Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
R-420010
V I- Z U-1 L I- rr < n U-1 rr V rr U-1 I- ►i U. 4' MIN. 12" DEPTH 2" - 4" ROCK 24" MIN. SETTLING DEPTH 3.5' - 5' - 1 1.5' MIN. SEDIMENT STORAGE CROSS SECTION NOTES: 1. MAY BE CONSTRUCTED BY EXCAVATION OR BY BUILDING A BERM 12" OVERFLOW DEPTH OUTFLOW CHANNEL IF r CONSTRUCTED BY S I n EXCAVATION 12" DEPTH 3/4" - 1 1/2" WASHED GRAVEL FILTER FABRIC FENCING UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 211.00 o PUBLIC WORKS APPR ED: DEPARTMENT SEDIMENT TRAP GAZ 9/28/2018 1 P�bo� wo,k: Aan,�mso-o�or DATE SEDIMENT TRAP NOT TO SCALE 0C)_ 0 1 000 Oo FLOW ,..-�. OoU �OOoU 0�0��1o�OC PLAN SECTION A SECTION B DITCH CHECK DAM (TYP.) NOTES: 1. CONDITIONS OF USE 1.1. WHERE THERE IS CONCENTRATED RUNOFF FROM DISTURBED AREAS TO AND FROM SEDIMENT PONDS OR TRAPS. 1.2. TO CONVEY RUNOFF INTERCEPTED FROM UNDISTURBED AREAS AROUND THE SITE TO A NON -EROSIVE DISCHARGE POINT. 2. MAINTENANCE STANDARDS 2.1. ANY SEDIMENT DEPOSITION OF MORE THAN 6 INCHES SHALL BE REMOVED SO THAT THE CHANNEL IS RESTORED TO ITS ORIGINAL DESIGN CAPACITY. 2.2. THE CHECK DAMS SHALL BE EXAMINED FOR SIGNS OF SCOURING AND EROSION OF THE BED AND BANKS. IF SCOURING AND EROSION HAS OCCURRED, AFFECTED AREAS SHALL BE PROTECTED BY RIPRAP OR AN EROSION CONTROL BLANKET OR NET. CHECK DAM NOT TO SCALE DITCH CHECK DAMS UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 217.40 PPR D: GAZ 9/28/2018 I 1. Pubriaworks Adn i,t,, r DATE EROSION AND SEDIMENT CONTROL (ESC) STANDARD PLAN NOTES: THE FOLLOWING IS A LISTING OF GENERAL NOTES THAT SHALL BE INCORPORATED IN THE EROSION AND SEDIMENT CONTROL (ESC) PLAN SET. ALL THE NOTES ON THE LIST MAY NOT PERTAIN TO EVERY PROJECT. THE APPLICANT OR OWNER, HEREBY REFERRED TO AS APPLICANT, MAY STRIKE OUT IRRELEVANT NOTES IF NOT APPLICABLE TO THE PROJECT. HOWEVER, THE APPLICANT SHALL NOT RENUMBER NOR EDIT THE REMAINING NOTES. IF ADDITIONAL NOTES ARE NEEDED FOR SPECIFIC ASPECTS, THEY SHALL BE ADDED AFTER THE ESC STANDARD PLAN NOTES. 1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING SHALL BE HELD AMONG THE CITY OF RENTON, HEREBY REFERRED TO AS THE CITY, THE APPLICANT, AND THE APPLICANT'S CONTRACTOR. 2. THE APPLICANT IS RESPONSIBLE FOR OBTAINING THE WASHINGTON STATE DEPARTMENT OF ECOLOGY (ECOLOGY) CONSTRUCTION STORMWATER GENERAL PERMIT, IF IT IS REQUIRED FOR THE PROJECT. THE APPLICANT SHALL PROVIDE THE CITY COPIES OF ALL MONITORING REPORTS PROVIDED TO ECOLOGY ASSOCIATED WITH THE CONSTRUCTION STORMWATER GENERAL PERMIT. 3. THE ESC PLAN SET SHALL INCLUDE AN ESC CONSTRUCTION SEQUENCE DETAILING THE ORDERED STEPS THAT SHALL BE FOLLOWED FROM CONSTRUCTION COMMENCEMENT TO POST -PROJECT CLEANUP IN ORDER TO FULFILL PROJECT ESC REQUIREMENTS. 