HomeMy WebLinkAboutPRE22-000363_Meeting SummaryPREAPPLICATION MEETING FOR
Hamway Sunset SFR
PRE 22-000363
CITY OF RENTON
Department of Community & Economic Development
Planning Division
November 10, 2022
Contact Information:
Planner: Jill Ding, 425.430.6598, jding@rentonwa.gov
Public Works Plan Reviewer: Scott Warlick, 425-430-7216, swarlick@rentonwa.gov
Fire Prevention Reviewer: Corey Thomas, 425.276.9582, cthomas@RentonRFA.org
Building Department Reviewer: Rob Shuey, 425.430.7235
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
formal submittal.
The pre-application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: November 7th, 2022
TO: Jill Ding, Senior Planner
FROM: Scott Warlick, Engineering Specialist III
SUBJECT: Seminoff Sunset Blvd Variance
827 SW 4th PL
PRE22-000363
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision-makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review for the above-referenced proposal located at parcel(s)
2143701845. The following comments are based on the pre-application submittal made to the City of
Renton by the applicant.
Water
1. The proposed Single Family Residence (SFR) is within the City of Renton’s water service area in
the Earlington 370 pressure zone.
2. The static water pressure is 106 psi at ground elevation of 124 feet. Because of the high water
pressure a Pressure Reducing Valve (PRV) will be required.
3. There is an existing 8-inch water main in SW 4th PL that can deliver a maximum flow capacity of
2500 gallons per minute.
4. There is currently no domestic water serving the property. The developer will need to show how
they plan to serve the new SFR.
5. A new 1-inch domestic water meter will be required for the proposed SFR, and it is subject to
payment of water system development charges and meter installation charges. The 2022 SDC
fee for a 1-inch meter is $4,500 and the 2022 fee for a new water meter installation is
$2,875.00.
Sanitary Sewer
1. This parcel is not currently hooked up to sewer.
2. There is an 8-inch gravity wastewater main located to the south of the lot and hugs the north
shoulder of SW Sunset Blvd (Record DWG – S-013803)
3. There is currently an 8-inch gravity wastewater main located to the north of the property in SW
4th PL. (Record DWG – S-308206)
4. The developer will need to show how they propose to serve the new SFR with a sanitary sewer
service.
5. The development is subject to a wastewater system development charge (SDC) fee. SDC fee for
sewer is based on the size of the new domestic water to serve the project. The 2022 sewer fee
for a 1-inch meter install is $3,500.00 per meter.
Surface Water
1. There is currently no connection to storm water on site or any on site BMP’s
2. Drainage plans and a drainage report complying with the adopted 2022 Renton Surface Water
Design Manual will be required. Refer to Figure 1.1.2.A – Flow Chart of the 2022 Renton Surface
Water Design Manual (RSWDM) to determine what type of drainage review is required for this site.
The site falls within the Flow Control Duration Standard Matching Forested Site Conditions. The site
falls within the May Creek drainage basin.
3. The current Surface Water Standard Plans shall be used in all drainage plan submittals. The current
City of Renton Standard Details are available online in the City of Renton website
https://edocs.rentonwa.gov/Documents/Browse.aspx?id=990403&dbid=0&repo=CityofRenton
4. If the new plus replaced pollution generating impervious surface exceeds 5,000 SF, the applicant will
be required to provide basic water quality treatment. Any proposed detention and/or water quality
vault shall be designed in accordance with the RSWDM that is current at the time of civil construction
permit application. Separate structural plans will be required to be submitted for review and approval
under a separate building permit for the detention and/or water quality vault.
5. Appropriate on-site BMPs satisfying Core Requirement #9 will be required to help mitigate the new
runoff created by this development to the maximum extent feasible. On-site BMPs shall be evaluated
as described in Section C.1.3 of the 2022 RSWDM. A preliminary drainage plan, including the
application of on-site BMPs, shall be included with the land use application, as applicable to the
project. The final drainage plan and drainage report must be submitted with the utility construction
permit application.
6. A geotechnical soils report for the site is required per the 2022 Renton Surface Water Design Manual
Section C.1.3. Information on the water table and soil permeability (measured infiltration rates), with
recommendations of appropriate on-site BMPs per Core Requirement #9 and Appendix C shall be
included in the report. The report should also include information concerning the soils, geology,
drainage patterns and vegetation present shall be presented in order to evaluate the drainage,
erosion control and slope stability for site development of the proposed plat. The applicant must
demonstrate the development will not result in soil erosion and sedimentation, landslide, slippage,
or excess surface water runoff.
