HomeMy WebLinkAboutMFP22002723.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Major Franchise Permit: MFP22002723
IVR Number: 22002723
Permit Information
Permit Name: Verizon - MCI
Address/Location:05/24/2022Application Date:3343301125Parcel Number: 1755 NE 48TH ST
Permit Type:11/28/2022Issue Date:Franchise
Permit Work Class:11/28/2023Expiration Date:Major Utility
Job Number: 087519-001Franchise Type:Telephone
Description: Verizon Business MCI Metro Place new Handhole, trench/directional bore in city ROW to place new conduit and
fiber cable. Pothole all existing utilities. Restoration per City of Renton standards.
Contacts
Name Address PhoneTypeBilling
Mic Woodman
Woodman Telcom Group
B: (801) 618-4664
C: (801) 599-9869
Applicant
HOLLY NORTH
MGC TECHNICAL CONSTULTING, INC
8521 154th Ave NE
REDMOND, WA 98052
B: (206) 618-0651Applicant
Louise Popelka
Verizon MCI Buisness
3245 158th Ave SE
Bellevue, WA 98008
B: (425) 240-0238Contact
Steve Leupold
Verizon
3120 139th Ave SE
Bellevue, WA 98005
Contact
Matthew Sapp
Verizon - MCI
Contact
Kevin Schenck
Utility Technologies Inc
PO Box 1355
Woodinville, WA 98072
B: (425) 205-2190
C: (206) 730-7327
Contractor
Business License Number: 50205Construction Contractor: UTILITI857DS
Amy Ledvina
Verizon - MCImetro
3245 158 Ave SE
Bellevue, WA 98008
H: (425) 505-5651Specialized
Billing
X
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
MCIMETRO ACCESS TRANSMISSION SERVICES CORP (VERIZON)
087519-001 801-618-4664
MIC WOODMAN MIC@WOODMANTELCO.COM
1755 NE 48TH STREET NFL SEAHAWKS LATERAL BUILD
PLACE NEW HANDHOLE, TRENCH/DIRECTIONAL BORE IN CITY ROW TO PLACE NEW
CONDUIT AND FIBER CABLE TO SEATTLE SEAHAWKS TRAINING FACILITY/HEADQUARTERS
X X
X X 200' IN CITY ROW
TBD, CURRENTLY IN BID
5/9/2022
Scott Warlick 6/7/2022
POTHOLE ALL EXISTING UTILITIES
RESTORATION PER CITY OF RENTON STANDARDS
MFP22002723
Utility Technologies Inc 206-730-7327
UTILITI857DS 50205
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
x
x
NFL/SEAHAWKS LATERAL BUILD TBD
1755 NE 48TH STREET, RENTON, WA 98056
12/1/22 2/28/23 9:00 AM 4:00 PM
UTILITY TECHNOLOGIES
KURT MOORE 206-396-1431
18612 144TH AVENUE NORTHEAST WOODINVILLE, WA 98072
DIRECTIONAL BORE TO PLACE NEW DUCT, PLACE HH IN CITY ROW TO FACILITATE
PLACEMENT OF NEW CABLE TO SEATTLE SEAHAWS PRACTICE FACILITY
Scott Warlick CED 11/28/2022
MFP22002723
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Mic Woodman
10/18/22
MCImetroACCESS TRANSMISSION SERVICES LLCOUTSIDE PLANT CONSTRUCTIONFIBER OPTIC CABLE ROUTESEAHAWKS SINGLE LATERAL12 SEAHAWKS WAYRENTON, WAOSP PROJECT #: 087519-001SITE CODE: STTLWAPROJECT STATUS: PERMITTINGMFP22002723
PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/22WOODMAN TELCOMW.T.G050922-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22TRAFFIC PLANSMW12 SEAHAWKS WAY02009N/AN/AAMW04MFP22002723
W-98MW-20W-175CP-20W-241VW-21W-5TP-206'CLFW-240-21/W-6TP-20WORK AREA100'W1-4LKEEPRIGHTKEEPRIGHTSIDEWALKCLOSED(R9-9)SIDEWALKCLOSED(R9-9)SIDEWALK CLOSEDCROSS HERER9-11A(RT)KEEPRIGHTKEEPRIGHTSE 76TH ST(25 MPH)SE 76TH ST(25 MPH)63'
100'ENDROAD WORKG20-2ENDROAD WORKG20-2ENDROAD WORKG20-2LAKE WASHINGTON BLVD (25 MPH)ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/22WOODMAN TELCOMW.T.G050922-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22TRAFFIC PLANSMW12 SEAHAWKS WAY0300950'N/AAMWNORTHCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811CLARIFICATION NO.QUANTITYUNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.04RENTON, WAKING COUNTY·WORK HOURS 9:00 AM TO 4:00 PM, MONDAY THROUGH FRIDAY·ALL TRAFFIC CONTROL TO BE REMOVED WHEN NO WORK IS TAKINGPLACE·PEDESTRIANS TO BE ACCOMMODATED THROUGH WORK ZONEMFP22002723
GATEW-104-20W-105-20W-106-205'CLF100'KEEPLEFTSHOULDERCLOSED AHEADW21-5A100
