Loading...
HomeMy WebLinkAboutT-422804O rr Z O N QC G Q N Q C/ ) T N DocuSign Envelope ID: 9D9BODA8-0385-4664-AE66-57BFF1561D7F CURB LANE LANE LANE CURBLANE 6" MIN. (TYP.) TIRE TRACKS CROSSWALK MARKINGS, r (TYP.) SEE NOTE 1 (TYP.) CONCRETE CURB / 8 GUTTER (TYP.) i LANE LANE LINE LINE WHITE CROSSWALK CENTEIiU CENTERED 8" MARKINGS (TYP.)—, W IN fTYP.) LANE LANE 0 24" 8' (TYP.) (TYP-) z 0 N Fo I WHITE STOP BAR FOR HAWK SIGNAL AND RECTANGULAR RAPID FLASHING BEACONS (RRFB), SEE NOTE 3 PIANO STYLE CROSSWALK PLAN 8 PROFILE VIEWS NOTES- 1 . PIANO STYLE CROSSWALK MARKINGS SHALL BE INSTALLED AT MARKED MID -BLOCK PEDESTRIAN CROSSINGS. SEE STD. PLAN 128 FOR ALL OTHER LOCATIONS. 2. PAVEMENT MARKING MATERIAL SHALL BE PER STD. PLAN 109. 3. 16" WIDE WHITE STOP BARS SHALL BE INSTALLED WHEN A HAWK SIGNAL OR RECTANGULAR RAPID FLASHING BEACONS (RRFB) ARE PRESENT AT A MID -BLOCK CROSSING. OTHERWISE, NO STOP BARS SHALL BE INSTALLED. 4. TO MINIMIZE WEAR, CROSSWALK MARKINGS SHALL BE LOCATED IN THE CENTER OF THE TRAVELLED PORTION OF THE LANE. MID —BLOCK CROSSWALK AND STOP PLAN— 127 �o PUBLIC WORKS . � + BAR PAVEMENT MARKINGS APPROVED: DEPARTMENT 7/27/2022 Martin Pastucha DATE 5:4 DocuSign Envelope ID: 9D9BODA8-0385-4664-AE66-57BFF1561D7F WHITE CROSSWALK MARKINGS (TYR N WHITE STOP BAR, SEE NOTE 3 PARALLEL STYLE CROSSWALK NOTES: 1, PARALLEL STYLE CROSSWALK MARKINGS SHALL BE INSTALLED AT ALL MARKED PEDESTRIAN CROSSINGS, EXCEPT AT MARKED MID•BLOCK PEDESTRIAN CROSSINGS. SEE STD. PLAN 127 FOR MID -BLOCK CROSSWALK. 2, PAVEMENT MARKING MATERIAL SHALL BE PER STD. PLAN 109. 3. STOP BARS SHALL BE INSTALLED WHEN TRAFFIC SIGNALS OR STOP SIGNS (IF REQUIRED BY CITY ENGINEER) ARE PRESENT. STOP BARS SHALL BE LOCATED A MINIMUM OF 4' FROM EDGE OF CROSSWALK MARKINGS OR MORE IF SPECIFIED BY CITY ENGINEER, OTHERWISE, NO STOP BARS SHALL BE INSTALLED, ��Y o INTERSECTION CROSSWALK AND STD, PLAN— 128 PUBLIC WORKS STOP BAR PAVEMENT MARKINGS A PROVED: + + DEPARTMENT Martin 7/27/2022 Martin Pastucha DATE BAND - OR MOUNTING ON EXISTING METAL POLE OR LUMINAIRE 5/16"x2-1/2" GALVANIZED BOLTWITH_ GALVANIZED WASHERS. 2" SQUARE METAL POST o TOP OF AN H _ Cr LOWER SQUAR - 5 TUBE) a. 0 W re FINISHED a UN - cr LINE O ' w i a a 4" MIN. ]z 1 DiMENSIONS'FOR THE PARTS USED TO ASSEMBLE THE BASE CONNECTIONS ARE' INTENTIONALLY NOT SHOWN. BASE CONNECTIONS ARE'PATENTED, MANUFACTURED PRODUCTS THAT ARE IN COMPLIANCE WITH NCHRP 350 CRASH TEST _ CRITERIA. TIDE -BASE 'CONNECTION DETAILS ARE SHOWN ON THIS PLAN ONLY TO ILLUSTRATE HOW THE PARTS ARE ASSEMBLED: 2. A'2" (IN) POSTiNATH A 2 1/4 (IN) PSST ANCHOR OR A 2 1 /4" (IN) POST WITH A � 2 1 /2" (IN) PSST ANCHOR MAY BE SUBSTITUTED: SEE,II,CON.TRACT PLANS. 3. PERFORATED., SQUARE STEEL POST SHALL MEET THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATION 9-06. 4. USE ONLY BASE CONNECTION MANUFACTURER SUPPLIED HARDWARE THAT MEETS THE REQUIREMENTS OF WSDOT STANDARD SPECIFICATIONS 9-06 AND 9-28. EDGE OF TRAVELED ROADWAY 90 30'�•t ' I OR REI LECTORIZED SIGNS: MOUNT '. FACING 3'(degree) OUTWARD IF SIGN IS WITHIN 30 FEET OF ROADWAY SIGN FACE ORIENTATION .. S GN POST - i .. e LOWLY SIGN DOST SUPPORT —5/I6%AIN) CORNER BOLT 0 3 IN FLANGED al SHOULDER BOLT MATH NUT AND WASHERS 2 REQUIRED (TYP.) BOLT STOP CN POST TYPE ST-4 SIGN SUPPORT LOWER _ SIGN POST SUPPORT (IN), 7—GAGE. HOT -'DIP GALV.;,l IN. HEAVY—DUTY ANCHOR IAM COMMERCIAL CONCRETE MOUNTING ON METAL POST SIGN MOUNTING 'I:ON SINGLE PUBLIC WORKS METAL POST 4 7■� DEPARTMENT 0 ADOPTED .C1 lc AN N V 5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com SURVEYED: SCALE: WHP/NV5 VERTICAL: NAVD 1988 DESIGNED: NTS HORIZONTAL: NAD 1983/1991 DRAWN: ONE INCH DATUM CHECKED: AT FULL SCALE IF NOT ONE INCH N 0. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY %�T. O WAS 0� DIGITA N D BY JUA R EZ 2022.09. 8 8-07'00' 41691 1P4 0�EGI STw SSIONAL E� C TY OF RENTON Planning/Building/Public Works Dept. STD. PLAN- 129 APPROVED: G� 1 D T-422805 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING % -F IL Michael Sippo 11/04/2022 w SWA2 AMAZON CITY OF RENTON CITY STANDARD DETAILS LO co It It O O N N , U co co N 0 0 T N a J T Ln N 0 C) N N Z O N Q DATE: 5 9-27-2022 Q FIELDBOOK: PAGE: DRAWING NO: C6.3 C� v' SHEET: OF: 21 36