Loading...
HomeMy WebLinkAboutzR-4231setM M N N q- qqT O � 0 O � � V_ O N N N w a rn U) Q J / a in / 0 Q 0 LL_ / 00 0 N 0 N / 0 N O N U N O L n w Q z Ld J LL GENERAL NOTES 1. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED PRIOR TO PLACEMENT OF PAVING AND BASE OR CONCRETE. 2. SECTION 4216/4217 OF THE GOVERNMENT CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE EXCAVATION WILL BE PERMITTED. CALL FOR MARK —OUTS AND A DIG ALERT I.D. NUMBER FROM UNDERGROUND SERVICE ALERT, AT 1-800-424-5555 AT LEAST TWO WORKING DAYS BEFORE EXCAVATION. 3. THE CONTRACTOR SHALL NOTIFY THE RESPECTIVE UTILITY OWNERS AND OTHER AGENCIES AT LEAST TWO WORKING DAYS PRIOR TO START OF CONSTRUCTION. 4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR EXPOSING, VERIFYING LOCATIONS BOTH HORIZONTAL AND VERTICAL, AND MAINTAINING ALL EXISTING UNDERGROUND UTILITIES, SHOWN OR NOT SHOWN ON THE PLANS DURING CONSTRUCTION. REPAIR DAMAGED UTILITIES TO THE SATISFACTION OF THE ENGINEER OF WORK. LOCATE EXISTING UNDERGROUND FACILITIES SUFFICIENTLY AHEAD OF CONSTRUCTION TO PERMIT REVISIONS TO PLANS BECAUSE OF LOCATIONS OF EXISTING FACILITIES. 5. IF THERE IS A CONFLICT BETWEEN THIS PLAN AND OTHER PLANS, EVEN IF THE OTHER PLAN IS DATED AFTER THIS PLAN, DO NO WORK UNTIL THE CONFLICT IS RESOLVED AND REVIEWED BY THE ENGINEER OF WORK. 6. ALL CONCRETE FORMS AND REINFORCING ARE TO BE INSPECTED AND ACCEPTED BY THE INSPECTOR OF RECORD BEFORE CONCRETE IS PLACED. 7. THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR TRAFFIC AND PEDESTRIAN SAFETY DURING THE COURSE OF CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS RESPONSIBILITY SHALL APPLY CONTINUOUSLY AROUND THE CLOCK. 8. APPROVAL OF THIS PLAN IS BASED ON THE INFORMATION PROVIDED BY THE ENGINEER OF WORK. WHERE FIELD CONDITIONS VARY, REVISION MAY BE REQUIRED. 9. EXISTING STREETS AND PARKING SHALL BE KEPT FREE OF DIRT AND DEBRIS, AND MAINTAINED IN GOOD CONDITION. DUST CREATED AS A RESULT OF THE WORK SHALL BE REMOVED REGULARLY. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR OF ANY STREET OR PROPERTY DAMAGED. 10. ALL EXISTING PAVEMENT SHOWN TO BE REMOVED SHALL BE CUT BACK TO FULL DEPTH OF BASE. 11. WHERE NEW CONSTRUCTION ADJOINS EXISTING PAVEMENT, A SMOOTH TRANSITION SHALL BE PROVIDED IF THERE IS AN EXISTING CRACK IN CONCRETE BEING REMOVED, WITHIN TWO FEET OF THE EDGE OF A TRENCH, THE CONCRETE PAVEMENT SHALL BE REMOVED TO THE CRACK. 12. ALL FILL AREAS SHALL BE COMPACTED TO A MINIMUM OF 90 PERCENT RELATIVE COMPACTION UNLESS OTHERWISE NOTED. 13. THE CONTRACTOR IS RESPONSIBLE FOR FOLLOWING AND UPDATING THE STORM WATER POLLUTION PREVENTION PLAN THAT HAS BEEN PROVIDED BY THE ENGINEER. 14. CONTRACTOR SHALL REPAINT STREET AND PARKING LOT STRIPING IN AREAS OF NEW PAVEMENT. 15. CONTRACTOR SHALL ENSURE NEW STORM DRAIN SYSTEM IS OPERATIONAL & FUNCTIONAL PRIOR TO PAVING. 16. CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, CONSTRUCTION TRADE CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS,AND CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. 17. SIGNAL SYSTEM SHALL BE INSPECTED BY TRANSPORTATION MAINTENANCE PRIOR TO FINAL ACCEPTANCE. 405 SW 16TH AVE r Ld > cl) to Q z SITE 0 0 Q I LLI > SW 19TH AVE a Q 167 0 Y Q 0 SW ST ST VICINITY MAP NOT TO SCALE CIVIL IMPROVEMENT PLANS FOR: THE INTERSECTION OF LIND AVENUE SW AND SW 19TH STREET I I I I 1� I I IC I I I I C I I I \ I I I I I El4"G(MPE) I _ \ 4"G(STW) 4"G(PE)— — — — — — — — — — — — — — — — — — — — — — — 4•G�PE) — -------J SW 19TH S T �f L----�—; ---- _ _---- -- _ --- _ --- _ _------ SITE MAP BASIS OF BEARING BEARINGS ARE REFERENCED TO THE GRID AS DEFINED BY THE WASHINGTON STATE PLANE COORDINATE SYSTEM, NORTH ZONE. BENCHMARK SET 3 1/2" BRASS DISK STAMPED "CITY OF RENTON BM" IN THE TOP OF THE EAST END OF THE CONCRETE RAILING ON THE NORTH SIDE OF THE S.W. 16TH STREET BRIDGE OVER THE P-1 CHANNEL. BRIDGE IS LOCATED JUST WEST OF THE INTERSECTION OF S.W. 16TH STREET AND OAKSDALE AVENUE S.W. ELEVATION = 24.157' SOURCE OF TOPOGRAPHY TOPOGRAPHY IS FROM SURVEY DATA COLLECTED BY C. HJORTEN, T. WHITE, AND J. PURKEY FROM NV5 ON 5/23/2022. SITE DESCRIPTION NE 1 /4 OF