and/or owner installed. (OF/OI, OF/CI) -Coordinate with all other disciplines.At wall infills, match existing construction. Wall tag shown onplans is estimate of exsiting construction. Patch & repair GWB totie new wall finish into existing. Paint entire wall from corner tocorner on both sides per schedule or to match existing. FLAG NOTES GENERAL NOTES E2.01 First Floor Power Plan NScale: 1/8" = 1'-0"E2.01 First Floor Power Plan1 NKey Plan PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 Classroom RECEIVED 11/01/2022 striplett BUILDING DIVISION B22005282_v2 E F G H I J K L 6 7 8 9 10 11 12 C A ROBOTICS LAB 110 SERVER/OFFICE 111A STORAGE 110A COMPUTER SCIENCE 111 ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D E F G H I J K L 6 7 8 9 10 11 12 C A FLAG NOTES GENERAL NOTES ED3.01 First Floor Lighting Demolition Plan NScale: 1/8" = 1'-0"ED3.01 First Floor Lighting Demolition Plan1 PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 NKey Plan Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION Floor Plan Notes1.2.3.4.5.6.7.8.9.10.11.Refer to Sheet T1.00 for Floor Plan LegendRefer to A7.01 for Finish Schedule and floor finish transitiondetails and typical corridor finishes.See Sheet A7.10 for partition types. Partitions are type A1 UON.Metal stud walls are dimensioned either from face of stud orcenterline of stud UON.Dimensions noted as clear ("CLR") are from final finished surfaceto final finished surface.At sound retardant walls, provide batt insulation across full extentof partition, including returns, jogs, and corners, whether indicatedor not, for complete isolation of space.Mechanical, and electrical components identified on architecturalplans are for general information and are not intended to fullydescribe such features. For full descriptions, see respectivedrawings.All conduit, piping, and ductwork to be concealed UON.whereexposed it shall be routed tight to deck or wall where indicated, itmay span or attach tight to bottom of structure.Coordinate with Electrical for floor boxes for power and data.Provide blocking and backing for all wall-mounted materials,accessories, equipment, and furnishings Including these indicatedas owner furnished and/or owner installed. (OF/OI, OF/CI) -Coordinate with all other disciplines.At wall infills, match existing construction. Wall tag shown onplans is estimate of exsiting construction. Patch & repair GWB totie new wall finish into existing. Paint entire wall from corner tocorner on both sides per schedule or to match existing. E F G H I J K L 6 7 8 9 10 11 12 C A 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0" 9' - 0"9' - 0" E F G H I J K L 6 7 8 9 10 11 12 C A ELEV. WOMEN'S CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D ALIGN F/O WALL W/ F/O (E) COLUMN INFILL WALL - SEE NOTE 11 INFILL WALL - SEE NOTE 11 ALIGN SF JAMB W/ (E) CJ Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Classroom/Lab 115 Conference/Clubs 120 Office Suite 110 FLAG NOTES GENERAL NOTES E3.01 First Floor Lighting Plan Scale: 1/8" = 1'-0"E3.01 First Floor Lighting Plan1 PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 NNKey Plan Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 Classroom B22005282_v2RECEIVED 11/01/2022 striplett BUILDING DIVISION GENERAL NOTES FLAG NOTES LEGEND E9.01 Partial Riser Diagram, Panel Schedules PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:21 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 Scale: NoneE9.01 Partial Riser Diagram1 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION E10.01 Panel Schedules PRELI M I N A R Y Client Project No. Date: SSW Architects Project No.: 09/30/ 2 0 2 2 3 : 0 2 : 0 9 P M Permit Set Building J First Floor Remodel Phase 1 September 30, 2022 2022-511 G (1-1) 22002 Plot date: 9/30/2022 9:22 PMENGINEERING A SC E Consulting Electrical Engineers 425-402-9400 office@caseeng.com Bothell, WA 98011 19515 North Creek Parkway, Suite 302 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION GENERAL MECHANICAL EQUIPMENT TAG REVISION CALLOUT FLAG NOTE CALLOUT LOCATION WHERE PICTURE WAS TAKEN AND DIRECTION DEMOLITION NOTE TAG EQUIPMENT TAG DETAIL/PLAN IDENTIFIER SECTION IDENTIFIER MATCHLINE OR PROPERTY LINE EXISTING ELECTRICAL TO BE REMOVED EXISTING ELECTRICAL TO REMAIN NEW ELECTRICAL WORK ELEVATION IDENTIFIER REVISION DEFINITION AREA, AREA ENCIRCLED CONTAINS CHANGES MADE SUBSEQUENT TO PREVIOUS ISSUE NORTH ARROW ENLARGED PLAN BOUNDARY 1 