Loading...
HomeMy WebLinkAboutUC-05-001 ;:, ,,} �,,, CIT�.�OF RENTON � " City Clerk Kathy Keolker-Wheeler, Mayor Boil[lle I.Wa1t011 September 19, 2005 Glenn Davis, Managing Partner BDJS Associates 1900 West Nickerson, #116-168 Seattle, WA 98119 Re: Urban Craft- Olympia Ave. NE Utility Oversizing Reimbursement; File UC-OS-001 Dear Mr. Davis: At the regular Council meeting of September 12, 2005, the Renton City Council approved the recommendation of the Utilities Committee to reimburse the developer for utility oversizing as referenced in the amount of$56,769 for water and $67,279 for sewer. A copy of the committee report is enclosed. If I can provide further information or assistance, please feel free to contact me. Sincerely, X�rK.ritit�� WQ�.'.r-0�^-' Bonnie I. Walton City Clerk Enclosure cc: Lys Hornsby, Utility Systems Director Jan Illian, Engineering Specialist 1055 South Grady Way-Renton,Washington 98055-(425)430-6510/FAX(425)430-6516 R E N T O N ��This paper contains 50%recycied matenal,30%post consumer .A H E A U O F T H E C U R V E � � 1����st�F_f���� � ����:�����L € � �at� 9-ia-�aas� UTILITIES COMMITT�E COMMITTEEREPORT September 12,2005 Urban Craft Utility Oversizing Reimbursement (Au usi 1,2005 �The Utilities�ommittee recommends concunence in the'staff rec��nmendation to approve the final costs for oversizing of utilities for sewer and water in the ainounts o�$56,769 for water and$67,279 for sewer. . � ���,���� . - T�e Cammitfee further recomm�n�s��iat �i�nc�l ai��c�r�ze the �dr�iriistration to reimburse t2ie develo.pei for his costs; not���e��c�d the"�nal amo ts ro�ied h�rEpn. �`� � �' , _ �� . � � - ; Y : .:: �— � A � � � ;� _,� �.. �k ' .��x� � Y �1"� � . . . � . • ' � - '�•_i :S �� �}�4���� �'. � . . . . . _ . . . • } _ . t: t �� .:t4��R��' �^ . _ , ' . ' . - � . . .. . - � ��� #� k ,# ..�9 c y�.'4� '� ' �a . ' - . . . . _ ' . - � R dy Corman, Ciiair �' � ��. �_ 3 � �. - _ � ��,�� ;� �� �y�� ;: , x � . . . . - r7 w'�c'.fF �t 2t` � �.� �-,�. . . . ;p_ �," • ^7v � .�.. � � �- ��- ��� ` Q . � . � . - � . . d . , �� k �:� �` � . � . .. . , ' ��. .`.� �4� P�'- ... . . . Dan�Claws�n, Vice Chaiz_ ���. ` .z�„ � �,'� `:` _ � f' B. Y,�, -� � �� 'NRn . . /���/� �,,, r.r �" , yy�, i�� , . . . . . .. .. _ .� . / ! �': . . .' �R�f kil,� . - �✓' �� 1 .. - - { ��-�.., L . . . . .. � f t., t .. . . �� .. f � . �x�-�a�:��%�.�E-,41�:�. . . . . ,��,�- .�- . �on Perssoii.,'Memlier, ` : cc: Lys Hornsby,Utilit}r Systems I'}irector � . ' D�ve Chr'istensen;WastevVater Utiiity Supervisor � . • Abdoul CO�four;Water iJtility Sugervisoi ' : Sepfember 12, 2005 �rr+ Renton City Council Minutes � Page 306 5. BRT Station at NE 44th St. MOVED BY PALMER, SECONDED BY CORMAN, COUNCIL CONCUR IN THE COMMITTEE REPORT.* Councilman Corman reported that he attended an Eastside Transportation Partnership(ETP) meeting at which this topic was discussed. He relayed the confusion experienced by many cities regarding Sound Transit's listing of the project priorities, and announced that a special meeting of the ETP will be held on September 30th to clarify the matter. *MOTION CARRIED. Transportation: Trans-Valley Transportation (Aviation) Committee Chair Palmer presented a report Corridor Intelligent recommending concurrence in the staff recommendation to authorize the Mayor Transportation System and City Clerk to execute the Trans-Valley Intelligent Transportation System Interlocal Agreement Project interlocal agreement for the transfer of ownership and the operation and maintenance of traffic signals and related equipment along the Trans-Valley Corridor. The Committee further recommended that the resolution regarding this matter be presented for reading and adoption. MOVED BY PALMER, SECONDED BY CORMAN, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 307 for resolution.) Utilities Committee Utilities Committee Chair Corman presented a report regarding the request by Utility: Oversizing BDJS Associates for the Urban Crafts development utility oversizing Reimbursement Request, reimbursement. The Committee recommended concurrence in the staff Urban Crafts, BDJS recommendation to approve the final costs for oversizing of utilities along Associates Olympia Ave. NE for sewer and water in the amounts of$56,769 for water and $67,279 for sewer. The Committee further recommended that Council �C — �� '�� ( authorize the Administration to reimburse the developer for his costs, not to exceed the final amounts approved herein. MOVED BY CORMAN, SECONDED BY PALMER, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Finance: Vouchers Finance Committee Vice Chair Nelson presented a report recommending approval of Claim Vouchers 240557-241078 and two wire transfers totaling $4,242,030.86; and approval of Payroll Vouchers 59606 -59932, one wire transfer, and 617 direct deposits totaling$2,034,386.41. MOVED BY NELSON, SECONDED BY LAW, COUNCIL CONCUR 1N THE COMMTTTEE REPORT. CARRIED. Tabled Item Refening to the motion that was tabled at the 8/15/2005 Council meeting Annexation: Akers Farms, regarding the Akers Farms Annexation, Councilman Clawson relayed that 108th Ave SE &Puget Dr S Council received a memo from the Administration