Loading...
HomeMy WebLinkAboutR-4200180 N It O i W z CW G Q n Q 0 W 17 rr W Q a Z a w rM I ; FG: 31 G PROPOSED CENTER OF BUS SHELTER FOUNDATION= C7.40 STA:11 +04.50, 40.59' LT' c 5 0, I�iOH) P(OH) P(OH) P(OH) P( ) P(OH) 0 ti '�'i 6C C7.30 PROPOSED SIDEWALK G: FG :` 10+00 Qra��3� Know what's b@IOW. Call before you dig. TOP 2 CURB AND GUTTER C7.30 - N 175758.14 E 1300554.78 _yZS �y�� OF 11A3 �C •(1' I STERF'9 ��ssIONAL E��ti QP/3q/IQ" TC:31.26- ( - - _ FL: 30.76 . FG: 30. 1-y 9 LF 12" DI CL52 @ 9.00% IE:27.43 12 ( E) A,Sc OTC(' �F� ST° \ s'' tic s c ctis s�yF�F`F���?� tiF iF`\ �6 • �� S• RECORD NOTE FG: 31.07- DRIVEWAY CL STA:11 +51.18, 29.89' LT EX CB# 6 RIM: 32.22 IE: g8.24 12" (S) IE: 8.24 12" (NE) 1 L 12" DI CL52 @ 0.93 0- ��-c-G-c-cc .3 /EX CB# 5 0� RIM: 31.53 ov - su - SD..--SD.- v U G - SDSDSD SD -SD ��-5 ft13+00 7/71 6 35 30 25 20 Jw _ EX MHO CITY � SINGLE WHITE STRIPE ,/ n s� A: 20+00 �� G 2 NEW CROSSWALK STRIPING 954,�0 EC7.40 1 1.71 AEG: 31.59 �IJ ILJI � ------------------------- a(�G °.S LILI LJLJ LJLJ P(uG S� ) cG/mil-�� ° Pp2 � CROSSWALK NG (TYP.)7.40 °° y°gyp 04 ko ti JGY .0 . ,. S. GR, (PUBLIC I . o01 o s � � 01, i 4F STOP BA R 03/26/2024 11 +00 11 +50 12+00 12+50 13+00 13+50 THESE RECORD DRAWINGS HAVE BEEN PREPARED BASED ON SURVEY INFORMATION PROVIDED BY A THIRD -PARTY SURVEYOR. AHBL WILL BE RESPONSIBLE FOR THE DATA PROVIDED BY THEM. THE THIRD -PARTY SURVEYOR WILL BE RESPONSIBLE FOR THE ACCURACY OF THE ACTUAL LOCATIONS IN THE FIELD. THOSE RELYING ON THIS RECORD DOCUMENT ARE ADVISED TO OBTAIN INDEPENDENT VERIFICATION OF ITS ACCURACY BEFORE APPLYING IT FOR ANY PURPOSE. Civil Eigineen 001 ASI-001 CJ 9/27/22 DT SURVEYED: sca.E: 1 ShucNraiEngirieers T.L. HOR ONiAL: VERTICAL NAD 1983/1991 - ��-p�k,G,;r.rs 002 PROGRESSIVE CONSTRUCTION SET CJ 12/5/22 DT DESIGNED, PER SHEET caamuaiyaiaaaers 003 UPDATES PER CONDITIONS OF APPROVAL DT 1 /27/23 DT J.N. O � 'I^°S-y- 004 GRADY WAY STORMWATER REVISIONS CW 12/26/23 TS DRAWN: J.N. � �hyma ONE INCH DATUM 005 AS -BUILT REVISIONS AA 03/26/24 TS CHECKED: AT FULL SCALE T A C O M A S E A T T L E DT IF NOT ONE INCH 2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422 TEL N 0 • REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY 1200 Sixth Avenue, Suite 1620, Seattle, WA 98101 206267.2425 TEL 2a OF RENTON Planning/Building/Public Works Dept. LEGEND --- -- -- -- -- -- -- -- -- -- --- EG EXISTING GRADE ELEVATION FIG FINISHED GRADE ELEVATION FL FLOW LINE ELEVATION TC TOP OF CURB ELEVATION OR X� GRADE/SLOPE ...X EXISTING MAJOR CONTOUR -XXX- - EXISTING MINOR CONTOUR XXX PROPOSED MAJOR CONTOUR XXX PROPOSED MINOR CONTOUR - - RIGHT-OF-WAY/PROPERTY LINE - CENTERLINE CONCRETE CURB AND GUTTER 2 C7.30 ASPHALT PAVEMENT -STANDARD DUTY ASPHALT PAVEMENT -HEAVY DUTY ° CEMENT CONCRETE -STANDARD 3 .p. DUTY C7.30 .; . CEMENT CONCRETE -HEAVY DUTY HMA CL�" PG 64-22, MATCH EXISTING -{- -I- THICKNESS, NO LESS THAN + + 4-INCHES. 6-INCHES CRUSHED SURFACING TOP COURSE. �- 2" GRIND AND OVERLAY, HMA" PG 64-22. GRINDING NOT REQUIRED AT FULL DEPTH REPLACEMENT AREAS. FOR ALL PLANTINGS, SEE LANDSCAPING PLAN KEYNOTES OSTREET LIGHTING AND CONDUITS PER TRAFFIC PLAN. OPEDESTRIAN PUSH BUTTON AND ASSOCIATED APPURTENANCES PER TRAFFIC PLAN. O3 BOREHOLE PER PSE PLAN. OPOWER CONDUIT (SHOWN FOR REFERENCE ONLY), FOR UNDER -GROUNDING OF POWER, SEE PSE PLAN. OSEE PSE PLAN FOR POLE RELOCATION AND ALL OTHER POWER APPURTENANCES, SHOWN FOR REFERENCE ONLY. CURB RETURN TABLE NUMBER STATION OFFSET ELEVATION DESCRIPTION 1 20+11.99 28.21' LTT 30.50 PC, R = 50.5' 2 20+33.84 15.08' LTT 30.26 M I D 3 20+59.31 14.30' LTT 30.02 PT 4 20+67.68 16.21' LTT 29.94 PC, R = 211.5' 5 20+91.05 20.17' LTT 29.73 M I D 6 21+14.71 21.50' LTT 29.60 PT 7 20+79.80 38.75' RTT 30.76 PC, R=10' 8 20+77.96 28.04' RTT 30.56 M I D 9 20+86.96 21.97' RTT 30.07 PT T T O O N u T Q J T U) IN COMPLIANCE WITH CITYRF42OO S ANDARDS � WATERSHED APARTMENTS CONSTRUCTION DRAFT SET 75 Cn GRADY WAY AVENUES. ROAD AND PAVING PLAN W a Q W DATE: 03/28/2023 = FlELDBOOK: PAGE DRAWING N0: C7.00 Q SHEET: OF: 27 48