'
42
'WORK AREA100'ENDROAD WORKG20-2ENDROAD WORKG20-2ROADWORKAHEADW20-1ROADWORKAHEADW20-1ROADWORKAHEADW20-1100
'SEAHAWKS WAY (25 MPH)PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/22WOODMAN TELCOMW.T.G050922-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22TRAFFIC PLANSMW12 SEAHAWKS WAY0400950'N/AAMWNORTHCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811CLARIFICATION NO.QUANTITYUNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.04RENTON, WAKING COUNTY·WORK HOURS 9:00 AM TO 4:00 PM, MONDAY THROUGH FRIDAY·ALL TRAFFIC CONTROL TO BE REMOVED WHEN NO WORK IS TAKINGPLACE·PEDESTRIANS TO BE ACCOMMODATED THROUGH WORK ZONEMFP22002723
MCImetroACCESS TRANSMISSION SERVICES LLCOUTSIDE PLANT CONSTRUCTIONFIBER OPTIC CABLE ROUTESEAHAWKS SINGLE LATERAL12 SEAHAWKS WAYRENTON, WAOSP PROJECT #: 087519-001SITE CODE: STTLWAPROJECT STATUS: PERMITTINGMFP22002723This permit is for Major construction work in the ROW and will be billed at an additional$150/HR for inspections. After hours and weekend work will be billed at $175/HR
LOCATION MAPNORTHVICINITY MAPPROJECT MAPRENTON, WAREVISIONSDATEDESCRIPTIONINITIALPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY02002N/AN/AAMW15RENTON, WAKING COUNTYMFP22002723
CONTACT SHEETPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY03003N/AN/AAMWMANAGER:PROJECT SUPERINTENDENT:NAME OF FIRM:PROJECT COORDINATOR:TSO MANAGER:PROJECT MANAGER:PROGRAM MANAGER:SPLICING MANAGER:LIGHTWAVE ENGINEER:CIVIL ENGINEER:TERMINAL CONST. REP.:NON MEMBERS:COORDINATOR:ROW AGENT:MANAGER:MANAGER:PROJECT ENGINEER:PROJECT COORDINATOR:PROJECT ENGINEER:MANAGER:PROJECT COORDINATOR:UTILITIESMCI UTILITY LOCATE RAILROADSFEDERAL GOVERNMENTOTHERCOUNTY GOVERNMENTSTATE GOVERNMENT1-800-624-9675CITY GOVERNMENTOUTSIDE PLANT CONSTRUCTION:SCOTT CHRISTENSEN(425) 471-1079MCISCOTT CHRISTENSEN(425) 471-1079BOB HAYES(972) 791-1537ENGINEERING CONTRACTORWOODMAN TELCOM GROUP, LLC2225 EAST MURRAY-HOLLADAY RDSALT LAKE CITY, UT 84117MIC WOODMANOFFICE:(801) 618-4664 X 202FAX:(801) 405-7001OFFICE:(801) 618-4664 X 202CELL: (801) 599-9869E-MAILMIC@WOODMANTELCO.COMKING COUNTY (206) 296-6600WASHDOT - JIM RHODESN/AN/AN/ACONSTRUCTION CONTRACTOR15CITY OF RENTON PUBLIC WORKS (206) 402-8626MFP22002723
GENERAL NOTES / CLARIFICATION NOTESADDENDUM NOTESCLARIFICATION NOTES1.7.5.6.4.3.2.GENERAL NOTESCLARIFICATION NOTES (CONTINUED)3. LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD EVALUATIONMAPS OR OTHER DRAWINGS AND MAY NOT BE AS SHOWN OR DEPICTED ON THESE DRAWINGS.4. UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUTARE NOT NECESSARILY EXACT. THEREFORE, UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET INADVANCE OF TRENCHING OR PLOWING, SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN THE EVENTOF CONFLICT.5.ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON THE CONSTRUCTION DRAWINGS. ANY AND ALL OTHERSENCOUNTERED ARE ALSO THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT AND REPAIR IFDAMAGED.6. ANY AND ALL IMPROVEMENTS, SUCH AS ASPHALT OR CONCRETE PAVEMENT, CURBS, GUTTERS, WALKS,DRAINAGE DITCHES, EMBANKMENTS, SHRUBS, TREES, GRASS SOD, ETC., IF DAMAGED, SHALL BE RESTOREDTO ORIGINAL CONDITION.7. EQUIPMENT TYPES SPECIFIED HEREIN (IE: "BACKHOE", SWAMP PLOW" ETC.) ARE SUGGESTIONS ONLY AND ARENOT INTENDED AS REQUIREMENTS. CONTRACTOR WILL BE NOTIFIED AS TO EXPECTATIONS.9. BURIED CABLE MARKERS WILL BE PLACED AT ALL UNDERGROUND UTILITY LOCATIONS AND ALL OTHERLOCATIONS IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS AND THE OUTSIDE PLANT HANDBOOK.8. SHORING OF BORE PITS AND TRENCHES IN ACCORDANCE WITH OSHA REGULATIONS IS MANDATORY.10. ALL 4" ID CONDUIT WILL BE SCHEDULE 40 (EG.: PVC OR GSP/BSP), OR AS SPECIFIED.11. UNDERGROUND CONDUIT WILL BE PLACED AT 48" MINIMUM COVER UNLESS OTHERWISE SPECIFIED ON THECONSTRUCTION DRAWINGS.2. ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES ORREQUIREMENTS OF ANY REGULATING GOVERNMENTAL AGENCY, VERIZON BUSINESS AND THERIGHT-OF-WAY GRANTOR.1. VERIZON BUSINESS COMPRISES THE FOLLOWING OPERATING ENTITIES:- MCI COMMUNICATIONS SERVICES, INC.- MCI METRO COMMUNICATIONS SERVICES, INC.- MCI METRO ACCESS TRANSMISSION SERVICES OF VIRGINIA, INC.- MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS, INC.- METROPOLITAN FIBER SYSTEMS OF NEW YORK, INC.4. QUANTITY LINEAR FOOTAGE/SQUARE FOOTAGE, SIZE OFMANHOLE/HANDHOLE SIZE OF PULL/SPLICE BOX, DIMENSION OF WALL,HEIGHT/CLASS/TYPE OF POLE5. TYPICAL DRAWING NO. AND TYPICAL DETAIL DRAWING NUMBER6. PLANT ACCOUNTING CODE7. SPECIFIED CONDUIT, HANDHOLE/MANHOLE NO., SPECIFIED PURPOSE ANDMATERIAL, BRIDGE NO. AND RAILROAD STATION, MATERIAL, POLE NO.1. STATION2. LOCATION3. CLARIFICATION NO. AND MINIMUM COVERPLACE BURIED CABLE MARKERS AND SIGNS/MWCOMPLACE ISOLATOR/PROTECTION SYSTEM AT EXISTINGWATER CROSSING SIGNSHANDHOLES/MANHOLESREMOVE CONCRETE BURIED CABLE MARKER POSTREMOVE BURIED CABLE MARKER POST/HARDWAREDIRECTIONAL BOREEMBEDMENT PLOW700710711630620ATTACH CONDUIT TO WALL OR STRUCTUREJETTING CONDUITREMOVE POLE/PUSH BRACEPLACE POLE/PUSH BRACEREMOVE AERIAL CABLERELASH AERIAL CABLEDELASH AERIAL CABLERELOCATE AERIAL CABLEPLACE AERIAL CABLEREMOVE AND DISPOSE OF CABLEEXPOSE DIRECT BURIED CABLE AND RELOCATEEXPOSE DIRECT BURIED CABLEDIRECT BURY CABLEREPOSITION ACTIVE CABLE SLACKREMOVE CABLE FROM CONDUITPULL THROUGH DUCT (INNERDUCT)ATTACH PULL/SPLICE BOX TO WALL OR STRUCTUREDETACH CONDUIT FROM WALL OR STRUCTUREREMOVE AND RESTORE CURBINGREMOVE AND RESTORE SIDEWALK610600500 526535528530527517525520515516510330320315310400300PULL CABLE420415411410CORE BORE282281PLACE HIGH DENSITY POLYETHYLENE (HDPE)REMOVE AND RESTORE CONCRETEREMOVE AND RESTORE ASPHALTCONSTRUCT WALLREPLACE/SUBSTITUTE PRECAST MANHOLERELOCATE PRECAST MANHOLEREMOVE EXISTING MANHOLEPLACE MANHOLEEXCAVATE SPLICE PITREPLACE/SUBSTITUTE HANDHOLERELOCATE HANHOLEREMOVE EXISTING HANDHOLEPLACE CONDUITEXPOSE CONDUITPLACE HANDHOLEREMOVE CONCRETE CAP REMOVE CONCRETE ENCASEMENTCONCRETE ENCASEEXPOSE AND REMOVE CONDUIT (ABANDONED)EXPOSE AND REMOVE CONDUITEXPOSE CONDUIT AND REPLACE/SUBSTITUTEEXPOSE CONDUIT AND RELOCATESLURRY BACKFILL ADDERJACK AND DRY BORE CONDUIT(S)240 222250256270280 260255252247 245244 221 220 219217216215213212 200100218ROCK ADDER214110714712210246713GENERAL NOTES / CLARIFICATION NOTESADDENDUM NOTESCLARIFICATION NOTES1.7.5.6.4.3.2.GENERAL NOTESCLARIFICATION NOTES (CONTINUED)3. LOCATIONS OF SOME OF THE PHYSICAL FEATURES WERE OBTAINED FROM DATED RAILROAD EVALUATIONMAPS OR OTHER DRAWINGS AND MAY NOT BE AS SHOWN OR DEPICTED ON THESE DRAWINGS.4. UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS AND FIELD OBSERVATIONS BUTARE NOT NECESSARILY EXACT. THEREFORE, UTILITY LOCATIONS WILL BE VERIFIED AT LEAST 100 FEET INADVANCE OF TRENCHING OR PLOWING, SO THAT CHANGES IN CABLE PLACEMENT CAN BE MADE IN THE EVENTOF CONFLICT.5.ALL KNOWN BURIED OBSTRUCTIONS ARE SHOWN ON THE CONSTRUCTION DRAWINGS. ANY AND ALL OTHERSENCOUNTERED ARE ALSO THE RESPONSIBILITY OF THE CONTRACTOR TO LOCATE, PROTECT AND REPAIR IFDAMAGED.6. ANY AND ALL IMPROVEMENTS, SUCH AS ASPHALT OR CONCRETE PAVEMENT, CURBS, GUTTERS, WALKS,DRAINAGE DITCHES, EMBANKMENTS, SHRUBS, TREES, GRASS SOD, ETC., IF DAMAGED, SHALL BE RESTOREDTO ORIGINAL CONDITION.7. EQUIPMENT TYPES SPECIFIED HEREIN (IE: "BACKHOE", SWAMP PLOW" ETC.) ARE SUGGESTIONS ONLY AND ARENOT INTENDED AS REQUIREMENTS. CONTRACTOR WILL BE NOTIFIED AS TO EXPECTATIONS.9. BURIED CABLE MARKERS WILL BE PLACED AT ALL UNDERGROUND UTILITY LOCATIONS AND ALL OTHERLOCATIONS IN ACCORDANCE WITH THE CONSTRUCTION DRAWINGS AND THE OUTSIDE PLANT HANDBOOK.8. SHORING OF BORE PITS AND TRENCHES IN ACCORDANCE WITH OSHA REGULATIONS IS MANDATORY.10. ALL 4" ID CONDUIT WILL BE SCHEDULE 40 (EG.: PVC OR GSP/BSP), OR AS SPECIFIED.11. UNDERGROUND CONDUIT WILL BE PLACED AT 48" MINIMUM COVER UNLESS OTHERWISE SPECIFIED ON THECONSTRUCTION DRAWINGS.2. ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH THE APPLICABLE CODES ORREQUIREMENTS OF ANY REGULATING GOVERNMENTAL AGENCY, VERIZON BUSINESS AND THERIGHT-OF-WAY GRANTOR.1. VERIZON BUSINESS COMPRISES THE FOLLOWING OPERATING ENTITIES:- MCI COMMUNICATIONS SERVICES, INC.- MCI METRO COMMUNICATIONS SERVICES, INC.- MCI METRO ACCESS TRANSMISSION SERVICES OF VIRGINIA, INC.- MCI METRO ACCESS TRANSMISSION SERVICES OF MASSACHUSETTS, INC.- METROPOLITAN FIBER SYSTEMS OF NEW YORK, INC.4. QUANTITY LINEAR FOOTAGE/SQUARE FOOTAGE, SIZE OFMANHOLE/HANDHOLE SIZE OF PULL/SPLICE BOX, DIMENSION OF WALL,HEIGHT/CLASS/TYPE OF POLE5. TYPICAL DRAWING NO. AND TYPICAL DETAIL DRAWING NUMBER6. PLANT ACCOUNTING CODE7. SPECIFIED CONDUIT, HANDHOLE/MANHOLE NO., SPECIFIED PURPOSE ANDMATERIAL, BRIDGE NO. AND RAILROAD STATION, MATERIAL, POLE NO.1. STATION2. LOCATION3. CLARIFICATION NO. AND MINIMUM COVERPLACE BURIED CABLE MARKERS AND SIGNS/MWCOMPLACE ISOLATOR/PROTECTION SYSTEM AT EXISTINGWATER CROSSING SIGNSHANDHOLES/MANHOLESREMOVE CONCRETE BURIED CABLE MARKER POSTREMOVE BURIED CABLE MARKER POST/HARDWAREDIRECTIONAL BOREEMBEDMENT PLOW700710711630620ATTACH CONDUIT TO WALL OR STRUCTUREJETTING CONDUITREMOVE POLE/PUSH BRACEPLACE POLE/PUSH BRACEREMOVE AERIAL CABLERELASH AERIAL CABLEDELASH AERIAL CABLERELOCATE AERIAL CABLEPLACE AERIAL CABLEREMOVE AND DISPOSE OF CABLEEXPOSE DIRECT BURIED CABLE AND RELOCATEEXPOSE DIRECT BURIED CABLEDIRECT BURY CABLEREPOSITION ACTIVE CABLE SLACKREMOVE CABLE FROM CONDUITPULL THROUGH DUCT (INNERDUCT)ATTACH PULL/SPLICE BOX TO WALL OR STRUCTUREDETACH CONDUIT FROM WALL OR STRUCTUREREMOVE AND RESTORE CURBINGREMOVE AND RESTORE SIDEWALK610600500 526535528530527517525520515516510330320315310400300PULL CABLE420415411410CORE BORE282281PLACE HIGH DENSITY POLYETHYLENE (HDPE)REMOVE AND RESTORE CONCRETEREMOVE AND RESTORE ASPHALTCONSTRUCT WALLREPLACE/SUBSTITUTE PRECAST MANHOLERELOCATE PRECAST MANHOLEREMOVE EXISTING MANHOLEPLACE MANHOLEEXCAVATE SPLICE PITREPLACE/SUBSTITUTE HANDHOLERELOCATE HANHOLEREMOVE EXISTING HANDHOLEPLACE CONDUITEXPOSE CONDUITPLACE HANDHOLEREMOVE CONCRETE CAP REMOVE CONCRETE ENCASEMENTCONCRETE ENCASEEXPOSE AND REMOVE CONDUIT (ABANDONED)EXPOSE AND REMOVE CONDUITEXPOSE CONDUIT AND REPLACE/SUBSTITUTEEXPOSE CONDUIT AND RELOCATESLURRY BACKFILL ADDERJACK AND DRY BORE CONDUIT(S)240 222250256270280 260255252247 245244 221 220 219217216215213212 200100218ROCK ADDER214110714712210246713PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY04004N/AN/AAMWREVISIONSDATEDESCRIPTIONINITIAL15MFP22002723
MCI OUTSIDE PLANT FOCUSMCI OUTSIDE PLANT CONSTRUCTION GENERAL REQUIREMENTSFIBER OPTIC CABLE UNCOVERING SYSTEMPRIOR TO ANY EXCAVATION, THE MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUST VERIFY THEINITIAL LOCATE MARKS COMPLETED BY MCI OPERATIONS. DO NOT TRUST LOCATE RESULTSCOMPLETED BY OTHERS THE MCI OR CONTRACT REPRESENTATIVE MUST LOCATE THE CABLERUNNING LINE BY MAKING AT LEAST ONE PASS IN EACH DIRECTION. LOCATE RESULTS MUST THEN BECOMPARED WITH PREVIOUS MARKS AND THE AS-BUILTS.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 3 FEET OF THE CABLE, THECABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGE PAINT AND SUPPLEMENTED BYMARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATION CONTRACTOR MUST POTHOLE (ALLPOTHOLES MUST BE COMPLETED BY HAND DIGGING OR VACUUM EXCAVATION) A MINIMUM OFEVERY 15 FT., THEN EXPOSE THE ENTIRE LENGTH OF THE CABLE BY HAND DIGGING OR VACUUMEXCAVATION.