requesting concurrence in the motion without the exclusion of Mr. Ableidinger's property,and pointing out that removal of this property would set a precedent and likely have a detrimental effect on future annexation efforts. MOVED BY CLAWSON, SECONDED BY BRIERE, COUNCIL REMOVE THE MOTION FROM THE TABLE. CARRIED. MOVED BY CLAWSON, SECONDED BY LAW, COUNCII.ACCEPT THE AKERS FARMS 60%DIRECT PETITION TO ANNEX> SUPPORT FUTURE ZONING CONSISTENT WITH THE COMPREHENSNE PLAN'S RESIDENTIAL SINGLE FAMILY LAND USE DESIGNATION, AND AUTHORIZE THE ADMINISTRATION TO SUBMTI'THE NOTICE OF � � � �� ��,�� � ��� � ;�� A=. � ���' ��:�a'����. � ��t� 9-ia-�oas. UTILITIES COMMITTEE COMMITTEE REPORT September 12,2005 Urban Craft Utility Oversizing Reimbursement (Au ust 1, 2005) The Utilities Committee recommends concurrence in the staff recommendation to approve the final costs for oversizing of utilities for sewer and water in the amounts of$56,769 for water and$67,279 for sewer. The Committee furtner recommends that Council authc�rize the Administration to reimburse the developer for his costs, not to exceed the final amounts approved here�n. R dy Corman, Chair � Dan Clawson, Vice Chair �-'',.-'"�-�� .,'�} �' ��/ '�LiY�.�f �".__ �5r Don Persson, Member cc: Lys Hornsby,Utility Systems Director Dave Christensen,Wastewater Utility Supervisor Abdoul Gafour,Water Utility Supervisor �C v �� ' �� � � �� h I� f��s �� �r � �-�e � � ��� I �,�-�1!�C �Y ti �� PLANNINGBUILDING/ + �� � � PUBLIC WORKS DEPARTMENT � ��N`��� M E M O R A N D U M DATE: August 24, 2005 TO: Randy Corman, Committee Chair Members of the Utilities Committee CC: Kathy Keolker-Wheeler, Mayor Jay Covington, Chief Administrative Officer FROM: Gregg Zimmerma��inistrator STAFF CONTACTS: Dave Christensen, Wastewater Utility Supervisor(ext. 7212) Abdoul Gafour, Water Utility Supervisor (ext. 7210) SUBJECT: Urban Craft Utility Oversizing Reimbursement ISSUE: BDJS Associates, LLC, is requesting reimbursement for utility oversizing costs in excess of the amount authorized by Council in July 2003. Council approved an amount not to exceed $35,075 for water main and $37,700 for sewer main oversizing. Final costs of the actual installation resulted in a request for reimbursements in the amounts of$56,760 for water and $67,279 for sewer. The Wastewater Utility has sufficient funds within its Miscellaneous Sewer Projects account and the Water Utility has sufficient funding within its Oversizing account to cover the requested increase in cost. RECOMMENDATION: Approve the final costs for oversizing of utilities for sewer and water in the amounts of $56,760 for water and $67,279 for sewer. BACKGROUND SUMMARY: BDJS Associates, LLC, is the developer for the Urban Craft project. As part of their off- site improvements, they were required to install a new water main and sewer main within Olympia Avenue NE. The City requested that the developer extend the main outside their project limits and to provide local service to properties across from their development. In July 2003, the developer submitted an oversizing request to the Council with costs based on an engineer's estimate. Utilities Committee/BDJ �rban Craft , August 30,2005 � vrr+` Page 2 Council approved the oversizing request conditioned on costs not exceeding $35,075 for water and $37,700 for sewer. The developer has since completed this work. Now that the work is complete, the costs of the main extensions have exceeded the maximum amount authorized by Council to reimburse the developer. The developer, BDJS Associates, LLC, has submitted a request to consider the additional costs based on final project costs. Utility Staff has reviewed their final project costs, and while these costs are higher than we would have anticipated for private development work, they do fall within the range we would anticipate as part of a City initiated project. Based on this, we are recommending that Council authorize the additional costs incuned by the developer. The Wastewater Utility has sufficient funds within its Miscellaneous Sewer Projects account and the Water Utility has sufficient funding within its Oversizing account to cover the requested increase in cost. CONCLUSION: BDJS Associates, LLC, has completed its work associated with the water and sewer main extension for the Urban Craft Development. The final costs of this extension exceed the amount authorized by Council in July 2003. However,the final costs are within an acceptable range for the construction performed. As such, staff recommends that Council authorize the total amount of reimbursement be $56,760 for water and $67,279 for sewer. cc: Lys Hornsby,Utility Systems Director H:\File S_ys\W WP-WasteWater\WWP-03-0000 Correspondence-Wastewater\davec\Urban_Craft_Oversizing_Final Issue.doc\DMCtp (;ity of Kenton Finance Department�'""'' `�"' Request for Claims Date of Request June 28, 2005 ' Date Required July 5, 2005 Requesting Department Water Utility/PBPW Authorized Signature � F f � - � ' '/ �� / t � '� ��-� -ti� ��=� � � i - E REASON FOR CHECK � f-�_ C �� � l Deposit Refund Name Amount Finance Receipt No. Receipt Date Other Describe Circumstances Requinng Issuance of Check: Partial reimbursement to BDJS Associates LLC, for City's share of construction cost of new water line in Olympia Avenue NE in conjunction with utilities improvements for Urban Craft project. This reimbursement was approved by City Council on July 3, 2003 per attached copy of Council minutes. CHECK PREPARATION INSTRUCTIONS Amount $35,075.00 Charge to Account(s) 421.000500.018.5960.0034.65.055100 Payable To BDJS Associates LLC Address 1900 W.Nickerson Street PMB116-168 Seattle,WA 98l 19 � Mail Check to Payee � Return.to Dept. Attn: Abdoul Gafow(x7210) Water Utility Supervisor Soc Sec or IRS ID No 33-0995831 � Other: CHECK AUTHORIZATION -Finance Department Use Only Approved Date � Claims Check No: . H:�File Sys\WTR-Drinking Water Uti(fty\WTR-01 -General\urbaneraR-request-for-check-062505.doc�AG �' � , � July 7, 2003 Renion City Council Minutes Paee 236 MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE, COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED. CAKRIED. Streets: S Grady Way Commenting on consent agenda item 6.e., S. Grady Way westbound lanes Westbound Lanes Weekend weekend closures, Councilman Persson emphasized the importance ofthe S. Closures Grady Way Pavement Rehabilitation Project, stating that it �vould be hard to complete without traffic disruptions. Added Correspondence�vas read from Mary and Kevin Nelson, 17252 128th Ave. SE, CORRESPONDENCE Renton, 98058, expressing support for an off-leash dog park in Renton. Citizen Comment:Nelson - MOVED BY KEOLKER-W}�EELER, SECONDED BY NELSON, COLJNCIL Off-Leash Dog Park REFER THIS CORRESPONDENCE TO COMMITTEE OF THE WHOLE. CARRIED. Citizen Comment:Johnson- Correspondence was read from Marci Johnson, 5]0 Stevens Ave. SW, S404, Fireworks Ban Renton, 98055, requesting that Renton ban the use of fireworks. MOVED BY CLAWSON, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER THIS CORRESPONDENCE TO THE PUBLIC SAFETY COMMITTEE. CARRIED_ Citizen Comment:Marconi et A petition containing 13 signatures was read submitted by Mary and Terry al- Smithers Ave S Closure Marconi, 2l 14 Smithers Ave. S., Renton,98055, requesting the closure of Smithers Ave. S. at SW 2tst St. for the following reasons: excessive vehicle speed, excessive vehicle usage;hazardous corner(Smithers and 21st), drainage and surface conditions, and pedestrian endangerment due to lack of shoulder. MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL REFER THIS PETITION TO THE TRANSPORTATION COMMITTEE. CARRIED. OLD BUSINESS Utilities Committee Vice Chair Briere presented a report recommending Utilities Committee concurrence in the recommendation ofthe Plannin widin CAG: 03-073, East Valley Lift Department that the East Valley Lift Station Repla�ent Projec�tl�be awa ded to Station Replacement, Stouder Stouder General Construction,LLC, in the amount of$607,321.60. General Construction, Fund Transfer The Committee further recommended that funds totaling$250,000 be transferred from Wastewater Account 421.000400.O18_5960.0035.65.045000(WO#45365 Central Plateau Interceptor)to Wastewater Account 421.000400.018.5960.0035.65.0450]0(WO#45360 East Valley Lift Station Replacement)to cover the cost ofthe project. IvIOVED BY BRIERE, � SECONDED BY CLAWSON, COUNCTL CONCUR IN THE COMMITTEE � REPORT. CARRIED. Utility: Olympia Ave NE Utilities Committee Vice Chair Briere presented a report recommending Utilities Installation, Urban concurrence in the recommendation of the Planning/Building/Public Works Craft Devetopment Request for Department that Council approve the reyuest by Urban Craft Development to Cost Sharing have the Water Lhi)ity and Wastewater Lltility reimburse the developer for the actual costs of the extension of the water and sanitary sewer lines that do not directly benefit the developer. The Committee also recommended that Council authorize the Administration to allow reimbursement by the City based upon final construction costs of the above utilities not to exceed$35,075 for the Water LJtility and $37,700 for the Wastewater Utility. :f final project costs exceed this amount, then the developer shall request such additional funding through City Council. MOVED BY BRIERE, SECONDED BY CLAWSON, COUNCIL CONCUR IN THE . ``�"'�" ;�° July 7, 2003 Renton City Counci) I�1inutes Page 237 � COMMITTEE REPOR7�_ CARRIED. � � � ln response to Council President Keolker-Wheeler's inquiry. Cot�ncihvoman � Briere stated that the location of the utiliry extension is Oly�npia Ave. NE, norih of NE 4th St. . �.�—�m�� _ __:-_ , ��.