HomeMy WebLinkAboutW-420006V )
Z
LU
73
I—
rr
Q
W
��2
vJ
rr
W
Q
zZ
J
lL
FIRE HYDRANT SHALL BE COREY—TYPE EQUAL TO IOWA F-5110 OR
COMPRESSION TYPE SUCH AS CLOW MEDALLION; M & H 929, MUELLER
SUPER CENTURION 200, AND WATEROUS PACER WITH 6" MECHANICAL
JOINT INLET WITH LUGS. 5-1/4" MAIN VALVE OPENING. TWO 2-1/2"
HOSE CONNECTIONS NATIONAL STANDARD THREADS. 4" PUMPER
CONNECTION CITY OF SEATTLE THREADS WITH A STORZ ADAPTOR,
4.875" SEATTLE THREAD X 5" STORZ, ATTACHED WITH 1/8" STAINLESS
STEEL CABLE. 1-1/4" PENTAGON OPERATING NUT. FIRE HYDRANT TO
BE PAINTED WITH TWO COATS OF PAINT. KELLY—MOORE/PRESERVATIVE
PAINT No. 5780-563 DTM ACRYLIC GLOSS, SAFETY YELLOW OR
APPROVED EQUAL. PUMPER CONNECTION TO FACE ROADWAY OR AS
DIRECTED BY RENTON FIRE DEPARTMENT. FIRE HYDRANT EXTENSION TO
BE USED IF REQUIRED.
MIN. 18" TO 20" BEHIND BACK OF
CURB OR 12" BEHIND BACK OF
SIDEWALK THAT IS ADJACENT TO
CURB
4.875" x 5" STORZ
5'x5'x6" THICK CONCRETE PAD AR
HYDRANT. FINISH TO MATCH SIDE
EXPANSION JOINT AT
00° BACK OF SIDEWALK
fCONCRETE SIDEWALK
OR PLANTING STRIP
36" MIN
COVER
3'
WALK.
2"
CONCRETE
THRUST BLOCK
16" x 8" x 4" MININUM
CONCRETE BEARING
BLOCK UNDER HYDRANT
1
�6
CUT
TWO—PIECE CAST IRON VALVE BOX WITH LUG
TYPE COVER. EQUAL TO OLYMPIC FOUNDRY CO.
STANDARD 8" TOP SECTION WITH REGULAR BASE
SECTION LENGTH TO FIT. VALVE NUT EXTENSION
AS REQUIRED.
RAISED PAVEMENT MARKER TYPE 88—A
STIMSONITE TWO—WAY BLUE REFLECTIVE
CONCRETE BLOCKING
MAIN LINE TEE. WITH 6" FLANGE SIDE OUTLET.
6" GATE VALVE (FL X MJ) AWWA C-509, RESILIENT SEAT
6" DUCTILE IRON PIPE, CLASS 52 CEMENT LINED, LENGTH TO FIT
2-3/4" COR—TEN STEEL TIE RODS.
1/2 YARD OF 1-1/4" WASHED DRAIN ROCK
1' ABOVE BOOT FLANGE. PLACE 8 MIL
POLYETHYLENE FILM AROUND TOP AND SIDES OF
GRAVEL.
FIRE HYDRANT ASSEMBLY
LEVEL ALL GROUND
MIN 3' RADIUS
ONE MAN ROCK-
1
6
6" CONCRETE PAD
LEVEL ALL GROUND
MIN 3' RADIUS
6" CONCRETE PAD
FI LL
HYDRANT LOCATION IN CUT OR FILL
�'UBILIC WORKS FIRE HYDRANT ASSEMBLY STD. PLAN — 310.1
DEP ARTM7NT
FIRE HYDRANT ASSEMBLY
NOT TO SCALE
Know what's below.
Call before you dig.
0511212022
WASTEWATER UTILITY STANDARD NOTES
1 ALL WORK AND MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY
OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND
SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS
A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION
2 DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 HORIZONTAL CONTROL
SHALL BE NORTH AMERICAN DATUM 1983/1991 UNLESS OTHERWISE APPROVED BY THE CITY BENCHMARKS
AND MONUMENTS SHALL BE REFERENCED ON THE APPROVED PLANS
3 A PRE -CONSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW
CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS,
INCLUDING STREET USE PERMITS, PRIOR TO STARTING CONSTRUCTION INSPECTION WILL BE ACCOMPLISHED
BY A REPRESENTATIVE OF THE CITY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PUBLIC
WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION
4 THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS
UNLESS OTHERWISE APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT AN APPROVED TRAFFIC
CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT-OF-WAY
5 CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND
FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL,
STATE AND FEDERAL REQUIREMENTS.
