Loading...
HomeMy WebLinkAboutEx02_Site_PlanIN OUT VEHICULAR ENTRANCE / EXIT IN OUT PEDESTRIAN ENTRANCE / EXIT SOUTHPORT (TOWERS #1 & #2) SOUTHPORT (TOWERS #3 & #4) INOUT IN OUT LOADING DOCK PHASE 1 LOADING DOCK PHASE 2 SOUTHPORT (TOWER #5) SOUTHPORT TOWER #6 INOUTINOUTLOADING DOCK PHASE 3 LAKE WASHINGTON LAKE WASHINGTON BLVD N BOEING RENTON FACTORY PSE SUBSTATION JOHNS CREEKS75°44'38"W 240.72' R=1388.68 ∆=25°05'56" L=608.32' S46°51'03"W 282.66'S14°34'17" E464.00'S46°43'23" E 646.03' N82°49'09"W85.74' S46°54'27" E 22.00' IN IN FRONTAGE ROAD CENTER ROAD IN IN IN IN IN 757TH AVE 40' - 0"24' - 0"24' - 0"PARK AVE NINOUTIN 34' - 0"28' - 6"36' - 0" 24' - 0" RAILROAD RAILROAD PSE - TRANSMISSION SWITCH UTILITY FRONT YARD SETBACK 15' - 0"SIDE YARD SETBACK, NOT REQUIRED SIDE YARD SETBACK, NOT REQUIRED 15' - 0"15' - 0"SECONDARY FRONT YARD SETBACK REAR YARD SETBACK, NOT REQUIRED R A IL R O A D HOUSER WAY N EXISTING SOUTHPORT OFFICE TOWERS GENE COULON MEMORIAL BEACH PARK BRISTOL APARTMENTS HYATT REGENCY LAKE WASHINGTON BRISTOL AT SOUTHPORT APARTMENTS PARK AVENUE NSOUTHPORT LANESOUTHPORT LANEWETLAND, SEE CRITICAL AREA REPORT 1/ A1.01M PROJECT NAME: PROJECT SIZE: PROJECT LOCATION: ZONING DESIGNATION: CURRENT SITE USE: SITE FEATURES: PROPOSED USE: HEIGHT LIMITATIONS: LOT COVERAGE: PARKING: BUILDING SQUARE FOOTAGE: BUILDING SETBACKS: SECO SOUTHPORT WEST PARCEL #0823059191, 336,992 SF AND (CURRENT UTILITY PSE LOCATION) -PARCEL #0823059178, 102,578 SF, ADDRESS = 1095 LAKE WASHINGTON BLVD, N 98056 ADDITIONAL PHASE 3 AND PHASE 4 WILL FURTHER UTILIZE PARCEL #0823059191, 336,992 SF TOTAL PARCEL AREAS = 439,570 SF REFER TO SHEET: UC-2 URBAN CENTER 2 UTILITY FUNCTION / VACANT JOHN'S CREEK AT SOUTHEAST PORTION OF SITE HAS A WETLAND DESIGNATION. PLEASE REFER TO WETLAND ASSESSMENT AND CRITICAL AREAS REPORT. NOTE ON SOIL TYPE AND DRAINAGE CONDITIONS: PLEASE REFER TO CIVIL DOCUMENTS, AND GEOTECH REPORT. FURTHER REFER TO LETTER OF UNDERSTANDING -GEOLOGIC RISK. 1,250,000 SF GROSS BUILDING AREA OF OFFICE AND RETAIL FUNCTION WITHIN (5) HIGH RISE BUILDINGS (T1-T5), DEVELOPED OVER (3) PLANNED PHASES. ADDITIONALLY AN ALLOTMENT FOR 130,000 SF GROSS BUILDING AREA FOR OFFICE AND RETAIL AT A FUTURE PHASE 4 DEVELOPMENT (T6). TOWERS WILL NOT EXCEED THE HEIGHT ESTABLISHED BY NEIGHBORING SOUTHPORT OFFICE TOWERS TO THE DIRECT NORTH, AND CONFORM TO RMC 4-2-120A FOR NO GREATER THAN 10 STORIES. ALSO THE BUILDING WILL COMPLY WITH RMC 4-3-020.F AIRPORT INFLUENCE MAP, SAFETY COMPATIBILITY ZONE SECTOR 6 FOR "TRAFFIC PATTERN ZONE" AND FURTHER RMC 4-3-020.G FEDERAL AVIATION REGULATION PART 77 OBJECTS AFFECTING NAVIGABLE AIRSPACE. BUILDING COVERAGE = 251,420 SF TOTAL ROAD COVERAGE FOR ON-SITE PARCELS = 64,540 SF LOT COVERAGE FOR BUILDINGS = 251,420 / 439,570 = 57%, BELOW 100% ALLOWED BY RMC 4-2-120A WHEN PARKING IS PROVIDED THROUGH A PARKING GARAGE. THIS COVERAGE INCORPORATES BOTH PARCELS AND IS REPRESENTATIVE OF THE COMPLETION OF (5) OFFICE TOWERS. PARKING WILL BE ADDRESSED THROUGH AN ON-SITE PARKING GARAGE AND AN OFF-SITE ALLOTMENT AS APPROVED BY THE CITY OF RENTON THROUGH COMPLIANCE TO RMC 4-4-080.E. ALL PARKING TO BE COMPLIANT WITH RENTON MUNICIPAL CODE SECTION 4-4-080 PARKING, LOADING AND