�� --__ . _-__ ,.._ . ,. Finance Committee Finance Committee Chair Parker presented a report recommending approva) of� Finance: Vouchers Claim Vouchers 216400- 215817 and three�vire transfers totaling $2,758,�38.57; and approval of Payroll Vouchers 44706- 44958, one wire transfer and 575 direct deposits totaling$1,725,448.82. MOVED BY PARKER, SECONDED BY PERSSON, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED_ Transportation (Aviation) Transportation (Aviation)Committee Chair Persson presented a report Committee recommending concurrence in the staff recommendation that Council approve the Transportation: Six-Year T1P proposed 2004—2009 Six-Year Transportation lmprovement Program (T1P)and (2004-2009) Arterial SVeet Plan. The Committee further recommended that the resolution regarding this matter be presented for reading and adoption. MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. (See later this page for resolution.) ORDINANCES A1VD The Sotlowing resolutions were presented for reading and adoption: RESOLUTIONS Resolution#3644 A resolution was read authorizing the Mayor and City Clerk to enter into an Public Works: Cedar River interlocal cooperative agreement with the State of Washington Department of Spawning Channel Natural Resources for an aquatic lands easement for the Cedar River Spa�vning Replacement Project, DNR Channel Replacement Project. MOVED BY BRIERE, SECONDED BY Aquatic Lands Easement CLAWSON, COIJNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Resolution#3645 A resolution was read authorizing the temporary closure of the westbound lanes Streets: S Grady Way of S. Grady Way, between Shattuck Ave. S. and Rainier Ave. S., for a period of Westbound Lanes Weekend six days(consecutive or non-consecutive)between August 1 and September 30, Closures 2003, for the S. Grady Way Pavement Rehabilitation Project. MOVED BY PERSSON, SECONDED BY NELSON, COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Resolution#3646 A resolution was read updating the City's Six-Year Transportation Improvement Transportation: Six-Year TIP Program,2004-2009. MOVED BY PERSSON, SECONDED BY NELSON, .r� (2004-2009) COL7NCIL ADOPT THE RESOLUTION AS READ. CARRIED. The following ordinance was presented for second and final reading and adoption: Ordinance#5014 An ordinance was read establishing an assessment district for sanitary sewer SAD: East Kennydale Sanitary service for properties adjacent to Monterey Ct.NE,NE ]6th St., Blaine Ave. Sewer Infill Phase I NE, Camas Ave.NE,Dayton Ave. NE, Edmonds Ave.NE, and Monterey Ave. NE, and establishing the amount of the charge upon connection to the facilities. MOVED BY KEOLKER-VI�IEELER, SECONDED BY NELSON, COUNCIL ADOPT THE ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRI ED. NEW BUSINESS Responding to Council President Keolker-Wheeler's inquiry regarding the dates AJLS: Sister City Cuautla, ofthe Cuautla, Jalisco, Mexico sister city delegation visit to Renton, Derek :: �- CIT,� OF RENTr�N� " � � � PlanningfBuilding/PublicWorks pepartment Kathy Keolkrr-lVheeler, Mayor GreggZimmerman P.E.,Administrator June 27, 2005 Mr. Alan Fossum Fossum Construction 1900-West Nickerson Street Suite I 16 PO Box 98 Seattle,WA. 98119-1661 SUBJECT: Urban Craft Reimbursement for Water and Sewer. Dear Allan: We received a copy of the invoice for$124,03934 and itemized cost breakdown, da2ed June 15, 2005 from BDJS Associates for tfie actual construction costs of the water line and sewer lines in Olympia Avenue NE, related to the Urban Craft development. We understand that you are requesting the City to reunburse you for the invoiced-amount as fhe City's share of the improvements. On .�uly 7, 2003, Renton Ci,ty Covncil approved a maximum City's reimbursement cost of $72,775.00 with a condition that the developer shall request additional funding through City Council if the final projeet costs exceed the approved amount. The approved amount was based on the cost estimates submitted by Jaeger Engineering on May l; 2003 which included $35,075.00 for water and$�7,700.00 fQr sanitary sewer improvements. Since your'requested final cost.,of the City'-s share is $51,264.24 (or 70%) over the Council's. approved amount; you wi11 need to:submit a vvritfen request to City Council for the additional amount. The request should include a detailed justification of the cost increase, including the description and reason for the cost increase, any changes or additions to the original scope bf work, and relevant supporting documents. T}ie City's Utility staff is reviewing the submitted revised costs and will contact you to discuss this matter further if they have questions or need additional information. However,you need to submit the request to City Council as soon as possible, since Council's action may take vp to a month. A check request for $ 35,075.00 for the water main is being process�d. It sHould be ready for issuance by July 6, 2005. The'eHeck will be made out to Glen Davis czf BI)JS Associates LLC since he is the o�vner of record. The remaining $37,700.00 previously approved for sewer will be released to the owner after the sewer main has been repaired,re-tv'd, approved and accepted by the City. Please ensure that Tom Main, inspector is present at the time of the fv. 1055 South Grady Way-Renton,Washington 98055 R E N T O N �This paper co�tains 50%recyded materiai,30%post consumer •q H E A D O F T H E C U R V E U S-BANK OF N/ASNINGTON �y_�� v�,v RENTON BRANCH . 1250 • �Y CITY OF RENTON '�' l � �� '���Noo�� ��1��T � r � ���..�� �` c���avrrr � r��,.�:.t< . . .,,� '�.�: s...�:,,.,,:- x n'=..�.� t?- c�s-"�'"�,.. x-.'ni'+�'.�..