HomeMy WebLinkAboutEX_15_C_Public_CommentsCAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:notification@civiclive.com
To:Party of Record
Subject:Party of Record/Public Comments 2022-10-19 12:54 PM(PST) Submission Notification
Date:Wednesday, October 19, 2022 12:54:39 PM
Party of Record/Public Comments 2022-10-19 12:54 PM(PST) was submitted by Guest on
10/19/2022 3:54:33 PM (GMT-08:00) Canada/Pacific
Name Value
NameFile:LUA22-000357
Gender Mx.
Name Duwamish Tribe
Address:4705 West Marginal Way SW
CityState:Seattle, WA
Email preservationdept@duwamishtribe.org
Phone 206 431 1582 ext 104
Party of Record Only
Comments
Thank you for the opportunity to review and comment. Based on the
information provided and our understanding of the project and its APE, we
would recommend an archaeological review performed for this project,
especially if excavation cuts below fill. This is in an area the Duwamish Tribe
considers culturally significant and has a high probability to have unknown
archaeological deposits. The DAHP WISAARD website predictive model
indicates that an archaeological survey is highly advised with a very high risk
for encountering archaeological resources. If any archaeological work is
performed, we request notification. An IDP should not be used in lieu of
archaeological investigation. Cultural and archaeological resources are non-
renewable and are best discovered prior to ground disturbance. In addition we
strongly support the use of native plants only for proposed landscaping and to
maintain a wetland buffer.
Prefer US Mail
To view this form submission online, please follow the link below:
https://rentonwa.gov/form/one.aspx?
objectId=19047310&contextId=17174246&returnto=submissions
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:notification@civiclive.com
To:Party of Record
Subject:Party of Record/Public Comments 2022-10-18 11:23 AM(PST) Submission Notification
Date:Tuesday, October 18, 2022 11:23:49 AM
Party of Record/Public Comments 2022-10-18 11:23 AM(PST) was submitted by Guest on
10/18/2022 2:23:41 PM (GMT-08:00) Canada/Pacific
Name Value
NameFile:LUA22-000357
Gender Company
Name King County Metro Transit
Address:201 S Jackson Street
CityState:Seattle, WA
Email construction.coord@kingcounty.gov
Phone (206) 477-1140
Party of Record Only
Comments
Thank you for the opportunity to review the upcoming project at
1901 Oakesdale Ave SW. Metro Transit requests the following from
the project contractor or manager: • 5-BUSINESS DAYS’ NOTICE
needed for bus stop closures or relocations • 10-BUSINESS DAYS’
NOTICE needed for road closures requiring buses to be detoured • 3
WEEKS’ NOTICE for requesting removal of transit-owned facilities’
structures (shelters/kiosks/signposts/waste receptacles) We also
request the following information: 1.The approved TCP for the
project’s scheduled day(s) of activity (please attach or snip)
2.Location of the project 3. Locations of any bus stops that you would
like closed or relocated and whether they need to be closed around-
the-clock or only during the specified work hours (also please try to
include the 4 or 5-digit identification number associated with the bus
stop(s)) 4. Name of street shut down to traffic, if applicable, by any
hard closure requiring a detour; also provide limits of the closure by
identifying cross streets and specify which direction(s) of travel are
affected (specify if closure is around-the-clock or only during work
hours) 5. Name and cell phone of the primary onsite contact 6. Start
and end dates of the activity (work dates – additionally, please
specify if work includes or doesn’t include weekends if dates go past
one weekend or more) 7. Daily start and end time of the activity
(work hours) 8. Nature of work 9.Company name Once we receive
this information, we will plan for any King County Metro transit
service impact. The following is the link to King County Metro
System Impacts website for information on King County Metro
construction notification requirements:
https://kingcounty.gov/depts/transportation/metro/about/construction-
contractors/transit-system-impacts.aspx Thank you!
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
Prefer US Mail
To view this form submission online, please follow the link below:
https://rentonwa.gov/form/one.aspx?
objectId=19037075&contextId=17174246&returnto=submissions
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:notification@civiclive.com
To:Party of Record
Subject:Party of Record/Public Comments 2022-10-27 07:47 AM(PST) Submission Notification
Date:Thursday, October 27, 2022 7:47:31 AM
Party of Record/Public Comments 2022-10-27 07:47 AM(PST) was submitted by Guest on
10/27/2022 10:47:24 AM (GMT-08:00) Canada/Pacific
Name Value
NameFile:LUA22-000357
Gender Ms.
