HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-26_FR_056 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 2 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/26/2022 Renton Elementary School 16 20180398E003 056 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Samantha Parker Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Cloudy, 70’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site in the morning for observation of the subgrade in Stormwater Detention Facility 2 at the request of Jerry Jr. of CDC. Stormwater Detention Facility 2 While on-site, we observed that the contractor had completed an additional approximately 20’ of the excavation for Stormwater Detention Facility 2. The area had been prepared prior to our arrival, by removing approximately 5’ of existing material. CDC informed AESI that they plan to complete Facility 2 in two phases and that the excavation for phase 1 was complete. AESI used a ½ diameter steel soils T-probe to assess the subgrade conditions. Generally, the area probed less that 2” under full body weight. In our opinion, based on our observations we found the area of subgrade observed today to be firm and unyielding and suitable for support of Stormwater Detention Facility 2. See Figure 1 for location of observed area today. 16 Date Project Name Project No. Report No. 08/26/2022 Renton ES 16 20180398E003 056 Page 2 of 2 FIELD REPORT Figure 1. Sheet C2.0 The observed area of Stormwater Detention Facility #2 is indicated in blue. North is to the right of the figure. Photo 1. The subgrade area prepared for Facility #2 observed today. Facility #2 – Subgrade observed today. Phase 1 excavation complete. Facility #2 – Location of previously observed subgrade.