THE SE 1 /4 OF SEC. 24, T. 23 N., R. 4 E., W.M. & NW 1 /4, SW 1 /4, & SE 1 /4, OF THE SW 1 /4 OF SEC. 19, T. 23., R. 4 E., W.M. NO. I REVISION ------------------------ o+ /i — — — — — — — — r — co — — — — loll — — — — — — -- -- — — — — \ I I I I 1 1 L_J L_J ILIND AVE SW :_ SURVEYED: DESIGNED: AK DRAWN: AK CHECKED: JMK AP P R APPROVED: JMK SCALE: SCALE: 1 " = 30' 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY aci is ANN V5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M LEGEND ►4 0 0 0 0 C•I CITY OF R 1%20F RENTON Planning/Building/Public Works Dept. SHEET INDEX Sheet Number Sheet Title 1 TITLE SHEET 2 TRAFFIC SIGNAL DESIGN 3 TRAFFIC SIGNAL NOTES & SCHEDULES 4-6 FIBER ROUTING PLAN 7-8 ADA CURB RAMP DETAILS 9 EROSION CONTROL PLAN 10 EROSION CONTROL NOTES & DETAILS 11-12 EROSION CONTROL DETAILS 13-21 STANDARD DETAILS SIGNAL POLE WITH MAST ARM AND LUMINAIRE TYPE PPB POLE WITH PUSH BUTTON VEHICLE SIGNAL HEAD TRAFFIC SIGNAL MOUNTED SIGN PEDESTRIAN SIGNAL HEAD TRAFFIC SIGNAL CONTROLLER CABINET ELECTRICAL SERVICE CABINET PULL BOX TYPE 2 PULL BOX TYPE 8 VEHICLE VIDEO DETECTION ZONE VEHICLE DETECTION CAMERA PTZ CAMERA EMERGENCY PREEMPTION DETECTOR CONDUIT SIGNAL POLE NOTE CONSTRUCTION NOTE WIRE NOTE SIGN NOTE LUMINAIRE SCHEDULE NOTE (SEE SHEET 2 F)R I I IMINAIRE SCHEDULE) REGIONAL FIRE AUTHORITY 4le-NTcti APPROVED d4 cthomas 11/07/2022 "'Fys-423101 R-4231 0 1 000' IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING + WASTEWATER UTILITY Michael Sippo 11 /04/2022 ' JStowell 11 /07/2022 :01 ..j FSURFACE WATER UTILITY WATER UTILITY ah 11 /04/2022 ABDOUL GAFOUR 11/4/22 DATE: 10-24-202 FIELDBOOK: TRAFFIC SIGNAL DESIGN PAGE: LIND AVE SW AND SW 19TH STREET DRAWING NO: SHEET: 1 OF: 21 z O N CQ G Q N Q U) N Q J ti M LO O N N [i] T t'MJ N Iql- I O rr coLO Nt O O N N A, u co co N O O O T N a D J 'T^ N O O O N N rr n Z O N a 75 a N a U) T t'MJ N Iql- I O rr coLO Nt O O N N A, u co co N O O O T N a D J 'T^ N O O O N N rr n Z O N a 75 a N a U) N O ry II-__ O N C� G Q N Q Cn 8 3 N N 0 N 0 0 M 0 L Ld 4-1 U) rn U) U) a� Q J 0 0 L Ld / 0 Q U Li ry / 00 0 N O N / O N O N U N O L 0_ Q z Ld J l- LEGEN D SILT FENCE SF -SF - EXISTING CONTOUR - - _10- INLET PROTECTION �■ NOTES: 01 CONSTRUCT SILT FENCE. SEE CITY OF RENTON STANDARD PLAN 214.00. O2 INSTALL INLET PROTECTION. SEE CITY OF RENTON STANDARD PLAN 216.40. SWPP PLAN NOTES: CONSTRUCTION SEQUENCE: 1. INSTALL INLET PROTECTION FOR EXISTING STORM DRAIN CATCH BASINS/INLETS AND IMPLEMENT OTHER APPLICABLE BMP's. 2. HOLD BMP INSPECTION AND STORM WATER PRE -CONSTRUCTION MEETING. 3. COMPLETE SELECTIVE DEMOLITION - KEEP EXISTING STORM COMPONENTS IN PLACE UNTIL NEW SYSTEMS ARE IN PLACE. 4. INSTALL SIGNAL POLES & PERFORM UTILITY RELOCATION WORK. 5. PREPARE AND FINE GRADE SIDEWALK AREAS. 6. INSTALL SIDEWALKS, ADA RAMPS, AND CONCRETE REPLACEMENT AREAS. 7. CLEAN PROJECT AREAS & STABILIZE SITE. 8. REMOVE T.E.S.C. BMP's. 1. NO HAZARDOUS LIQUID PRODUCTS, INCLUDING BUT NOT LIMITED TO PETROLEUM PRODUCTS, FUEL, SOLVENTS, DETERGENTS, PAINT, PESTICIDES, CONCRETE ADMIXTURES AND FORM OILS SHALL BE STORED ON -SITE WITHOUT PRIOR APPROVAL. IF REQUESTED, THE CONTRACTOR SHALL PROVIDE FOR SPILL CONTAINMENT IN ACCORDANCE WITH KING COUNTY AND CITY OF RENTON REQUIREMENTS. CONTRACTOR SHALL PROVIDE A LIST OF THESE TYPES AND SIZES OF LIQUIDS THAT WILL BE STORED/HANDLED ON SITE. CONTRACTOR WILL ALSO SHOW THE PROPOSED LOCATION FOR STORAGE ON A PROJECT SITE PLAN AND WILL PROVIDE A PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND KING COUNTY SHALL REVIEW AND APPROVE THE PLAN PRIOR TO STORAGE. PRESERVE & 2. CONSTRUCTION WASTE SHALL BE PROMPTLY REMOVED FROM THE SITE AND SHALL NOT BE STOCKPILED. PROTECT TREE 3. NO STATIONARY FUEL TANKS SHALL BE ALLOWED. 4. FUELING OF CONSTRUCTION EQUIPMENT SHALL BE A MOBILE FUEL TRUCK AND SHALL BE ALLOWED ONLY IN PAVED AREAS. I I I CONTRACTOR SHALL PROVIDE A PLAN FOR FUELING AREA SPILL CONTAINMENT TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON WITH A PROPOSED METHOD OF SECONDARY CONTAINMENT. THE OWNER'S REPRESENTATIVE AND CITY OF RENTON, SHALL 70 - REVIEW AND APPROVE THE PLAN PRIOR TO FUELING. ALL SPILLS, CONTAINMENT, AND CLEAN UP SHALL BE THE CONTRACTOR'S RESPONSIBILITY AND AT THEIR OWN EXPENSE. 