Loading...
HomeMy WebLinkAboutEX_15_C_Public_CommentsCAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:notification@civiclive.com To:Party of Record Subject:Party of Record/Public Comments 2022-10-19 12:54 PM(PST) Submission Notification Date:Wednesday, October 19, 2022 12:54:39 PM Party of Record/Public Comments 2022-10-19 12:54 PM(PST) was submitted by Guest on 10/19/2022 3:54:33 PM (GMT-08:00) Canada/Pacific Name Value NameFile:LUA22-000357 Gender Mx. Name Duwamish Tribe Address:4705 West Marginal Way SW CityState:Seattle, WA Email preservationdept@duwamishtribe.org Phone 206 431 1582 ext 104 Party of Record Only Comments Thank you for the opportunity to review and comment. Based on the information provided and our understanding of the project and its APE, we would recommend an archaeological review performed for this project, especially if excavation cuts below fill. This is in an area the Duwamish Tribe considers culturally significant and has a high probability to have unknown archaeological deposits. The DAHP WISAARD website predictive model indicates that an archaeological survey is highly advised with a very high risk for encountering archaeological resources. If any archaeological work is performed, we request notification. An IDP should not be used in lieu of archaeological investigation. Cultural and archaeological resources are non- renewable and are best discovered prior to ground disturbance. In addition we strongly support the use of native plants only for proposed landscaping and to maintain a wetland buffer. Prefer US Mail To view this form submission online, please follow the link below: https://rentonwa.gov/form/one.aspx? objectId=19047310&contextId=17174246&returnto=submissions DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:notification@civiclive.com To:Party of Record Subject:Party of Record/Public Comments 2022-10-18 11:23 AM(PST) Submission Notification Date:Tuesday, October 18, 2022 11:23:49 AM Party of Record/Public Comments 2022-10-18 11:23 AM(PST) was submitted by Guest on 10/18/2022 2:23:41 PM (GMT-08:00) Canada/Pacific Name Value NameFile:LUA22-000357 Gender Company Name King County Metro Transit Address:201 S Jackson Street CityState:Seattle, WA Email construction.coord@kingcounty.gov Phone (206) 477-1140 Party of Record Only Comments Thank you for the opportunity to review the upcoming project at 1901 Oakesdale Ave SW. Metro Transit requests the following from the project contractor or manager: • 5-BUSINESS DAYS’ NOTICE needed for bus stop closures or relocations • 10-BUSINESS DAYS’ NOTICE needed for road closures requiring buses to be detoured • 3 WEEKS’ NOTICE for requesting removal of transit-owned facilities’ structures (shelters/kiosks/signposts/waste receptacles) We also request the following information: 1.The approved TCP for the project’s scheduled day(s) of activity (please attach or snip) 2.Location of the project 3. Locations of any bus stops that you would like closed or relocated and whether they need to be closed around- the-clock or only during the specified work hours (also please try to include the 4 or 5-digit identification number associated with the bus stop(s)) 4. Name of street shut down to traffic, if applicable, by any hard closure requiring a detour; also provide limits of the closure by identifying cross streets and specify which direction(s) of travel are affected (specify if closure is around-the-clock or only during work hours) 5. Name and cell phone of the primary onsite contact 6. Start and end dates of the activity (work dates – additionally, please specify if work includes or doesn’t include weekends if dates go past one weekend or more) 7. Daily start and end time of the activity (work hours) 8. Nature of work 9.Company name Once we receive this information, we will plan for any King County Metro transit service impact. The following is the link to King County Metro System Impacts website for information on King County Metro construction notification requirements: https://kingcounty.gov/depts/transportation/metro/about/construction- contractors/transit-system-impacts.aspx Thank you! DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 Prefer US Mail To view this form submission online, please follow the link below: https://rentonwa.gov/form/one.aspx? objectId=19037075&contextId=17174246&returnto=submissions DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:notification@civiclive.com To:Party of Record Subject:Party of Record/Public Comments 2022-10-27 07:47 AM(PST) Submission Notification Date:Thursday, October 27, 2022 7:47:31 AM Party of Record/Public Comments 2022-10-27 07:47 AM(PST) was submitted by Guest on 10/27/2022 10:47:24 AM (GMT-08:00) Canada/Pacific Name Value NameFile:LUA22-000357 Gender Ms. Name Kelli Sheldon