Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-10_FR_047 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 3 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/10/2022 Renton Elementary School 16 20180398E003 047 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Bruce Guenzler Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Partly cloudy, 70’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) made site visits at 9am and 1pm to observe progress on detention facilities #1A and #1B, water line, and footing backfill. Sketches and photos appear below observation notes. Detention Facilities #1A and #1B Today the contractor partially completed placement of the liner and the liner protection geotextile at Facility #1A. Protective nonwoven fabric consisted of Tencate Mirafi PT800E 8oz delivered in 15 foot by 300 foot rolls. The delivered protection geotextile was not listed on the Tencate Mirafi web site, so ACF West (the material supplier) was contacted and provided a product information sheet. The liner was delivered to the site prefabricated in a single folded sheet with no field seaming, and reportedly consisted of PVC. There was no labelling directly on the liner to confirm the polymer type or thickness. Placement of liner and protection geotextile completed today was generally consistent with sheet C2.11 in our opinion, and the nonwoven geotextile appeared consistent with project Specification section 33 4000 2.6 based on the product information sheet supplied by ACF West. During our visit the base protective layer of geotextile was placed and the liner was placed, the top protective layer was not placed pending sealing around control structures. Today excavation of Facility #1B was completed to base of facility elevation. Exposed soil at base of excavation consisted of very dense native lodgement till suitable in our opinion to support the planned detention chamber system. Water Line Water line progress was stopped during excavation of Facility #1B, and resumed later in the day. One lift of approximately 18 inches of fill was placed over pipe bedding and was firm and unyielding with hand probe penetration of 0.5 to 2 inches. Density testing will be completed when additional cover is present over pipe bedding. Footing Backfill One footing area was stripped of forms today but not backfilled during our site visits, see plan clip below for location. 16 Date Project Name Project No. Report No. 08/10/2022 Renton ES 16 20180398E003 047 Page 2 of 3 FIELD REPORT Facilities #1A and #1B Progress Today Liner Placement Facility #1A 16 Date Project Name Project No. Report No. 08/10/2022 Renton ES 16 20180398E003 047 Page 3 of 3 FIELD REPORT