4. THE BOUNDARIES OF THE CLEARING LIMITS, SENSITIVE AREAS AND THEIR BUFFERS, AND AREAS OF VEGETATION PRESERVATION AND TREE RETENTION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY DELINEATED BY FENCING AND PROTECTED IN THE FIELD IN ACCORDANCE WITH APPENDIX D OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL (RENTON SWDM) PRIOR TO THE START OF CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION. 5. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK -OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT. IF SEDIMENT IS TRACKED OFFSITE, PUBLIC ROADS SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY, OR MORE FREQUENTLY DURING WET WEATHER, AS NECESSARY TO PREVENT SEDIMENT FROM ENTERING WATERS OF THE STATE. 6. WASHOUT FROM CONCRETE TRUCKS SHALL BE PERFORMED OFF -SITE OR IN DESIGNATED CONCRETE WASHOUT AREAS ONLY. DO NOT WASH OUT CONCRETE TRUCKS ONTO THE GROUND, OR TO STORM DRAINS OR OPEN DITCHES. ON -SITE DUMPING OF EXCESS CONCRETE SHALL ONLY OCCUR IN DESIGNATED CONCRETE WASHOUT AREAS. 7. ALL REQUIRED ESC BMPS SHALL BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL ESC BMPS SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. ALL ESC BMPS SHALL BE REMOVED AFTER CONSTRUCTION IS COMPLETED AND THE SITE HAS BEEN STABILIZED TO ENSURE POTENTIAL FOR ON -SITE EROSION DOES NOT EXIST. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT, ENHANCEMENT, AND REMOVAL OF ESC BMPS SHALL BE THE RESPONSIBILITY OF THE APPLICANT. 8. ANY HAZARDOUS MATERIALS OR LIQUID PRODUCTS THAT HAVE THE POTENTIAL TO POLLUTE RUNOFF SHALL BE DISPOSED OF PROPERLY. 9. THE ESC BMPS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE APPLICANT SHALL ANTICIPATE THAT MORE ESC BMPS WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE APPLICANT TO ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL ESC BMPS, OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM. 10. APPROVAL OF THIS PLAN IS FOR ESC ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR STORMWATER FACILITIES. 11. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES SHALL BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL. 12. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH APRIL 30TH) OR SEVEN DAYS DURING THE DRY SEASON (MAY 1ST THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.) IN CONFORMANCE WITH APPENDIX D OF THE RENTON SWDM. 13. WET SEASON ESC REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES BETWEEN OCTOBER 1ST AND APRIL 30TH, UNLESS OTHERWISE APPROVED BY THE CITY. 14. ANY AREA NEEDING ADDITIONAL ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 15. THE ESC BMPS ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED AT A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A STORM EVENT. INSPECTION AND MAINTENANCE SHALL OCCUR MORE FREQUENTLY AS REQUIRED BY THE CITY. 16. BEFORE COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY, CATCH BASIN INSERTS PER THE CITY STANDARD PLAN 216.30 SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE INLET WILL BE CONVEYED TO A SEDIMENT POND OR TRAP. ALL CATCH BASIN INSERTS SHALL BE PERIODICALLY INSPECTED AND REPLACED AS NECESSARY TO ENSURE FULLY FUNCTIONING CONDITION. 