Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-18_FR_052 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/18/2022 Renton Elementary School 16 20180398E003 052 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Samantha Parker Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 80’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was onsite in the morning to observe progress on Detention Facility #1B. Upon arrival, we met with Jerry Jr. of CDC. Detention Facility #1B AESI observed that placement of stormwater chambers was complete in Facility #1B. While onsite, we observed a Telebelt being used to place aggregate around and 0.5’ above the stormwater chambers. Approximately half of the aggregate had been installed at the time of our visit. CDC informed AESI that they plan to compact the top 0.5’ of aggregate with a plate compactor. In our opinion, based on our observations, the installation of Detention Facility #1B appears consisted with project plans and our recommendations. See Figure 1 for location of observed areas. Photos 1. Progress observed in Facility #1B. 16 Date Project Name Project No. Report No. 08/18/2022 Renton ES 16 20180398E003 052 Page 2 of 2 FIELD REPORT From sheet C2.1 Facility #1B progress observed today. North is to the right. Facility #1B – Chamber installation complete and aggregate installation underway.