Loading...
HomeMy WebLinkAbout20180398E003_Renton_ES_16_2022-08-31_FR_057 Kirkland | Tacoma | Mount Vernon 425-827-7701| www.aesgeo.com Date Mailed: Principal / PM: Bruce Guenzler, L.G., L.E.G. This document is considered a DRAFT until signed or initialed by an AESI Principal or Project Manager Page 1 of 3 v.7.20 FIELD REPORT Date Project Name Project No. Report No. 08/31/2022 Renton Elementary School 16 20180398E003 057 Location Municipality AESI Project Manager AESI Field Rep 1075 Duvall Ave NE Renton Bruce Guenzler, L.E.G. Samantha Parker Permit No. Client/Owner Attn Requested By B21004604 Renton School District No. 403 Ed Thomson Contractor Engineer/Architect General Contractor Grading Contractor Weather CPL / Hutteball + Oremus Cornerstone/Kyle Continental Dirt Contractors/ Jerry Jr. Sunny, 90’s THE FOLLOWING WAS NOTED: Associated Earth Sciences Inc. (AESI) was on-site in the morning for observation of Stormwater Detention Facility 2 progress and storm line backfill, at the request of Jerry Jr. of CDC. Stormwater Detention Facility 2 While on-site, we observed that the contractor had completed placement of the bottom geotextile protection liner and partially completed placement of PVC liner. See Figure 1 for location of observed area today. Storm Line Backfill While onsite, AESI observed that a short section of 2’ of backfill was completed along Chelan Ave NE. The backfill, consisting of 5/8” minus crushed rock, was placed in 1’ lifts and compacted with a hoepac. The contractor moisture conditioned the backfill during placement, per our recommendation. AESI used a density gauge to test the newly backfilled section. Test results met or exceeded 95% compaction (Table 1). In our opinion, based on our observations and test results, we found the observed area of backfill, to be firm and unyielding and suitable for support of planned paving. See Figure 2 for location of area observed today. Table 1: Compaction Test Results Test No. Location Approximate Backfill Depth Relative to Existing Ground Surface (ft) Proctor (ASTM D1557) Dry Density (pcf) Moisture % Compaction % Pass/Fail Notes 1 See Figure 2 0 141.0/7.4 133.2 10.4 95 Pass 2 See Figure 2 0 141.0/7.4 133.5 9.7 95 Pass 16 Date Project Name Project No. Report No. 08/31/2022 Renton ES 16 20180398E003 057 Page 2 of 3 FIELD REPORT Figure 1. Sheet C2.0 The observed area of Stormwater Detention Facility #2. North is to the right of the figure. Facility #2 – Missing area of PVC liner. Facility #2 – Location of observed geotextile fabric and PVC liner. 16 Date Project Name Project No. Report No. 08/31/2022 Renton ES 16 20180398E003 057 Page 3 of 3 FIELD REPORT Figure 2. Sheet C2.1 The location of storm line backfill is indicated in blue. Photo 1. Facility #2 progress observed today. 2 1