1 1 1 1 E1.01 1 E1.01 1 E1.01 AHU-01 TELECOMMUNICATIONS SYSTEM RACEWAY AND BOXES J JUNCTION BOX J FURNITURE WALL FEED OUTLET BOXF PULL BOX VAULT HANDHOLE FLOORBOX (WHERE INDICATED, SUBSCRIPT INDICATES FLOOR BOX TYPE) POKE-THRU POKE-THRU TYPE) (WHERE INDICATED, SUBSCRIPT INDICATES FLOOR A A RACEWAY CONCEALED IN-WALL OR IN-CEILING (EXPOSED IN UNFINISHED AREAS) RACEWAY RUN BELOW FLOOR OR BELOW GRADE RACEWAY (CIRCLE DENOTES VERTICAL TRANSITION) RACEWAY CONTINUATION RACEWAY STUB WITH BUSHINGS RACEWAY SLEEVE WITH BUSHINGS 1 (WHERE INDICATED, SUBSCRIPT INDICATES PULL BOX NUMBER) (WHERE INDICATED, SUBSCRIPT INDICATES VAULT TYPE) PB XX XX HH POWER POLE, FLOOR TO CEILING SURFACE METAL RACEWAY CABLE TRAY, 12"W x 4"H OVERHEAD, UNLESS OTHERWISE NOTED CABLE TRAY, OVERHEAD LADDER TYPE GROUNDING GROUNDING ROD GROUNDING BUSBAR EQUIPMENT GROUNDING CONNECTION GROUNDING STRAP G GROUNDING CONDUCTOR HA- HOMERUN TO PANEL (INDICATES PANEL DESIGNATION AND CIRCUIT NUMBER) #(GAUGE OF WIRE OTHER THAN AWG#12) NUMBER OF CONDUCTORS (GROUND CONDUCTOR) (PHASE CONDUCTORS) (NEUTRAL CONDUCTOR) NOT ALL SYMBOLS MAY APPEAR ON THE DRAWINGS (WHERE INDICATED, SUBSCRIPT INDICATES HANDHOLE NUMBER) FLEXIBLE RACEWAY FIRE STOPPING SLEEVE DRAWING INDEX CLASSROOM AUDIO VISUAL SYSTEM AV AUDIO VISUAL INPUT PLATE, WALL-MOUNTEDX6TELECOMMUNICATIONS DEVICE Y X ABOVE CEILING TELECOMMUNICATIONS DEVICEWAP (X = REPRESENTS THE # OF TELECOMMUNICATIONS MODULES) (X = REPRESENTS THE # OF TELECOMMUNICATIONS MODULES) (W = TELECOMMUNICATIONS WALL PHONE MTD AT +48" AFF) (B = BLANK COVER PLATE) (AC = ABOVE COUNTER DEVICE) (S = SURFACE MOUNT) (WAP = WALL-MOUNTED WIRELESS ACCESS POINT DATA DEVICE) (WAP = WIRELESS ACCESS DEVICE) INTRUSION DETECTION SYSTEM CONFERENCE ROOM AUDIO VISUAL SYSTEM AV AUDIO VISUAL INPUT PLATE, WALL-MOUNTED X FLAT PANEL DISPLAY, WALL-MOUNTEDFPD S PIR MOTION DETECTOR, WALL-MOUNTED RECESSED WALL BOX, WALL-MOUNTEDWBC S DOOR POSITION SWITCH WALL-MOUNTED ENCLOSURE TWO-POST EQUIPMENT RACK DOOR HARDWARE POWER SUPPLY (DIV 08) (EL = ELECTRIFIED LOCKSET/EXIT DEVICE) EL ACCESS CONTROL SYSTEM CREDENTIAL/CARD READERS CR (CR = CARD READER, WALL-MOUNTED) R REQUEST TO EXIT, INTEGRAL MICRO SWITCH 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethirdavenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 4 A M T0.01 TELECOM AND LOW VOLTAGE LEGEND AND DRAWING INDEX Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 T0.01 TELECOM AND LOW VOLTAGE LEGEND AND DRAWING INDEX T0.02 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES T0.03 TELECOM AND LOW-VOLTAGE ROUGH-IN SCHEDULES T6.01 TELECOM FLOOR PLAN LEVEL 1 - AREA B T8.01 TELECOM DETAILS T8.02 TELECOM DETAILS TD6.01 TELECOM DEMO PLAN LEVEL 1 - AREA B Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION ABBREVIATIONS 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. ENERGY CODE NOTES NON-STRUCTURAL ELECTRICAL COMPONENT NOTES PERFORM WORK IN ACCORDANCE WITH APPLICABLE NATIONAL AND STATE CODES AS AMENDED LOCALLY AND ENFORCED BY THE AHJ. OBTAIN AND PAY FOR PERMITS REQUIRED FOR INSTALLATION OF WORK. ARRANGE AND SCHEDULE REQUIRED INSPECTIONS. COORDINATE WITH UTILITY COMPANIES FURNISHING SERVICES TO PROJECT. INSTALLATION OF UTILITY SERVICES SHALL BE IN ACCORDANCE WITH UTILITY REQUIREMENTS. VERIFY APPLICABLE INSTALLATION STANDARDS AND REQUIREMENTS. PROVIDE AND SUBMIT ELECTRICAL DRAWINGS TO UTILITY FOR APPROVAL PRIOR TO ROUGH-IN AND PRIOR TO ORDERING EQUIPMENT. DEVICE LOCATIONS ARE APPROXIMATE. COORDINATE DEVICE LOCATIONS AND ELEVATIONS WITH APPROPRIATE DOCUMENTS INCLUDING CASEWORK SHOP DRAWINGS AND ARCHITECT'S INTERIOR ELEVATIONS PRIOR TO ROUGH-IN. COORDINATE ELECTRICAL WORK WITH THAT OF OTHER TRADES. REFER TO MECHANICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, AND LANDSCAPE DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL OCCUR PRIOR TO FABRICATION, PURCHASE, AND INSTALLATION OF WORK. COORDINATE LOCATION OF LIGHT FIXTURES AND CEILING-MOUNTED DEVICES WITH ARCHITECTURAL REFLECTED CEILING PLANS AND ELEVATIONS. PROVIDE RATED ENCLOSURES AROUND ALL LIGHT FIXTURES PENETRATING RATED CEILINGS. COORDINATE WITH ARCHITECTURAL. REFER TO ARCHITECTURAL AND STRUCTURAL DRAWINGS FOR LOCATIONS OF EXPANSION/SEISMIC JOINTS. PROVIDE RACEWAY EXPANSION/SEISMIC JOINTS FOR RACEWAYS CROSSING BUILDING EXPANSION/SEISMIC JOINTS. DEMOLISH EXISTING SYSTEMS AS INDICATED ON PLANS OR AS REQUIRED FOR INSTALLATION OF NEW WORK. MATERIAL SHALL BE REMOVED FROM SITE AND LEGALLY