6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE
THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF RCW 19122 A DIG TICKET SHALL BE
OBTAINED A MINIMUM OF TWO BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION THE CONTRACTOR
SHALL HAVE A COPY OF THE DIG TICKET ON SITE AT ALL TIMES
7. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH
OF 12-INCHES, MAXIMUM DEPTH 18-INCHES, THOROUGHLY COMPACTING EACH LAYER TO 95 PERCENT OF
MAXIMUM DENSITY THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE
PIPE OR TO THE SIDE OF THE TRENCH MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL BE
EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL (9-03.19).
8 SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER-GASKETED ASTM D 3034, SDR 35,
C900IC905 OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE CITY
9 SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC)
UNLESS APPROVED BY THE CITY IF A SANITARY SEWER IS TO BE LOCATED UNDER ANY STRUCTURE (WALL,
BUILDING FOUNDATION, ETC.), IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE
OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412
10. OPEN -CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAYS SHALL BE
BACKFILLED WITH CRUSHED SURFACING AGGREGATE (WSDOT SPECIFICATION 9-03 9(3) AND MECHANICALLY
COMPACTED UNLESS OTHERWISE APPROVED BY THE CITY
11 ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH
THE STANDARDS AND SPECIFICATION OF THE CITY AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS
AND SPECIFICATION AS APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS &
SPECIFICATIONS THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE
FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED
ON A UNIFORMLY DENSE, UNYIELDING BASE PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN
405
12 ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF
THE CITY FOR THE PREVENTION OF ON -SITE EROSION BOTH DURING CONSTRUCTION AND AFTER THE
COMPLETION OF CONSTRUCTION IN ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL
13 THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF THE SANITARY SEWER
SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED
PROFESSIONAL SURVEYOR
SSSS , PLAN - 423
,� PUBLIC WORKS WASTEWATER UTILITY APPROVED
wit DEPARTMENT STANDARD NOTES Martin PastuchaO/26/2
Nbkwork:Mm 41,tw DATE
WATER PLAN GENERAL NOTES Standard Plan No. 300
1. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE CITY OF RENTON PUBLIC WORKS
STANDARD SPECIFICATIONS AND SPECIAL PROVISIONS AND WSDOT / APWA STANDARD SPECIFICATIONS, LATEST EDITION AS
AMENDED BY THE CITY OF RENTON. A SET OF CITY APPROVED PLANS SHALL BE KEPT ATTHE JOB SITE WHENEVER CONSTRUCTION
IS IN PROGRESS. A PRE -CONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF CONSTRUCTION. THE CONTRACTOR
AND OR DEVELOPER SHALL BE RESPONSIBLE FOR SECURING ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION.
2. ALL EXISTING UTILITIES SHALL REMAIN IN SERVICE DURING CONSTRUCTION UNLESS OTHERWISE NOTED. THE CONTRACTOR SHALL
CALL 1-800-424-5555 TO VERIFY UTILITY LOCATIONS BEFORE BEGINNING EXCAVATION.
3. ALL MATERIALS USED FOR THE CONSTRUCTION OF WATER SYSTEM IMPROVEMENTS SHALL BE NEW AND UNDAMAGED, AND
"CATALOG CUTS" FOR ALL MATERIALS SHALL BE APPROVED IN WRITING BY THE CITY OF RENTON PRIOR TO BRINGING ANY
MATERIALS ON -SITE.
4. ALL WATER MAIN PIPE MATERIALS SHALL BE CEMENT LINED DUCTILE IRON PIPE, THICKNESS CLASS 52 PER AWWA C 151 AND C
104. PIPE JOINTS SHALL BE PUSH -ON OR MECHANICAL JOINT. CAST IRON OR DUCTILE IRON PIPE FITTINGS SHALL BE CLASS 250 AS
PER ANSI/AWWA C110/A21.10-82. ALL DUCTILE IRON PIPE AND FITTINGS SHALL BE WRAPPED WITH 8-MIL BLACK, TUBE -TYPE,
POLYETHYLENE PLASTIC PER AWWA C105 STANDARDS.
5. MINIMUM COVER FROM TOP OF WATER MAINS TO FINISHED GRADE SHALL BE 36 INCHES FOR PIPE DIAMETER OF 10-INCH OR LESS
AND 48 INCHES FOR PIPE DIAMETER OF 12-INCH AND LARGER. MAXIMUM COVER FOR ALL WATER MAINS SHALL BE 60 INCHES.
