HomeMy WebLinkAboutAdden 2 - ProspectusAft Washington State State
VI/ Department of Transportation Local Agency Federal Aid
Project Prospectus
Prefix
Route
( )
Date
9-17-18
Federal Aid
Project Number
DUNS Number
092278894
Local Agency
Project Number
1
CAG-18-125
! WSDOT 1
Use Only
` J
Federal Employer
Tax ID Number
91-6001271
Agency
Federal Program Title
City of Renton
rCAAgency
Yes ❑ No
❑ 20.205 ❑ Other
Project Title
Start Latitude N 470 28' 55.6"]End
Start Longitude W 122° 12' 10.8"
Bronson Way Bridge - Seismic Retrofit and Painting
End Latitude N 470 28' 56.8"
22° 12' 9.0"
Lon78057-5647
Project Termini From -To
Nearest City Name
oject Zip Code (+4)
Mill Ave. S N Riverside Dr.
Renton
Begin Mile Post
End Mile Post
Length of Project
Award Type
N/A
N/A
N/A
❑✓ Local ❑ Local Forces ❑ State ❑ Railroad
Route ID
Begin Mile Point
End Mile Point
City Number
County Number
County Name
900
10.72
10.75
1070
17
King
WSDOT Region 737
gislative District(s)
Congressional District(s)
Urban Area Number
Northwest Region
9
1
Total
Local Agency
to
Phase Start
Phase
Estimated Cost
Funding
Funds
Date
Nearest Hundred Dollar
Nearest Hundred Dollar
Nearest Hundred Dollar
Month Year
P. E.
620,000
0
620,000
10 2018
R/W
0
0
0
N/A N/A
Const.
2,380,000
0
25380,000
5 2020
Total
3,000,000
0
3,000,000
Description of Existing Facility (Existing Design and Present Condition)
Roadway Width
56 feet
Number of Lanes
5
Bridge built in 1939. Main span is 2 steel thru-plate girders, with deck beams spanning between them to
support deck. Fracture critical. Last painted in 1999. Seismic site class E. Seismic retrofit not done since built.
Description of Proposed Work
Description of Proposed Work (Attach additional sheet(s) if necessary)
Bridge preservation, seismic retrofit and painting.
Local Agency Contact Person
Derek Akesson
Title
Transportation Project Manager
Phone
425-430-7337
Mailing Address
Renton City Hall - 5th Floor, 1055 S Grady Way
City
nton
State
WA
Zip Code
98057
Project Prospectus
By
Approving Authority
Title Transportation Design Manager
c)
Dat�d
uui rune i,+u-ivi Page
Revised 04/2015 Previous Editions Obsolete
Agency
Project Title
Date
City of Renton
Bronson Way Bridge - Seismic Retrofit and Painting
9-17-18
Type of Proposed Work
Project Type (Check all that Apply)
Roadway Width
Number of Lanes
❑ New Construction ❑ Path / Trail ❑ 3-R
56 feet
5
❑ Reconstruction ❑ Pedestrian / Facilities ❑ 2-R
❑ Railroad ❑ Parking ❑ Other
❑✓ Bridge
Geometric Design Data
Description
Through Route
Crossroad
❑✓ Principal Arterial
❑ Principal Arterial
Federal
Minor Arterial
❑✓ Urban ❑
❑ Minor Arterial
❑ Urban
Functional
❑ Rural El collector
❑ Rural ❑ Collector
Classification
❑ NHS ❑ Major Collector
❑ NHS ❑ Major Collector
❑ Minor Collector
❑ Minor Collector
❑ Local Access
❑ Local Access
Terrain
❑✓ Flat [:]Roll ❑ Mountain
❑ Flat ❑ Roil ❑ Mountain
Posted Speed
25 mph
Design Speed
N/A
Existing ADT
18,280
Design Year ADT
N/A
Design Year
N/A
Design Hourly Volume (DHV)
N/A
Performance of Work
Preliminary Engineering Will Be Performed By
Others
Agency
Consultant
99 %
1
Construction Will Be Performed By
Contract
Agency
Contractor
100 %
0
Environmental Classification
❑ Class I - Environmental Impact Statement (EIS) ❑✓ Class II - Categorically Excluded (CE)
❑ Project Involves NEPA/SEPA Section 404 ❑✓ Projects Requiring Documentation
Interagency Agreement (Documented CE)
❑ Class II I - Environmental Assessment (EA)
❑ Project Involves NEPA/SEPA Section 404
Interagency Agreements
Environmental Considerations
This is not a FHWA funded project. It is a state funded project. Therefore, NEPA is not applicable. SEPA is
applicable. MDNS. Executive Order 05-05 is applicable. Environmental Considerations - In water work, lane
closure traffic impacts, evaluation of historical significance of existing bridge.
1 U1111 1wU- lu 1 Page 2
Revised 0412015 Previous Editions Obsolete
Agency
Project Title
Date
City of Renton
Bronson Way Bridge - Seismic Retrofit and Painting
9-17-18
ay
of Way Needed
M
❑ Right of Way Needed
nstruction required by the
❑ No Relocation ❑ Relocation Required
conract can be accomplished
within the exiting right of way.
Utilities
Railroad
❑ No utility work required
Z✓ No railroad work required
❑ All utility work will be completed prior to the start
[:]All railroad work will be completed prior to the start of
of the construction contract
the construction contract
0✓ All utility work will be completed in coordination
❑All the railroad work will be completed in coordination
with the construction contract I
with the construction contract
Description of Utility Relocation or Adjustments and Existing Major Structures Involved in the Project
A number of utilities utilize this bridge to cross over the Cedar River. Some permanent adjustments to utility
routing and/or temporary relocations may need to occur in order to perform this bridge preservation work.
FAA Involvement
Is any airport located within 3.2 kilometers (2 miles) of the proposed project? 0✓ Yes ❑ No
Remarks
The Renton Municipal Airport is located within 2 miles of the proposed project. However, this bridge
preservation work will not involve construction equipment or activities that affect airport operations.
V1.
his project has peen reviewed by the legislative body of the administration agency or agencies qr it's
designee, and is not inconsistent with the ag c 's comprehen plan for community d v*1.1` sir i '�
�
Agency y```,,,•\\\,Illl�,l,,r�py,,r��
f= c°
s
Dated v, j By _ -
Denis Law, Mayor
ATTEST:
DOT Form
evised 4/2 Ja on A i ethr. 11 1ORs'lo 9e3
Revised 04/2015 Previous Editions Obsolete
�111161bVN\\\\\\