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET (BUT NOT CLOSERTHAN 3 FEET) OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGEPAINT AND SUPPLEMENTED BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATIONCONTRACTOR MUST POTHOLE THE CABLE A MINIMUM OF EVERY 15 FT.IF THE PROPOSED WORK INVOLVES DIGGING OR EXCAVATING WITHIN 5 FEET (BUT NOT CLOSERTHAN 3 FEET) OF THE CABLE, THE CABLE ROUTE WILL BE MARKED CONTINUALLY WITH ORANGEPAINT AND SUPPLEMENTED BY MARKER FLAGS PLACED EVERY 10 FT. THE EXCAVATIONCONTRACTOR MUST POTHOLE THE CABLE A MINIMUM OF EVERY 15 FT.THE CABLE WILL ALSO BE POTHOLED AT ANY CHANGE IN THE RUNNING LINE OF MORE THAN 1 FT.IN ANY DIRECTION, ANYTIME THE ACCURACY OF THE ELECTRONIC LOCATE IS QUESTIONED, ORTHE MARKED RUNNING LINE DOES NOT MATCH THE AS-BUILTS.NO MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES WILL BE ALLOWED UNLESS THEFACILITIES HAVE FIRST BEEN PROPERLY LOCATED, POTHOLED, POSITIVELY IDENTIFIED,CONTINUOUSLY EXPOSED BY HAND DIGGING OR VACUUM EXCAVATION, AND THE FACILITES ARECLEARLY VISIBLE.IN ADDITION, MECHANICAL EXCAVATION WITHIN 3 FT. OF OSP FACILITIES REQUIRES ON-SITE PRIORAPPROVAL FROM MCI'S EMPLOYEE OR CONTRACT REPRESENTATIVE.7. PLEASE REFER TO THE LATEST EDITION OF THE MCI OSP HANDBOOK FOR ADDITIONAL DETAILS. KNOWIT AND FOLLOW IT.1. THE TITLE OF THIS PROGRAM, F.O.C.U.S., AN ACRONYM FOR "FIBER OPTIC CABLE UNCOVERINGSYSTEM," WAS SELECTED TO REMIND EVERYONE INVOLVED WITH WORKING NEAR MCI'S ACTIVE FIBEROPTIC SYSTEMS TO FOCUS ON PROTECTING THE FACILITIES. IF, DURING THE COURSE OF THE PROJECT,YOU NOTICE ANY ACTIVITY WHICH MAY JEOPARDIZE THE MCI OSP FACILITIES, IT IS YOUR DUTY TO STOPTHE WORK AND RE-F.O.C.U.S.2. F.O.C.U.S. RULES MUST BE FOLLOWED ON ALL MCI PROJECTS INVOLVING WORK ON OR NEAR MCI OSPFACILITIES. SAFETY IS MCI'S NUMBER ONE PRIORITY; EVERYONE MUST REFRAIN FROM UNSAFE ANDIMPROPER PRACTICES.3. REVIEW OF F.O.C.U.S. IS MANDATORY AT EVERY PRE-BID, PRE-CONSRUCTION SITE MEETING AND DAILYTAILGATE MEETING. F.O.C.U.S. DISCUSSION MUST INCLUDE SITE-SPECIFIC HISTORY, UNIQUE PROBLEMS,FACILITY CONFIGURATIONS THAT MAY BE ENCOUNTERED, AND PAST ERRORS. "THOSE WHO DO NOTLEARN FROM HISTORY ARE DOOMED TO REPEAT IT." DO NOT LET THIS HAPPEN TO YOU.4. ANY WORK NEAR OR REQUIRING HANDLING OF MCI OUTSIDE PLANT FACILITIES CAN ONLY BEPERFORMED WITH AN MCI EMPLOYEE OR CONTRACT REPRESENTATIVE PRESENT -- THIS MEANS OUT OFHIS OR HER VEHICLE AND DIRECTLY MONITORING THE WORK. THE REPRESENTATIVE MUST HAVE APROPERLY OPERATING CABLE LOCATOR CHECKED FOR ACCURACY EVERY DAY PRIOR TOCOMMENCEMENT OF WORK (COMPARISON OF LINE AND DEPTH READINGS TO ACTUAL LINE AND DEPTHOF THE CABLE).TOOLS AND EQUIPMENT SPECIFICALLY DESIGNED FOR THE JOB AT HAND AREREQUIRED. USE THE PROPER TOOL FOR THE JOB.PROTECTING MCI FACILITIES IS EXTREMELY IMPORTANT; HOWEVER, SAFETYREGARDING YOURSELF AND OTHERS IS THE MOST IMPORTANT PART OF ANYPROJECT.CONTRACTORS ARE NOT ALLOWED TO CUT ANY CABLE. CABLES SCHEDULED FORREMOVAL WILL BE CUT BY MCI OPERATIONS PERSONNEL, AND ONLY AFTERVERIFICATION THAT ALL TRAFFIC HAS BEEN OFF-LOADED.PERSONAL PROTECTIVE EQUIPMENT APPROPRIATE FOR THE SPECIFIC WORK SITESHALL BE USED AT ALL TIMES. AT A MINIMUM, HARD HAT, SAFETY SHOES/STEEL-TOEDBOOTS, AND FLORESCENT ORANGE OR GREEN WORK VEST ARE REQUIRED UPONENTERING ANY MCI WORK SITE.USE OF INTOXICANTS, DRUGS, INHALANTS OR ANY OTHER SUBSTANCES THAT MAYIMPAIR ALERTNESS ARE STRICTLY PROHIBITED.EXTREME CAUTION MUST BE USED AT ALL TIMES WHEN WORKING ON OR NEARACTIVE CABLES. AN MCI EMPLOYEE OR CONTRACT REPRESENTATIVE MUSTAPPROVE AND BE PRESENT PRIOR TO AND DURING ALL CABLE HANDLINGACTIVITIES.CONDUIT WORK INVOLVING ACTIVE CABLES REQUIRES SPECIALIZED TOOLSSPECIFICALLY DESIGNED TO ACCESS DUCTS WITH ACTIVE CABLES.5. LOCATE AND POTHOLE REQUIREMENTS:6. EXPOSING REQUIREMENTS:ALL FEDERAL, STATE AND LOCAL SAFETY REGULATIONS MUST BE FOLLOWEDWITHOUT EXCEPTION.PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY05004N/AN/ABMWREVISIONSDATEDESCRIPTIONINITIAL15FOREMAN SIGNATUREDATEMFP22002723