7. Erosion control measures to meet the City requirements shall be provided.
8. The development falls within the R-8 zone which has a maximum impervious surface area of 65% per
lot.
9. The development is subject to a surface water system development charge (SDC) fees. Fees will be
charged based on the rate at the time of construction permit issuance.
• The current SDC fee for a single family residence is $2,100 per lot.
• The full fee schedule can be found at:
https://edocs.rentonwa.gov/Documents/DocView.aspx?id=9010319&dbid=0&repo=CityofR
enton
Transportation
1. Frontage improvements are not required if the following criteria are met: The New construction
or addition with valuation less than $150,000. If frontage improvements are required however, the
proposed SFR fronts SW Sunset Blvd along the south property line and is classified as a Principal
Arterial Road. Existing right-of-way (ROW) width is 100-120 feet. To meet the City’s complete street
standards for Principal Arterial streets, minimum ROW is 103 feet. Based on a survey for the
property, ROW may need to be dedicated in order to meet the minimum ROW width. Per City code
4-6-060, half street improvements shall be required and must include a pavement width of 66-feet
(33 feet from centerline), a 0.5-foot curb, an 8-foot planting strip, an 8-foot sidewalk, street trees
and storm drainage improvements.
2. Frontage improvements are not required if the following criteria are met: The New construction
or addition with valuation less than $150,000. If frontage improvements are required however, the
proposed SFR fronts SW 4th PL along the north property line and is classified as a Residential Access
Road. Existing right-of-way (ROW) width is 66 feet. To meet the City’s complete street standards
for Residential Access streets, minimum ROW is 53 feet. Based on the King County Assessors map,
no ROW dedication will be needed. Per City code 4-6-060, half street improvements shall be
required and must include a pavement width of 20 feet (13 feet from centerline), a 0.5-foot curb,
an 8-foot planting strip, an 5-foot sidewalk, street trees and storm drainage improvements.
3. A formal fee-in-lieu request may be submitted for the street frontage improvements along SW
Sunset Blvd and SW 4th PL. See the wavier and fee-in-lieu request form using the following link:
http://rentonwa.gov/uploadedFiles/Business/CED/FORMS/BPW.pdf
A fee-in-lieu can be paid at $128 per linear foot.
4. If you wish to construct the frontage improvements, a full utility construction permit will be
required. Requirements for intake of a full utility construction permit are listed below.
a. Payment of plan review / inspection fees. Plan review / inspection fees are based on
the anticipated value of the construction of the frontage improvements.
b. Survey prepared by a Professional Land Surveyor licensed in the State of Washington
c. Civil Plans prepared by a Professional Civil Engineer licensed in the State of Washington.
d. Survey and Civil Plans shall conform to the City of Renton attached survey and drafting
standards.
e. A written drainage and geotechnical assessment to account for the portion of right of
way where work will be done.
f. First review of utility permit plans takes approximately three to four weeks.
5. Payment of the transportation impact fee is applicable on the construction of the SFR at the time
of application for the building permit. The current rate of transportation impact fee for 2022 is
$10,861.69 per SFR. The transportation impact fee that is current at the time of building permit
application will be levied, payable at building permit issue.
General Comments
1. If frontage improvements are required, all existing and proposed utility lines (i.e. electrical, phone,
and cable services, etc.) along property frontage or within the site must be underground. The
construction of these franchise utilities must be inspected and approved by a City of Renton
inspector.
2. Maximum exposed retaining wall height is 6-ft and shall be setback a minimum of 3-ft from the
right-of-way as outlined in RMC 4-4-040 – Fences, Hedges and Retaining Walls.
3. Adequate separation between utilities as well as other features shall be provided in accordance
with code requirements.
a. 7-ft minimum horizontal and 1-ft vertical separation between storm and other utilities is
required with the exception of water lines which require 10-ft horizontal and 1.5-ft
vertical.
b. The stormwater line should be minimum 5 feet away from any other structure or wall or
building.
c. Trench of any utility should not be in the zone of influence of the retaining wall or of the
building.
4. All construction utility permits for utility and street improvements will require separate plan
submittals. All utility plans shall confirm to the Renton Drafting Standards. A licensed Civil
Engineer shall prepare the civil plans. Please visit the Development Engineering Forms page for
the most up-to-date plan submittal requirements:
http://rentonwa.gov/business/default.aspx?id=42473
5. A landscaping plan shall be included with the civil plan submittal. Each plan shall be on separate
sheets.