ANY DEVIATIONS MUST BE APPROVED BY THE CITY OF RENTON PRIOR TO CONSTRUCTION. WHERE UTILITY CONFLICTS OCCUR,
THE PROFILE OF THE WATER MAIN SHALL BE ADJUSTED AS NECESSARY TO CLEAR CONFLICTS AND TO PROVIDE MINIMUM COVER.
PIPE DEFLECTION SHALL NOT EXCEED ONE-HALF OF PIPE MANUFACTURER'S SPECIFICATION FOR SIZE OF PIPE USED. ALL TRENCH
BACKFILL SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY AS DETERMINED BY THE MODIFIED PROCTOR TEST
METHOD (MDD) IN ROADWAYS, ROADWAY SHOULDERS, ROADWAY PRISM AND DRIVEWAYS, AND 85 PERCENT MDD IN UNPAVED
AREAS. ALL PIPE ZONE COMPACTION SHALL BE 95 MDD.
6. CONCRETE BLOCKING FOR WATER MAINS SHALL BE DESIGNED, INSTALLED AND POURED IN PLACE IN ACCORDANCE WITH CITY OF
RENTON STANDARD DETAILS AND SPECIFICATIONS AND SHALL BE INSTALLED AT ALL VERTICAL AND HORIZONTAL BENDS, FITTINGS
AND BASE OF HYDRANTS. MEGA -LUGS (OR SIMILAR PRODUCT) MAYBE REQUIRED ON ALL MECHANICAL JOINTS IN ADDITION TO
CONCRETE BLOCKING.
7. ALL NEW WATER MAIN PIPES AND FITTINGS SHALL HAVE A FOAM PIPE PIG RUN THROUGH THEM PRIOR TO BEING FLUSHED,
DISINFECTED, AND TESTED. CLEANING, PRESSURE AND PURITY TESTING SHALL BE DONE IN THE PRESENCE OF AND UNDER THE
SUPERVISION OF A CITY OF RENTON UTILITY INSPECTOR. THE CONTRACTOR SHALL SUPPLY, INSTALL AND REMOVE PLUGS,
CORPORATION STOPS, BLOW -OFF ASSEMBLIES, AND THRUST RESTRAINT / BLOCKING FOR TESTING AND PURITY ACCEPTANCE. NO
CONNECTION SHALL BE MADE BETWEEN THE NEW MAIN OR BETWEEN THE NEW WET -TAP VALVE TO AN EXISTING MAIN UNTIL
THE NEW PIPING HAS BEEN FOAM -PIGGED, DISINFECTED, FLUSHED, AND PASSED BOTH PRESSURE AND PURITY TESTING.
8. NEW WATER MAINS INCLUDING SERVICE LATERALS SHALL BE TESTED AT A STATIC PRESSURE OF 150 PSI ABOVE WORKING
PRESSURE WITH A MINIMUM OF 225 PSI TEST PRESSURE FOR 120 MINUTES WITH A MAXIMUM OF 5 PSI PRESSURE DROP DURING
THE ENTIRE TEST PERIOD. UPON SATISFACTORY COMPLETION OF THE PRESSURE TEST, THE LINE SHALL BE DISINFECTED, FLUSHED,
AND THEN WATER SAMPLES SHALL BE TAKEN FOR PURITY TESTING BYTHE PUBLIC WORKS INSPECTOR.
9. THE CONTRACTOR SHALL NOTIFY THE CITY OF RENTON WATER UTILITY AND MAINTENANCE DEPARTMENTS AT LEAST 10 WORKING
DAYS PRIOR TO MAKING CONNECTIONS TO THE EXISTING WATER SYSTEM. THE CONTRACTOR SHALL EXPOSE THE EXISTING WATER
MAIN AND FITTINGS AT THE CONNECTION POINT BEFORE ORDERING THE NECESSARY ADAPTORS AND FITTINGS REQUIRED FOR
THE FINAL CONNECTION. THE CONTRACTOR SHALL EXCAVATE, REMOVE ALL SURFACE MATERIALS, AND PROVIDE SHORING AND
ALL MATERIALS REQUIRED FOR THE CITY OF RENTON TO PERFORM THE CONNECTION TO THE EXISTING WATER SYSTEM. THE
CONTRACTOR SHALL PROVIDE AND INSTALL BACKFILL, CONCRETE BLOCKING, AND COMPLETE SURFACE RESTORATION.