DISPOSED OF OFF SITE UNLESS OTHERWISE DIRECTED. RETURN ITEMS TO OWNER IN EXISTING CONDITION WHEN DIRECTED BY OWNER. COMPLETION OF WORK SHALL BE EXECUTED IN ACCORDANCE WITH THE PROJECT SCHEDULE. SCHEDULE INSTALLATION WITH OTHER TRADES TO ENSURE PROJECT MILESTONES ARE MET. DRAWINGS ARE DIAGRAMMATIC AND DO NOT SHOW ALL COMPONENTS REQUIRED FOR A COMPLETE INSTALLATION. PROVIDE COMPONENTS REQUIRED FOR COMPLETE AND OPERATIONAL SYSTEMS INCLUDING RACEWAYS, CONDUCTORS, BOXES, SUPPORTS AND SIMILAR ITEMS. BRANCH CIRCUIT HOMERUNS ARE SHOWN TO INDICATE CIRCUIT PROPERTIES AND CONFIGURATION. SINGLE-CIRCUIT HOMERUNS SERVED FROM THE SAME PANELBOARD MAY BE COMBINED IN ACCORDANCE WITH THE DIVISION 26 SPECIFICATIONS, UNLESS INDICATED OTHERWISE. EXTEND AND CONNECT BRANCH CIRCUIT RACEWAY AND WIRING FROM HOMERUN TO DEVICES AND EQUIPMENT WITH CIRCUIT NUMBERS INDICATED. CONDUCTOR QUANTITIES AND SIZES ARE INDICATED AT HOMERUNS ONLY. SHOW ACTUAL RACEWAY ROUTING AND CIRCUITING ON RECORD DRAWINGS. MINIMUM CONDUCTOR SIZE #12 AWG. LIGHT FIXTURES MOUNTED IN CONTINUOUS ROWS SHALL BE THROUGH-WIRED VIA FIXTURE INTERNAL WIREWAYS. CIRCUITS AS INDICATED ON DRAWINGS. FIXTURES NOT LISTED FOR THROUGH WIRING SHALL BE WIRED VIA SEPARATE RACEWAY AND WIRING SYSTEM EXTERNAL TO THE FIXTURES. PROVIDE RACEWAYS, WIRING AND CONNECTIONS FOR A COMPLETE AND OPERATIONAL SYSTEM. GENERAL NOTES 1. 2. 3. 4. RECORD DRAWINGS: SUBMIT TO THE BUILDING OWNER PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. OPERATION AND MAINTENANCE MANUALS: SUBMIT TO THE BUILDING OWNER PER ENERGY CODE ENFORCED BY THE LOCAL AHJ. THIS BUILDING AND ITS ENERGY SYSTEMS HAVE BEEN DESIGNED TO COMPLY WITH ENERGY CODE ENFORCED BY THE LOCAL AHJ. CONTRACTOR IS RESPONSIBLE FOR CORRECT INSTALLATION OF ENERGY CONSERVATION MEASURES. LIGHTING CONTROL SYSTEMS COMMISSIONING AND COMPLETION REQUIREMENTS: TEST SYSTEMS TO ENSURE THAT BUILDING SYSTEMS HAVE BEEN INSTALLED AND FUNCTION PROPERLY AND EFFICIENTLY, AND CAN BE MAINTAINED IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND OPERATIONAL REQUIREMENTS PER ENERGY CODE ENFORCED BY THE AHJ. REFER TO SPECIFICATIONS FOR ADDITIONAL COMMISSIONING REQUIREMENTS. 14. 15. 16. 17. 18. 19. 20. 21. 22. 23. 24. 25. LOCATIONS OF RACEWAY, PATHWAY AND SIMILAR ITEMS ARE SHOWN SCHEMATICALLY. COORDINATE INSTALLATION, INCLUDING BUT NOT LIMITED TO CABLING, TELECOMMUNICATION PATHWAYS AND SPACES, AND EXACT LOCATION OF HORIZONTAL AND BACKBONE CABLING WITH LOCATIONS OF FIXED CASEWORK AND BUILDING CONDITIONS AFFECTING THE WORK OF THIS CONTRACT. COORDINATE TELECOMMUNICATIONS WORK WITH THAT OF OTHER TRADES. REFER TO ELECTRICAL, MECHANICAL, ARCHITECTURAL, STRUCTURAL, CIVIL, AND LANDSCAPE DRAWINGS AND SPECIFICATIONS. COORDINATION SHALL OCCUR PRIOR TO FABRICATION, PURCHASE, AND INSTALLATION OF WORK. NEW CABLING INSTALLATIONS SHALL BE CONCEALED IN WALL, CEILINGS, AND BELOW RAISED FLOOR SPACES UNLESS OTHERWISE NOTED ON THE DRAWINGS. CABLING IN ACCESSIBLE CEILING SPACES SHALL BE INSTALLED AS OPEN CABLING NEAR STRUCTURES AND WALLS OR AS SPECIFICALLY NOTED ON DRAWINGS. SEE SPECIFICATIONS FOR SUPPORT REQUIREMENTS. PROVIDE FIRESTOPPING SYSTEMS FOR CONDUIT AND RACEWAY SYSTEMS AT PENETRATIONS, SLEEVES AND SLOTS OF FIRE RATED CONSTRUCTION FOR HORIZONTAL AND INTRABUILDING PATHWAYS AND SPACES. INTRABUILDING OPTICAL FIBER CABLING SHALL BE CLEARLY AND VISIBLY IDENTIFIED IN PULLBOXES, ENTRANCE POINTS, EACH RISER ROOM, AND 5'-0" BEFORE ENTERING A FREE STANDING RACK UTILIZING AN OPTICAL FIBER CABLE MARKER TAG SYSTEM. MAINTAIN A MINIMUM SPACING OF 12" FROM ELECTRICAL FEEDERS AND BRANCH CIRCUIT WIRING AND 12" FROM AUXILIARY SYSTEM CABLING. MINIMUM SPACING FROM ELECTRICAL APPARATUS SUCH AS MOTOR DRIVEN EQUIPMENT AND TRANSFORMERS SHALL BE 6'-0". SPACING REQUIREMENTS SHALL APPLY TO OPEN CABLING PATHWAYS WHERE EQUIPMENT IS LOCATED ON THE SAME FLOOR, FLOOR ABOVE, FLOOR BELOW, OR IN ROOMS ADJACENT TO SUCH EQUIPMENT AS THOUGH WALLS AND FLOORS DID NOT EXIST. EXCEPTION: BUILDING CONSTRUCTION THAT RESULTS IN CONTINUOUS METALLIC BARRIER BETWEEN ELECTRICAL APPARATUS AND CABLE PATHWAYS SHALL BE CONSIDERED AS SUITABLE SEPARATION. PRIOR TO STARTING TELECOMMUNICATIONS INSTALLATION, CAREFULLY INSPECT INSTALLED WORK OF OTHER TRADES AND VERIFY THAT SUCH WORK IS COMPLETE TO THE POINT WHERE WORK MAY PROPERLY COMMENCE. NOTIFY THE ARCHITECT AND ENGINEER IN WRITING OF CONDITIONS DETRIMENTAL TO THE PROPER AND TIMELY COMPLETION OF THE WORK. DO NOT BEGIN TELECOMMUNICATIONS