FIELD REPORT
Date Project Name Project No. Report No.
09/29/2022 Renton Elementary School 16 20180398E003 066
Location Municipality AESI Project Manager AESI Field Rep
1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Jake Talbot
Permit No. Client/Owner Attn Requested By
B21004604 Renton School District No. 403 Ed Thomson Contractor
Engineer/Architect General Contractor Grading Contractor Weather
CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. P/C 60s
THE FOLLOWING WAS NOTED:
Associated Earth Sciences Inc. (AESI) was on-site today around 8am to observe placement and compaction of electrical trench
backfill.
Electrical Trench Backfill
Upon our arrival, the elecrical contractor started backfilling previously excavated electrical trench located at the south end of the site
this morning (Photo 1). Electrical pipes were embedded with fine sand bedding followed by 2-3 feet of onsite fill soils. We
observed the fill to be comprised mostly of brownish-grey silty sand which appeared to be firm and unyielding probing no more
than 1-2 inches using a ½” diameter steel t-probe. The contractor compacted the fill in 1-foot lifts using a hoe compactor as they
worked their way south (Photo 2). AESI performed 6 compaction tests using a nuclear densometer. All tests met or exceeded the
minimum specified compaction of 95% of the proctor value. All test results from today are shown in Table 1 and their approximate
locations on Figure 1 below. AESI left the site in the afternoon and will return upon request.
Table 1: Compaction Test Results
Test
No.
Approx. Approx. Proctor
(pcf)/Opt. %
Moisture
%
Moisture
Dry
Density
(pcf)
%Compaction Pass/Fail Location Depth from final
grade (ft)
1 See Figure 1 0 129.9 / 9.2% 10.5 123.9 95 Pass
2 See Figure 1 0 129.9 / 9.2% 8.5 125 96 Pass
3 See Figure 1 0 129.9 / 9.2% 9.6 125.2 96 Pass
4 See Figure 1 0 129.9 / 9.2% 8.7 126.1 97 Pass
5 See Figure 1 0 129.9 / 9.2% 9.2 123.7 95 Pass
6 See Figure 1 0 129.9 / 9.2% 10.3 123.5 95 Pass
16
Date Project Name Project No. Report No.
09/29/2022 Renton ES 16 20180398E003 066
Page 2 of 2
FIELD REPORT
Figure 1: Approximate location of electrical trench outlined in yellow. Approximate location of compaction tests. Test numbers
correspond to Table 1.
Photo 1: Exposed electrical trench. West side of trench facing north.
Photo 2: Placing and compacting
electricaltrench backfill. North side of electrical trench facing south.