Re: Oversizing/Extra Depth Compensation RequeSt; File No. UC-04-005
Earlington Ridge Development
Dear Mr. Jones:
At the regular Cduncil meeting of June 21, 2004,,the Renton City Councii approved the
recommendation of the Utilities Committee to compensate Lakeridge Development in an
` amount not to exceed$143,f 16 for the install`afion of sanitary sewermains associated
with the Earlington Ridge development project located near Steuens Avenue SW and
South 134th Street. A copy of the commitfee report<is enclosed.
: Sincerely,
i����c� �
Michele Neumann
Deputy City Clerk
cc`. Mayor Kathy Keolker-Wheeler
Council President Don.Persson
Lys Hornsby,Utility Systems Director
Dave Christensen, Utility Engineering Supervisor
1055 South Grady Way-Renton,Washington 98055-(42S)430-6510/FAX(425)430-6516- R E N T O N
� . � � � �This paper contains 50%recyded material,30%post consumer � A H E A D�O F T H E C U R V E
• June 21,2004 � Renton City Council Minutes � Page 212
with the City's priorities in supporting infrastructure improvements for
economic development projects in the Downtown and Highlands areas.
First Savings Bank may request additional funding through City Council if 50%
of the bank's final cost for the waterline exceeds the City's contribution of
$50,000 plus the City's cost for the asphalt overlay of one-half the street.
The Committee also recommended that Council authorize the funding of
$50,000 to come from the Water Utility's 2004 Capital Improvement Project
budget contingency fund for the Downtown Core Rehabilitation,account no.
421.500.18.5960.34.65.055290. MOVED BY CLAWSON, SECONDED BY
PALMER,COUNCII.CONCUR IN THE COMMITTEE REPORT.
CARRIED.
Utility: Oversizing Request for Utilities Committee Chair Clawson presented a report regarding the request by
Compensation,Earlington Lakeridge Development for approval of required oversizing and extra depth
Ridge,Lakeridge Development compensation for the installation of sanitary sewer mains associated with its
Earlington Ridge development, located near Stevens Ave. SW and S. 134th St.
i��'a"� ��Q�
The Committee concuned in the recommendation of the
Planning/Building/Public Works Department that Council approve the request
by Lakeridge Development for oversizing and extra depth,in accordance with
City Code 4-6-010.C, in an amount not to exceed$143,616. MOVED BY
CLAWSON, SECONDED BY NELSON,COUNCIL CONCUR IN THE
COMMTTTEE REPORT. CARRIED.
Utility: Sewer Service Utilities Committee Chair Clawson presented a report concurring with the
. Connection Request, 154th recommendation of the Planning/Building/Public Works Department that
Ave SE,Levack Council approve the Morris and Verna Levack request for connection to sewer
service of one existing single-family home on an existing platted single-family
lot,located at 13815 154th Ave. SE,King County Parcel No. 146340-0016.
The Committee further recommended that the applicants execute a covenant to
annex document and an agreement that all development on the parcel is in
compliance with Renton zoning and development standards. MOVED BY
CLAWSON, SECONDED BY NELSON, COUNCII.CONCUR IN THE
COMMITTEE REPORT. CARRIED.
Utility: Sewer Service Utilities Committee Chair Clawson presented a report concurring with the
Connection Request, 154th recommendation of the Planning/Building/Public Works Department that
Ave SE,Fattore Council approve the Robert Fattore request for connection to sewer service of
one existing single-family home on an existing platted single-family lot,located
at 138XX 154th Ave. SE, King County Parcel No. 146340-0017.
The Committee further recommended that the applicant execute a covenant to
annex document and an agreement that all development on the parcel is in
compliance with Renton zoning and development standards. MOVED BY
CLAWSON,SECONDED BY NELSON,COUNCIL CONCUR IN THE
COMMITTEE REPORT. CARRIED.
RESOLUTIONS AND The following ordinances were presented for first reading and refened to the
ORDINANCES Council meeting of 6/28/2004 for second and final reading:
Planning: Downtown Core An ordinance was read amending Section 4-4-080 of Chapter 4,Citywide
Off-Street Parking Property Development Standards,of Title IV (Development Regulations)of
Requirements City Code by creating parking standards for development in the downtown
.
����� � �., „�;,a
� `�` � s��<,�4
���������,�
UTILITIES COMMITTEE
COMMITTEE REPORT Dat��,l �Q
June 21,2004
Lakeridge Development Request for Oversizing/Extra Depth Compensation—Earlington
Ridge Development
(Referred June 7, 2004)
Lakeridge Development has submitted a zequest to Council to approve required oversizing
and extra depth compensation for the installation of sanitary sewer mains associated with its
Earlington Ridge development.
