Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout10�.
Department
LUA_00-01„—__ 9, SA -A,
City of Renton P/8/PW Dep C=
administrative Site Plan .4pproval & Envirowne Review Committee Staff Report
__ --- page 2 of e
WIZARD— S CHILD CAR_ E CEN7E—„_ _-0
---=-- _�
REPORT AND DECISION OF MARCH 7, 2000 ---- f
PART PROJECT JF
DESGRIPTIONIBAGKGI�O�N_ Dare -----ter tthei p ate campus
to develop a childoffice buildings totaling
The applicant, Wizards of the Coast, is proposing
located in the Green River Valley. The site is developed with four, two-story office
are also located on the
gross square feet. Associated parking, utility and tenor landscape
208,752 g hoses, which include interior and exterior alterations to the existing
site. The proposal consists of two phases,
building and site.
and is
nded
ould alter approximately 3,720 square feet within the building
Phase I would be located on the south ha oefVhe west office building on the firststory de of tinseportion "o`
accommodate up to 46 children. This care center. Approximately 4,25C square fee
la area. The new play area, which would require the
footprint for the creation of the day care foot anopy,
the building would be converted to da Poutdoor
ka 9 is also proposed to include a 560 square
removal of existing landscaping
d 4,600
Approximately 6,100 square feet within the ity and outdoor play area
Phase II, which would be located on hewestPide of the same building, would be designed to
accommodate up to 56 additional children.
is also proposed for the phase 11 outdoor play area.
square feet outside sof the quarebootcanwould be converted to a second child care
for the site — — --� —
PART TWO_ENViR®---MEN�pI- REVIEW
lance with RGW 4°.21C 240, the fallowing prcj ironmental review addresses only those
In comp uatel addressed under existing development standards and
project impacts that are not adeq Y
environmental regulatons.
A. Environmental Impacts various City Departments and Divisionsipt a determine
The proposal was circulated and reviewed by
whether the applicant has adequately identified veand
addressed environmental impacts anticipate o
occur in conjunction with the proposed
1, Earth c halt paving areas as well as
The proposal wo
s: uld require the disturbance of the exiting asphalt,
existing landscaping.
The rase of fill is also prop©sad in both phases in orde�aoimately 20level
cubi play
roximate. 279 cubic yards of fill. Phase II is anticipated fill materials
areas adjacent to the remodeled building areas. Phase I would include apP
yards of excavation and app approximately 335 cubic yards of fill. Theproposed quarry
excavation of 15 cubic yards and imported structural fill from an approved
would consist of on -site excavated materials and imp
source as supplement. No r.ative material would be disposed of of -site.
Mitioation Measure: No further mitigation is recommended.
Poiic Nexus: NIA
2. Water
Impacts: The p la areas would be
proposal would not significantly aiter the the oppSea outdoo t Of impervious
p Y us surface for e
the runoff to connection points with the
site. Small increases in storm :eater run-off created by
collected by drains and/or catch basins which would carry ouffall,
existing drainage system. e existing
h an outlet cuntr I strgcture anelsiprap h Street surface
drainage system, after passing line, The proposal does
within the 200-foot boundary regulated by toe City's Shoreline master
Springbrook Creek is locav d within 450 feet of the site's western property
j not include any activities
Program.
sarpt