6. Fees quoted in this document reflect the fees applicable in the year 2022 only and will be assessed
based on the fee that is current at the time of the permit application or issuance, as applicable to
the permit type. Please visit www.rentonwa.gov for the current development fee schedule.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: November 10, 2022
TO: Pre-Application File No. 22-000363
FROM: Jill Ding, Senior Planner
SUBJECT: Hamway Sunset Single Family Residence
8XX SW 4th PL
(Parcel No. 2143701845)
General: We have completed a preliminary review of the pre-application for the above-referenced development
proposal. The following comments on development and permitting issues are based on the pre-application
submittals made to the City of Renton by the applicant and the codes in effect on the date of review. The
applicant is cautioned that information contained in this summary may be subject to modification and/or
concurrence by official decision-makers (e.g., Hearing Examiner, Community & Economic Development
Administrator, Public Works Administrator, Planning Director, and City Council). Review comments may also need
to be revised based on site planning and other design changes required by City staff or made by the applicant. The
applicant is encouraged to review all applicable sections of the Renton Municipal Code. The Development
Regulations are available online at https://www.codepublishing.com/WA/Renton/.
Project Proposal: The subject property (tax parcel 2143701845) is located at southeast of Thomas Ave SW and
SW 4th PL. The project site is zoned Residential-8 (R-8). The proposal is to build a home with a footprint of
approximately 23’ x 60’. King County Assessor’s Records indicate that the site is 4,103 SF. The site is a through lot
that fronts SW 4th PL and SW Sunset BLVD. The applicant is requesting a three and a half foot (3-1/2’) front yard
setback and a five foot (5’) secondary front yard setback. Sensitive slopes are mapped on the project site.
Current Use: The project site is currently vacant.
Development Standards: The project would be subject to RMC 4-2-110A, “Development Standards for Single
Family Zoning Designations” effective at the time of complete application (noted as “R-8 standards” herein).
Zoning/Density Requirements: The subject property is located within the R-8 zoning classification. The density
range allowed in the R-8 zone is a minimum of 4.0 to a maximum of 8.0 dwelling units per one net acre. The
Residential Medium Density Land Use designation is intended to create opportunities for new single family
residential neighborhoods and to facilitate high-quality infill development that promotes reinvestment in existing
single-family neighborhoods. Detached single family residential dwelling units are permitted uses within the R-8
zoning designation. No subdivision is proposed, therefore the density calculations would not be applicable.
Minimum Lot Size, Width and Depth –The minimum lot size in the R-8 zone is 5,000 sq. ft. The minimum lot width
is 50 feet for interior lots and 60 ft. for corner lots and the minimum lot depth is 80 feet. Additionally, the
subdivision regulations require new residential lots to contain a minimum width at their foremost points (where
the front property line meets ROW) of no less than 80-percent of the required lot width and no new lots shall have
a depth-to-width ratio greater than four to one. The existing lot has an area of 4,103 sq. ft. with a width of 120
Hamway Sunset Single Family Residence
Page 2 of 5
November 10, 2022
feet and a depth of approximately 29 feet. The existing lot size and lot depth are less than the minimum required
in the R-8 zone, however as no subdivision is proposed these requirements are not applicable.
Building Standards – The R-8 standards allow a maximum building coverage of 50% of the lot area. The maximum
impervious coverage in the R-8 zone is 65%. The maximum wall plate height is restricted to 24 feet, and the
buildings shall be not more than two stories. Roofs with a pitch equal to or greater than 4:12 may project an
additional six (6) vertical feet from the maximum wall plate height; common rooftop features, such as chimneys,
may project an additional four (4) vertical feet from the roof surface. Non-exempt vertical projections (e.g., decks,
railings, etc.) shall not extend above the maximum wall plate height unless the projection is stepped back one-
and-a-half (1.5) horizontal feet from each façade for each one (1) vertical foot above the maximum wall plate
height. Compliance with the building standards for the new single-family residences would be reviewed at the
time of formal land use application.