The Utilitias Committee Concurs in the recommendation of the Planning/Building/Public
Works Department that Council approve the request by Lakeridge Development for
Oversizing/Extra Depth, in accordance with Section 4-6-010C of City Code, in an amount not
to exceed $143,616.
�
_.�___--
Marcie Palmer, Member
Toni Nelson, Substi ' Member
cc: Lys Hornsby
Dave Christensen
v✓✓ �
From: David Christensen
To: Neumann, Michele
Date: 6/23/2004 7:50:49 AM
Subject: Re: Lakeridge Development
Michele,
The info is:
Wayne Jones
Lakeridge Development
P.O. Box 146
Renton, WA 98057-0146
Dave C.
»> Michele Neumann 06/23/2004 6:32:20 AM »>
Hi Dave,
Please provide me with the address and contact name for Lakeridge Development (they made an
oversizing request). I need to send them a copy of the committee report that was approved at Monday's
Council meeting.
Thanks,
Michele
June 7,2004 ``'� Renton City Council Minutes � Page 187
Planning: Primary Use Surface Economic Development,Neighborhoods and Strategic Planning Department
Parking Lots Development, recommended incorporation of new policies for park and ride facilities in the
Park&Ride Lots Comprehensive Plan, and adoption of�an ordinance establishing regulations for
primary use and shared-use parking for park and ride facilities. Refer to
. PlanninQ and Develo�ment Committee; set public hearing on 6/14/2004.
Utility: Oversizing Request for Planning/Building/Public Works Department recommended approval of the
Compensation,Earlington request from Lakeridge Development for compensation in an amount not to
Ridge,Lakeridge Development exceed $143,616 for oversizing the sewer main for the Earlington Ridge
�� development located near Stevens Ave. SW and S. 134th St. Refer to Utilities
Committee.
Solid Waste: Residential Utility Systems Division requested a briefing on the planned residential solid
Collection Reroute waste collection reroute scheduled to occur in late June. Refer to Committee of
the Whole.
CAG: 03-168,Maplewood Utility Systems Division recommended approval of an amendment to CAG-03-
Water Treatment Facility 168, agreement with Economic and Engineering Services,Inc.,for additional
Improvements,Economic and geotechnical services in the amount of$71,976.35 for the Maplewood Water
Engineering Services Treatment Improvements and Golf Course Improvements project. Council
concur.
Utility: Surveying Services Utility Systems Division requested approval of the Surveying Services Roster
Roster, 2004-2007 2004-2007, listing ten professional land surveyors. Council concur.
Fire: International Fire Code Fire Department recommended approval to adopt the 2003 International Fire
(2003)Adoption,Fire Code and associated amendments, to amend the fire prevention fees, and to
Prevention Fees establish penalties for violations. Refer to Planning and Development
Committee.
MOVED BY BRIERE, SECONDED BY CORMAN, COUNCIL APPROVE
THE CONSENT AGENDA AS PRESENTED. CARRIED.
Development Services: Councilman Corman commented on the national building codes and the State
Building Codes Adoption, law that goes into effect on July lst,which bans open flame gas and charcoal
Barbecue &Christmas Tree grilling on combustible apartment or condominium decks that lack sprinklers,
Bans and bans cut Christmas trees in apartments and churches that lack sprinklers.
He indicated that in the context of the fireworks discussions,more effort is
being made overall to control fire risks.
Mayor Keolker-Wheeler pointed out that Renton law can be more restrictive
than State law; however, it cannot be less restrictive. She stated that effort is
being made on the State level to reduce the restrictions,particularly those on
the display of Christmas trees, but there is not much that can be done on the
local level.
CORRESPONDENCE Correspondence was read from Robert Fattore, 13810 152nd Ave. SE,Renton,
Citizen Comment: Fattore- 98059, requesting connection to Renton's sewer for property he is purchasing at
Sewer Service Connection 138XX 154th Ave. SE, located outside the City limits. MOVED BY BRIERE,
Request for Property Outside SECONDED BY CLAWSON, COLINCIL REFER THIS
City Limits, 154th Ave SE CORRESPONDENCE TO THE UTILI'TIES COMMITTEE. CARRIED.
Citizen Comment: Levack- Correspondence was read from Morris and Verna Levack, 13815 154th Ave.