Name Kelli Sheldon
Address:15700 Dayton Ave N
CityState:Shoreline, WA
Email nwsepa@ecy.wa.gov
Phone 206-594-0014
Party of Record Only
Comments
Thank you for the opportunity to provide comments on the State
Environmental Policy Act (SEPA) notice of application utilizing the optional
determination of nonsignificance (ODNS/NOA) process for the Sounders FC
Center at Longacres project. Based on review of the checklist associated with
this project, the Department of Ecology (Ecology) has the following comments:
Section B Environmental Elements Subsection 3 Water b Ground Water: The
regional groundwater table appears to be shallow. Please provide the
maximum excavation depth of the project. If dewatering is needed during the
excavation, please provide the dewatering procedure. Section B
Environmental Elements Subsection 7 Environmental Health: This subsection
indicated that potential soil or groundwater impact may be present in the
project area related to former Boeing operation or Tacoma Smelter Plume. In
the events that soil and groundwater contamination is encountered during
construction, please provide mitigation measures to address the following: •
Hazardous waste operation workers training, health and safety plan, and site
control requirements. • Management of contaminated soil or groundwater
encountered during construction, including sampling, containment, and
disposal at a permitted facility. Thank you for considering these comments
from Ecology. If you have any questions or would like to respond to these
comments, please contact Jing Song from the Toxics Cleanup Program at (425)
229-2565 or by email at jing.song@ecy.wa.gov.
Prefer US Mail
To view this form submission online, please follow the link below:
https://rentonwa.gov/form/one.aspx?
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
objectId=19064868&contextId=17174246&returnto=submissions
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
From:Manning, Ryan
To:Party of Record; Jennifer Cisneros
Subject:FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
Date:Wednesday, October 26, 2022 12:31:51 PM
Attachments:image001.png
image002.png
image003.png
To Whom It May Concern:
Seattle Public Utilities (SPU) operates a 60-inch regional water supply main south of proposed
project LUA22-000357. SPU’s parcel ID for the regional supply main is: 0005800017
SPU is requesting further information from the developer’s geotechnical engineers pertaining to any
potential impacts this work may pose to SPU’s supply main in parcel 0005800017; specifically any
induced settlement due to vibratory, loading (i.e. stockpiling of soils, etc.), dewatering, or the like,
anticipated for this project.
SPU can provide plans for our aforementioned infrastructure upon request.
Regards,
Ryan Manning, P.E.
Senior Civil Engineer
Engineering & Technical Services Division
Project Delivery & Engineering Branch
Seattle Public Utilities
PO Box 34018 | Seattle, WA 98124
Desk: (206) 684-0127
Cell: (206) 473-8004
Email: Ryan.Manning@Seattle.gov
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Wednesday, October 19, 2022 11:24 AM
To: Manning, Ryan <Ryan.Manning@seattle.gov>
Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
CAUTION: External Email
Hi Ryan,
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
You’re most welcome. Please send comments to por@rentonwa.gov.
Thanks and have a great day!
JENNY CISNEROS, Planning Technician
City of Renton | CED | Planning Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center | Online Applications and Inspections
(425) 430-6583 | jcisneros@rentonwa.gov
From: Manning, Ryan <Ryan.Manning@seattle.gov>
Sent: Wednesday, October 19, 2022 11:16 AM
To: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
Hi Jenny,
I just got back into the office, so I wanted to say thanks for these, I really appreciate it.
Are you the contact if I have comments?
Thanks,
Ryan Manning, P.E.
Senior Civil Engineer
Engineering & Technical Services Division
Project Delivery & Engineering Branch
Seattle Public Utilities
PO Box 34018 | Seattle, WA 98124
Desk: (206) 684-0127
Cell: (206) 473-8004
Email: Ryan.Manning@Seattle.gov
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Monday, October 17, 2022 10:36 AM
To: Manning, Ryan <Ryan.Manning@seattle.gov>
Subject: RE: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
CAUTION: External Email
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
CAUTION: This email originated from outside the City of Renton. Do not click links, reply or open
attachments unless you know the content is safe.
Here are the civil plans pages 1 of 2. Will send the second batch.
JENNY CISNEROS, Planning Technician
City of Renton | CED | Planning Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center | Online Applications and Inspections
(425) 430-6583 | jcisneros@rentonwa.gov
From: Manning, Ryan <Ryan.Manning@seattle.gov>
Sent: Friday, October 14, 2022 10:42 AM
To: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
Hi Jenny,
I am trying to download some of the project docs to review since Seattle Public Utilities has a 60”
water transmission main in the parcel abutting the south of this project that we need to assess
impacts on. I am not able to download the following documents for review:
RS_Geotechnical_Report_220812_v1 (rentonwa.gov)
P_Architectural_Site_Plans_220920_v1 (rentonwa.gov)
P_Civil_Plans_220812_v1 (rentonwa.gov)
Do you have an FTP/Cloud drive I can download these from since the links above only allow viewing,
but will not download (other plans were downloadable, but the above are problematic).
Thanks,
Ryan Manning, P.E.
Senior Civil Engineer
Engineering & Technical Services Division
Project Delivery & Engineering Branch
Seattle Public Utilities
PO Box 34018 | Seattle, WA 98124
Desk: (206) 684-0127
Cell: (206) 473-8004
Email: Ryan.Manning@Seattle.gov
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
From: Herold, Joseph <Joseph.Herold@seattle.gov>
Sent: Thursday, October 13, 2022 4:02 PM
To: Manning, Ryan <Ryan.Manning@seattle.gov>
Cc: Mantchev, Eugene <Eugene.Mantchev@seattle.gov>
Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
Ryan,
Please take a look at this and see if it is anywhere near CRPL4. Looks like a big project.