5. FUELING OF CONSTRUCTION EQUIPMENT SHALL ONLY BE ALLOWED DURING DAYLIGHT HOURS. 6. THE CONTRACTOR SHALL REMOVE FROM THE SITE ALL EQUIPMENT THAT REQUIRES SIGNIFICANT REPAIR. MINOR REPAIRS OR o MAINTENANCE MAY BE ALLOWED ON SITE IN AN APPROVED AREA. THE CONTRACTOR SHALL SUBMIT A PLAN FOR THE PROPOSED x SW 19TH ST LOCATION OF VEHICLE MAINTENANCE AND REPAIR AND SHALL INDICATE THE PROPOSED METHOD OF CONTAINMENT FOR POSSIBLE LEAKING VEHICLE FLUIDS. THE CONTRACTOR SHALL ALSO PROVIDE A PLAN TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON - J" FOR THE COLLECTION, STORAGE, AND DISPOSAL OF VEHICLE FLUIDS. THE OWNER'S REPRESENTATIVE AND CITY OF RENTON SHALL o REVIEW AND APPROVE PLAN PRIOR TO ANY ON -SITE MAINTENANCE. 3Dx" SDx SDx SDx SDx= 7. TRUCK WASHOUT SHALL NOT BE ALLOWED ON SITE. THE CONTRACTOR SHALL PROVIDE TRUCK WASHOUT OFF -SITE AT AN APPROVED AND LEGAL LOCATION. 8. CONTRACTOR SHALL PROVIDE TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON THE LOCATION OF SPILL RESPONSE MATERIALS. CONTRACTOR WILL ALSO IDENTIFY DISPOSAL METHODS FOR CONTAMINATED WATER AND SOIL AFTER A SPILL. -------------------- 9. THE CONTRACTOR SHALL PROVIDE A REPORT TO THE OWNER'S REPRESENTATIVE AND CITY OF RENTON IDENTIFYING THE PERSONNEL RESPONSIBLE FOR POLLUTION PREVENTION, INCLUDING CONTACT INFORMATION, AND CLEARLY LISTING THE RESPONSIBILITIES OF THESE PERSONNEL. �J 10. THE CONTRACTOR SHALL PROVIDE A DESCRIPTION OF THE PROCEDURES TO BE USED IN MONITORING THE POLLUTION PREVENTION L7A BMP's AND RESPONDING TO A BMP THAT NEEDS ATTENTION, INCLUDING RECORD KEEPING. WET SEASON SPECIAL PROVISIONS (OCTOBER 1 to APRIL 30): 1. THE ALLOWED TIME THAT A DISTURBED AREA MAY REMAIN UNWORKED WITHOUT COVER MEASURES IS REDUCED TO TWO CONSECUTIVE WORKING DAYS, RATHER THAN SEVEN. 2. STOCKPILES AND STEEP CUT AND FILL SLOPES ARE TO BE PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS. 3. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED AREAS SHALL BE STOCKPILED ON SITE. 4. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. 5. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS. 6. FIFTY LINEAR FEET OF SILT FENCE (AND NECESSARY STAKES) PER ACRE OF DISTURBANCE MUST BE STOCKPILED ON SITE. 7. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS UNDERLAIN BY COARSE -GRAINED SOIL. 8. SEDIMENT RETENTION IS REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 9. SURFACE WATER CONTROLS ARE REQUIRED UNLESS NO OFFSITE DISCHARGE IS ANTICIPATED FOR THE SPECIFIED DESIGN FLOW. 10. PHASING AND MORE CONSERVATIVE BMP's MUST BE EVALUATED FOR CONSTRUCTION ACTIVITY NEAR SURFACE WATERS. 11. ANY RUNOFF GENERATED BY DEWATERING MAY BE REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE SAND FILTER SYSTEMS, OR HOLDING TANKS. C. G 0 I + i SDx \y \ � s \ v- LL � I I I � co CONSTRUCTION NOISE NOTES: PRESERVE & I I I I i I I I I I GENERAL NOTES: I I 1. ALL DISTURBED AREAS, BOTH ONSIDE AND IN THE RIGHT-OF-WAY SHALL BE TEMPORARILY AND/OR PERMANENTLY SEEDED PER LANDSCAPE PLANS AND SPECIFICATIONS. SEED MIX SHALL BE USED ON DISTRIBUTED AREAS THAT HAVE REACHED FINAL GRADE OR THAT WILL REMAIN UNWORKED FOR MOR THAN 30 DAYS. CONDITION OF USE AND INSTALLATION SHALL BE PER THE 2017 CITY OF RENTON SURFACE WATER DESIGN MANUAL SECTION C.3.10. I 2.AT PROPOSED CONNECTION POINTS TO EXISTING UTILITIES, CONTRACTOR TO POTHOLE TO CONFIRM LOCATION AND ELEVATION OF UTILITIES PRIOR TO CONSTRUCTION. I I I 3.UTILIZE SITE FENCING AS NECESSARY TO SECURE SITE. 4.PROVIDE INLET PROTECTION 300 FEET DOWNSTREAM OF SITE AND ALONG HAUL ROUTE. I 5.THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION AND EROSION CONTROL ON THE PROPOSED SITE PER THE CONSTRUCTION I I STORMWATER POLLUTION PREVENTION PLAN (SWPPP). I I I 0 0 1 I I � I� 1 \ s \ ys -n \-------- - I - SDx SDx of 0 CO PROTECT TREE 1. FOR THIS PROJECT, CONSTRUCTION -RELATED NOISE IS ALLOWED. 