Sewer Service Connection SE,Renton,98059,requesting connection of their property located outside the
Request for Property Outside City limits to Renton's sewer. MOVED BY CLAWSON, SECONDED BY
City Limits, 154th Ave SE LAW, COiJNCIL REFER THIS CORRESPONDENCE TO THE LJTILITIES
COMMI'I'TEE. CARRIED.
� C�,✓Y OF RENTON COUNCIL AGEND`A"�ILL
AI#: •
Submitting Data: For Agenda of: June 7, 2004
Dept/Div/Board.. Planning/Building/Public Works
Staff Contact...... Dave Christensen Agenda Status
Consent.............. X
Subject: Public Hearing..
Lakeridge Development Request for Correspondence..
Oversizing/Extra Depth Compensation—Earlington Ordinance.............
Ridge Development Resolution............
Old Business........
Exhibits: New Business.......
Issue Paper Study Sessions......
Exhibit Map Information.........
Recommended Action: Approvals:
Refer to Utilities Committee Legal Dept.........
Finance Dept...... X
Other...............
Fiscal Impact:
Expenditure Required... $143,616 Transfer/Amendment.......
Amount Budgeted....... $0 Revenue Generated.........
Total Project Budget $1,215,000 (421/45300) City Share Total Project..
SUMMARY OF ACTION:
Lakeridge Development is developing a new single-family plat known as Earlington Ridge. As
part of the Wastewater Utility's review of the development, we have worked with the
Developer to build the sewer system in such a manner as to eliminate the Section's need to
make certain capital improvements needed to serve the West Hill portion of our service area.
These revisions to the developer's plans result in a larger sewer main than needed for the
development, as well as increased depth beyond what would be needed to serve the
development and originally identified basin. As such, in accordance with Section 4-6-OlOC of
City Code, the developer is requesting to be compensated for his additional costs associated
with this work.
STAFF RECOMMENDATION:
It is the recommendation of the Planning/Building/Public Works Department that Council approve
the request by Lakeridge Development for Oversizing, in accordance with Section 4-6-OlOC of City
Code, in an amount not to exceed $143,616.
H:\File Sys\WWP-WasteWater\WWP-03-0000 Correspondence-Wastewater\davec\Sewer_Avail_EarlingtonRidge_Oversizing_AB.doc\DMCtp
. �,, �,.rrr
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: May 26, 2004
TO: Don Persson, Council President
Members of the Renton City Council
VIA: Mayor Kathy Keolker-Wheeler �
�
FROM: Gregg Zimmermar�Ad�mmistrator
Planning/Building/Public Works
STAFF CONTACT: Dave Christensen, x-7212
SUBJECT: Lakeridge Development Request for Oversizing/E�rtra Depth
Compensation — EarGngton Ridge Development
ISSUE:
Lakeridge Development is developing a new single-family plat known as Earlington Ridge. As
part of the Wastewater Utility's review of the development, we have worked with the
Developer to build the sewer system in such a manner as to eliminate the Section's need to
make certain capital unprovements needed to serve the West Hill portion of our service area.
These revisions to the developer's plans result in a larger sewer main then needed for his
development, as well as increased depth beyond what would be needed to serve the
development and originally identified basin. As such, in accordance with Section 4-6-OlOC of
City Code, the developer is requesting to be compensated for his additional costs associated
with this work.
RECOMMENDATION:
• It is the recommendation of the Planning/Building/Public Works Department that Council
approve the request by Lakeridge Development for Oversizing, in accordance with Section
4-6-OlOC of City Code, in an amount not to exceed $143,616.
BACKGROUND SUMMARY:
Lakeridge Development has been working on preparing engineering plans for its proposed
Earlington Ridge Development located on the West Hill near Stevens Avenue SW and S 134�'
Street. The plat is located outside Renton City Limits, but within our agreed upon sewer
service area with the Skyway Water and Sewer District. In addition, the plat received sewer
availability from the City prior to our current code that would preclude the City from
providing sewer service to a new development outside the Renton Ciry Limits.
May 26, 2004 � �;�y,
Page 2
During review of the plans, Wastewater staff recognized an opportunity to utilize the routing of
the new sewer main for this development as part of our needed interceptor to serve a portion of
the West Hill area that allows for the eventual elimination of the City's Earlington Lift Station.