Setbacks – Setbacks are the minimum required distance between the building footprint and the property line. The
required setbacks for the R-8 zone are: Front yard: 20 feet for the primary structure, except when all vehicle access
is taken from an alley, then 15 ft ; Rear yard: 20 feet; Side yards: 5 feet; and Secondary Front yard: 15 feet. Corner
lots required to have a front yard and a secondary front yard are relieved of the requirement to have a rear yard;
in place of a rear yard setback, the side yard setback of the zone shall apply. The applicant is requesting an
administrative setback variance for a three and a half foot (3-1/2’) front yard setback and a five foot (5’)
secondary front yard setback.
Fences/Walls: If the applicant intends to install any fences or retaining walls as part of this project, the location
must be designated on the landscape plan or grading plan. A fence and/or wall detail should also be included on
the plan. A retaining wall that is 4 feet or taller, as measured by the vertical distance from the bottom of the
footing to the finish grade at the top of the wall requires a building permit. A fence shall not be constructed on
top of a retaining wall unless the total combined height of the retaining wall and the fence does not exceed the
allowed height of a standalone fence. For more information about fences and retaining walls refer to RMC 4-4-
040.
Landscaping: With the exception of critical areas, all pervious area shall have landscape treatment. Landscaping
may include hardscape such as decorative paving, rock outcroppings, fountains, plant containers, etc. Ten feet
(10') of on-site landscaping is required along all public street frontages. Where there is insufficient right-of-way
space or no public frontage, street trees are required in the front yard subject to approval of the Administrator. A
minimum of two (2) trees are to be located in the front yard prior to final inspection. Single family residential
building permits, when not a part of a new subdivision are exempt from the Landscaping Regulations.
Significant Tree Retention: When significant trees (greater than 6-inch caliper or 8-caliper inches for alders and
cottonwoods) are proposed to be removed, a tree inventory and a tree retention plan along with an arborist
report, tree retention plan and tree retention worksheet shall be provided with the formal land use application as
defined in RMC 4-8-120. The tree retention plan must show preservation of at least 30% of significant trees. Please
refer to RMC 4-4-130, Tree Retention and Land Clearing Regulations for further general and specific tree retention
and land clearing requirements.
In addition to retaining a minimum of 30% of existing significant trees, each new lot would be required to provide
a minimum tree density of 30 tree credits per net acre. Tree credits encourage retention of existing significant
trees with larger trees being worth more tree credits.
Hamway Sunset Single Family Residence
Page 3 of 5
November 10, 2022
TREE SIZE TREE CREDITS
New small species tree 0.25
New medium species tree 1
New large species tree 2
Preserved tree 6 – 9 caliper inches 4
Preserved tree 10 – 12 caliper inches 5
Preserved tree 12 – 15 caliper inches 6
Preserved tree 16 – 18 caliper inches 7
Preserved tree 19 – 21 caliper inches 8
Preserved tree 22 – 24 caliper inches 9
Preserved tree 25 – 28 caliper inches 10
Preserved tree 29 – 32 caliper inches 11
Preserved tree 33 – 36 caliper inches 12
Preserved tree 37 caliper inches and
greater
13
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees on slopes greater
than twenty percent (20%); significant trees adjacent to critical areas and their associated buffers; significant trees
over sixty feet (60') in height or greater than eighteen inches (18") caliper; and trees that shelter interior trees or
trees on abutting properties from strong winds, which could otherwise allow such sheltered trees to be blown
down if removed.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other significant native
evergreen or deciduous trees; and other significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been evaluated for retention
and are not able to be retained, unless the alders and/ or cottonwoods are used as part of an approved
enhancement project within a critical area or its buffer.
The Administrator may require independent review of any land use application that involves tree removal and
land clearing at the City's discretion.
The Administrator may authorize the planting of replacement trees on the site if it can be demonstrated to the
Administrator's satisfaction that replacement requirements in RMC 4-4-130H1e can be met.
Hamway Sunset Single Family Residence
Page 4 of 5
November 10, 2022
Tree retention standards shall be applied to the developable area, as defined in RMC 4-11-040, Definitions D, of
a property. A formal tree retention plan and tree retention worksheet prepared by an arborist or landscape
architect would be reviewed at the time of the land use application.
Access/Driveways/Parking: Access to the site is proposed via a residential driveway off of SW 4th Pl. The maximum
width of single loaded garage driveways shall not exceed 9 feet and double loaded garage driveways shall not
exceed 16 feet. Compliance with driveway standards would be verified at the time of building permit review. The
project site is required to accommodate off street parking for a minimum of two vehicles.