17. AT NO TIME SHALL SEDIMENT ACCUMULATION EXCEED 2/3 OF THE CAPACITY OF THE CATCH BASIN SUMP. ALL CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM. 18. ANY PERMANENT STORMWATER FACILITY LOCATION USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY ESC BMPS AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE TEMPORARY FACILITY IS TO ULTIMATELY FUNCTION AS AN INFILTRATION SYSTEM IN ITS PERMANENT STATE, THE TEMPORARY FACILITY SHALL BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY. 19. AREAS DESIGNATED ON THE PLAN(S) CONTAINING EXISTING STORMWATER FACILITIES OR ON -SITE BMPS (AMENDED SOILS, BIORETENTION, PERMEABLE PAVEMENT, ETC.) SHALL BE CLEARLY FENCED AND PROTECTED USING ESC BMPS TO AVOID SEDIMENTATION AND COMPACTION DURING CONSTRUCTION. 20. PRIOR TO THE BEGINNING OF THE WET SEASON (OCTOBER 1ST), ALL DISTURBED AREAS SHALL BE INSPECTED TO IDENTIFY WHICH ONES SHALL BE SODDED OR SEEDED IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SODDED OR SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. AN EXHIBIT OF THOSE AREAS TO BE SODDED OR SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY FOR REVIEW. 21. PRIOR TO FINAL CONSTRUCTION ACCEPTANCE, THE PROJECT SITE SHALL BE STABILIZED TO PREVENT SEDIMENT -LADEN WATER FROM LEAVING THE PROJECT SITE, ALL ESC BMPS SHALL BE REMOVED, AND STORMWATER CONVEYANCE SYSTEMS, FACILITIES, AND ON -SITE BMPS SHALL BE RESTORED TO THEIR FULLY FUNCTIONING CONDITION. ALL DISTURBED AREAS OF THE PROJECT SITE SHALL BE VEGETATED OR OTHERWISE PERMANENTLY STABILIZED. AT A MINIMUM, DISTURBED AREAS SHALL BE SODDED OR SEEDED AND MULCHED TO ENSURE THAT SUFFICIENT COVER WILL DEVELOP SHORTLY AFTER FINAL APPROVAL. MULCH WITHOUT SEEDING IS ADEQUATE FOR AREAS TO BE LANDSCAPED BEFORE OCTOBER 1ST. 22. ROCKERIES ARE CONSIDERED TO BE A METHOD OF BANK STABILIZATION AND EROSION CONTROL. ROCKERIES SHALL NOT BE CONSTRUCTED TO SERVE AS RETAINING WALLS. ALL ROCKERIES IN CITY ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH CITY STANDARDS. ROCKERIES OUTSIDE OF ROAD RIGHTS -OF -WAY SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE INTERNATIONAL BUILDING CODE. UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS) STD. PLAN - 268.00 o PUBLIC WORKS EROSION AND SEDIMENT CONTROL PPR DEPARTMENT STANDARD PLAN NOTES GAZ 9/z8/zols P.bk wo,k: nan,�oi:eW.o DATE i /N 001 ASI-001 CJ 9/27/22 DT SURVEYED: T.L. CS 002 PROGRESSIVE CONSTRUCTION SET CJ 12/5/22 DT DESIGNED: °mm°mmPe°°ers 003 UPDATES PER CONDITIONS OF APPROVAL DT 1/27/23 DT J.N. O © O ghb ^'ey°� Wghbors 004 GRADY WAY STORMWATER REVISIONS CW 12/26/23 TS Dom ' J.N. � Nei Know what's below. 