PROJECT SPECIFICCLARIFICATION SUMMARY SHEETPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY06004N/AN/ACMWPROJECT CLARIFICATION SUMMARYCLARIFICATIONNUMBERCLARIFICATIONNUMBER ANDALPHADESCRIPTIONQUANTITYUNITREVISIONSDATEDESCRIPTIONINITIAL15210PLACE (1)-4" HDPE DUCT834LF200PULL (1)-96CT FOC THRU HDPE (SLACK NOT INCLUDED)1298LF410400PLACE 3060 HAND HOLE2EA240PULL (1)-10AWG TRACE WIRE834LFDIRECTIONAL BORE TO PLACE NEW CONDUIT812LF630600212TRENCH TO PLACE (1)-4" HDPE DUCT22LFMFP22002723
REVISIONSDATEDESCRIPTIONINITIALOVERHEAD GUY (ARROW IN DIRECTION OF PULL)C/LR/WTAX DISTRICTCITY, COUNTY OR STATE BOUNDARY LINEFENCE LINETOP OF SLOPETOE OF SLOPEPROPERTY LINEGUARDRAILF/LMAIN TRACKSAUXILLARY TRACKSCENTERLINERIGHT-OF-WAYUNDERGROUND UTILITY (TELEPHONE)AERIAL UTILITY (ELECTRIC)DITCH LINETO BE REMOVED OR ABANDONED(SHOWN FOR HDPE)SIDEWALKEDGE OF PAVEMENTF/LF/LF/LF/LF/LRAILROAD SIGNAL CONTROL BOXCAUTION NOTEGAS VALVEFIRE HYDRANTD/LS/WEOPD/LS/WEOPR/WC/LTEHTHECULVERT (SIZE AS INDICATED)BRIDGEWATER METERBOND AND GROUNDSIDEWALK ANCHOR AND GUYPUSH BRACE (EXISTING POLE)ACCOUNT CODE CHANGE (BURIED TO AERIAL)FOREIGN ANCHOR AND GUY DIRECT BURIED HDPEPVC OR SPLIT PVC CONDUITBSP/GSP OR SPLIT BSP/GSP CONDUITJACK AND BOREFUTURE CABLEREMOVE AND RESTORE ASPHALT OR CONCRETE(WIDTH AS INDICATED)DIRECTIONAL BORECORE BOREREMOVE CABLESTEEL CASINGBURIED CABLESUBMARINE CABLEAERIAL CABLEFOGWIRE CABLEDASHED = NOT FOUND IN FIELD48''48''ANCHOR AND GUYGUY ONLYPOLEANCHOR ONLYPERMIT TRACKING FORM IDENTIFIER HANDHOLE, MANHOLE OR PULLBOXUTILITY COVER DEPTHROCK PROBE (DEPTH AS INDICATED)SYMBOLS KEYFOGWSUBMEXISTINGFOGWSUBMPROPOSEDSTEEL MARKER AND SIGN-(A)ALUMINUM "HUB"-STYLE MARKER-(B)FLAT MARKER-(C)TUBULAR MARKER-(D)TUBULAR MARKER, & ISOLATOR PROTECTOR-(E)MILE POST MARKERNOTE: A
E
R
I
A
L
F
I
B
E
RCAUTIONACTIVE MCIC
A
U
T
I
O
NBURIED FIBEROPTIC CABLEACTIVE MCIOPTIC CABLE30'-5-84B&GB&G12"30'-5-8412"PBSTA.
STA.
STA.
STA.
STA.
STA. 48"42"187P.T.F.OHG92' 10MP=OHGP=48"18742"P.T.F.92' 10M(C)PROPOSED(B)(A)(C)2121(D)STA.
STA.
MKR. #
MKR. #
STA.
MKR. #
MKR. #STA. (E)(A)(B)STA. MKR. #
STA.
MKR. #
STA.
MKR. #
STA. EXISTING(D)21(E)MKR. #STA.
MKR. #
STA.
MKR. #DBDBPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY07005N/AN/AAMW15MFP22002723
CONSTRUCTION DETAILSCROSS SECTION OF PROPOSED HDPEPROPOSED FIBER OPTIC CABLETYPICAL DETAILCONDUIT AS SPECIFIEDE/W ANY NUMBER OFINNERDUCTS AND /ORHDPE's AS SPECIFIED"B" MIN.TRENCH & PLACE CONDUITCOVERTYPICAL DETAIL6" MIN.EXISTING GRADEBURIED CABLEMARKER TAPECOMPACT BACKFILLS IN6" LAYERS WITH ROCKFREE MATERIALCONDUIT AS SPECIFIED E/WANY NUMBER OF INNERDUCTSAND/OR HDPE's, AS SPECIFIED& FIBER OPTIC CABLE12" MIN. BELOWFINISHED GRADE"A"48"PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY08006N/AN/AAMW3" CORE BORENOTE:EPOXY GROUT IS USED AT BOTH ENDS OF CORE BORE TOSEAL GAP BETWEEN 2.375" CONDUIT AND PVC SLEEVE.1-2.375" O.D. HDPEEPOXIED INTO 3"DIAM. CORE BORE1-2.375" O.D. HDPE3" O.D. DIAMETERCORE BORECONCRETE ORROCK HEADWALL(WHERE OCCURS)TYPICAL DETAIL "C"REVISIONSDATEDESCRIPTIONINITIALPROPOSED1-4" CONDUIT &FIBER CABLEBURIED CABLEMARKER TAPECOMPACT BACKFILLSIN 6" LAYERS WITHROCK FREE MATERIAL6"MIN.6"MIN.REMOVE AND REPLACE ASPH. AND CONCRETEEXISTINGASPHALTCONCRETESUB BASE(VARIES PER PERMIT REQUIREMENT)ASPHALT PAVEMENT OPEN CUTTYPICAL DETAIL "D"CROSS SECTION18" MIN.4" MIN.12"MIN.6"6"MIN.16" MIN.48" MIN.3" MIN.15MFP22002723
PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY09006N/AN/ACMWREVISIONSDATEDESCRIPTIONINITIAL2.5' x 5' x 2.5' 30K STANDARD HANDHOLE DETAILSBBAA66 1/8"63 3/8"60"59"18"29"4 1/2"10"1 3/4"3 1/2"36 1/8"33 3/8"30"5"4 1/2" KNOCKOUTS2 EACH END (4x)2 1/2"KNOCKOUTS1 EACH END(2x)2" KNOCKOUTS1 EACH END (2x)SLOTTED DRAIN(4x)8"ØSUMP30"M C I800 MCI-WORK30KM C I800 MCI-WORK30KUNISTRUTSUPPORT BEAM(2x)LOCKDOWN(2x)LIFT PIN(2x)SEE DETAIL A-1EMS MAKER (1x)NON-SKIDSURFACESEE DETAIL A-2FLUSH MOUNTPOLYMER CONCRETECOVERARMORCASTLOGO (2x)OPEN BASEPOLYMER CONCRETEDETACHABLE BASESLOTTED DRAIN(4x)LIFTING BOLT2 EACH SIDEWALLRUBBER COVER1/2" S.S. BOLTDOWNDETAIL "A"EXPLODED ISOMETRIC DETAILDETAIL "B"LOCKING DEVICECROSS SECTIONDETAIL "C"FLUSH MOUNTCOVER DETAILDETAIL A-1DETAIL A-2SECTION A-ASECTION B-BITEM123NOTE: SEALED PLASTIC BAG PLACED INSIDE VAULT TO CONTAIN:QTY(1)(2)MATERIALJOHNNY LOCK KEYS.S. JOHNNY BOLT W/ FLAT WASHERSHRINK WRAP COVERS TO FRAME FOR PACKAGING15MFP22002723
34"D
EC
8"DEC
ID
16"D
EC
IDW-101-20
W-102-
20 W-103-20HEDGEHEDGE
GATE
6' CLF
4' CLF 6' CLF
6' CL
FW-98MW
-2
0W-104
-2
0
W-105
-
20
W-106
-2
0
W-136MW
-
20W-136-
20
W-71MW
-2
0 W-139
CP
-2
0 W-175
CP
-2
0W-198C
P-
20 W-420-20
W-4TP
-2
0
W-24
1VW
-
21 W-5TP-
20
10"X3 & 12"X2DECID CLUSTER
12"DECID
2 X12"DECID
6'CLF
5'CLFEDGEOFHEDGE& UNK"DECID
5 X18"DECID
30"DECID
W-240-2
1/W-6TP-2
0
SEAHWAK TRAINING CENTER12 SEAHAWKS WAYRENTON, WA 98056R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSDSDSD SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWW
WWWWWWWWWWWWWWW
MCI0+00
1+00
2+00
3+00
4+00
5+00
6+00
7+00
8+00
9+00
10+00
11+0012+0012+98
MCIMCIMCIINDEX SHEETRENTON, WAKING COUNTYSHEET 11PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY10009N/AN/AAMWNORTHCLARIFICATION NO.QUANTITY15SHEET 12SHEET 13MFP22002723
34"DEC8"DECID16"DECID6' CLF
4' CLF W-136MW-20W-136-20W-71MW-20W-139CP-20W-198CP-20W-4TP-2010"X3 & 12"X2DECID CLUSTER
MCIMCI0+001+00PULL 132' NEW MCI 96CT FOC THROUGHEX. BUILDING ENTRANCE DUCTEXISTING MCI POP SITEACCESS EX. SITE TOPLACE NEW 96CT FOC+50' COILPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY1100950'N/AAMWNORTHCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811CLARIFICATION NO.QUANTITY410132'UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.15RENTON, WAKING COUNTYSEE SHEETTO MATCH SURVEY STA.121+324100+001132'PULL 96CT FOCMFP22002723
6' CLFW-98MW-20W-175CP-20W-241VW-21W-5TP-2012"DECID2 X12"DECID6'CLFW-240-21/W-6TP-20MCIMCI2+003+004+00
5+00
6+00 7+00 8+00
PULL 150' NEW MCI 96CT FOC THROUGHEX. BUILDING ENTRANCE DUCTBORE PITEXISTING MCI BUILDINGENTRANCE VAULTACCESS VAULT TO PLACENEW DUCT & FIBERPLACE NEW MCI 3060 HHACCESS NEW VAULT TOPLACE NEW 96CT FOC+100' COILTRENCH 2' TO PLACE (1)-4" DUCT FROM EX.MCI HH TO NEW MCI HHPULL 2' (1)-96CT FOC & 10AWG TRACER WIRETHRU NEW DUCTDIRECTIONAL BORE 500' TO PLACE (1)-4" HDPE DUCTPULL 500' NEW MCI 96CT FOC & 10AWG TRACER WIRETHROUGH NEW CONDUITTRENCH 20' TO PLACE (1)-4" HDPE DUCTPULL 20' (1)-96CT FOC & 10AWG TRACERWIRE THRU NEW DUCTMCIMCIMCIMCIMCIMCIMCIMCIMCIMCIPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY1200950'N/AAMWNORTHCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811CLARIFICATION NO.QUANTITY410672'21222'210522'2401630500'UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.15RENTON, WAKING COUNTYSEE SHEET TO MATCH SURVEY STA.13 8+04
SEE SHEETTO MATCH SURVEY STA.111+324101+321672'PULL 96CT FOC2122+8222'TRENCH2102+8232'PLACE CONDUIT2402+8441PLACE HANDHOLE2122+84520'TRENCH2102+84620'PLACE CONDUIT6303+047500'DIRECTIONALBORE2103+048500'PLACE CONDUITNOTE: SEE SHEET 14 FOR BORE PROFILE UNDERWASHDOT I-405 FREEWAYMFP22002723
W-105-20W-106-20
GRAS
S
DIRT
