Loading...
HomeMy WebLinkAboutAdden 2 - ProspectusAft Washington State State VI/ Department of Transportation Local Agency Federal Aid Project Prospectus Prefix Route ( ) Date 9-17-18 Federal Aid Project Number DUNS Number 092278894 Local Agency Project Number 1 CAG-18-125 ! WSDOT 1 Use Only ` J Federal Employer Tax ID Number 91-6001271 Agency Federal Program Title City of Renton rCAAgency Yes ❑ No ❑ 20.205 ❑ Other Project Title Start Latitude N 470 28' 55.6"]End Start Longitude W 122° 12' 10.8" Bronson Way Bridge - Seismic Retrofit and Painting End Latitude N 470 28' 56.8" 22° 12' 9.0" Lon78057-5647 Project Termini From -To Nearest City Name oject Zip Code (+4) Mill Ave. S N Riverside Dr. Renton Begin Mile Post End Mile Post Length of Project Award Type N/A N/A N/A ❑✓ Local ❑ Local Forces ❑ State ❑ Railroad Route ID Begin Mile Point End Mile Point City Number County Number County Name 900 10.72 10.75 1070 17 King WSDOT Region 737 gislative District(s) Congressional District(s) Urban Area Number Northwest Region 9 1 Total Local Agency to Phase Start Phase Estimated Cost Funding Funds Date Nearest Hundred Dollar Nearest Hundred Dollar Nearest Hundred Dollar Month Year P. E. 620,000 0 620,000 10 2018 R/W 0 0 0 N/A N/A Const. 2,380,000 0 25380,000 5 2020 Total 3,000,000 0 3,000,000 Description of Existing Facility (Existing Design and Present Condition) Roadway Width 56 feet Number of Lanes 5 Bridge built in 1939. Main span is 2 steel thru-plate girders, with deck beams spanning between them to support deck. Fracture critical. Last painted in 1999. Seismic site class E. Seismic retrofit not done since built. Description of Proposed Work Description of Proposed Work (Attach additional sheet(s) if necessary) Bridge preservation, seismic retrofit and painting. Local Agency Contact Person Derek Akesson Title Transportation Project Manager Phone 425-430-7337 Mailing Address Renton City Hall - 5th Floor, 1055 S Grady Way City nton State WA Zip Code 98057 Project Prospectus By Approving Authority Title Transportation Design Manager c) Dat�d uui rune i,+u-ivi Page Revised 04/2015 Previous Editions Obsolete Agency Project Title Date City of Renton Bronson Way Bridge - Seismic Retrofit and Painting 9-17-18 Type of Proposed Work Project Type (Check all that Apply) Roadway Width Number of Lanes ❑ New Construction ❑ Path / Trail ❑ 3-R 56 feet 5 ❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R ❑ Railroad ❑ Parking ❑ Other ❑✓ Bridge Geometric Design Data Description Through Route Crossroad ❑✓ Principal Arterial ❑ Principal Arterial Federal Minor Arterial ❑✓ Urban ❑ ❑ Minor Arterial ❑ Urban Functional ❑ Rural El collector ❑ Rural ❑ Collector Classification ❑ NHS ❑ Major Collector ❑ NHS ❑ Major Collector ❑ Minor Collector ❑ Minor Collector ❑ Local Access ❑ Local Access Terrain ❑✓ Flat [:]Roll ❑ Mountain ❑ Flat ❑ Roil ❑ Mountain Posted Speed 25 mph Design Speed N/A Existing ADT 18,280 Design Year ADT N/A Design Year N/A Design Hourly Volume (DHV) N/A Performance of Work Preliminary Engineering Will Be Performed By Others Agency Consultant 99 % 1 Construction Will Be Performed By Contract Agency Contractor 100 % 0 Environmental Classification ❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE) ❑ Project Involves NEPA/SEPA Section 404 ❑✓ Projects Requiring Documentation Interagency Agreement (Documented CE) ❑ Class II I - Environmental Assessment (EA) ❑ Project Involves NEPA/SEPA Section 404 Interagency Agreements Environmental Considerations This is not a FHWA funded project. It is a state funded project. Therefore, NEPA is not applicable. SEPA is applicable. MDNS. Executive Order 05-05 is applicable. Environmental Considerations - In water work, lane closure traffic impacts, evaluation of historical significance of existing bridge. 1 U1111 1wU- lu 1 Page 2 Revised 0412015 Previous Editions Obsolete Agency Project Title Date City of Renton Bronson Way Bridge - Seismic Retrofit and Painting 9-17-18 ay of Way Needed M ❑ Right of Way Needed nstruction required by the ❑ No Relocation ❑ Relocation Required conract can be accomplished within the exiting right of way. Utilities Railroad ❑ No utility work required Z✓ No railroad work required ❑ All utility work will be completed prior to the start [:]All railroad work will be completed prior to the start of of the construction contract the construction contract 0✓ All utility work will be completed in coordination ❑All the railroad work will be completed in coordination with the construction contract I with the construction contract Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility routing and/or temporary relocations may need to occur in order to perform this bridge preservation work. FAA Involvement Is any airport located within 3.2 kilometers (2 miles) of the proposed project? 0✓ Yes ❑ No Remarks The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge preservation work will not involve construction equipment or activities that affect airport operations. V1. his project has peen reviewed by the legislative body of the administration agency or agencies qr it's designee, and is not inconsistent with the ag c 's comprehen plan for community d v*1.1` sir i '� � Agency y```,,,•\\\,Illl�,l,,r�py,,r�� f= c° s Dated v, j By _ - Denis Law, Mayor ATTEST: DOT Form evised 4/2 Ja on A i ethr. 11 1ORs'lo 9e3 Revised 04/2015 Previous Editions Obsolete �111161bVN\\\\\\