Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-09-07_FR_059 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 3 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 09/7/2022 Renton Elementary School 16 20180398E003 059 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Samantha Parker Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 70’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site in the morning for observation of Stormwater Detention Facility 2 progress and water line backfill at the request of Jerry Jr. of CDC. Stormwater Detention Facility 2 While on-site, we observed that the contractor had installed most of the remaining strip of PVC liner. The contractor informed AESI that a small section, noted in Figure 1, will remain accessible until more material can be obtained. We observed that the contractor had completed placement of 9” of aggregate across the base of the facility and the placement of stormwater chambers was underway. In the western end of the facility, the contractor had placed aggregate around the chambers and 1’ above, as per plan. AESI observed the contractor using a plate compactor to compact the top of the 1’ of aggregate. See Figure 1 for location of observed area today. Water Line Backfill Upon arrival, AESI observed 4’ of water line backfill being placed across Chelan Ave NE. The backfill, consisting of 5/8” minus crushed rock, was placed in 1’ lifts and compacted with a hoepac. AESI observed the contractor moisture condition the backfill prior to placement, per our recommendation. AESI used a density gauge to test the newly backfilled section. Test results met or exceeded 95% compaction (Table 1). In our opinion, based on our observations and test results, we found the observed area of backfill, to be firm and unyielding and suitable for support of planned paving. See Figure 2 for location of area observed today. Table 1: Compaction Test Results Test No. Location Approximate Backfill Depth Relative to Existing Ground Surface (ft) Proctor (ASTM D1557) Dry Density (pcf) Moisture % Compaction % Pass/Fail Notes 1 See Figure 2 -2 141.0/7.4 133.2 8.5 95 Pass 2 See Figure 2 -1 141.0/7.4 133.4 6.3 95 Pass 3 See Figure 2 0 141.0/7.4 137.0 8.9 97 Pass 4 See Figure 2 0 141.0/7.4 134.0 5.9 95 Pass 16 Date Project Name Project No. Report No. 09/07/2022 Renton ES 16 20180398E003 059 Page 2 of 3 FIELD REPORT Figure 1. Sheet C2.0 The observed area of Stormwater Detention Facility #2. North is to the right of the figure. Figure 2. Sheet C3.1 Location of water line backfill observed today is indicated in green. Facility #2 – Missing section of PVC liner. Facility #2 – 9” of aggregate installed over the base of the Facility. 7 See Figure 2 0 9 Pass 8 See Figure 2 0 9 Pass 1 2 3 4 Facility #2 –PVC liner installed. Bottom and top geotextile liners installed previously. Facility #2 – Installation of aggregate around storm tanks and 1’ of aggregate over the top complete. 16 Date Project Name Project No. Report No. 09/07/2022 Renton ES 16 20180398E003 059 Page 3 of 3 FIELD REPORT Photo 1. Facility #2 progress observed today.