7 AM TO 8 PM MON-FRI 9 AM TO 8 PM SAT, WORK ON THIS DAY IS BY CITY PERMISSION ONLY NO WORK SHALL BE PERMITTED ON SUNDAY I I v J I I I w NO DELIVERIES SHALL BE SCHEDULED PRIOR TO 7:00 AM OR AFTER 6.00 PM. I I I 2. CONSTRUCTION -RELATED NOISE IS NOT ALLOWED OUTSIDE OF ALLOWABLE HOURS, o LEGAL HOLIDAYS, OR SUNDAYS. i i 10 I I z MOBILIZATION/STOCKPILE AREA NOTES: I I I J 1. ANY EXCAVATED MATERIALS REMOVED FROM THE CONSTRUCTION SITE AND I I DEPOSITED ON PROPERTY WITHIN THE CITY LIMITS MUST BE DONE IN COMPLIANCE WITH A VALID CLEARING & GRADING PERMIT. LOCATIONS FOR THE MOBILIZATION AREA AND STOCKPILED MATERIAL MUST BE APPROVED BY THE CITY INSPECTOR AT LEAST 24 HOURS IN ADVANCE OF ANY DUMPING. 2. HAULING HOURS WITHIN THE RIGHT-OF-WAY ARE RESTRICTED TO MON-FRI 8:30 I I I AM-3:30 PM. 3. CONTRACTOR TO COORDINATE CONSTRUCTION STAGING AREA WITH PROPERTY OWNER. SURVEYED: SCALE: "= 1 20' DESIGNED: AK DRAWN: AK ONE INCH CHECKED: JMK AT FULL SCALE IF NOT ONE INCH NO. REVISION BY DATE AP P R SCALE ACCORDINGLY APPROVED: JMK SDx aci is ANN V5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M ow (TYPICAL) FIN ---------- - - - - - - - - - 1L(TYPICAL) PROTECT TREE n • CITY OF R RENTON • Planning/Building/Public Works Dept. 01 20'1 .1 STREET SWEEPING NOTES: z O N CQ G Q N Q U) N Q J ti co CD LO N N W-1 1. CONTRACTOR SHALL IMMEDIATELY SWEEP THE PAVED CITY RIGHT-OF-WAY WHEN DIRT OR OTHER CONSTRUCTION RELATED DEBRIS IS DEPOSITED. DUST SUPPRESSION: 1. DUST FROM CLEARING, GRADING, AND OTHER CONSTRUCTION ACTIVITIES SHALL BE MINIMIZED AT ALL TIMES. N 2. IMPERVIOUS SURFACES ON OR NEAR THE CONSTRUCTION AREA SHALL BE SWEPT, N VACUUMED, OR OTHERWISE MAINTAINED TO SUPPRESS DUST ENTRAINMENT. p 3. ANY DUST SUPPRESSANTS USED SHALL BE APPROVED BY THE CITY OF RENTON. N PETROCHEMICAL DUST SUPPRESSANTS ARE PROHIBITED. WATERING THE SITE TO SUPRESS DUST IS ALSO PROHIBITED UNLESS IT CAN BE DONE IN A WAY THAT KEEPS SEDIMENT OUT OF THE PUBLIC DRAINAGE SYSTEM. O .co O T-423109 R-423104 w IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING LMclael Sippo 11/04/2022 U) Q DATE: SWA2 AMAZON 10-24-2022 CITY OF RENTON FIELDBOOK: \� PAGE: / DRAWING NO: Q EROSION CONTROL PLAN _0 LIND AVE SW AND SW 19TH STREET SHEET: OF: 21 J Ir- c' EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) N_ 17 PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL 10 NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1. 2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. z 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE 0 FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION C AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE Q FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL N BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF Q CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE Cn DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF O EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 N HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE o CITY. N 0 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION o AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. O L w 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS Cn AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. °2 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE 3: NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY co FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO © THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. � 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID a) Q SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY j WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR o F, SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. w 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER / 0 FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, Q AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 00 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN o ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE o WITH THE INTERNATIONAL BUILDING CODE. PUBLIC WORKS DEPARTMENT N / O N O N U N O L n Q 71 NO. li DocuSign Envelope ID: 6 EEC F5B6-602A-4E4A-B436-A317AA638878 2.2 8"-10" DIA. DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 JOINTS IN FILTER FABRIC SHALL BE SPLICED AT POSTS. USE STAPLES, WIRE RINGS, OR EQUIVALENT TO ATTACH FABRIC TO POSTS ROLL SPACING DEPENDS ON SOIL TYPE AND SLOPE SEDIMENT, ORGANIC MATTER, mr STEEPNESS AND NATIVE SEEDS ARE CAPTURED BEHIND THE ROLLS 2"x2" 14 GAUGE WIRE, OR EQUIVALENT, IF STANDARD STRENGTH FABRIC USED STRAW ROLLS MUST BE WOODEN STAKE 2' MIN. PLACED ALONG SLOPE FILTER FABRIC CONTOURS IN A IACENT ROLLS SHALL HTLY ABUT LIVE STAKE NOTES: 1. CONDITIONS OF USE 1.1. INSTALL ON DISTURBED AREAS THAT REQUIRE IMMEDIATE EROSION PROTECTION. 