Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-15_FR_050 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/15/2022 Renton Elementary School 16 20180398E003 050 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Samantha Parker Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 80’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite in the afternoon to observe progress on detention facilities #1A and #1B. Detention Facilities #1A and #1B AESI observed, that installation of base aggregate had been completed and placement of stormwater chambers was underway in Facility #1B. In Facility #1A, CDC had completed placement of aggregate around and 0.5’ above stormwater chambers. CDC informed AESI that a plate compactor had been used to compact the top 0.5’ of aggregate and a Telebelt was used for aggregate placement. The installation of geotextile fabric over the top of the aggregate was partially completed. See Figure 1 for location of observed areas. Photo 1. Progress observed in Facility #1B. 16 Date Project Name Project No. Report No. 08/15/2022 Renton ES 16 20180398E003 050 Page 2 of 2 FIELD REPORT Photo 2. Progress observed in Facility #1A. From sheet C2.1 Facilities #1A and #1B progress observed today. North is to the right. Facility #1B – Leveling pad placement complete and chamber installation underway. Facility #1A – Placement of aggregate around and above chambers complete and installation of geotextile fabric underway.