The City has had an on-going capital project for this new interceptor, but we have put this
work on hold to allow the utility to concentrate on higher priority needs in the system. With
the development moving forward at this time and with the opportunity to partner with the
development to install a portion of the system as part of the development at a significant
savings to the City, the developer is proceeding with his project with the included changes
requested by Wastewater Staff.
The changes to the initial plans include upsizing the sewer main from the required 8-inch size
main needed for the development, to a 16-inch sewer interceptor. We also requested that the
depth of the main be buried an additional 10 to 12-feet to accommodate the needs of the entire
subbasin. This put the overall depth greater than 20-feet through about a 1,000-foot reach.
This change in plans result in two significant cost issues, the first is cost of materials. Based
on current pricing for materials, we are looking at an additional $54,000, which includes
pipes, fittings, manholes and pipe bedding. The second significant factor is the extra
excavation needed to accommodate our needed depth for the line. In order to construct the
main, the contractor will need to bench the excavation, which will result in a significant
amount of additional material removed during the installation and then backfilled into place.
This additional excavation will cost approximately $66,000.
The total estimated additional cost items are $120,000 plus adding a 10% contingency and
sales tax, the final estimated cost will be $143,616. This cost to the City is significantly lower
than our estimate for just a crossing of the Seattle Water Main of$350,000 alone. In addition
to the cost savings for the crossing, we also will realize cost savings associated with increasing
the total basin being able to be served with this new facility. The Wastewater Utility has
sufficient funds to cover the estimated costs within its Earlington Sewer Replacement project
(Sanitary Sewer Main Replacement/Rehabilitation budget line). By paying for this work
upfront, we will simply defer other Earlington main replacement work programmed for 2004,
to allow for payment at this time.
CONCLUSION:
The Wastewater Utility has an excellent opportunity to partner with Lakeridge Development to
allow for a portion of our needed interceptor to be constructed as a portion of the proposed
single-family development. The Utility has sufficient funds to cover the additional costs to
participate in the work and the Utility will ultimately benefit from an overall cost savings of over
$200,000 compared to our original plan to provide the service to the area. As such,we are
recommending that Council approve the request for oversizing/extra depth cost participation for
the sewer improvements associated with the Lakeridge Development known as Earlington Ridge.
H:�File Sys\WWP-WasteWater\WWP-03-0000 Correspondence-
W astewater\davec�.Sewer_Avail_Eazl ingtonRi dge_Oversizing_Issue.doc�DMCtp
��+�'��� ����J ll� ■j • III���i.l■-��+J �a- w S �������1►,1� '\�r��i�� r1��1����I��II;. ■�`\`U 'I
� � � ��.�� • �����n����._ '�\�' ' �' � I �/��i� I ■ t I ,
� `7 r �{ 1 � ����������� �` � !��\ ���I��� � �; L'�J���i�� I ��� I �
- � .I�_-, ,� :�►� (.
, '�► � ��
��'+• � r " '" � � K — - ' — _ --=� � --
�� 1 � -_-
�`� �►��I► I � � � ►' A_ .���: �►�� ....., �
�'� 11 .:., ■ ♦ ,II � �� ;� �, c ■■ 'Il�f�> '•7 �� li�,�i' �
�r, - ,� �, 1�-. '�r � � � _ � . ,. �• _- ��. �
, �. ,r�, , � ' . _ � � �. • „ � � li�'0�?��� I r►`��
� �� �ti ' v'i �.� � .� �� �'� -_'� � ���I�i J +�.r�_ # , ..._
�.. � . �- ��. �`�� _`.I� ..� I ,C�
• �� �. t � . .■ � 1 � �.,
�� �III ;'�'��� � �1 �'■ 'I) � � A •' � • �r'�')i �� I • ,.�� �--. ��
. ! '�►- ��
�) ������� ��ill.�,���1�,� $ �� � I���� �����r \' Rd ��� ■ :1 �1� R C�' ���s -
� �` • '
. .
� �.. ���►)) �: ��11�,._�i - �
- ,1n,,,� . ---- �� . � I
��r -- "=='�cf _.�_�.� I — �����r-- t7 � � ur-
, - - - - -- _--_ � . ,�_.- i ��i�� � I �
��- ��� ;;.�= �,;�,�;-, -- .��::�;�--_. �� ;�=�.w,��� ., ��.: - ! ,�., • ._ _ �� �� �L:: -
� i_ .� > -� r+ � •� V � �. " a�.��ll'�/��l �� � �%►. .; ; � _ `'
� � � � � � . . f �� / •
�. � ►_c�l �' .����� i � ,�,�.',� � '�' � �• � �, �.� �o �
-.� ; � � � .� .i.�,, y � ��. �' r ..r . ��_.