INSTALLATION UNTIL ALL UNSATISFACTORY CONDITIONS ARE RESOLVED. BEGINNING WORK CONSTITUTES ACCEPTANCE OF CONDITIONS AS SATISFACTORY. ROUTE CATEGORY 6/6A CABLES TO THEIR ASSIGNED CROSS- CONNECT PER THE IDENTIFICATION LABEL AT EACH TELECOMMUNICATIONS WORKSTATION DEVICE. TERMINATE ALL CABLES ON 48-PORT PATCH PANELS ON RACKS UNLESS OTHERWISE NOTED. THE ELECTRICAL CONTRACTOR SHALL PROVIDE ALL CONDUIT, OUTLET BOXES, JUNCTION BOXES, RACEWAY SYSTEMS, ETC. FOR A COMPLETE AND OPERATIONAL PATHWAY SYSTEM FOR ALL TELECOMMUNICATIONS SYSTEMS PER THE SCOPE OF WORK INDICATED ON THE CONSTRUCTION DRAWINGS AND BID SPECIFICATIONS. CABLE TRAY PATHWAYS ABOVE ACCESSIBLE CEILINGS SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. CABLE TRAY PATHWAYS BELOW RAISED FLOOR SPACES SHALL BE PROVIDED BY THE TELECOMMUNICATIONS CONTRACTOR. 1. 2. 3. 4. THE FOLLOWING ITEMS ARE TAKEN DIRECTLY FROM THE 2018 INTERNATIONAL BUILDING CODE AND FROM THE AMERICAN SOCIETY OF CIVIL ENGINEERS (ASCE) STANDARD 7. THE CONTRACTOR SHALL REFER TO THE ABOVE FOR ADDITIONAL INFORMATION, EXCEPTIONS, AND FURTHER DESCRIPTIONS. THE CONTRACTOR SHALL ADHERE TO REQUIREMENTS AND AS SUCH, SHALL BE INCLUDED WITHIN BID. ALSO REFER TO SPECIFICATIONS. 2018 IBC, 1613.1, SCOPE: ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND NON-STRUCTURAL COMPONENTS THAT ARE PERMANENTLY ATTACHED TO STRUCTURES AND THEIR SUPPORTS AND ATTACHMENTS SHALL BE DESIGNED AND CONSTRUCTED TO RESIST THE EFFECTS OF EARTHQUAKE MOTIONS IN ACCORDANCE WITH ASCE 7, EXCLUDING CHAPTER 14 AND APPENDIX 11A. ASCE 7 CONTRACTOR RESPONSIBILITY: THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE CONSTRUCTION OF A SEISMIC-FORCE-RESISTING SYSTEM, DESIGNATED SEISMIC SYSTEM, OR COMPONENT LISTED IN THE QUALITY ASSURANCE PLAN AND SHALL SUBMIT A WRITTEN CONTRACTOR'S STATEMENT OF RESPONSIBILITY TO THE AUTHORITY HAVING JURISDICTION AND TO THE OWNER PRIOR TO THE COMMENCEMENT OF WORK ON THE SYSTEM OR COMPONENT. THE CONTRACTOR'S STATEMENT OF RESPONSIBILITY SHALL INCLUDE THE FOLLOWING: A. ACKNOWLEDGMENT OF AWARENESS OF THE SPECIAL REQUIREMENTS CONTAINED IN THE QUALITY ASSURANCE PLAN; B. ACKNOWLEDGMENT THAT CONTROL WILL BE EXERCISED TO OBTAIN CONFORMANCE WITH THE CONSTRUCTION DOCUMENTS APPROVED BY THE AUTHORITY HAVING JURISDICTION; C. PROCEDURES FOR EXERCISING CONTROL WITHIN THE CONTRACTOR'S ORGANIZATION, THE METHOD AND FREQUENCY OF REPORTING AND THE DISTRIBUTION OF THE REPORTS; AND D. IDENTIFICATION AND QUALIFICATIONS OF THE PERSON(S) EXERCISING SUCH CONTROL AND THEIR POSITION(S) IN THE ORGANIZATION. DIVISION 26 RESPONSIBILITIES: A. HANGERS AND SEISMIC BRACING FOR ELECTRICAL SYSTEMS SHALL BE DESIGNED AND SPECIFIED BY DIVISION 26. DIVISION 26 SHALL REFER TO THE ELECTRICAL DRAWINGS FOR LOCATIONS OF EQUIPMENT AND ELECTRICAL SYSTEMS AS STRUCTURAL DRAWINGS DO NOT SHOW THE LOCATIONS OF ELECTRICAL EQUIPMENT, RACEWAYS, AND OTHER COMPONENTS. B. DIVISION 26 SHALL COORDINATE THE SUPPORT SYSTEMS AND DESIGN LOADS FOR HUNG RACEWAYS AND OTHER ELECTRICAL SYSTEMS (INCLUDING COMBINED MULTIPLE RACEWAY RUNS) WITH THE GENERAL CONTRACTOR AND THE STEEL AND WOOD JOIST MANUFACTURERS IN ADDITION TO OTHER TRADES THAT MAY BE IMPACTED. 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 4 A M T0.02 ELECTRICAL ABBREVIATIONS AND GENERAL NOTES Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 PIR PASSIVE INFRARED PIV POST INDICATING VALVE PNL PANEL PP PATCH PT POTENTIAL TRANSFORMER PVC POLYVINYL CHLORIDE RCP REFLECTED CEILING PLAN REC RECEPTACLE REF REFER TO REV REVISION RM ROOM RTRC REINFORCED THERMOSETTING RESIN CONDUIT RU RACK UNIT SHT SHEET SLC SIGNALING LINE CIRCUIT SM SINGLEMODE SMFC SURFACE-MOUNTED OPTICAL FIBER CABINET SMR SURFACE METAL RACEWAY SONET SYNCHRONOUS OPTICAL NETWORK SP SERVICE PROVIDER SPD SURGE PROTECTIVE DEVICE SPEC SPECIFICATIONS SPST SINGLE POLE SINGLE THROW ST SHUNT TRIP STP SHIELDED TWISTED PAIR SVGA SUPER VIDEO GRAPHICS ARRAY SW SWITCH SWBD SWITCHBOARD TBB TELECOMMUNICATIONS BONDING BACKBONE TEL TELEPHONE TELCO TELEPHONE COMPANY TGB TELECOMMUNICATIONS GROUNDING BUSBAR TIA TELECOMMUNICATIONS INDUSTRY ASSOCIATION TMGB TELECOMMUNICATIONS MAIN GROUNDING BUSBAR TP TAMPERPROOF TR TELECOMMUNICATIONS ROOM TTB TELEPHONE TERMINAL BOARD TV TELEVISION TVSS TRANSIENT VOLTAGE SURGE SUPPRESSION TYP TYPICAL UG UNDERGROUND UL UNDERWRITERS LABORATORIES UON UNLESS OTHERWISE NOTED UPS UNINTERRUPTIBLE POWER SUPPLY USB UNIVERSAL SERIAL BUS UTP UNSHIELDED TWISTED PAIR UV UNIT VENTILATOR