Loading...
HomeMy WebLinkAboutT-423101M M N N q- qqT O � 0 O � � V_ O N N N w a rn U) Q J / a in / 0 Q 0 LL_ / 00 0 N 0 N / 0 N O N U N O L n w Q z Ld J LL GENERAL NOTES 1. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED PRIOR TO PLACEMENT OF PAVING AND BASE OR CONCRETE. 2. SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE EXCAVATION WILL BE PERMITTED. CALL FOR MARK —OUTS AND A DIG ALERT I.D. NUMBER FROM UNDERGROUND SERVICE ALERT, AT 1-800-424-5555 AT LEAST TWO WORKING DAYS BEFORE EXCAVATION. 3. THE CONTRACTOR SHALL NOTIFY THE RESPECTIVE UTILITY OWNERS AND OTHER AGENCIES AT LEAST TWO WORKING DAYS PRIOR TO START OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING, VERIFYING LOCATIONS BOTH HORIZONTAL AND VERTICAL, AND MAINTAINING ALL EXISTING UNDERGROUND UTILITIES, SHOWN OR NOT SHOWN ON THE PLANS DURING CONSTRUCTION. REPAIR DAMAGED UTILITIES TO THE SATISFACTION OF THE ENGINEER OF WORK. LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS BECAUSE OF LOCATIONS OF EXISTING FACILITIES. 5. IF THERE IS A CONFLICT BETWEEN THIS PLAN AND OTHER PLANS, EVEN IF THE OTHER PLAN IS DATED AFTER THIS PLAN, DO NO WORK UNTIL THE CONFLICT IS RESOLVED AND REVIEWED BY THE ENGINEER OF WORK. 6. ALL CONCRETE FORMS AND REINFORCING ARE TO BE INSPECTED AND ACCEPTED BY THE INSPECTOR OF RECORD BEFORE CONCRETE IS PLACED. 7. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR TRAFFIC AND PEDESTRIAN SAFETY DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS RESPONSIBILITY SHALL APPLY CONTINUOUSLY AROUND THE CLOCK. 8. APPROVAL OF THIS PLAN IS BASED ON THE INFORMATION PROVIDED BY THE ENGINEER OF WORK. WHERE FIELD CONDITIONS VARY, REVISION MAY BE REQUIRED. 9. EXISTING STREETS AND PARKING SHALL BE KEPT FREE OF DIRT AND DEBRIS, AND MAINTAINED IN GOOD CONDITION. DUST CREATED AS A RESULT OF THE WORK SHALL BE REMOVED REGULARLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY STREET OR PROPERTY DAMAGED. 10. ALL EXISTING PAVEMENT SHOWN TO BE REMOVED SHALL BE CUT BACK TO FULL DEPTH OF BASE. 11. WHERE NEW CONSTRUCTION ADJOINS EXISTING PAVEMENT, A SMOOTH TRANSITION SHALL BE PROVIDED IF THERE IS AN EXISTING CRACK IN CONCRETE BEING REMOVED, WITHIN TWO FEET OF THE EDGE OF A TRENCH, THE CONCRETE PAVEMENT SHALL BE REMOVED TO THE CRACK. 12. ALL FILL AREAS SHALL BE COMPACTED TO A MINIMUM OF 90 PERCENT RELATIVE COMPACTION UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING AND UPDATING THE STORM WATER POLLUTION PREVENTION PLAN THAT HAS BEEN PROVIDED BY THE ENGINEER. 14. CONTRACTOR SHALL REPAINT STREET AND PARKING LOT STRIPING IN AREAS OF NEW PAVEMENT. 15. CONTRACTOR SHALL ENSURE NEW STORM DRAIN SYSTEM IS OPERATIONAL & FUNCTIONAL PRIOR TO PAVING. 16. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION TRADE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS,AND CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. 