Loading...
HomeMy WebLinkAboutC_Cover_Letter_221104_v1 November 4, 2022 Electronic Submittal via Renton FileShare Nathan Janders, P.E., Civil Engineer III City of Renton Development Engineering Division 1055 South Grady Way, 6th Floor Renton, WA 98057 RE: Formal Final Short Plat Submittal for Edenfield (f.k.a Sumpter) 14204 – 156th Avenue SE, Renton, WA City of Renton File No. LUA19-000091 (PSUB22-000285) Our Job No. 21925 Dear Nathan: On behalf of MainVue WA LLC, we are formally submitting for Final Short Plat approval for the Edenfield short plat. We have revised the plans for the above-referenced project in accordance with your third pre- submittal comments received October 27, 2022. The preliminary short plat was approved on July 1, 2019. An extension was granted on December 9, 2021, for the preliminary short plat to remain valid through January 3, 2023. Enclosed are the following documents for your review and approval: 1. Signed Land Use Permit Master Application Form 2. Signing Authority documentation for Vanessa Normandin on behalf of MainVue Homes 3. Final plat checklist 4. Final Short Plat Map prepared by Barghausen Consulting Engineers, Inc. dated October 31, 2022 5. Title Report prepared by First American Title Insurance Co. dated October 7, 2022 6. Lot Closure Calculations 7. Articles of Incorporation for the Edenfield Homeowners Association 8. Draft Declaration of Covenants, Conditions, and Restrictions for Edenfield 9. Confirmation of Compliance with all Conditions of Plat Approval 10. Draft Deed of Right-of-Way Dedication and REETA 11. Draft Declaration of Covenant for Inspection and Maintenance of Drainage Facilities and On- site BMPs 12. Final Short Plat Application Fee (Will be paid upon invoice) Nathan Janders, P.E., Civil Engineer III City of Renton Development Engineering Division -2- November 4, 2022 13. Monument Cards prepared by Barghausen Consulting Engineers, Inc. and dated October 31, 2022 14. Proof of Improvement Deferral or Installation (Deferral application submitted by MainVue on October 28, 2022 and approval is pending) 15. Public Works Approval for permit C21003180 issued by Nathan Janders on October 31, 2022 16. Receipt for payment of MainVue’s share of the traffic signal installed at the 156th Avenue S.E. and S.E. 142nd Place intersection 17. Stormwater Facility Final Report, Earthwork Observation and Consulting Services, prepared by Earth Solutions NW LLC dated November 3, 2022 A 3rd pre-review of the final short plat map was completed on October 27, 2022. The following outline provides each of your pre-review comments in italics exactly as written, along with a narrative response describing how each comment was addressed: Deed of Dedication Please add “of MainVue Homes LLC, Manager” and update title if needed. Response: Text has been added as requested. Wapato Pl SE Response: Legal description has been updated as requested. Real Estate Excise Tax Affidavit Check box and list percentage sold Response: Check and percentage has been added. Add: “None” Response: Text has been added as requested. Replace with: “Dedication of street Right of Way” Response: Text has been added as requested. Will need to add date when signing Response: Acknowledged. Wapato Pl SE Response: Legal description has been updated as requested. Nathan Janders, P.E., Civil Engineer III City of Renton Development Engineering Division -3- November 4, 2022 Declaration of Covenant MainVue WA LLC Response: Text has been added as requested. Please insert name and title of signatory for MainVue Homes LLC, I.E., “Joan Smith, President of MainVue Homes, manager of MainVue WA LLC” Response: Name and title of signatory has been added as requested. Final Short Plat Map - Sheet 1 of 3 Title report and recorded LLA show this bearing as S0 25’ 10”W. Please correct Response: This bearing has been corrected to match the title report and recorded LLA. Title report and recorded LLA show this distance as 167.67. Please correct Response: This distance has been corrected to match the title report and recorded LLA. Please add (after ‘LLC’): , Manager of MainVue WA LLC Response: This additional text has been added to the MainVue acknowledgment. Please review and approve the enclosed at your earliest convenience. If you have questions or need additional information, please do not hesitate to contact me at this office. Thank you. Sincerely, George Newman, AICP Senior Project Manager GN/kb 21925c.008.docx enc: As Noted cc: Vanessa Normandin, MainVue WA, LLC Serena Dudas, MainVue WA, LLC Allison Rothstein, MainVue WA, LLC Tom Barghausen, Barghausen Consulting Engineers, Inc. Barry Talkington, Barghausen Consulting Engineers, Inc.