V VOLTS VA VOLT AMPERES VFD VARIABLE FREQUENCY DRIVE W WASTE, WATT, WIDE, WATER W/ WITH W/O WITHOUT WA WORKSTATION AREA WAN WIDE AREA NETWORK WG WIRE GUARD WH WATT HOUR METER WP WEATHERPROOF XFMR TRANSFORMER Y WYE Z IMPEDANCE GB GROUND FAULT CIRCUIT INTERRUPTER BREAKER GF GROUND FAULT CIRCUIT INTERRUPTER GFP GROUND FAULT PROTECTION GND GROUND GRS GALVANIZED RIGID STEEL HC HORIZONTAL CROSS CONNECT HID HIGH INTENSITY DISCHARGE HP HORSEPOWER HTR HEATER Hz HERTZ IBC INTERNATIONAL BUILDING CODE IC INTERMEDIATE CROSS CONNECT IDF INTERMEDIATE DISTRIBUTION FRAME IEEE INSTITUTE OF ELECTRICAL AND ELECTRONIC ENGINEERS IG ISOLATED GROUND IMC INTERMEDIATE METALLIC CONDUIT ISDN INTEGRATED SERVICES DIGITAL NETWORK J JUNCTION K KIRK KEY KCMIL THOUSAND CIRCULAR MILS kVA KILOVOLT AMPERE KVAR KILOVOLT AMPERE REACTIVE kW KILOWATT LAN LOCAL AREA NETWORK LCP LIGHTING CONTROL PANEL LEC LOCAL EXCHANGE CARRIER LT LIGHT LTG LIGHTING M METER MAN METROPOLITAN AREA NETWORK MAX MAXIMUM MC MAIN CROSS CONNECT; METAL CLAD (CABLE) MCB MAIN CIRCUIT BREAKER MCC MOTOR CONTROL CENTER MDF MAIN DISTRIBUTION FRAME MDP MAIN DISTRIBUTION PANEL MFR MANUFACTURER MH MANHOLE MIN MINIMUM MLO MAIN LUGS ONLY MM MULTIMODE MPOE MAIN POINT OF ENTRY MPOP MAIN POINT OF PRESENCE MTD MOUNTED MTS MANUAL TRANSFER SWITCH MV MEDIUM VOLTAGE (N) NEW N NEUTRAL NAC NOTIFICATION APPLIANCE CIRCUIT NEC NATIONAL ELECTRICAL CODE NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION NF NON-FUSED NIC NOT IN CONTRACT NL NIGHT LIGHT OFC OPTICAL FIBER CABLE OHL OVERHEAD LINE OL OVERLOAD OS OCCUPANCY SENSOR OSP OUTSIDE PLANT P POLE PBX PRIVATE BRANCH EXCHANGE PF POWER FACTOR PH PHASE A AMPERE AC AIR CONDITIONING; ALTERNATING CURRENT, ABOVE COUNTER AF AMP FUSE; AMP FRAME AFC AVAILABLE FAULT CURRENT AFF ABOVE FINISHED FLOOR AG ABOVE GRADE AHJ AUTHORITIES HAVING JURISDICTION AHU AIR HANDLING UNIT AIC AMPERE INTERRUPTING CAPACITY AL ALUMINUM ANSI AMERICAN NATIONAL STANDARDS INSTITUTE AS AMP SWITCH AT AMP TRIP ATM ASYNCHRONOUS TRANSFER MODE ATS AUTOMATIC TRANSFER SWITCH AV AUDIO VISUAL AWG AMERICAN WIRE GAUGE BAS BUILDING AUTOMATION SYSTEM BATT BATTERIES BIL BASIC IMPULSE INSULATION LEVEL BKBD BACKBOARD BKR BREAKER BLDG BUILDING C CONDUIT; DEGREES CELCIUS CAB CABINET CAT CATEGORY CATV COMMUNITY ANTENNA TELEVISION CB CIRCUIT BREAKER CCTV CLOSED CIRCUIT TELEVISION CLG CEILING CM CEILING-MOUNTED CO CONDUIT ONLY COW COMPUTER ON WHEELS CR CONTROLLED RECEPTACLE CT CURRENT TRANSFORMER CU COPPER D DEDICATED DDC DIRECT DIGITAL CONTROL DEMARC DEMARCATION POINT DISC DISCONNECT DIST DISTRIBUTION DSL DIGITAL SUBSCRIBER LINE DWG DRAWING (E) EXISTING EA EACH EF EXHAUST FAN EIA ELECTRONIC INDUSTRIES ASSOCIATION ELEV ELEVATION EM EMERGENCY EMT ELECTRICAL METALLIC TUBING ENCL ENCLOSURE EPM ELECTRONIC POWER METER EPO EMERGENCY POWER OFF EQUIP EQUIPMENT ETR EXISTING TO REMAIN EVCS ELECTRIC VEHICLE CHARGING STATION EWC ELECTRIC WATER COOLER F FUSES; DEGREES FAHRENHEIT FA FIRE ALARM FAAP FIRE ALARM ANNUNCIATOR PANEL FACP FIRE ALARM CONTROL PANEL FBO FURNISHED BY OWNER FOIC FURNISHED BY OWNER INSTALLED BY CONTRACTOR FOIO FURNISHED BY OWNER INSTALLED BY OWNER FSD FIRE SMOKE DAMPER G GROUND Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION TELECOMMUNICATIONS ROUGH-IN SCHEDULE SYMBOL MOUNTING HEIGHT DEVICE NAME OUTLET BOX CONDUIT MUD RING DETAIL NOTESQTY SIZE QTY SIZE TERM LOCATION +18", UON CATEGORY 6A DEVICE 1 4-11/16" 1 1" ACCESSIBLE CLG SINGLE GANG - +72", UON CATEGORY 6A DEVICE 1 4-11/16" 1 1" ACCESSIBLE CLG SINGLE GANG - ABOVE CLG CATEGORY 6A WAP DEVICE 1 4-11/16" 1 1" ACCESSIBLE CLG SINGLE GANG 1 - SURFACE MOUNT FLOOR DEVICE - - - - SEE NOTE - 2,3 GENERAL NOTE: 1. MOUNTING HEIGHTS INDICATED ON THE SCHEDULE REFER TO CENTER OF BACK BOX. NOTES: 1.PROVIDE ROUGH-IN (FLUSH) FOR HARD-LID AND (SURFACE MOUNT) IN OPEN TO STRUCTURE CEILINGS. 2. SURFACE MOUNT FLOOR DEVICES SHALL BE ROUTE UNDER CARPET IN RACEWAY TO THE NEAREST TELECOM ROOM OR AS INDICATED ON THE FLOOR PLANS. 3. SURFACE MOUNT FLOOR DEVICE ARE PROVIDED UNDER SECTION 260535, SEE SECTION 271100 FOR CONNECTIVITY. AUDIO VISUAL ROUGH-IN SCHEDULE SYMBOL MOUNTING HEIGHT DEVICE NAME OUTLET BOX CONDUIT MUD RING DETAIL NOTES QTY SIZE QTY SIZE TERM LOCATION +18", UON AV OUTLET 1 4-11/16" 1 1-1/4" ACCESSIBLE CLG SINGLE GANG - +72" FLAT PANEL OUTLET 1 4-11/16" 1 1-1/4" ACCESSIBLE CLG SINGLE GANG - +72" FLAT PANEL OUTLET 1 SPECIALTY BACK BOX AT ENCLOSURE 1 1-1/4" ACCESSIBLE CLG - 1 GENERAL NOTE: 1. MOUNTING HEIGHTS INDICATED ON THE SCHEDULE REFER TO CENTER OF BACK BOX. NOTES: 1. MOUNTING HEIGHT SHALL BE COORDINATED WITH OWNER. 