HomeMy WebLinkAbout20160674E003 Bethany Corner 2022-11-07 TESC 098.pdf
www.aesgeo.com
This document is considered DRAFT until reviewed and initialed by an AESI Project Manager
Temporary Erosion and
Sediment Control Monitoring
DATE PROJECT NAME AESI PROJECT NO. TESC REPORT NO.
11/07/2022 Bethany Corner 20160674E003 098
LOCATION CITY MUNICIPALITY CSWGP
16451 111th Ave SE Renton Renton WAR307077
PREVIOUS SITE VISIT CLIENT/OWNER WEATHER 24 HOUR RAINFALL PAST WEEK RAINFALL
11/01/2022
Mark Seek (Tiger Mountain
Homes) Cloudy, 40's 0.11" 3.33"
AESI FIELD REP Catherine Ikeda AESI PROJECT MANAGER Matthew A. Miller,
P.E.
Catherine Ikeda
QUALITY/CONDITION (SEE SWPPP FOR BMP LOCATIONS)
CONSTRUCTION ENTRANCE SITE RESTRICTED ACCESS
Asphalt pavement No
WHEEL WASH SEDIMENT TRACK OUT
N/A Trace sediment trackout
ROADWAY SURFACE CATCH BASIN
Asphalt silt socks installed, along 165th St
LIMITS BUFFER AREA STABILIZATION
Silt fence Landscaping grass, bark
SILT FENCING CONCRETE WORK (Sidewalks, curbing, foundation)
Installed along N, S, and W perimeter None observed
COVER MEARSURES OVERALL STRAW
Exposed soils on lot N/A
PLASTIC SHEETING HYDROSEED
N/A Sidewalk planters
CONVEYENCE CHANNEL CHECK DAMS
N/A N/A
STOCKPILE COVER PIPE SLOPE DRAINS
N/A N/A
LEVEL SPREADER LANDSCAPE/MULCH
South side of site Sidewalk planters
SEDIMENT POND TRAP SEDIMENT POND INLET/OUTLET
Detention vault N/A
SEDIMENT POND SIDE SLOPES SURFACE WATER OBSERVATION
(Creek, Wetland, or Lake) (Clear, Turbid, Sheen)
Concrete (detention vault) Slightly turbid puddles
WATER QUALITY SAMPLE TURBIDITY (NTU) pH OVERALL
Yes 10 6.5 BMPs adequate
SAMPLE LOCATION AREAS OF CONCERN
SE of site: 111th Ave swale outfall Repair silt fence and install additional silt socks in CBs
CORRECTIVE ACTIONS
Repair silt fence and add silt socks in CB off 111th Ave
PAST CORRECTIVE ACTIONS
Silt fence
Is this site in compliance with the terms and conditions
of the SWPP and CSWGP discharge Permit?
Yes
www.aesgeo.com
TESC REPORT
DATE CSWGP PROJECT NO. TESC REPORT NO.
11/07/2022 WAR307077 20130674E003 098
Sample Location Approximate Flow Turbidity NTU/Transparency pH Compliance
SE of site: 111th Ave
swale outfall
10 6.5 yes
ADDITIONAL COMMENTS:
No sediment was observed leaving the site. AESI took a water sample from the swale SE of the site. The turbidity and pH
of the sample were 10 NTU and 6.5, this is in compliance with the SWPP. While onsite, AESI observed some silt fencing
knocked down. AESI notified the client and recommended repairing the silt fencing around the perimeter of the site and
adding additional silt socks in the catch basins off of 111th Ave. AESI also observed several slightly turbid puddles onsite.
AESI talked to the contractor about the potential of a temporary sediment pond to impound onsite water. The