DRIVEWAY REGULATIONS. (RMC 4-4-080-F.8) -PARKING STALL SIZES AND TYPES WILL BE AS FOLLOWS: (RMC 4-4-080-F.10) -NUMBER OF PARKING SPACES REQUIRED APPROXIMATE OFFICE SF 1,200,000 SF APPROXIMATE RETAIL SF 50,000 SF TOTAL SF (EXCLUDING PARKING)1,250,000 SF PARKING REQUIREMENT OFFICE USE: 2/1,000 SF (MIN) AND 4.5/1,000 SF (MAX) PARKING REQUIREMENT RETAIL USE: 10/1,000 SF (MIN&MAX) OFFICE (1,200,000/1000) * 2 = 2,400 STALLS RETAIL (50,000/1,000) * 10 = 500 STALLS TOTAL (MIN)2,400 + 500 =2,900 STALLS (RMC 4-4-080-F.8.g) -ACCESSIBLE SPACES OVER 1,000 STALLS = 20 SPACES PLUS 1 SPACE FOR EVERY 100 SPACES OR FRACTION THEREOF, OVER 1,000 = 20 + (2,900-1,000)/100 = 20 + 19 = 39 ACCESSIBLE SPACES (RMC 4-4-080-F.11) -BICYCLE PARKING 10% OF TOTAL CAR PARKING STALLS = 2,900 * 10% = 290 BICYCLE PARKING STALLS (RMC 4-4-080-F.10.b) -ALTERNATIVE COMPLIANCE PATH TO PROVIDE NUMBER OF PARKING SPACES REQUIRED: A. IF AFTER FURTHER DESIGN DEVELOPMENT OF THE PROJECT A PARKING DEFICIENCY EXISTS, A JOINT PARKING AGREEMENT MAY BE UTILIZED TO PROVIDE COMPLIANCE WITH THE NUMBER OF PARKING SPACES REQUIRED PER THE RENTON MUNICIPAL CODE. (RMC 4-4-080-F.8.c) -COMPACT PARKING STALL SIZE AND MAXIMUM NUMBER OF COMPACT SPACES: THE PERCENTAGE OF COMPACT STALLS WILL NOT EXCEED FIFTY PERCENT (50%) OF THE TOTAL PARKING SPACES AVAILABLE. (RMC 4-4-080-F.8.g) -ACCESSIBLE PARKING SHALL BE PROVIDED AS PER THE TABLE NOTED IN THE REFERENCED CODE SECTION: 20 SPACES PLUS 1 SPACE FOR EVERY 100 SPACES OR FRACTION THEREOF OVER 1,000 PARKING STALLS. TOWER #1 = 247,950 SF TOWER #2 = 249,445 SF TOWER #3 = 249,445 SF TOWER #4 = 254,755 SF TOWER #5 = 248,405 SF TOTAL = 1,250,000 SF (RMC 4-2-120A) -DEVELOPMENT STANDARDS FOR COMMERCIAL ZONING DESIGNATIONS (UC) SETBACKS: MIN FRONT YARD: 15FT MAX FRONT YARD: 20FT MIN SECONDARY FRONT YARD: 15FT MAX SECONDARY FRONT: 20FT MIN REAR YARD: NONE, EXCEPT 15FT IF LOT ABUTS A LOT ZONED FOR RESIDENTIAL. MIN SIDE YARD: NONE, EXCEPT 15FT IF LOT ABUTS A LOT ZONED FOR RESIDENTIAL. CLEAR VISION AREA: IN NO CASE SHALL A STRUCTURE OVER 42 IN. IN HEIGHT INTRUDE INTO THE 20FT CLEAR VISION AREA DEFINED IN RMC 4-11-030 A.FRONT YARD: THE YARD REQUIREMENT THAT SEPARATES THE STRUCTURE(S) FROM PUBLIC RIGHT-OF-WAY, PRIVATE ACCESS EASEMENT, OR SHARED DRIVEWAY. FOR THROUGH LOTS, CORNER LOTS, AND LOTS WITHOUT STREET FRONTAGE, THE FRONT YARD WILL BE DETERMINED BY THE PLANNING DIVISION DIRECTOR.13' - 0"16' - 0"20' - 0"20' - 0"8' - 0" 5' - 0"8' - 4"8' - 0" 9' - 0"7' - 6" COMPACT/SMALL STANDARD ADA STANDARD ADA VAN PARALLEL 9' - 0"23' - 0"925 Fourth Avenue Suite 2400 Seattle, Washington 98104 206.623.9414 www.zgf.com ZGF Project Number Consultant Client and Project Information Original Issue Revisions Sheet Status Sheet Title Sheet Number Current Issue Date Current Issue S24119 PROJECT NORTH Key Plan and Orientation Sheet Size: 34 x 440"1" 2" TRUE NORTH 43.09 DEGREES NOT FOR CONSTRUCTION 6/22/2022 1:30:39 PMSOUTHPORT WEST MASTER SITE PLAN RENTON, WA 06/24/2022 DR 01.1 - MASTER SITE PLAN REVIEW A1.02M LEGEND - SITE PLAN 1" = 60'-0"A1.02M 1 PLAN, SITE - OVERALL PHASE 1, 2, 3 & 4 0'30'60'120' PROJECT INFORMATION T1 T2 T3 T4 T5 T6 EXHIBIT 2 DocuSign Envelope ID: 6EA7C613-A4CD-406B-935E-3399EFC72433