2. CONDUITS FOR THE AV DEVICE SHALL TERMINATE IN THE ACCESSIBLE CEILING SPACE OF THE ROOM IN WHICH THE AV DEVICE RESIDES, UON. INTRUSION DETECTION ROUGH-IN SCHEDULE SYMBOL MOUNTING HEIGHT DEVICE NAME OUTLET BOX CONDUIT MUD RING DETAIL NOTESQTY SIZE QTY SIZE TERM LOCATION +96" PIR MOTION DETECTOR 1 4"S 1 3/4" ACCESSIBLE CLG SINGLE GANG - GENERAL NOTE: 1. MOUNTING HEIGHTS INDICATED ON THE SCHEDULE REFER TO CENTER OF BACK BOX. NOTES: ACCESS CONTROL ROUGH-IN SCHEDULE SYMBOL MOUNTING HEIGHT DEVICE NAME OUTLET BOX CONDUIT MUD RING DETAIL NOTESQTY SIZE QTY SIZE TERM LOCATION +44" CARD READER 1 4"S 1 3/4" J-BOX ABOVE ACCESSIBLE CLG SINGLE GANG 2 TOP OF FRAME DOOR POSITION SWITCH - SEE NOTE 1 3/4" J-BOX ABOVE ACCESSIBLE CLG - 1,3 - INTEGRAL MICRO REX - - - - - - 1 SEE NOTE ELECTRIFIED LOCKSET/ EXIT DEVICE VARIES MASONRY VARIES 3/4" J-BOX ABOVE ACCESSIBLE CLG SINGLE GANG 1,4 GENERAL NOTE: 1. MOUNTING HEIGHTS INDICATED ON THE SCHEDULE REFER TO CENTER OF BACK BOX. NOTES: 1. COORDINATE REQUIREMENTS WITH SECURITY CONTRACTOR AND DOOR HARDWARE CONTRACTOR. 2. SINGLE GANG MASONRY BACK BOXES ARE ACCEPTABLE FOR EXTERIOR MOUNTED DEVICES. 3. WHERE DOOR FRAME IS FILLED, PROVIDE SINGLE GANG MASONRY BACK BOX AT TOP OF DOOR FRAME AT 4" ON CENTER FROM STRIKE SIDE OF DOOR. 4. PROVIDE SINGLE GANG MASONRY BACK BOX AT CENTER HINGE ON BOTH SIDES OR AT STRIKE. WIRELESS ACCESS POINT SCHEDULE RENTON TECHINCAL COLLEGE SHEET NUMBER ROOM / HALLWAY AP MODEL AP ANTENNA TYPE AP MOUNT TYPE AP ENCLOSURE MAC ADDRESS CABLE PORT I.D.AP LABEL T6.01 OFFICE SUITE CORRIDOR (WEST) INTERNAL ACT CEILING T6.01 OFFICE SUITE CORRIDOR (EAST) INTERNAL ACT CEILING T6.01 CLASSROOM 115 INTERNAL ACT CEILING T6.01 CONFERENCE 120 INTERNAL ACT CEILING GENERAL NOTES: 1. SEE SECTION 271100 AND DETAIL 3/T8.02 FOR ADDITIONAL INFORMATION. ACCESS CONTROL SCHEDULE ACCESS CONTROL DEVICES ARE PROVIDED BY DIVISION 28 DOOR NO. DEVICE TYPE SHEET NO. ROOM / AREA MOUNTING TYPE PRIMARY READER DOOR DETAIL NO. DOOR HARDWARE POWER SUPPLY LOCATION (NOTE 1)NOTES POWER SUPPLY INTRAGRAL REX DEVICE INTEGRATED DOOR POSITION SWITCH AUTO OPERATOR (NOTE 2) 115.1 CARD READER T6.01 CLASSROOM 115 WALL - - EXISTING IDF SPRINKLER VALVE 100L 1 X X - 117 CARD READER T6.01 CONFERENCE 120 WALL - - EXISTING IDF SPRINKLER VALVE 100L 1 X X - NOTE 1: DOOR HARDWARE POWER SUPPLIES ARE PROVIDED BY DIVISION 28 AND INSTALLED BY DIVISION 26. NOTE 2: COORDINATE INTEGRATION OF ADA OPERATOR WITH DIVISION 08 AND DIVISION 26. S S CR S R EL F AV 1 AV F AV FWBCWAP X X X 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 4 A M T0.03 TELECOM AND LOW-VOLTAGE ROUGH-IN SCHEDULES Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION 2FPDWBC 1 2 AV FPDWBC 1AV 2 233 33333332 WBC 1AV FPD23AV3 AV 1 SSSSSELELSSRRSSSELEL2 SEE SHEET T0.03 FOR BACK BOX AND CONDUIT ROUGH-IN REQUIREMENTS. COORDINATE DEVICE LOCATIONS AND HEIGHTS WITH ARCHITECTURAL ELEVATION DRAWINGS. PROVIDE J-HOOKS SPACED 4'-0" APART FOR LOW-VOLTAGE OPEN CABLING PATHWAY. J-HOOKS SHALL BE SUPPORTED BY DEDICATED HANGERS/ ROD FROM STRUCTURE AND/ OR WALLS. PROVIDE SEPARATE J-HOOK PATHWAY FOR EACH LOW-VOLTAGE SYSTEM. LOW-VOLTAGE CONDUIT SLEEVES HAVE BEEN INDICATED FOR MAIN PATHWAYS ONLY. PATHWAYS SHALL BE PROVIDED WHERE CABLING PENETRATES A WALL RATED OR NOT. PROVIDE (3)1"C SLEEVES AS A MINIMUM; (1) FOR TELECOM, SECURITY AND A SPARE AT EACH LOCATION. SHEET NOTES FLAG NOTES 1. 2. 3. 4. TELECOMMUNICATION CATEGORY 6A CABLING SOUTH OF BOUNDRY LINE SHALL TERMINATE AT THE CATEGORY 6A 49-PORT PATCH PANEL IN THE EXISTING IDF WALL ENCLOSURE IN SPRINKLER VALVE ROOM 100L. TELECOMMUNICATION CATEGORY 6A CABLING NORTH OF BOUNDRY LINE SHALL TERMINATE AT THE CATEGORY 6A 48-PORT PATCH PANEL AT THE EXISTING 2-POST FLOOR MOUNT EQUIPMENT RACK IN STORAGE 102B. 1 2 B Office 110A Office 110C Office 110E Office 110G Office 110I Office 110J Office 110B Office 110D Office 110H Kitchenette 110K Office 110F Classroom 115 120 Office Suite 110 Mech. 100C Men's 100F Women's 100G Conference 100H Office 100I Classroom 100J Cust. 100K Sprinckler Valve Room 100L Classroom 100N Office 100O Storage 100P Boiler/Prop Maint. Asst. 100Q Elevator 100R Lounge 110L Lounge 110M Elec 110N Storage 113A 6 7 8 9 10 11 12 L K J I H G F E D A C F F WAP WAP WAP F F WAP F F 1 T8.01 1 EXISTING IDF 1 CAM CR CR 2 1 2 1 115.1 117 ALTERNATE BID ITEM #2ALTERNATE BID ITEM #1 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 5 A M T6.01 TELECOM FLOOR PLAN LEVEL 1 - AREA B Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 SCALE: 1/8" = 1'-0"T6.01 FIRST FLOOR -TELECOM FLOOR PLAN -LEVEL 1 -AREA B1 NOT IN SCOPE KEY PLAN Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 Classroom RECEIVED 11/01/2022 striplett BUILDING DIVISION B22005282_v2 C3K-XNM-10G NETWORKMODULE G1 G2/TE1 G3 G4/TE2 C IS C OMODEC O NSOLE SYST XP S STAT SP EED D UP LXS-P OW ER M AST STAC K P oEEN 9 3331 32 7 8 19 43383634 35 37 4139 40 42 141210 11 13 1715 16 18 4644 45 47 48 2220 21 23 241 2 43 5 6 292725 26 28 30 9 3331 32 7 8 19 43383634 35 37 4139 40 42 141210 11 13 1715 16 18 4644 45 47 48 2220 21 23 241 2 43 5 6 292725 26 28 30 9 3331 32 7 8 19 43383634 35 37 4139 40 42 141210 11 13 1715 16 18 4644 45 47 48 2220 21 23 241 2 43 5 6 292725 26 28 30 9 3331 32 7 8 19 43383634 35 37 4139 40 42 141210 11 13 1715 16 18 4644 45 47 48 2220 21 23 241 2 43 5 6 292725 26 28 30 CIS COMODECO NSO LE SYST XPS STAT SPEED DUPLXS- POWER M AST STACK PoEEN CATALYST 2960 9 3331 32 7 8 19 43383634 35 37 4139 40 42 141210 11 13 1715 16 18 4644 45 47 48 2220 21 23 241 2 43 5 6 292725 26 28 30 SD 100L EQUIPMENT PLAN ENLARGED IDF FLOOR PLAN SCALE: 1/4" = 1'-0"1 DETAIL - IDF RACK ELEVATION SCALE: 1/4" = 1'-0"2 SPRINKLER RISER ROOM RACK REQUIREMENTS 1. RACK ASSEMBLY SHALL INCLUDE BY NOT LIMITED TO ANCHOR BOLTS, CLAMPS, RACKS AND MISC. INSTALLATION HARDWARE. EQUIP EACH RACK AS SHOWN, AND AS DESCRIBED IN THE SPECIFICATIONS. PROVIDE CABLE MANAGEMENT PANELS, PATCH PANELS, ETC., UNLESS NOTED OTHERWISE. 2. GROUND EQUIPMENT TO NEAREST NEC RECOGNIZED GROUNDING ELECTRODE SUBSYSTEM WITH A DEDICATED #6 AWG COPPER, STRANDED, GREEN GROUNDING CONDUCTOR. 3. ASSEMBLE EQUIPMENT RACKS SO RACK UNIT 1 IS NEAREST TO THE FLOOR AND NUMBERS INCREASE VERTICALLY. RACK COMPONENTS NOT USED NOT USED NOT USED NOT USED CATEGORY 6A 48-PORT STATION PATCH PANEL CATEGORY 6 48-PORT STATION PATCH PANEL CATEGORY 5e 48 PORT VOICE PATCH PANEL NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED NOT USED EXISTING CATEGORY 5e 48-PORT STATION PATCH PANEL EXISTING ETHERNET NETWORK SWITCH EXISTING 19-RU WALL MOUNT ENCLOSURE ON PLYWOOD BACK BOARD FLOOR NOT USED NOT USED NOT USED EXISTING 1-RU HORIZONTAL CABLE MANAGEMENT PANEL NOT USED ACCESSIBLE CEILING EXISTING 66-BLOCKS WITH MULIT-PAIR COPPER CROSS-CONNECT EXISTING SURFACE MOUNT FIBER CABINET EXISTING SURFACE MOUNT FIBER CABINET EXISTING CATEGORY 5e 300 PAIR 110 BLOCK AND (6) SPLIT D-RINGS, (3) PER SIDE EXISTING 3/4" FIRE RETARDANT PLYWOOD BACKBOARD, MOUNT AT +6"AFF 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 RACK-1 23 25 24 26 (TYP) 22 19 24 7 14 19 22 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 5 A M T8.01 TELECOM DETAILS Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION WBC AV F WAP2 321 SCALE: NONE SCALE: NONE45 SCALE: NONE6 SCALE: NONE SCALE: NONE DETAIL - ORGANIZATION, ICON AND LABELING DETAIL SCALE: NONE DETAIL - TELECOMMUNICATIONS OUTLET1 2 3 ACCESS POINT AND CAMERA OUTLET DETAIL - ACCESSIBLE CEILING WIRELESS CONNECTIVITY LABELING DETAIL - COPPER AND OPTICAL FIBER DETAIL - UNIVERSAL PUNCHDOWN DETAIL - WALL BOX - INSTALLATION WAP - IDF-1-02-04, 05 MDF-1-02-04, 05 NOTE 1. CONDUIT SHALL BE CONTINUOUS FROM BACK BOX TO ACCESSIBLE CEILING SPACE OR AS INDICATED ON PLANS. 2. NOT ALL PARTS SHOWN. CONTRACTOR SHALL ENSURE A COMPLETE WORKING INSTALLATION INCLUDING MISCELLANEOUS APPURTENANCES. 654321 26 27 28 29 30 654321 25 MDF-11-01,02 MDF-11-01-01 MDF-11-01,02-03 MDF-11-01-01 MDF-11-01-01 DRAWING SYMBOLDRAWING SYMBOLDRAWING SYMBOL DATA ICON "BLUE" MDF/IDF DESIGNATION RACK DESIGNATION PORT DESIGNATION PATCH PANEL DESIGNATION DATA ICON "BLUE" (TYP) CATEGORY 6A 8P8C MODULAR JACK (TYP) 2-PORT SURFACE MOUNT BOX SERVICE LOOP AND SURFACE MOUNT BOX SHALL BE SUPPORTED ABOVE AND OFF THE CEILING J-HOOK SHALL BE SUPPORTED VIA DEDICATED STRINGER OR THREADED ROD ATTACHED TO STRUCTURE MDF/IDF DESIGNATION RACK DESIGNATION PORT DESIGNATION PATCH PANEL DESIGNATION MDF/IDF DESIGNATION RACK DESIGNATION PORT DESIGNATION PATCH PANEL DESIGNATION CATEGORY 6A 8P8C MODULAR JACK. PROVIDE BLANKS TO FILL SPARE SPACES CONDUIT ELBOW, MINIMUM RADIUS PER SPECIFICATIONS EXTEND CONDUIT TO ACCESSIBLE CEILING SPACE CATEGORY 6A CABLING TO TELECOMMUNICATIONS ROOM PLASTIC BUSHING BACK BOX AND MUD RING, SEE ROUGH-IN SCHEDULE FOR REQUIREMENTS DATA ICON "BLUE" (TYP) BOTTOM