Address:15700 Dayton Ave N CityState:Shoreline, WA Email nwsepa@ecy.wa.gov Phone 206-594-0014 Party of Record Only Comments Thank you for the opportunity to provide comments on the State Environmental Policy Act (SEPA) notice of application utilizing the optional determination of nonsignificance (ODNS/NOA) process for the Sounders FC Center at Longacres project. Based on review of the checklist associated with this project, the Department of Ecology (Ecology) has the following comments: Section B Environmental Elements Subsection 3 Water b Ground Water: The regional groundwater table appears to be shallow. Please provide the maximum excavation depth of the project. If dewatering is needed during the excavation, please provide the dewatering procedure. Section B Environmental Elements Subsection 7 Environmental Health: This subsection indicated that potential soil or groundwater impact may be present in the project area related to former Boeing operation or Tacoma Smelter Plume. In the events that soil and groundwater contamination is encountered during construction, please provide mitigation measures to address the following: • Hazardous waste operation workers training, health and safety plan, and site control requirements. • Management of contaminated soil or groundwater encountered during construction, including sampling, containment, and disposal at a permitted facility. Thank you for considering these comments from Ecology. If you have any questions or would like to respond to these comments, please contact Jing Song from the Toxics Cleanup Program at (425) 229-2565 or by email at jing.song@ecy.wa.gov. Prefer US Mail To view this form submission online, please follow the link below: https://rentonwa.gov/form/one.aspx? DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 objectId=19064868&contextId=17174246&returnto=submissions DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. From:Manning, Ryan To:Party of Record; Jennifer Cisneros Subject:FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 Date:Wednesday, October 26, 2022 12:31:51 PM Attachments:image001.png image002.png image003.png To Whom It May Concern: Seattle Public Utilities (SPU) operates a 60-inch regional water supply main south of proposed project LUA22-000357. SPU’s parcel ID for the regional supply main is: 0005800017 SPU is requesting further information from the developer’s geotechnical engineers pertaining to any potential impacts this work may pose to SPU’s supply main in parcel 0005800017; specifically any induced settlement due to vibratory, loading (i.e. stockpiling of soils, etc.), dewatering, or the like, anticipated for this project. SPU can provide plans for our aforementioned infrastructure upon request. Regards, Ryan Manning, P.E. Senior Civil Engineer Engineering & Technical Services Division Project Delivery & Engineering Branch Seattle Public Utilities PO Box 34018 | Seattle, WA 98124 Desk: (206) 684-0127 Cell: (206) 473-8004 Email: Ryan.Manning@Seattle.gov From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Wednesday, October 19, 2022 11:24 AM To: Manning, Ryan <Ryan.Manning@seattle.gov> Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 CAUTION: External Email Hi Ryan, DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. You’re most welcome. Please send comments to por@rentonwa.gov. Thanks and have a great day! JENNY CISNEROS, Planning Technician City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6583 | jcisneros@rentonwa.gov From: Manning, Ryan <Ryan.Manning@seattle.gov> Sent: Wednesday, October 19, 2022 11:16 AM To: Jennifer Cisneros <JCisneros@Rentonwa.gov> Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 Hi Jenny, I just got back into the office, so I wanted to say thanks for these, I really appreciate it. Are you the contact if I have comments? Thanks, Ryan Manning, P.E. Senior Civil Engineer Engineering & Technical Services Division Project Delivery & Engineering Branch Seattle Public Utilities PO Box 34018 | Seattle, WA 98124 Desk: (206) 684-0127 Cell: (206) 473-8004 Email: Ryan.Manning@Seattle.gov From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Monday, October 17, 2022 10:36 AM To: Manning, Ryan <Ryan.Manning@seattle.gov> Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 CAUTION: External Email DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open attachments unless you know the content is safe. Here are the civil plans pages 1 of 2. Will send the second batch. JENNY CISNEROS, Planning Technician City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6583 | jcisneros@rentonwa.gov From: Manning, Ryan <Ryan.Manning@seattle.gov> Sent: Friday, October 14, 2022 10:42 AM To: Jennifer Cisneros <JCisneros@Rentonwa.gov> Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 Hi