R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
R/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W R/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/WR/W
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSDSD
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW
WWWWWWWWWWWW
W
W
W
W
W
W
MCIMCIMCI8+00
9+00
10+
0
0
11+0
012+0012
+
9
8
EXISTING BUILDING ENTRANCE VAULTACCESS EXISTING VAULT TO PLACENEW DUCT & FIBER(PULL THRU)PULL 182' NEW MCI 1.25" PLENUMINNER-DUCT & NEW 96CT FIBERCABLE THROUGH EX. BUILDINGENTRANCE DUCTEXISTING BUILDINGMPOEROOM 1A12+50' COILBOREPITDIRECTIONAL BORE 158' TO PLACE (2)-2" HDPE DUCTSPULL 158' NEW MCI 96CT FOC & 10AWG TRACER WIRETHROUGH NEW CONDUITDIRECTIONAL BORE 154' TO PLACE (1)-4" HDPE DUCTPULL 154' NEW MCI 96CT FOC & 10AWG TRACER WIRETHROUGH NEW CONDUITPLACE NEW MCI 3060 HHACCESS NEW VAULT TOPLACE NEW 96CT FOC+100' COILMCIMCIMCIPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY1300950'N/AAMWNORTHCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811CLARIFICATION NO.QUANTITY410494'630312'210312'2401UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.15RENTON, WAKING COUNTYSEE SHEET TO MATCH SURVEY STA.12 8+04 4108+041494'PULL 96CT FOC2409+6241PLACE HANDHOLE6308+042158'DIRECTIONALBORE2108+043158'PLACE CONDUIT6309+625154'DIRECTIONALBORE2109+626154'PLACE CONDUITMFP22002723
-30-20-10010203040506070-30-20-100102030405060703+004+005+006+007
+
0
0
8+009+001
0
+
0
0
1
1
+
0
0
1
2
+
0
0 BORE PIT STA.3+04NEW MCI HHSTA 9+60EX. SEAHAWKS MHSTA 11+14PROPOSEDSDPROPOSEDSDPROPOSEDSDPROPOSEDPSE 12" GASCASINGPROPOSEDPSE 12" GASCASINGMCIPROPOSED(1)-4" DUCTMCIPROPOSED(1)-4" DUCTPROPOSEDGRADEEXISTINGGRADEWASHDOT ROWRENTON CITY ROW
WASHDOT ROW
KING COUNTY ROW
KING COUNTY ROW
PRIVATE PROPERTY
PROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL3/8"=1"=RENTON, WAREVISIONSDATEDESCRIPTIONINITIAL3/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY1400975'10'AMWCALL BEFORE YOU DIG72 HOURS NOTICE REQUIRED1-800-624-9675 or 811UNDERGROUND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE RECORDS ANDFIELD OBSERVATIONS BUT ARE NOT NECESSARILY EXACT. IT IS THE CONTRACTORSRESPONSIBILITY TO FIELD LOCATE ALL UNDERGROUND OBSTRUCTIONS ANDUTILITIES PRIOR TO CONSTRUCTION. COMPLETE REPAIR OF ANY AND ALLDAMAGES INCURRED SHALL BE AT THE EXPENSE OF THE CONTRACTOR.15RENTON, WAKING COUNTYMFP22002723
BUILDING ENTRANCE MANHOLE AT STA. 11+14,CONTRACTOR TO ACCESS EX. MH TO PLACENEW FIBER CABLEBUILDING MPOE, CONTRACTOR TOCOORDINATE ACCESS THROUGH SITE CONTACTPROPOSED EQUIPMENT LOCATION IN BUILDINGMPOE 1A12EXISTING CONDUITS FROM BUILDINGENTRANCE MANHOLE TO BUILDING MPOEPROJECT:SCALETO MPMPEXCEPT AS MAY BE OTHERWISE PROVIDED BYCONTRACT, THESE DRAWINGS AND SPECIFICATIONSSHALL REMAIN THE PROPERTY OF MCICOMMUNICATIONS SERVICES INC. BOTH BEINGISSUED IN STRICT CONFIDENCE AND SHALL NOT BEREPRODUCED, COPIED, OR USED FOR ANYPURPOSE WITHOUT SPECIFIC WRITTEN PERMISSION.TITLE: FIBER OPTIC ROUTE
OUTSIDE PLANT CONSTRUCTION
MCImetro
ACCESS TRANSMISSION SERVICES LLC
087519-001DATE:ENGINEER:DRAWN BY:HORIZONTAL:VERTICAL:SHEETOFFILE:03/24/2022WOODMAN TELCOMW.T.G032422-1NFL SEAHAWKS LATERAL1"=1"=RENTON, WA REVISIONSDATEDESCRIPTIONINITIAL03/24/22BAA DESIGNMW4/15/22DESIGNMW12 SEAHAWKS WAY1500950'N/AAMW15RENTON, WAKING COUNTYMFP22002723
05/20/2022
To Whom It May Concern;
Please allow Woodman Telcom Group act on behalf of Verizon Business/ MClmetro Access
Transmission Services Corp behalf for PDR (Poles, Ducts, Right of Way) requests in the City
of Renton.
Sincerely,
Scott Christenson
Global Transport Implementation & Engineering I Verizon Wireline Network Engr IV Spec,
West Region, WA
11311 NE 120th Street Kirkland, Washington 98034
M 425.471.1079
scott.christenson@verizon.com