�,'`.....,? ,`:: � ACCOUNTS PAYABLE 008176 06/30/2005 2389101 � ""35,075.00 e �-'- 1055 S. GRADY WAY , � � � RENTON,WA 98055 '� O� Phone:(425)430-6918 �j�jT Fax:(425)430-6855 VOID AFTER 6 MONTHS PAY Thirty Five Thousand Seventy Five Doliars and No Cents PAY gDJS ASSOCIATES LLC . ' � ,�� � — TOTHE �gp0 W NICKERSON ST � � �� �°�� - �`` �����` � ���J ORDER PMB 116-168 � ; . nnAvoR SEATTLE, WA 98119 � (�` '^\_ j-� - _�, / . OF . . . \ 7i�'YI�,L:. �� `?-^ u��[/ FtSCAL SERVICES DIRECTOR u'O 2 38 9 �On' �: � 2 5000 l0 5�: � 5 3 500 6 98 3 l8n' PLEASE DETACH BEFORE DEPOSITING CITY OF RENTON,WA 98055 ACCOUNTS PAYABLE CHECK N0238910 � . _ . � �. .. �=.�� .. >'_.. > , :. .k _ , �€..� Reimbursemen 06/28/2005 Partiai Reimbursement for City's share 0.00 35,075.00 35.075.00 "rrrr' +�.r� � �������� COUNCIL REFERIZAL TO ADMINISTRATION AUI� O 2 1��3 ClTY OF RE�lTO�J Pt►8 tc'tVnRKSrDn�iN TO: ✓Gregg Zimmerman, PBPW Administrator DATE: 8/2/2005 FROM: �Bonnie Walton, City Clerk , LOG#: N/A On 8/1/2005, Council referred the following: Letter from Glenn Davis, Managing Partner, BDJS Associates, LLC, 1900 West Nickerson, PMB 116-168, Seattle, 98119, requesting reimbursement in the amount of$51,264.24 for utilities oversizing along Olympia Ave. NE for the Urban Crafts development. Referred to Utilities Committee Please respond as follows: Prepare memo to Councilmembers via Mayor. (After Mayor's approval, Mayor's secretary will copy for Council and Clerk and return copy to you.) Prepare memo to Councilmembers via Mayor and include attached letter with memo. (After Mayor's approval, Mayor's secretary will copy for Council and Clerk and return copy to you.) Prepare letter(s) to citizen/agency with department head's signature and submit to Mayor for approval. (After Mayor approves the letter, the Mayor's secretary�vill mail it out after making a copy for Council and Clerk and returning a copy to you.) XX Schedule matter on Council committee agenda. Arrange with Council Liaison ASAP. (Copy of response to City Clerk not required.) Other: PLEASE REFERENCE LOG NUMBER ON ALL LETTERS. Please complete request by(as determined). Thank you. cc: Linda Herzog Tami Dauenhauer Jan Illian Ser,t fiy: ; 206 284 �625� Jul-1 F �5 1 1 :22Ah4; Page t/t , � `� < BDJS Assvciates, LLC �brres n�enc� g-l-ao�s � �.{fiR�iem�Urse`me� �ie cr�sf July 12, 2005 �F'ilc �UL'-OS-OD/� �1��er �O �fr�t fl eS Jan Illian � �ornrn��ee City Cour�cilmember's 1055 Souttt grady Way Rentvn, Wf� 98055 SUBJ�CT: Urban Craft Reimbursement for Wster and Sewer. Dear Jan&�City Counciimember's: Thank you"or you recent response regarding the cos#overruns for the water& sewer lines:in Olympia Ave NE. As you are�aware, the costs for completing ihis wo►ic have exceecied the approved r►aaximum reimbursement amount. We have included for your review a copy of tt�e Actual cost vs. the originat estimates by Jaeger Engineering. The balanps for the City's port;on of ihe work is$51,2f4_24. Please s�mit this request to the aty council for approval as soon as possibfe. If yQu hav�;any questions regat�ding Nte costs or estimates that v�re prvvided py the enginee�r and confractor ptease do not hesitate to calE. Sincer nn av Managing i��rtner BDJS Associates (206)284-7603 laoo I�i�st'. �3�c,(Ceri+�. PA16 j�b— I�� St� b�l� WA �8ti`i Cc: Jan�ilian Ab�u!Gafour Dave Christianson � Kay�en Kit#rick Neil�Watts �sao w�r N�ke►soR ri fs-�ss s�ear�,wA sa»e Sent dy—,— -- - -•— 206 28d 6625; Jul-1r 05 11 :02Af.7; Page i/2 ` - Jul 15 05 09_ 07a James Jae�er 253 f350 0155 P• i � ��C�R �NC��I���F�l� .C�a ' ��i t� S. 204 P�wcE - K�, WASHw�'row 96031 PHONE {253) 850-0954 �AX �25�) Sb�-O 155 Jvly 14, 2(305 pave Christianson City of Ftenton Public Works i o�s. Grady wav Renlon, v�lA. 980.55 Projeci: Urban Cro�ts-01YmP►a Ave_ Final Construction Costs for Public Improvements Dave, The consfrvction at the Urbon Croff projecf is nearing complet�on. The �� work that was pecformed w►fhin OlympiQ Ave. N�in�luded improvements to the Ohrmpia Ave.lC1fiQStNCtLlf@ ifl qC�C3{�IOh t0 tt10S@?F1Qt WOU{C� r10rCti'1QIIY be req�iCed for fhe project and wiU benefrt the pubtic/City. Those improvements in�luded a water and sewer moin irtstallation that extende�i ►�o�th of the site's frontoge to service e�osting {ots on Otympia Ave. Th�new wote�ond sewer mains replaced existing sub-s#andard systems�hot hrnie been abandoned. �- The City hcas ogreed to the financiol responsib�ty for the fotal cost of the wate�csnd sewer systems in ihat portion of Otympia Ave. thoi is north of . ihe site..The City aiso agreed to pay for S0�of the cosi of ihe waier and sewer systems wlthin the site frontage olong Olympia Ave. I had prepared csn estimpte of the water and sewer moin constrvction in Moy, 20a3, th�ai wc�s used to discuss thE wcxk ond estobiish�osts. I have now reviewed the actuai construcfion cosfs for the projecfi that t�re bsing si,bmitted for reimbur5ement by the Ciiy. The City hod set a budgef of�75,t�00 for ihe worlc. 'fhe requested reimbur�emerit is opprox_�i 14,000. The incredse is due to a number of fcsctcxs. Yhe cost of moteriols, pcirticuEorly steel pipe, ht�s fipied in the last 2 years. The est�mated unifi costs fc.r the water and sewer moin have fiipled due to the materivls increase and olso due to the reeonstruction of the road. The estimoted unit costs dd not inGtud�the gravel#rench backfiil,lesfiing, compoction, e1c. AA�o, the locaies for the e�sting water and sewer services to the houses�bvsinesses along Otympia Ave-have been factored into the vnit cosis. �"he cost for re-surfocing the rac�d wos vlso higher due to constraints by exis�ing droinage and drivewdys. the devetoper has prepared o iable that compvres the actual costs ond the es�imated costs using �irn��r line items. 