Jenny, I am trying to download some of the project docs to review since Seattle Public Utilities has a 60” water transmission main in the parcel abutting the south of this project that we need to assess impacts on. I am not able to download the following documents for review: RS_Geotechnical_Report_220812_v1 (rentonwa.gov) P_Architectural_Site_Plans_220920_v1 (rentonwa.gov) P_Civil_Plans_220812_v1 (rentonwa.gov) Do you have an FTP/Cloud drive I can download these from since the links above only allow viewing, but will not download (other plans were downloadable, but the above are problematic). Thanks, Ryan Manning, P.E. Senior Civil Engineer Engineering & Technical Services Division Project Delivery & Engineering Branch Seattle Public Utilities PO Box 34018 | Seattle, WA 98124 Desk: (206) 684-0127 Cell: (206) 473-8004 Email: Ryan.Manning@Seattle.gov DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 From: Herold, Joseph <Joseph.Herold@seattle.gov> Sent: Thursday, October 13, 2022 4:02 PM To: Manning, Ryan <Ryan.Manning@seattle.gov> Cc: Mantchev, Eugene <Eugene.Mantchev@seattle.gov> Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 Ryan, Please take a look at this and see if it is anywhere near CRPL4. Looks like a big project. From: Madura, Jalaine <Jalaine.Madura@seattle.gov> Sent: Thursday, October 13, 2022 2:32 PM To: Aigbe, Fred <Fred.Aigbe@seattle.gov>; Alfi, Aziz <Aziz.Alfi@seattle.gov>; Brennan, Michael <Michael.Brennan@seattle.gov>; Burrell, Kevin <Kevin.Burrell@seattle.gov>; Christiansen, Gary <Gary.Christiansen@seattle.gov>; DeLaTorre-Evans, Tracy <Tracy.DeLaTorreEvans@seattle.gov>; Fithian, Joe <Joe.Fithian@seattle.gov>; Ford, Jon <Jon.Ford@seattle.gov>; Gregg, Terri <Terri.Gregg@seattle.gov>; Harper, Wylie <Wylie.Harper@seattle.gov>; Hart, Nathan <Nathan.Hart@seattle.gov>; Herold, Joseph <Joseph.Herold@seattle.gov>; Horbelt, Cristofer <Cristofer.Horbelt@seattle.gov>; Kelleher, Shannon <Shannon.Kelleher@seattle.gov>; Koehler, Michele <Michele.Koehler@seattle.gov>; Lackey, Brent <Brent.Lackey@seattle.gov>; Mantchev, Eugene <Eugene.Mantchev@seattle.gov>; Marre, Ben <Ben.Marre@seattle.gov>; Munger, Julia <Julia.Munger@seattle.gov>; Neuman, Martha <Martha.Neuman@seattle.gov>; Neuner, Jeff <Jeff.Neuner@seattle.gov>; Orr, Matthew <Matt.Orr@seattle.gov>; Rodriguez, Jacques <Jacques.Rodriguez@seattle.gov>; Ronnell, Connie <Connie.Ronnell@seattle.gov>; Treat, Tanya <Tanya.Treat@seattle.gov>; Waldron, Jerry <Jerry.Waldron@seattle.gov>; Wells, Bill <Bill.Wells@seattle.gov>; Wertz, Ingrid <Ingrid.Wertz@seattle.gov> Cc: Antieau, Clayton <Clayton.Antieau@seattle.gov>; Burchard-Juarez, Keri <Keri.Burchard- Juarez@seattle.gov>; Chen, Alex K <Alex.Chen@seattle.gov>; Fowler, Jeff <Jeff.Fowler@seattle.gov>; Holmes, John <John.Holmes@seattle.gov>; Jaeger, Mark <Mark.Jaeger@seattle.gov>; Laschober, Paula <Paula.Laschober@seattle.gov>; Lee, Andrew (SPU) <Andrew.Lee@seattle.gov>; Patterson, Gavin <Gavin.Patterson@seattle.gov>; Walker-Taylor, Heather <Heather.Walker-Taylor@seattle.gov> Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 All, We have received this environmental review notice from the City of Renton. Please share it with others in the utility as you think appropriate. Thanks, everyone, JM Jalaine Madura DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521 SEPA Process Manager City of Seattle, Seattle Public Utilities O: 206-386-4064 From: Jennifer Cisneros <JCisneros@Rentonwa.gov> Sent: Thursday, October 13, 2022 1:07 PM To: glen.stamant@muckleshoot.nsn.us; Laura.murphy@muckleshoot.nsn.us; sepacenter@dnr.wa.gov; Planning@TukwilaWA.gov; jgreene@kingcounty.gov; steveo@newcastlewa.gov; andy.swayne@pse.com; sepa@pscleanair.org; Jim.Ishimaru@kingcounty.gov; Duffy McColloch <McCollD@wsdot.wa.gov>; egeorge@kentwa.gov; Madura, Jalaine <Jalaine.Madura@seattle.gov>; 'katherine.fischer@kingcounty.gov' <katherine.fischer@kingcounty.gov>; SEPA@dahp.wa.gov; R4Splanning@dfw.wa.gov; NWS.Compliance@usace.army.mil; culturalpreservation@duwamishtribe.org Cc: Jill Ding <JDing@Rentonwa.gov> Subject: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357 CAUTION: External Email Hello, Please see linked documents below for City of Renton LUA acceptance for the following project: Sounders FC Center at Longacres LUA22-000357 Please see related documents linked below: Notice of Application Site Plan Environmental Checklist As the project progresses, more information will be available by request and through our online Public Notice of Land Use Applications Map. Regards, JENNY CISNEROS, Planning Technician City of Renton | CED | Planning Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center | Online Applications and Inspections (425) 430-6583 | jcisneros@rentonwa.gov DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521