005 AS -BUILT REVISIONS AA 03/26/24 TS CHECKED: TACOMA • S EATTLE DT Call before you dig. 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422 TEL N 0. REVISION BY DATE APPR APPROVED: 1200 Sixth Avenue, Suite 1620, Seattle, WA 98101 206,267,2425 TEL � TOP I hr�, OF WASkjNCrrti �r yl�O �'� I ST)E¢�9 �SSIONAL E��1 SCAM, PER SHEET HORIZONTAL: NAD 1983/1991 ONE INCH DATUM AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY UNDISTURBED NATIVE VEGETATION UNDISTURBED NATIVE SOIL T'4' ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 3" OF COMPOST INCORPORATED INTO 5" OF SITE SOIL (TOTAL AMENDED DEPTH OF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW COMPOST AMENDED LAYER (12" BELOW SOIL SURFACE) 3"4" ARBORIST WOOD CHIP MULCH, SEE STD. PLAN 262.60 6" IMPORTED TOPSOIL MIX (COMPACTED DEPTH) SUBSOIL IS SCARIFIED 6" BELOW IMPORTED TOPSOIL MIX TURF (LAWN) AREAS PLANTING BEDS/UNDISTURBED VEGETATION, SEE NOTE 1 0" UNDISTURBED TURF (LAWN) AREAS, SEE NOTE 1 IItI��tl� �II I��II�� ll� 11 l�l�� 11 li, OPTION 1 - NO DISTURBANCE PLANTING BEDS J y 0" 8" GRASS: SEED OR SOD UNDISTURBED NATIVE SOIL 3RASS: SEED OR SOD 1.75" OF COMPOST INCORPORATED INTO 3,25" OF SITE SOIL (TOTAL AMENDED DEPTH DF 9.5", FOR A SETTLED DEPTH OF 8") SUBSOIL SCARIFIED 4" BELOW :;OMPOST AMENDED LAYER ;12" BELOW SOIL SURFACE) OPTIONS 2. 3. AND 4 - AMEND IN PLACE OR STOCKPILE AND AMEND PLANTING BEDS 0" 6" 12" OPTION 5 - IMPORTED TOPSOIL TURF (LAWN) AREAS GRASS: SEED OR SOD NOTES: 1. AREAS OF NO DISTURBANCE TO BE FENCED AND EXISTING VEGETATION AND SOIL TO BE PROTECTED FROM CONSTRUCTION IMPACTS. 6" IMPORTED TOPSOIL MIX (COMPACTED GENERAL NOTES - DEPTH) 1. TO MEASURE SETTLED DEPTH, WATER SOIL SUFFICIENTLY TO FULLY SATURATE WITHOUT CAUSING EROSION SUBSOIL IS 2. COMPOST TO MEET STD. PLAN 262.60. SCARIFIED 6" BELOW IMPORTED 3. COMPACTION OF TOPSOIL (WHERE REQUIRED) TOPSOIL MIX TO BE TO 85 % OF STANDARD PROCTOR. 4. SEE CONSTRUCTION PLANS FOR SPECIFIC PROJECT REQUIREMENTS. SOIL AMENDMENT SECTIONS UNLESS OTHERWISE NOTED, DRAWING IS NOTTO SCALE (NTS) STD. PLAN - 264.00 APPR ED: GAZ 9/28/2018 I P.briawork:Ad iW.o DATE SOIL AMMENDMENT SECTIONS NOT TO SCALE RECORD NOTE 03/26/2024 THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED ON SURVEY INFORMATION PROVIDED BY A THIRD -PARTY SURVEYOR. AHBL WILL BE RESPONSIBLE FOR THE DATA PROVIDED BY THEM. THE THIRD -PARTY SURVEYOR WILL BE RESPONSIBLE FOR THE ACCURACY OF THE ACTUAL LOCATIONS IN THE FIELD. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. CITY OF [;%Rl RENTON Planning/Building/Public Works Dept. U) T '^^ 'T L J O O T N 1 L J T J R-42001 0 I � IN COMPLIANCE WITH CITY OF RENTON STANDARDS 7 WATERSHED APARTMENTS CONSTRUCTION DRAFT SET TESC DETAILS U-1 G Q Q 0 U-1 = DATE: 03/28/2023 FIELDS", PAGE LU DRAWING NO: C3.20 Q SHEET: 10 OR 48