1 have reviewed the actu�l .. costs and have compvred them to ihe esfimaie5_ I agree that the actual SenY Py: i _ — — — -�,. 206 284 6625; Jul-15 1t :02AP�; Page 2/2 ReCelvbd' I/75/D5 �'U7AM• ?63 BKq 0�55 -� Z06 284 �a25;�aHd � � � 253 850 0155 P. 2 Jul l5 05 09: 07a James Jar�er costs ar�e representvlive of the work thoi wds performed ond drB justified by vnforeseen job site conditions, the uncerfoinfiy of the originai vtilifies r�nd the indUstry cost increoses. Please feel free to cali or meet wiih me to discuss vn�r questions. Thank you. Sincerety. � � �� ���� . James Jv�9er � � ' BDJS Associates LLC ����I�� � 1900 W Nickerson PMB 116-16B Seattle WA 98119 Phone(206)284-7603 Fax(2Q6) 284-6625 INVOICE #44�-0305-02 DATE: MAY 20, 2005 TO: SNIP TO: Abdoui Gafour Clty Of Renton Public Works Department Utilities Systems- fiRh Floor 1055 Sou[h Grady Way Renton WA 98055 Phone(425)430-7210 Fax(425)430-7241 COMMENTS OR SPECIAL INSTRUCTIONS: SAtESPERSON P.O.NUMBER REQUISITIONER SHIPPED VIq F.O.B.POINT TERMS Due on receipt QUANTITY DESCRIPTION UNIT PRICE TOTAL 90.50 LF 8"D.I.Water main and fittfngs(181 LF on pcoper[y trontage split SO/50 with Contractor and City of Renton) 115.46 10,444.13 130 LF 8"D.I.Water mafn and fttin9s north of property frontage 115.46 15,009.80 1 ea New fire hydrant assembty 2,795.00 2,795,00 0.5 ea Connection to the exfsting main(Cost spllt wlth ConUac[or and City of Renton 50/SO) � 7,857.00 3,428.50 153.5 LF 8"�C sewer main(307 LF on property frontage spiit SO/50 with ConEractor and Gty of Renton) 106.19 16,300.17 91 LF 8"PVC 5ewer main north of property frontage 106.19 9,663.29 0.5 ea Man hoie spiit 50/50 wfth Contracior and City of Renton 3,642.00 1,821.00 i ea Man ho►e City oi Renton Only 3,642.00 3,642.00 8 ea S)de sewer connections 1,228.00 9,824.00 .05 ea Connection to existing sewer(SO/50 split between Contrac[or and Qty of Renton 1,200.00 600.00 SUBTOTAL 74,032.89 SALES TAX SHIPPING&HANDLING TOTALDUE A�� �O D . '�"r' '�' � BDJS Associates LLC I���I�� 1900 W Mckerson PMB 116-168 Sea[Ue WA 98119 Phone(20b)Z84-7603 fax(?06) 284-6625 )NVOICE �442-0305-02 DATE: MAY 20, 2005 TO: SNIP TO: Abdoul Gafour City Of Renton Publfc Works Department Uti(ities Systems-Fifth Floor 1055 South Grady Way Renton WA 98055 Phone(425}430-7210 Fax(925)430-7241 COMMENTS OR SPECIAL INSTRUCTIONS: SALESPERSON P.O.tVUMBER REQUISITIONER SHIPPED VIA F.O.B.POINT TERMS Due on receipt QUANTTTY DESCRIPTION UNITPRICE TOTAL 9711 SF Street restoration along frontage of property Cty of Renton portlon 3.25 15,310.75 3639 SF Street restora[ion north of project 95'x 38.31' 3.25 11,826.75 0.5 ea Tra(flc Controi(50/SO split with between Contrador and City of Renton) 5,000.00 2,500.00 0.5 ea Signage and Striping(SO/SO spltt between Cantractor and City of Renton) SOO.DO 250.00 0.5 ea Demolition and disposal(50/SO)spiit between Contractor and City of Renton) 3,509.99 1,605.00 0.5 ea Engineering and plan preparatton(50/50 splk belween Contractor and Aty of Renton) 2,500.00 1,250.00 0.5 ea Surveyfng and as-buitts(SO/SO split between Contractor and City oF Rentonj 2,930.00 1,465.00 0.5 ea Construc[ion manaqement(50/50 split behveen Conhactor and City of Renton) 11,132.72 5,566.36 SUBTO7At 114,OD6.74 SAlES TAX 10,932.59 SHIPPING&HANDLING TOTAL DUE ;124,039.34 Make a!t checks payabie to BD)S Associa[es LLC If you have any quesiions conceming thfs invoice,contact Alan Fossum, (425)957-1234, Email:a{anf@fossumconstrudlon.com Thank you for your bustness! � �o b� O � � F �� � P: 425 957 1234 f: 425 40t 1830 . e: info@iossumconstruction.com www.fossumconstruction.com C 0 N S T R U C T 1 0 N 2005 152n°Place SE Bellevue,WA 98007 Unit Calculations February 14, 2005 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Part One Linear footage Cost Calculations: LF of Owners private 8"D.I. water main = 96 If LF of City's portion of 8" D.I. water main = 181 If LF Shared cost Owner/City 8"D.I_water main = 130 If � Total LF of water 8'D.l. water main =407 tf LF City's portion of 8" PVC sewer main = 91 If LF shared portion of owner/city 8"PVC sewer main =307 If Total LF of sewer 8"PVC sewer main =398 If Total LF of sewer and water mains 4071f+ 398 If =805 tf. Total costs that applied to both sewer and water(gravel fill etc)_ $5,687.00. Cost per If to be applied to both water and sewer mains. $5,687.00/805tf= 7.06 er If. Total Costs for 8"D.I.water main and fittings =$44,119.00. Costs per If for 8"D.1.water main $44,119.00/407 If= 108.40+7.09 = �115.16 per If. Total Costs for 8"PVC sewer main=$39,452.00. Costs per If for 8"PVC sewer main $39,452.00/398 If=99.13+7.09=5106.19 per If. Note: Linear Feet is based on actual Measurements. Square Footage Cost Calculations: Square Feet of Asphalt that is the owners responsibility = 6.300 sqft Square Feet of Asphalt City's responsibility