.� � � � � / ,. t� .�.
' �-� � �� ��t`w �'�,: .t�� �' :� ■ a . � I �
, .,� :., i J, � • , � , � ,�i r► � �� _
._�, � r �,71, • ., i�'► �: s :�� � �r. f��Y�
� .. I�- , 1�� .,Q„�� I,.� - _ _ �\ II
\ a�i� � -� ^:( �
•� '7 �7 - � • � � ♦'�� � ��,1
!
__� �� �■� s1 � � 7 � �'�� 1 � � �� - �. �� �I .. '
�.:i. ��—..�,..� � � � �� l'•y�. • � �'� �
""'�� ►,� �� �.c—�------�-_��__ ��. � �� �, ��Ili� �� � � ► � �
.�.� ��� ' �� � � ( � a/� ���
� -i �-------�-���,� ___�-- ' v�..�i L��: ' '� � ��t�.+h, � � r
�r.+.. -�.�..
` �r� *���� � �n�.�, I��s�
`. � \:�� _ � ��' �� , •, • • `- . ._ + � i
. � �. , ! ,� o _� � II
� � pi'� �'►�r ���� � � � r ..�.��
�`r``�� ���'� � � . �,�
;
'1' � � r �; � ,
,� . �,i� -� �-� \, I► "" , '• - Ii�� :���i � � �� �: '
a `, � . r. ♦ s' � ,^�� .�1��V=�����// i � � �
- .
, �_ � - • I � 1�'��- i� ��
�• ■ '4`� .�.� • �� ��D�1'�,� ��-�--- � < � �.4 _
���\I ��j�� -=- � ���� l" 11, °
' �\,/ ' � -� r,1 i
., � � � � �� � � � �� �� . �,.
� �I�\ �� � . •. � � r—�
♦
�/� � � ■ i�■ � .- '� �
;-.-'�� I � ��. �� �, r �� • ' �
' � �����- _ �'� '�R, � �
►/�/���� �� � - � ti �� , � '� � �
�� � � �.o \�. .�, _' ' ' ' `� .
�-• � ��"� ��:�•� '•�i: �`f1 ���-�� � i ;.i� �r�'►� ,,; ��' •�, �.
% �''� �� ' • 1 .'/',� �' �,- '�j�,� — �'°�+il; �y�. - r � ��. I��, �- ����=
r �� �,� �y�/��,��j.� ��-;;� �� �: �'�'r'l�'� ,I'�� , . � �
� ♦ _ '' •� �i �, � `,• � , . "�.•�I■� .�;i ' '' � ( a
1 �
IW
4�!i• �`j � J��,� li. r•� ,� ',!% �i :`'�I ry��J��•►�,%%� .�����(i' '���nj r ,�, � + r� � ' is
, - , .
�' ,
1 : � �ti,, �►� �•,� ,S •� �♦ r/ `�..,, '"'��.,./ �' 1�
' �� .� � ��►'-� �'�� f��';i ;'� ••��.'// • /��<�`��r�1/`J�l� � 11 �1- ■ :�
� � 1y �!�► .;�►' �1�,. '� ,/��/� �� �;c ���y � ������ � � I �: �,
/ir� � t �� �� ��� �I f��r�\�l�J � ♦ ` � _ "' !�G �� • �;
I � I
� :����� ��I i.�^�i �.`�;� '�� ���/ �ryl / �1 I'�!r'� �� ` -------
��/•�► ;��\�`���/���•`� � r � s�;�� /�. �.'��.,,`a1V�I'I. ,�"'���
!V ..� i� /� r��'I i � ���, � �� �I �.. �'I I� ,/o '� ,
�'�� �,f� .::��`/,i�� ,,� y ; �i,;,� ;.,;, �k�.� , •;��...;.. r�� ��,---� - .
�� ,,.. � � . .; �., r�. � .: � � � :�.f�� �--
► �.���,, � �yl, `�; ,, �,.�, .�.� ,,�, ���;�. . � � ��l ��,.
/` „��;�.�'-'�.1��� 'iA !���►1 �.�•. � -.3 . � .� . . • ._.-�
�- m . . . � ,
�� . � .���: !` �� -__ � , �r�,..,'�� L� �
^���. \.` ,.1 �'=r`�-�������/-,���.�; . �'� ' ' .�!_I�l/�!'' `�'�"/''�o� �
�.. + .._ • .+ �i