From: Madura, Jalaine <Jalaine.Madura@seattle.gov>
Sent: Thursday, October 13, 2022 2:32 PM
To: Aigbe, Fred <Fred.Aigbe@seattle.gov>; Alfi, Aziz <Aziz.Alfi@seattle.gov>; Brennan, Michael
<Michael.Brennan@seattle.gov>; Burrell, Kevin <Kevin.Burrell@seattle.gov>; Christiansen, Gary
<Gary.Christiansen@seattle.gov>; DeLaTorre-Evans, Tracy <Tracy.DeLaTorreEvans@seattle.gov>;
Fithian, Joe <Joe.Fithian@seattle.gov>; Ford, Jon <Jon.Ford@seattle.gov>; Gregg, Terri
<Terri.Gregg@seattle.gov>; Harper, Wylie <Wylie.Harper@seattle.gov>; Hart, Nathan
<Nathan.Hart@seattle.gov>; Herold, Joseph <Joseph.Herold@seattle.gov>; Horbelt, Cristofer
<Cristofer.Horbelt@seattle.gov>; Kelleher, Shannon <Shannon.Kelleher@seattle.gov>; Koehler,
Michele <Michele.Koehler@seattle.gov>; Lackey, Brent <Brent.Lackey@seattle.gov>; Mantchev,
Eugene <Eugene.Mantchev@seattle.gov>; Marre, Ben <Ben.Marre@seattle.gov>; Munger, Julia
<Julia.Munger@seattle.gov>; Neuman, Martha <Martha.Neuman@seattle.gov>; Neuner, Jeff
<Jeff.Neuner@seattle.gov>; Orr, Matthew <Matt.Orr@seattle.gov>; Rodriguez, Jacques
<Jacques.Rodriguez@seattle.gov>; Ronnell, Connie <Connie.Ronnell@seattle.gov>; Treat, Tanya
<Tanya.Treat@seattle.gov>; Waldron, Jerry <Jerry.Waldron@seattle.gov>; Wells, Bill
<Bill.Wells@seattle.gov>; Wertz, Ingrid <Ingrid.Wertz@seattle.gov>
Cc: Antieau, Clayton <Clayton.Antieau@seattle.gov>; Burchard-Juarez, Keri <Keri.Burchard-
Juarez@seattle.gov>; Chen, Alex K <Alex.Chen@seattle.gov>; Fowler, Jeff
<Jeff.Fowler@seattle.gov>; Holmes, John <John.Holmes@seattle.gov>; Jaeger, Mark
<Mark.Jaeger@seattle.gov>; Laschober, Paula <Paula.Laschober@seattle.gov>; Lee, Andrew (SPU)
<Andrew.Lee@seattle.gov>; Patterson, Gavin <Gavin.Patterson@seattle.gov>; Walker-Taylor,
Heather <Heather.Walker-Taylor@seattle.gov>
Subject: FW: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
All,
We have received this environmental review notice from the City of Renton. Please share it with
others in the utility as you think appropriate.
Thanks, everyone,
JM
Jalaine Madura
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521
SEPA Process Manager
City of Seattle, Seattle Public Utilities
O: 206-386-4064
From: Jennifer Cisneros <JCisneros@Rentonwa.gov>
Sent: Thursday, October 13, 2022 1:07 PM
To: glen.stamant@muckleshoot.nsn.us; Laura.murphy@muckleshoot.nsn.us;
sepacenter@dnr.wa.gov; Planning@TukwilaWA.gov; jgreene@kingcounty.gov;
steveo@newcastlewa.gov; andy.swayne@pse.com; sepa@pscleanair.org;
Jim.Ishimaru@kingcounty.gov; Duffy McColloch <McCollD@wsdot.wa.gov>; egeorge@kentwa.gov;
Madura, Jalaine <Jalaine.Madura@seattle.gov>; 'katherine.fischer@kingcounty.gov'
<katherine.fischer@kingcounty.gov>; SEPA@dahp.wa.gov; R4Splanning@dfw.wa.gov;
NWS.Compliance@usace.army.mil; culturalpreservation@duwamishtribe.org
Cc: Jill Ding <JDing@Rentonwa.gov>
Subject: City of Renton LUA Acceptance: Sounders FC Center at Longacres, LUA22-000357
CAUTION: External Email
Hello,
Please see linked documents below for City of Renton LUA acceptance for the following project:
Sounders FC Center at Longacres
LUA22-000357
Please see related documents linked below:
Notice of Application
Site Plan
Environmental Checklist
As the project progresses, more information will be available by request and through our online
Public Notice of Land Use Applications Map.
Regards,
JENNY CISNEROS, Planning Technician
City of Renton | CED | Planning Division
1055 S Grady Way | 6th Floor | Renton, WA 98057
Virtual Permit Center | Online Applications and Inspections
(425) 430-6583 | jcisneros@rentonwa.gov
DocuSign Envelope ID: A56F3DC7-D564-4883-A9F5-21D84A1EE521