along frontage of Property = 4,711 sqft Square Feet of Asphalt City's Responsibility North of Project = 3,639 s4ft Total Square Feet of asphalt per Northwest Asphalt = 14,650 sqft Total Costs of New Asphalt including grading and fill $47,609.80 Cost per Square Foot for New Asphalt=$47,609.80/14,650sqft =3.25 per SqFt � � , F��� �� p: 425 957 1234 f: 425 401.1830 e: info@fossumconstruction.com www.fossumconstruction.com C 0 N 5 T R U C T I 0 N 2005 152"tl Place SE Believue, WA 98007 Part 2 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Billing for City Portion of Utility Improvements: Water 8"D.I. Water Main and fittings 181 LF $ 115.46 = $20,89826 @ 50%a= $10,449.13 8" D.I. Water Main and fittings 130LF $ 115.46 = $ 15,009.80 @ 100%= $15,009.80 New Fire Hydrant Assembly 1 Ea $ 2,795.00 = $ 2,795,00 @ 100%= $2,795.00 Estimated service connection/stubs OEa $ - _ $ - @ 100%= $ - Connection to the Existing main 1 Ea $ 7,857.00 = _$ 7,857.00 50%= $3 928 50 Total Water = $32,182.43 Sewer 8" PVC sewer main 307 LF $ 106_19 = $32,600.33 @ 50%= $16,300.17 8"PVC sewer main 91 LF $ 106.19 = $ 9,663.29 @ 100%= $9,663.29 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 @ 50%= $ 1,821.00 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 @ 100%= $3,642.00 Estimated side sewer connections 8 Ea $ 1,228.00 = $ 9,824.00 @ 100%= $9,824.00 connection to existing sewer 1 Ea $ 1,200.00 = $ 1,200.00 50%= $ 600.00 Total Sewer = $41,850.46 Street Restoration Along Frontage 315'x14.96' 4711 sf $ 325 = $ 15,310.75 @ 100%= $15,310.75 North of Project 95'x38.31' 3639sf $ 325 = $ 11,826.75 @ 100%= $11,826.75 Traffic control 1 ea $ 5,000.00 = $ 5,000.00 @ 50%= $ 2,500.00 Signage and striping 1 ea $ 500.00 = $ 500.00 @ 50%= $ 250.00 Demolition and disposal 1 ea $ 3,609.99 = $ 3,609.99 50%= $ 1 805.00 Total Road = $31,692.50 Total Hard Costs $105,725.38 Miscellaneous Costs Engineering and Plan Preparation 1 Ea $ 2,500.00 = $ 2,500.00 @ 5p%= $ 1,250.00 Surveying and As-Builts 1 Ea $ 2,930.00 = $ 2,930.00 @ 50%= $ 1,465.00 Construction Management 1 Ea $11,132.72 = $ 11,132.72 @ 50%= $5,566.36 10%Contingencies 1 Pct $ - _ $ - 50%= $ - Total Miscellaneous = $ 8,281.36 Total Cost to City of Renton = $114,006.74 050520 CreWor CitRen UtiImp Invoice dbs ver 2.doc Clty or ReMon Sew�r 6 Walar Improwm�nls Cky Bttimat�Pt�Ja�por EnpinHrl�p dst�d May 1 2003 Fossum Gonstrudlon Cosb Water Walor 6'�.I.Wale�MOIn ind fltUnp3 215 �F 3 J2.00 � S 0,600,00 � SO% • S J,4W.00 6'0.1.Wa�or Maln and RtUnps 18� l.F S >>5.�6 • S 2o.HHe.26 � ��G • f �o.��•» 6'0.1.Water Msin and fitUrqs 90 lf S J2,00 ■ S 3.138.00 � 100% ■ S J,138,00 E'0.1.Water Maln and fitU�qs 130 LF S 1 t5.a6 • S 15,009.60 Q ��X = S �5,009.60 New FIro Hydront Assemby � Ea S 2,2pp,00 � S 2,200.00 � t00% � i �.200.00 New Flre NyOrnnt I�saembly 1 Ea S 2,795.00 • S 2.7p5.00 � ��% • S 2,795.00 Ealkn�lod sorvlec aonn�clbNslubs 5 Ea i �00,00 ■ S 2,000.00 � 100% � 3 Z,000.00 Esllma�ed aervke conneqb�/slubs o Ea S • • S � � ��r • 3 ' Co�nacllp�to tl�o FxlsUnp main 1 �e S 1.00p.pp s S �,000.00 G� 50% ■ S 500.00 Connectlo�to tha Exlstinp maln t Ea S �,057.pp = S �.857.00 � 5016 = 5 J,928.50 _ TotaJ Wat�� • S 11,27i.00 Tobl Water • S 12,182.47 Sewer S�wer �' 8'PVC sawer maln J08 l.F S 40.00 � S 12,320.00 QS� 50%. = 3 6,160.00 C'PV sewer rt�l� J07 lF S 108,19 • S J2,600.SJ � SOX = 5 76,300,17 8'PVC sewer main 92 lF S �0,00 • S 3,680.00 � 100% = S 3,600.00 E'PVC sewer maln 9/ �f 5 106.i9 = S 9.863.29 � �OOX � S 9,66J.29 Man Hob t Ea 5 1,400.00 ■ S 2,400.00 � 30% ■ S 1,Qpp.00 Man Hole 1 Ea S J.6t2.00 = S J.6a2.00 Q SOSG = b i,82�.00 ManHo�a � Ea S 2,400.00 � S 2.400,00 � 100Y. = S 2,a00.00 ManHoie i Ea S J.8�2.00 = S J,842.00 Q �009: = S J,642.00 Estlmat9d aba sawerppnrxt�lons 8 Ea S 800.00 ■ S E,100.00 � 100X ■ 1 8,�00.00 EsUmalad sida sewer tonnectipns 8 Ea 5 �.228,00 = 3 9.eZ4.00 Q t00% • 1 9,824.00 connecuon to�Istlrq sewer t Ea i t,000.00 • S 1,000.00 �4 50% � S 500.00 cannactbn to axlsUng sewar i Ea S t,y00.00 = S 1,200.00 � 50;6 = S 500.00 TO{il S�WO► • S 20,340.00 TOtal Sowar a S 41,e50AB Slreat R�etoratlon Stroat Rntorotlon Along fron�aqe 345'x10' 3�t50 sf S 2.50 • S E,625.00 � t0pti � S a,825.00 Ab�g Fro�tafle J15'x1�.96' 4711 sf S 3.25 ■ 5 15.3/0.75 � t00X = 5 �S,Jt0.75 NOM 01 PrpJeCt 851cZ0' 1900 s/ S 2.50 ■ i �.750.00 � 100% • S �,750.00 North o/Pro�oct 85x3E.�1' 36J9 al S �.25 � S 11,826.75 � 100X � S 1 t.626.75 TraScic eonlrpl t �a S 5,000.00 ■ S 5,000.00 � b0% ■ S 2.500.00 Trome conUW � oa S 5,000.00 • S 5,000,00 � 50% = S 2.500.00 Sipnsge and sViping � ea 3 300.00 • S 300.00 � SOY. ■ S 250.00 Siqnapa and avlD�r+p � ea S 500.00 • S 500.00 � 30X � 3 250.00 OemollUon and dbposal 1 at S 3.000.00 ■ S J.000.00 Qf1 30X ■ 3 1,500.00 pemoUtlon ar+d disposal t ea S J.609.D9 � S 3.809.99 Q�50% = 3 �eo3 00 Totsl Road . S 17,63500 Total Road = 3 11,69Z50 Total Hs►d Costs S 49,24'{.00 Totsl Hard Com S�OS,725.38 MfsuU�neous Cosb Mt�e�llansous Costs Enpineoring and Plan Prep�ratlpn 1 Ea S 2,500.00 s S 2.500.00 � 50X = S 1,250.00 E�+glnaerir�g and Plan Preparatlon 1 Ea 5 2,500.00 � S 2.500.00 � 50% = 3 +,254.00 Ii Surveylnq ard As�BWlts 1 Ea S 2,000.00 � S 2,000,00 � SOS: = S 1,000,00 Survayfng and As•Bullls 1 Ea 5 2.D30.00 • 5 Z,'J30.00 � 50% � S i,a65.o0 CorssWtibnMa�aqsmant 1 Ea S 3.300.00 • S 3.500.00 � 50',4 = S 1.750.00 Constrtn'tionMan�qtmenl 1 E� S >>.t32.7Z s S tt.iJZ.72 � 509G = S 5,586.36 1px r.o�linpe�cbe 1 Pct S 5.000.00 • S 5.000.00 � 50Y. ■ S 2,500.00 10%ContlnpenClas i Pc� S - � S � 50X = S 7ota1 Mlaeallan�oua = S 8,500.00 Total Mlsaollanoous � S B,Za1.3& � Tobl Estlmat�d Cost to CFty = i SOL�1.