ti�Y O
O i► '{' PUBLIC WORKS STD. PLAN — 300.0
DEPARTMENT WATER PLAN GENERAL NOTES
MARCH 2O10
TESTING DETAIL
i4 CT
W-A"
TAPPING TEE (MJxFL)
TAPPING GATE VALVE (FL XMJ)
TEMPORARY PLUG (MJ) WITH 2—INCH TAP
AND 2—INCH BLOW —OFF ASSEMBLY
CONCRETE BLOCKING
IEW D.I. WATER LINE
VERTICAL CROSS(MJxFL) FOR POLYPIGGING
1—BLIND FLANGE ON TOP WITH 2" TAP AND 2" PLUG
1—BLIND FLANGE ON BOTTOM
1—PLUG(MJ) WITH 2"TAP & 2" BLOW —OFF
TEMPORARY BLOCK
FINAL CONNECTION DETAIL
' NEW D.I. WATER LINE
AFTER ALL CLEANING BY POLYPIG, PRESSURE TESTING
AND DISINFECTION, REMOVE TEMPORAY BLOCK & BLOW —OFF
AND CONNECT TO VALVE WITH D.I. SLEEVE (MJ) & D.I. SPOOLS
FINAL CONNECTION BY CITY FORCES
NOTES:
1. TAPPING TEES SHALL BE MADE OF CAST IRON, DUCTILE IRON OR
EPDXY —COATED STEEL. BOLTS AND NUTS SHAL BE COR—TEN. ALL TEES
AND VALVES SHALL BE WATER TESTED BEFORE TAP
2. NO SIZE ON SIZE TAPS ON CAST—IRON WATER LINES. TAP SHALL BE AT
LEAST 2" SMALLER DIAMETER THAN THE EXISTING MAIN.
3. NO WET TAP ON ASBESTOS CEMENT LINE OR STEEL LINE
4, WET —TAPPING OF EXISTING CITY OF RENTON WATER MAINS WILL BE DONE BY
SPEER TAP OR SUPERIOR TAPPING INC.
5. CONTRACTOR SHALL POTHOLE AND VERIFY THE HORIZONTAL AND VERTICAL
ALIGNMENT OF EXISTING LINE OR STUB AND SHALL START LAYING THE NEW
LINE AT THE SAME HORIZONTAL AND VERTICAL ALIGNMENT OF THE EXISTING
STUB.
6. CITY FORCES WILL PERFORM THE FINAL CONNECTION FROM THE WATER LINE
TO THE TAPPING VALVE WITH D.I. SLEEVE AND D.I. SPOOL.
tiY �
AL + PUBLIC WORKS CONNECTION TO WATER MAIN WITH STD. PLAN — 300.1
�'. $ DEPARTMENT TAPPING TEE & VALVE
�N20 MARCH 2O10
CONNECTION TO MAIN WITH TAPPING TEE
NOT TO SCALE
LO
T
T
LO
C)
C)
T
N
U
T
N
a
J
T
W-420006 U)
IN COMPLIANCE WITH CITY OF RENTON STANDARDS ~
Z
W
DEVELOPMENT ENGINEERING
JChavez 05/17/2022
:01
WATER UTILITY Q
Lagafour 05/19/2022 '
0
Civil Ergiriews
1 PERMIT REVISION JN 3/18/22 DT SURVEYED: SCALE: DATE LLI
1 sm n aiEngmaa� T.L. VERTICAL"AV° 1988 • WATERSHED APARTMENTS / / 2
2 PERMIT REVISION JN 4/25/22 DT PER SHEET HORIZONTAL NAD 1983/1991 03 18 2022
La�Mscape Arohdects DESIGNED: ® CITY OF FlELDBOOK:
— communiryPanne 3 PERMIT REVISION JN 5/12/22 DT J.N. R RENTON CIVIL CONSTRUCTION PERMIT U)
La�MSurveyas
DRAWN: PAGE
H] B] L
J.N. ONE INCH • DRAWING NO: W
Nel9hbas DATUM Planning/Building/Public Works De t. PUBLIC WATER DETAILS C6.50
CHECKED: AT FULL SCALE
TACOMA • SEATTLE DT IF NOT ONE INCH P Q
r�Z
2215 North 30th Street, Suite 300, Tacoma, WA 98403 253.383.2422 TEL N 0. REVISION S 10 N BY DATE APPR R APPROVED: SCALE ACCORDINGLY SHEET: OF:
1200 Sixth Avenue, Suite 1620, Seattle, WA 98101 206.267.2425 TEL n 46