Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-12_FR_049 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/12/2022 Renton Elementary School 16 20180398E003 049 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Bruce Guenzler Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 80’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite in the morning to observe progress on detention facilities #1A and #1B and water line backfill. Detention Facilities #1A and #1B Facility #1A had stormwater chambers in place, ACF West was sealing connections and end caps. Geotextile had been placed atop the levelling pad below the storage chambers and distribution manifold in accordance with detail 2 / C2.10. Geotextile used is woven ADSPLUS 175, which is heavier than specified for facility #1A but is as specified for Facility#2 which has not yet been started. Facility #1B had the liner and liner protection geotextiles in place, and placement of the base rock below the storage chambers was underway. Water Line Progress Water line installation continued today as shown in the sketch below. The first lift of fill was placed in approximately 10 feet of trench during our site visit and appeared firm and unyielding based on hand probe observations. 16 Date Project Name Project No. Report No. 08/12/2022 Renton ES 16 20180398E003 049 Page 2 of 2 FIELD REPORT From sheet C2.1 Facilities #1A and #1B progress observed today. North is to the right. Facility #1B - Liner and the liner protection geotextile complete, levelling pad placement underway. Facility #1A – Geotextile below distribution manifold observed, sealing of chamber end caps and seams underway.