Loading...
HomeMy WebLinkAboutC21003180 Sumpter Short Plat - Construction Close Out CompleteAllison, Trent, Barry, All construction work associated with the Sumpter Short Plat has been completed and the City has signed off on the Construction Portion of the Civil Construction Permit today. Please note that with the sign off of this permit, your 2-year Maintenance Period begins today with your maintenance period ending on 12/19/2024. If you have any questions, please let us know. NATHAN JANDERS, P.E., Civil Engineer III City of Renton | CED | Development Engineering Division 1055 S Grady Way | 6th Floor | Renton, WA 98057 Virtual Permit Center <https://rentonwa.gov/cms/One.aspx?portalId=7922741&pageId=17625638> | Online Applications and Inspections <https://permitting.rentonwa.gov/#/home> (425) 430-7382 | NJanders@rentonwa.gov