Residential Design and Open Space Standards: All single family residences would be subject to the Residential
Design Standards for the R-8 zone, outlined in RMC 4-2-115. Residential Design Review occurs as part of the
Building Permit Review.
Critical Areas: Sensitive slopes are mapped on the project site. Whenever a proposed development requires a
development permit and a geologic hazard, including sensitive slopes, is present on the site of the proposed
development or on abutting or adjacent sites within fifty feet (50') of the subject site, geotechnical studies by
licensed professionals, such as a geotechnical engineer and/or engineering geologist, shall be required. The study
shall demonstrate that the proposal will not increase the threat of the geological hazard to adjacent properties
beyond the pre-development conditions, the proposal will not adversely impact other critical areas, and the
development can be safely accommodated on the site. In addition, the study shall assess soil conditions and detail
construction measures to assure building stability. The geotechnical study must meet the requirements set forth
in the City of Renton Critical Areas Regulations, RMC 4-3-050. It is the applicant’s responsibility to ascertain
whether any additional critical areas or environmental concerns are present on the site during site development
or building construction.
Variance Justification: In order to approve a variance, the Reviewing Official must find ALL of the following
conditions exist:
a. That the applicant suffers practical difficulties and unnecessary hardship and the variance is necessary
because of special circumstances applicable to subject property, including size, shape, topography,
location or surroundings of the subject property, and the strict application of the Zoning Code is found to
deprive subject property owner of rights and privileges enjoyed by other property owners in the vicinity
and under identical zone classification;
b. That the granting of the variance will not be materially detrimental to the public welfare or injurious to
the property or improvements in the vicinity and zone in which subject property is situated;
c. That approval shall not constitute a grant of special privilege inconsistent with the limitation upon uses
of other properties in the vicinity and zone in which the subject property is situated;
d. That the approval is a minimum variance that will accomplish the desired purpose.
Environmental Review: The construction of one single family residence would be exempt from State
Environmental Policy Act (SEPA) review provided the proposal complies with critical areas regulations. Should the
proposal require a variance or reasonable use exception related to critical areas then SEPA would be required.
Permit Requirements: The proposal would require Administrative Variance approval. The 2022 fees would total
$1,396.55 ($1,330 Variance + $66.55 Technology Fee = $1,396.55). Any modifications requested would be an
Hamway Sunset Single Family Residence
Page 5 of 5
November 10, 2022
additional $273 ($260 plus a 5% Technology Surcharge Fee). All fees are subject to change. The applications
would be reviewed concurrently within an estimated time frame of six to eight weeks. Detailed information
regarding the land use application submittal can be found on the City’s permitting page at
permitting.rentonwa.gov and clicking on “Land Use”, then “All Forms (A to Z).” The City now requires electronic
plan submittal for all applications.
In addition to the required land use permits, separate construction and building permits would be required.
Public Notice: A minimum of one Public Information Sign is required for a Variance application. The applicant is
responsible for the procurement, installation and maintenance of the sign. Detailed information regarding the
land use application submittal requirements is provided on the City of Renton website (www.rentonwa.gov).
Fees: In addition to the applicable building and construction fees, impact fees would be required. Such fees would
be payable prior to building permit issuance. Fees change periodically and the fee in effect at the time of building
permit issuance would be required. For informational purposes, the fees in effect at the date of this letter are as
follows:
• A Transportation Impact Fee based on $10,861.69 per each new detached dwelling unit.
• A Parks Impact Fee based on $2,914.99 per each new detached dwelling unit.
• A Fire Impact fee of $829.77 per each new detached dwelling unit.
• A Renton School District Impact Fee of $2,659.00 (plus a 5% processing charge) per each new detached
dwelling unit.
A handout listing Renton’s development-related fees is available on the City of Renton website for your review.
Note: When the formal application materials are complete, the applicant is strongly encouraged to send a copy
of the application materials via email prior to submitting the complete application package. Please contact Jill
Ding, Senior Planner at jding@rentonwa.gov or 425-430-6598 before sending any documents associated with
the project.
Expiration: Any variance granted, unless otherwise specified in writing, shall become null and void in the event
that the applicant or owner of the subject property for which a variance has been requested has failed to
commence construction or otherwise implement effectively the variance granted within a period of two (2) years
after such variance has been issued. For proper cause shown, an applicant may petition for an extension of the
two (2) year period during the variance application review process, specifying the reasons for the request. The
time may be extended but shall not exceed one additional year in any event. It is the responsibility of the owner
to monitor the expiration date.