17. SIGNAL SYSTEM SHALL BE INSPECTED BY TRANSPORTATION MAINTENANCE PRIOR TO FINAL ACCEPTANCE. 405 SW 16TH AVE r Ld > cl) to Q z SITE 0 0 Q I LLI > SW 19TH AVE a Q 167 0 Y Q 0 SW ST ST VICINITY MAP NOT TO SCALE CIVIL IMPROVEMENT PLANS FOR: THE INTERSECTION OF LIND AVENUE SW AND SW 19TH STREET I I I I 1� I I IC I I I I C I I I \ I I I I I El4"G(MPE) I _ \ 4"G(STW) 4"G(PE)— — — — — — — — — — — — — — — — — — — — — — — 4•G�PE) — -------J SW 19TH S T �f L----�—; ---- _ _---- -- _ --- _ --- _ _------ SITE MAP BASIS OF BEARING BEARINGS ARE REFERENCED TO THE GRID AS DEFINED BY THE WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE. BENCHMARK SET 3 1/2" BRASS DISK STAMPED "CITY OF RENTON BM" IN THE TOP OF THE EAST END OF THE CONCRETE RAILING ON THE NORTH SIDE OF THE S.W. 16TH STREET BRIDGE OVER THE P-1 CHANNEL. BRIDGE IS LOCATED JUST WEST OF THE INTERSECTION OF S.W. 16TH STREET AND OAKSDALE AVENUE S.W. ELEVATION = 24.157' SOURCE OF TOPOGRAPHY TOPOGRAPHY IS FROM SURVEY DATA COLLECTED BY C. HJORTEN, T. WHITE, AND J. PURKEY FROM NV5 ON 5/23/2022. SITE DESCRIPTION NE 1 /4 OF THE SE 1 /4 OF SEC. 24, T. 23 N., R. 4 E., W.M. & NW 1 /4, SW 1 /4, & SE 1 /4, OF THE SW 1 /4 OF SEC. 19, T. 23., R. 4 E., W.M. NO. I REVISION ------------------------ o+ /i — — — — — — — — r — co — — — — loll — — — — — — -- -- — — — — \ I I I I 1 1 L_J L_J ILIND AVE SW :_ SURVEYED: DESIGNED: AK DRAWN: AK CHECKED: JMK AP P R APPROVED: JMK SCALE: SCALE: 1 " = 30' 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY aci is ANN V5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M LEGEND ►4 0 0 0 0 C•I CITY OF R 1%20F RENTON Planning/Building/Public Works Dept. SHEET INDEX Sheet Number Sheet Title 1 TITLE SHEET 2 TRAFFIC SIGNAL DESIGN 3 TRAFFIC SIGNAL NOTES & SCHEDULES 4-6 FIBER ROUTING PLAN 7-8 ADA CURB RAMP DETAILS 9 EROSION CONTROL PLAN 10 EROSION CONTROL NOTES & DETAILS 11-12 EROSION CONTROL DETAILS 13-21 STANDARD DETAILS SIGNAL POLE WITH MAST ARM AND LUMINAIRE TYPE PPB POLE WITH PUSH BUTTON VEHICLE SIGNAL HEAD TRAFFIC SIGNAL MOUNTED SIGN PEDESTRIAN SIGNAL HEAD TRAFFIC SIGNAL CONTROLLER CABINET ELECTRICAL SERVICE CABINET PULL BOX TYPE 2 PULL BOX TYPE 8 VEHICLE VIDEO DETECTION ZONE VEHICLE DETECTION CAMERA PTZ CAMERA EMERGENCY PREEMPTION DETECTOR CONDUIT SIGNAL POLE NOTE CONSTRUCTION NOTE WIRE NOTE SIGN NOTE LUMINAIRE SCHEDULE NOTE (SEE SHEET 2 F)R I I IMINAIRE SCHEDULE) REGIONAL FIRE AUTHORITY 4le-NTcti APPROVED d4 cthomas 11/07/2022 "'Fys-423101 R-4231 0 1 000' IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING + WASTEWATER UTILITY Michael Sippo 11 /04/2022 ' JStowell 11 /07/2022 :01 ..j FSURFACE WATER UTILITY WATER UTILITY ah 11 /04/2022 ABDOUL GAFOUR 11/4/22 DATE: 10-24-202 FIELDBOOK: TRAFFIC SIGNAL DESIGN PAGE: LIND AVE SW AND SW 19TH STREET DRAWING NO: SHEET: 1 OF: 21 z O N CQ G Q N Q U) N Q J ti M LO O N N [i]