1.2. USE ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED. 1.3. CAN BE USED ALONG THE PERIMETER OF A PROJECT, AS A CHECK DAM IN UNLINED DITCHES AND AROUND TEMPORARY STOCKPILES. 1.4. WATTLES CAN BE STAKED TO THE GROUND USING WILLOW CUTTINGS FOR ADDED REVEGETATION. 1.5. RILLING CAN OCCUR BENEATH AND BETWEEN WATTLES IF NOT PROPERLY ENTRENCHED, ALLOWING WATER TO PASS BELOW AND BETWEEN WATTLES. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. IT IS CRITICAL THAT WATTLES ARE INSTALLED PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOUR. 2.2. NARROW TRENCHES SHOULD BE DUG ACROSS THE SLOPE, ON CONTOUR, TO A DEPTH OF 3 TO 5 INCHES ON CLAY SOILS AND SOILS WITH GRADUAL SLOPES. ON LOOSE SOILS, STEEP SLOPES, AND DURING HIGH RAINFALL EVENTS, THE TRENCHES SHOULD BE DUG TO A DEPTH OF 5 TO 7 INCHES, OR 1/2 TO 2/3 OF THE THICKNESS OF THE WATTLE. 2.3. START CONSTRUCTION OF TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UPHILL. EXCAVATED MATERIAL SHOULD BE SPREAD EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHOD. CONSTRUCT TRENCHES AT CONTOUR INTERVALS OF 3 TO 30 FEET APART DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE, AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE TRENCHES SHOULD BE CONSTRUCTED. VERTICAL DISTANCE BETWEEN WATTLES IS NOT TO EXCEED 10 FEET. 2.4. INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY END TO END. DO NOT OVERLAP THE ENDS. 2.5. INSTALL STAKES AT EACH END OF THE WATTLE, AND AT 4 FOOT CENTERS ALONG THE ENTIRE LENGTH OF THE WATTLE. 2.6. IF REQUIRED, INSTALL PILOT HOLES FOR THE STAKES USING A STRAIGHT BAR TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE SOIL. 2.7. AT A MINIMUM, WOODEN STAKES SHOULD BE APPROXIMATELY 3/4 X 3/4 X 24 INCHES. WILLOW CUTTINGS OR 3/8-INCH REBAR CAN ALSO BE USED FOR STAKES. 2.8. STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE. 3. MAINTENANCE STANDARDS 3.1. INSPECT WATTLES PRIOR TO FORECASTED RAIN, DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE WET SEASON, AND AT TWO WEEK INTERVALS AT ALL OTHER TIMES OF THE YEAR. 3.2. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING WATTLES 3.3. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING 1/2 THE HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 213.40 P"AR) PUBLIC WORKS APPR ED: DEPARTMENT STRAW WATTLES GAZ 9/28/2018 Public Works Administrator DATE SANDBAG OR EQUIVALENT LL IMPERMEABLE Oc SHEETING 3 FT TYP. 10' (MIN) SANDBAG n= = = rl� IMPERMEABLE SHEETING 1:1 OR FLATTER U O O O U SIDE SLOPE SECTION A -A PLAN ac �CONCRFTF SHOL N.T.S. SURVEYED: DESIGNED: AK DRAWN: AK CHECKED: JMK REVISION BY DATE APPR APPROVED: JMK SCALE: 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY : 4 5 --i�------------i�- U MAX. 12"MIN. POST SPACING MAYBE INCREASED I TO 8' IF WIRE BACKING IS USED I I 4 x4" MIN. TRENCH ul BACKFILL TRENCH WITH NATIVE SOIL OR 3/4" TO 1-1/2" WASHED GRAVEL 2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.) NOTES: 1. CONDITIONS OF USE 1.1. SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS. 1.2. SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE. AOS (ASTM D4751) 30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM 50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS WATER PERMITTIVITY (ASTM D4491) 0.02 SEC"' MINIMUM GRAB TENSILE STRENGTH (ASTM D4632) 180 LBS. MIN. FOR EXTRA STRENGTH FABRIC 100 LBS. MIN. FOR STANDARD STRENGTH FABRIC GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) ULTRAVIOLET RESISTANCE (ASTM D4355) 70% MIN. 2.2. STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE. 2.3. WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2HAV 2.4. IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE. 2.5. FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE. 3. MAINTENANCE STANDARDS 3.1. ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY. 3.2. IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND. 3.3. IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT. 3.4. SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH. 3.5. IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 214.00 PRI GAPUBLIC WORKS PRO DEPARTMENT SILT FENCE Z9/2s/201s Public Works Administrator DATE aci is ANN V5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M N A004tkCITY OF R RENTON • Planning/Building/Public Works Dept : 4 5 T-4231 10 R-423105 IN COMPLIANCE WITH CITY OF RENTON STANDARDS DEVELOPMENT ENGINEERING Aoftk% IL � Michael Sippo 11 /04/2022 w SWA2 AMAZON CITY OF RENTON EROSION CONTROL NOTES & DETAILS LIND AVE SW AND SW 19TH STREET DATE: 10-24-202 FIELDBOOK: PAGE: SHEET: 1 O OF: z O N CQ G Q N Q U) N Q J ti co LO O O N N �] M N O ry H Z O N 75 N v ) 0) 3 N N O N O C O W O L LLI 4-1 O) U) Q J / C O U) O L Ld / r) Q U L� ry / Do n 0 N O N / O N O N U N 0 L n w Q z Ld J li DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 TOP OF FABRIC BELT TOP 8" DIAGONAL ATTACHMENT DOUBLES STRENGTH ATTACHMENT DETAILS: 1. GATHER FABRIC AT POSTS, IF NEEDED. 2. UTILIZE THREE TIES PER POST, ALL WITHIN TOP 8" OF FABRIC. 3. POSITION EACH TIE DIAGONALLY, PUNCTURING HOLES VERTICALLY MINIMUM OF 1" APART. 4. HANG EACH TIE ON A POST NIPPLE AND TIGHTEN SECURELY. USE CABLE TIES (50 LBS) OR SOFT WIRE. ­=:3OPERATION 'E GROUND SLICING HORIZONTAL CHISEL POINT ( NOTES: 1. POST SPACING: 7' MAX. ON OPEN RUNS 4' MAX. ON POOLING AREAS. 2. POST DEPTH: AS MUCH BELOW GROUND AS FABRIC ABOVE GROUND. 3. PONDING HEIGHT 24" MAX. ATTACH FABRIC TO UPSTREAM SIDE OF POST. 4. DRIVE OVER EACH SIDE OF SILT FENCE 2 TO 4 TIMES WITH DEVICE EXERTING 60 P.S.I. OR GREATER. 5. NO MORE THAN 24" OF A 36" FABRIC ROLL IS ALLOWED ABOVE GROUND. 6. VIBRATORY PLOW IS NOT ACCEPTABLE BECAUSE OF HORIZONTAL COMPACTION. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 214.10 PUBLIC WORKS ED: PAR) DEPARTMENT SILT FENCE INSTALLATION BY SLICING GAZ 9/28/2018 1 Public Works Administrator DATE :45 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 INSTALL DRIVEWAY CULVERT IF THERE IS A ROADSIDE DITCH PRESENT, AS PER CITY ROAD STANDARDS u ATCC. EX�s�\NGROPO 4"-8" QUARRY SPALLS 12" MIN. THICKNESS CONSTRUCTION ENTRANCE NOTES: 1. DRIVEWAYS SHALL BE PAVED TO THE EDGE OF THE RIGHT-OF-WAY PRIOR TO INSTALLATION OF THE CONSTRUCTION ENTRANCE TO AVOID DAMAGING OF THE ROADWAY. 2. IT IS RECOMMENDED THAT THE ENTRANCE BE CROWNED SO THAT RUNOFF DRAINS OFF THE PAD 15' MIN. PROVIDE FULL WIDTH OF INGRESS/EGRESS AREA 1. CONDITION OF USE 1.1. CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER PAVED AREAS WITHIN 1,000 FEET OF THE SITE. 1.2. FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION. 2. DESIGN AND INSTALLATION SPECIFICATIONS 2.1. A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE SHALL MEET THE FOLLOWING STANDARDS: GRAB TENSILE STRENGTH (ASTM D4632) 200 LBS. MIN. GRAB TENSILE ELONGATION (ASTM D4632) 30% MAX. (WOVEN) CBR PUNCTURE STRENGTH (ASTM D6241) 495 LBS. MIN. AOS (ASTM D4751) 20-45 (U.S. STANDARD SIEVE SIZE) 2.2. DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED. 2.3. HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS. HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT. 2.4. FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE. 2.5. WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE. 3. MAINTENANCE STANDARDS 3.1. QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS. 3.2. IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND. 3.3. ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS. 3.4. ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY. 3.5. IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL TRAFFIC. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 215.10 PRI PUBLIC WORKS APPROVED: DEPARTMENT STABILIZED CONSTRUCTION ENTRANCE GAZ 9/28/2018 Public Works Administrator DATE REVISION SURVEYED: DESIGNED: AK DRAWN: AK CHECKED: JMK BY DATE APPR APPROVED: JMK SCALE: 1 "=20' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY :45 DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878 5" MAX. DRAINAGE GRATE TRIM GRATE FRAME _ C— OVERFLOW BYPASS d' • d BELOW INLET GRATE DEVICE SEDIMENT AND DEBRIS{ =,•A .: d FILTERED WATER d d • d. SECTION VIEW DRAINAGE GRATE (RECTANGULAR GRATE SHOWN) RETRIEVAL SYSTEM (TYP.) OVERFLOW BYPASS (TYP.) BELOW INLET GRATE DEVICE ISOMETRIC VIEW NOTES: 1. PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. 2. INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM. 3. THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE. 4. SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE. 5. THE BIGD SHALL HAVE A BUILT-IN HIGH -FLOW RELIEF SYSTEM (OVERFLOW BYPASS). 6. THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL. 7. PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15). 8. ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 216.30 .® PUBLIC WORKS APPR ED: DEPARTMENT CATCH BASIN INSERT GAZ 9/28/2018 Public Works Administrator DATE aci is AN N�V�5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M :45 T-423111 R-423106 ® IN COMPLIANCE WITH CITY OF RENTON STANDARDS 0g w `$ . DEVELOPMENT ENGINEERING Michael Sippo 11/04/2022 ' dr A004tkCITY OF R RENTON 1%20F Planning/Building/Public Works Dept. SWA2 AMAZON CITY OF RENTON EROSION CONTROL DETAILS LIND AVE SW AND SW 19TH STREET DATE: 10-24-202 FIELDBOOK: PAGE: SHEET: 1 1 OF: 21 z O N Q 75 Q N Q C) co LO O O N T CM N T I O rr coLO Nt O O N N A, u co co N O O O T N a D J 'T^ N O O O N N rr n Z O N a 75 a N a U) FACE OF CURB 6112-_- 5 1/2" 1" 1/2" R. 1" R. 1 24 1 I TOP OF in 1-/2" R. ROADWAY t r y 1 - 6" CEMENT CONCRETE TRAFFIC CURB AND GUTTER FACE OF ADJACENT CURB 6 12 FLUSH WITH GUTTER PAN AT SIDEWALK RAMP ENTRANCE 1:12 1:24 TOP OF 12'R. ROADWAY t DEPRESSED CURB SECTION AT SIDEWALK RAMPS P. • ►.� .i tic' 7o PREMOLDED JOINT FILLER E FULL -DEPTH EXPANSION JOINT 6" _ CEMENT CONCRETE 112" R. 1" R SIDEWALK RAMP OR LANDING VARIES ' FROM r 6"TOO I 6" 1 3/8" PREMOLDED JOINT FILLER CEMENT CONCRETE PEDESTRIAN CURB AT SIDEWALK RAMPS AND LANDINGS FACE OF ADJACENT CURB 6 1/2" SEE DEPRESSED CURB DETAIL THIS SHEET 1:24 TOP OF r 1 1• 112" R. ROADWAY 2 t I fn 1 V-6" DEPRESSED CURB SECTION AT RESIDENTIAL DRIVEWAYS ONLY. FOR COMMERCIAL DRIVEWAYS SEE STD PLAN 104.2 FACE OF ADJACENT CURB GUTTER SURFACE FACE OF CURB 6 1/2" -' s 1f2" 1 1/2" R. ` - 1" R. I TOP OF ZD ROADWAY r f _ 81 /4" CEMENT CONCRETE TRAFFIC CURB DEPRESSED CURB DETAIL AT RESIDENTIAL OR COMMERCIAL DRIVEWAYS, AND ALLEYS GENERAL NOTES: 1. See standard plans 102 and 101.1 for curb expansion and contraction joint spacing. 2. Expansion joint shall be full depth, 3/6" (In.) premolded joint filler. 3. For Depressed Monolithic Driveway Curb & Gutter Section, see Standard Plan 104.2 STD. PLAN - 101 • PUBLIC WORKS CEMENT CONCRETE CURBS I'F'I i DEPARTMENT LANDING GRADE BREAK - SEE CONTRACT PLANS - 4' - 0" MIN. CEMENT CONCRETE SIDEWALK - SEE NOTE 5 FLARE (TYP.) 3/8" EXPANSION JOINT (TYP.) - SEE STANDARD PLAN F-30.10 GRADE BREAK A CURB RAMP WIDTH 4'- 0" MIN. LANDING TO MATCH CURB RAMP WIDTH - SEE CONTRACT PLANS LANDING I GRADE BREAK CURB RAMP SEE CONTRACT PLANS - CEMENT CONCRETE 4' - 0" MIN. SIDEWALK - SEE NOTE 5 \ I ?' I PROVIDE SMOOTH TRANSITION TO SIDEWALK WIDTH (TYP.) SEE CONTRACT PLANS - 4'-0"MIN. 3/8" EXPANSION JOINT (TYP.) - SEE CURB RAMP STANDARD PLAN F-30.10 v GRADE BREAK TRANSITION TO SIDEWALK BUFFER, IF :K::: - PRESENT, OR TO BACK OF CURB (TYP.) SEE CONTRACT PLANS CURB, OR CURB _ AND GUTTER _ SEE NOTE 4 DETECTABLE WARNING SURFACE - SEE STANDARD PLAN F-45.10 FACE OF CURB MEASURED PARALLEL , i \_ DEPRESSED CURB AND GUTTER - TO CURB (TYP.) CROSSWALK SEE NOTE 4 L_ PLAN VIEW TYPE PERPENDICULAR A CURB, OR CURB AND GUTTER - SEE NOTE 4 FACE OF CURB A NOTES CURB RAMP WIDTH 4'- 0" MIN. 1. At marked crosswalks, the connection between the curb ramp and the road - LANDING E MATCH CURB RAMP I WIDTH -SEE CONTRACT PLANS way must be contained within the width of the crosswalk markings. y 9 2. Where "GRADE BREAK" is called out, the entire length of the grade break GRADE BREAK between the two adjacent surface planes shall be flush. 