OF CEILING GRID CABEL ID DRAWING SYMBOL 10'-0" SERVICE LOOP SUPPORTED VIA J-HOOK CABEL ID CATEGORY 6A, RJ45, 8P8C, MODULAR JACK CATEGORY 6A, RJ45, 8P8C, MODULAR JACK (TYP)CATEGORY 6A, RJ45, 8P8C, MODULAR JACK (TYP) 4 PORT, LOW-PROFILE FACEPLATE 4 PORT, LOW-PROFILE FACEPLATE 4 PORT, LOW-PROFILE FACEPLATE 4 PORT, LOW-PROFILE FACEPLATE NOTE: 1. IF ADAPTER PLATES DO NOT HAVE LOCATION FOR DESIGNATION STRIP, PROVIDE LABELS ON TRAY IN FRONT OF ADAPTER PLATE. PROVIDE LABELS ON SEE-THROUGH COVER. LABELS ON FRONT COVER SHALL BE CLEAR WITH WHITE LETTERING. RACK MOUNT FIBER ENCLOSURE BLACK PLASTIC ENGRAVED LABEL WITH WHITE LETTERING (TYP) COPPER VOICE PATCH PANEL COPPER PATCH PANEL 110 TERMINATION PROTECTION COVER SUPPLIED WITH PANEL MAINTAIN TIGHT PAIR TWIST UP TO POINT OF TERMINATION (TYP EACH PAIR) MAXIMUM LENGTH OF CONDUCTOR PAIR EXPOSED BEYOND CABLE JACKET NOT TO EXCEED 1/2" (TYP) PATCH PANEL 110 CONNECTOR STRIP CENTER CABLE ON 110 TERMINALS (TYP) PATCH PANEL BEND RADIUS MINIMUM 4 TIMES OUTSIDE CABLE DIAMETER CABLE BEND RADIUS SUPPORT BAR SUPPLIED WITH PANEL VELCRO STRAPS DRAWING SYMBOL (2) STUD BRACKET STUD MOUNTING HARDWARE (TYP)CABLING ENTRY BOX WITH 1"C FOR CATEGORY 6A DEVICE COVER CENTER SECTION COVER PLATE MOUNTING HOLES FOR 1/2" DRYWALL DIRECT-TO-STUD MOUNTING HOLES MOUNTING HOLES FOR 5/8" DRYWALL STUD FRAMING ELECTRICAL OUTLET BOX, SEE ELECTRICAL FOR REQUIREMENTS CABLING ENTRY BOX WITH 1-1/4"C CATEGORY 6A HORIZONTAL CABLING TO TELECOMMUNICATIONS ROOM STRANDS 1-6 TO IDF-1A STRANDS 7-12 TO IDF-1A PP-1VPP-1RMFC-11201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 5 A M T8.02 TELECOM DETAILS Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION CVP S2 4 4 444424222SS 22SSSVP 444426 444 4444C2 S22222VP 1 SC4 4 4422 66666VP SHEET NOTES FLAG NOTES 1. 2. 3. 4. REMOVE, SALVAGE AND RETURN (E) CLOCK TO THE OWNER. REMOVE, SALVAGE AND RETURN (E) CEILING PROJECTOR AND MOUNT TO THE OWNER. 1 2 TELECOM AND SECURITY ITEMS SHOWN ARE DIAGRAMMATIC BASED ON AVAILABLE RECORD DRAWINGS AND SITE WALKS DURING THE DESIGN PERIOD. NOT ALL SYSTEM COMPONENTS ARE SHOWN. FIELD VERIFY DEVICE LOCATIONS AND QUANTITIES PRIOR TO COMMENCING WORK. REMOVE UNUSED SURFACE RACEWAY, BOXES AND CABLING. PROVIDE BLANK COVERS FOR UNUSED RECESSED BOXES TO REMAIN. REFER TO SPECIFICATIONS SECTION 271100 FOR ADDITIONAL INFORMATION. CABLING AND CONNECTIVITY SHALL BE REMOVED IN ITS ENTIRETY FROM THE WORKSTATION BACK TO THE MDF/IDF PATCH PANEL, UON. PATCHING AND PAINTING TO MATCH EXISTING CONDITIONS SHALL BE PROVIDED BY DIVISION 09 CONTRACTOR. 6 7 8 9 10 11 12 L K J I H G F E D A C D-43 D-44 D-03 D-04 D-05 D-06 EXISTING RACEWAY D-11 D-12 D-13 D-14 D-15 D-16 D-17 D-18 D-19 D-20 D-21 D-22 D-23 D-24 D-25 D-26 D-31 D-32 D-33 D-34 D-01 D-02 D-27 D-28 D-29 D-30 D-39 D-40 107-A 107-B 23 24 S EXISTING RACEWAY D-41 D-42 5765 5712 S EXISTING VIDEO SCREEN EXISTING TELECOM ENCLOSURE 100-5,6,7,8 9,10, 11,12 100-9,10,11,12 13,14, 15,16 B-1 B-2 17,18, 19,20 100-11,12,13,14 100-15,16, 17,18,21,227,8 100-19,100-20 100-21,B-3 5,6 100-22,100-23 100-24, B-4 3,4 100-25,100-26 100-27, B-5 5,6 100-22,100-23 100-24, B-4 D-37, D-38 100-1,2 EXISTING VIDEO PROJECTOR 26A 26B 27A 27B 28A 28B 29A 29B 30A 30B 31A 31B 115F 24A 24B 021A,021B 022A,022B 023A,023B 015A,015B 016A,016B 017A,017B 012A,012B 013A,013B 014A,014B 009A,009B 010A,010B 011A,011B 018A,018B 019A,019B 020A,020B 007A,007B 008A,008B 005A,005B 006A,006B 003A,003B 004A,004B 001A,001B 002A,002B T8.01 1 EXISTING IDF ROBOTICS LAB 110 OFFICE 111A COMPUTER SCIENCE 111 MECH. 100B ELEV. MEN'S 100C WOMEN'S 100D CONFERENCE 112 OFFICE 114A OFFICE 112B STORAGE 112A BUSINESS OFFICE 114 STORAGE 113A PROPERTY MAINTENANCE 115 OFFICE 115A BOILER/ PROP. MAINT. ASST. 113 ELEC. 100G NURSING 117 SPRINKLER VALVE ROOM 116 ESL 118 CUST. 100E MENS MECH. 100B 100C 100D 2 2 2 2 1 EXISTING SURFACE MOUNT FIBER CABINET 1 1 ALTERNATE BID ITEM #2ALTERNATE BID ITEM #1 B 1201 seattle 206.448.3376 www. .hargis biz ,wa 98101 stethird avenue,600 P R E L I M I N A R Y Client Project No.: Date: SSW Architects Project No.: 1 0 /3 /2 0 2 2 9 :5 9 :1 6 A M TD6.01 TELECOM DEMO PLAN LEVEL 1 - AREA B Project Status BUILDING J FIRST FLOOR REMODEL PHASE 1 9/30/2022 SCALE: 1/8" = 1'-0"TD6.01 FIRST FLOOR -TELECOM DEMO PLAN -LEVEL 1 -AREA B1 NOT IN SCOPE KEY PLAN Permit Set Client Project No:2022-511 G (1-1) Construction DocumentsPermit Set 10/04/2022 B22005282_V1RECEIVED 10/05/2022 striplett BUILDING DIVISION