Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-09-29_FR_066 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 09/29/2022 Renton Elementary School 16 20180398E003 066 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Jake Talbot Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. P/C 60s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site today around 8am to observe placement and compaction of electrical trench backfill. Electrical Trench Backfill Upon our arrival, the elecrical contractor started backfilling previously excavated electrical trench located at the south end of the site this morning (Photo 1). Electrical pipes were embedded with fine sand bedding followed by 2-3 feet of onsite fill soils. We observed the fill to be comprised mostly of brownish-grey silty sand which appeared to be firm and unyielding probing no more than 1-2 inches using a ½” diameter steel t-probe. The contractor compacted the fill in 1-foot lifts using a hoe compactor as they worked their way south (Photo 2). AESI performed 6 compaction tests using a nuclear densometer. All tests met or exceeded the minimum specified compaction of 95% of the proctor value. All test results from today are shown in Table 1 and their approximate locations on Figure 1 below. AESI left the site in the afternoon and will return upon request. Table 1: Compaction Test Results Test No. Approx. Approx. Proctor (pcf)/Opt. % Moisture % Moisture Dry Density (pcf) %Compaction Pass/Fail Location Depth from final grade (ft) 1 See Figure 1 0 129.9 / 9.2% 10.5 123.9 95 Pass 2 See Figure 1 0 129.9 / 9.2% 8.5 125 96 Pass 3 See Figure 1 0 129.9 / 9.2% 9.6 125.2 96 Pass 4 See Figure 1 0 129.9 / 9.2% 8.7 126.1 97 Pass 5 See Figure 1 0 129.9 / 9.2% 9.2 123.7 95 Pass 6 See Figure 1 0 129.9 / 9.2% 10.3 123.5 95 Pass 16 Date Project Name Project No. Report No. 09/29/2022 Renton ES 16 20180398E003 066 Page 2 of 2 FIELD REPORT Figure 1: Approximate location of electrical trench outlined in yellow. Approximate location of compaction tests. Test numbers correspond to Table 1. Photo 1: Exposed electrical trench. West side of trench facing north. Photo 2: Placing and compacting electricaltrench backfill. North side of electrical trench facing south.