3. Do not place Gratings, Junction Boxes, Access Covers, or other appurten- ances on any part of the Curb Ramp or Landing, or in front of the Curb Ramp where it connects to the roadway. 2'-0" MIN. SEE CONTRACT 4. See Contract Plans for the curb design specified. See Standard Plan PLANS - 4'- 0" MIN. * F-10.12 for Curb, Curb and Gutter, Depressed Curb and Gutter, and _ BUFFER WIDTH -MATCH Pedestrian Curb details. TO CURB RAMP DEPTH I `'' (Typ) 5. See Standard Plan F-30.10 for Cement Concrete Sidewalk Details. See Contract Plans for width and placement of sidewalk. V, Vi 6. The Bid Item "Cement Concrete Curb Ramp Type _" does not include the adjacent Curb, Curb and Gutter, Depressed Curb and Gutter, Pedestrian I 0v Curb, or Sidewalks. ........ ...... / 7. The Curb Ramp length is not required to exceed 15 feet (unless shown CEMENT CONCRETE otherwise in the Contract Plans). When applying the 15-foot max. length, PEDESTRIAN CURB - the running slope of the Curb Ramp is allowed to exceed 8.3%. Use a B i SEE NOTE 4 single constant slope from bottom of ramp to top of ramp to match into DETECTABLE WARNING SURFACE - the landing over a horizontal distance Of 15 feet. DO not Include the SEE STANDARD PLAN F-45.10 abutting landing in the 15-foot max. measurement. DEPRESSED CURB AND GUTTER 8. Curb Ramps and Landings shall receive a broom finish. See Standard CROSSWALK Specifications 8-14. 9. Pedestrian Curb may be omitted if the ground surface at the back of the O CONTRACTION JOINT (TYP.) - SEE STANDARD PLAN F-30.10 FOR CURB RAMP LENGTHS GREATER THAN 8' - 0" PROVIDE CONTRACTION JOINT EQUALLY SPACED 4'- 0" MIN. OC. PLAN VIEW DETECTABLE WARNING SURFACE - SEE STANDARD PLAN F-45.10 4'- 0" MIN. 15' - 0" MAX. (TYP.) SEE CONTRACT PLANS SEE NOTE 7 SLOPE TREATMENT - SEE STANDARD PLAN F-30.10 *_ GRADE BREAK o Q LANDING CURB RAMP 1 CEMENT CONCRETE PEDESTRIAN CURB - SEE NOTE 4 3" R. TYP. SECTION O CEMENT CONCRETE CURB RAMP "TYPE PERPENDICULAR "A" PAY LIMIT - SEE DETECTABLE WARNING SURFACE - SEE STANDARD PLAN F-45.10 DEPRESSED CURB AND GUTTER - SEE NOTE 4 CEMENT CONCRETE CURB AND GUTTER - SEE NOTE 4 CURB RADIUS DETAIL O TYPE PERPENDICULAR B (SHOWN WITH BUFFER) GRADE BREAK COUNTER SLOPE - 5.0% MAX. T TOP OF ROADWAY DEPRESSED CURB AND GUTTER - SEE STANDARD PLAN F-10.12 ISOMETRIC VIEW TYPE PERPENDICULAR A PAY LIMIT CEMENT CONCRETE CURB RAMP "TYPE PERPENDICULAR "B" PAY LIMIT Curb Ramp and/or Landing will be at the same elevation as the Curb Ramp or Landing and there will not be material to retain. LEGEND SLOPE IN EITHER DIRECTION * 1.5% OR FLATTER RECOMMENDED FOR DESIGN/FORMWORK (2% MAX.) * * 7.5% OR FLATTER RECOMMENDED FOR DESIGN/FORMWORK (8.3% MAX.) 9.5% OR FLATTER RECOMMENDED FOR * * * DESIGN/FORMWORK (10% MAX.) ISOMETRIC VIEW TYPE PERPENDICULAR B PAY LIMIT 'WHpTafic AN N V 5 COMPANY 19201 120th Ave NE, Suite 201 Bothell, WA 98011 425-951-4800 www.NV5.com SURVEYED: SCALE: WHP/NV5 VERTICAL: NAVD 1988 NTS HORIZONTAL: NAD 1983/1991 DESIGNED: DRAWN: GMP q ONE INCH DATU IVI CHECKED: AT FULL SCALE IF NOT ONE INCH N 0. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY "7 7fA � DIGIT SI NED 22.10. 38-07' 41691 �EGISTER�� �SSI0 AL Adoftlliil C TY OF tvRENTON Planning/Building/Public Works Dept. ®F WAsy�Nc a �® 28680 O �� Ec 1 S T ERF 10NAL t Digitally signed by R. Scott Zeller Date: 2020.09.22 13:23:53 -OT00' PERPENDICULAR CURB RAMP STANDARD PLAN F-40.15-04 SHEET 1 OF 1 SHEET APPROVED FOR PUBLICATION Date: 2020.09.25 14:44:37-07'00' STATE DESIGN ENGINEER Washington State Department of Transportation T-423120 R-423109 IN COMPLIANCE WITH CITY OF RENTON STANDARDS E ELOPMENT ENGINEERINGhael Sippo 11/04/2022 ' SWA2 AMAZON CITY OF RENTON DETAILS LIND AVE SW AND SW 19TH ST LO M O O N N Alu coco C) O T N Q J T LO N O N I..L Z O N a DATE: 5 10-24-2022 Q FIELDBOOK: PAGE: DRAWING NO: DET02 3: v' SHEET: OF: 20 21 T t'MJ N Iql- I O rr f R coLO Nt O O N N A, u co co N O O O T N a D J 'T^ N O O O N N rr n Z O N a 75 a N a U)