�� Totai Cost Io Clty • S t��,�,� � lU Q � 050529 CroWor CttRan estlmale Foacon Costs Compartso�dbs vort,xls � r August l,2005 � Renton City Council Minutes � Page 273 Vacation: Bremerton Ave NE, Utility Systems Division reported submittal of the appraisal performed for the Liberty Ridge,VAC-04-007 vacation of portions of BremeRon Ave. NE, south of NE 4th St. (VAC-04-007; � Liberty Ridge LLC,petitioner),and requested that Council accept the appraisal and set compensation for the right-of-way at$5,170. Council concur. MOVED BY BRIERE, SECONDED BY PERSSON, COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED. CARRIED. CORRESPONDENCE Correspondence was read from Glenn Davis,Managing Partner,BDJS Citizen Comment: Davis - Associates, 1900 W. Nickerson,PMB 116-168, Seattle, 98119,requesting Oversizing Request for reimbursement in the amount of$51,264.24 for utilities oversizing along Reimbursement, Urban Crafts, Olympia Ave. NE for the Urban Crafts development. MOVED BY PERSSON, BDJS Associates SECONDED BY CLAWSON, COUNCIL REFER THIS �.-D tj-Q D/ CORRESPONDENCE TO THE UTILITIES COMMITTEE. CARRIED. Citizen Comment: Chan- Correspondence was read from Evan Chan,Project Manager,N&C Investments Waiver Request for LLC,7432 SE 27th St.,Mercer Island, 98040,requesting waiver of Development&Mitigation development and mitigation fees for the Morris Avenue Townhomes Fees,Morris Ave Townhomes, development located at 513 S. 2nd St. MOVED BY PERSSON, SECONDED N&C Investments BY PALMER, COiJNCIL REFER THIS CORRESPONDENCE TO THE FIlVANCE COMMITTEE. CARRIED. Added Councilwoman Nelson noted receipt of a letter from Rev. Kenneth Colman,Co- Citizen Comment: Colman- Chair Renton Domestic Violence Task Force,United Christian Church, 1707 Municipal Court Security Edmonds Ave. SE,Renton, 98058,regarding the lack of security in the Renton Concerns Municipal Court. Mayor Keolker-Wheeler indicated that the Administration is reviewing the matter. UNFIr1ISHED BU5INESS Planning and Development Committee Chair Clawson presented a report Planning & Development regarding the compensation for the City of Renton's street vacation request on Committee behalf of Bales Limited Partnership(VAC-04-006). The Committee Vacation: NE 4th St,City of recommended concurrence in the staff recommendation to accept the appraisal Renton,VAC-04-006 and waive compensation for the vacation of an eight-foot by 150-foot portion of NE 4th St., located east of Rosario Ave. NE. MOVED BY CLAWSON, SECONDED BY LAW,COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. Community Services Community Services Committee Chair Nelson presented a report Committee recommending concurrence in the staff recommendation that Renton enter into Human Services: 2006-2008 the joint interlocal agreement to receive Community Development Block Grant CDBG Interlocal Agreement, funds through the King County Consortium for 2006-2008. The Committee King County further recommended that the resolution authorizing the Mayor and City Clerk to enter into the agreement be presented for reading and adoption. MOVED BY NELSON,SECONDED BY PALMER,COUNCII.CONCUR IN THE COMMITTEE REPORT. CARRIED. (See page 274 for resolution.) Finance Committee Finance Committee Chair Persson presented a report recommending approval - Finance: Vouchers of Claim Vouchers 239307-239740 and one wire transfer totaling $1,882,430.27;and approval of Payroll Vouchers 58507-58875,one wire transfer, and 620 direct deposits totaling$2,067,280.59. MOVED BY PERSSON,SECONDED BY NELSON,COUNCIL CONCUR IN THE COMMITTEE REPORT. CARRIED. t�,��./�,}x.,;,�/�y s„�i°!�'',+,'.� �" t+r -�j�?�T � BDJS Associates LLC � � � ��� ���� �� ��� ����''�r�� � �'� � ��� �,:��,�—,—�s�.s ���T`�'�, �.__ , .�. ��� �; '� r,�;�.�� �, t; July 12, 2005 ��n.;�,,;;�_-P� � .�'r��t°la�.�=;� r,, :; .�r . Jan Illian ��►1� �leS ��erSlZtny City Councilmember's ��i�{ �ltr�ira,.�i,,,� /��.�'�-�'� 1055 South grady Way Renton, WA 98055 �� ' � �"�ar SUBJECT: Urban Craft Reimbursement for Water and Sewer. Dear Jan & City Councilmember's Thank you for you recent response regarding the cost overruns for the water& sewer lines in Olympia Ave NE. As you are aware, the costs for completing this work have exceeded the approved maximum reimbursement amount. We have included for your review a copy of the Actual cost vs. the original estimates by Jaeger Engineering. The balance for the City's portion of the work is $51,264.24. Please submit this request to the city council for approval as soon as possible. If you have any questions regarding the costs or estimates that were provided by the engineer and contractor please do not hesitate to call. Sincer �i enn avis Managing Partner BDJS Associates (206) 284-7603 Cc: Jan Ilian Abdoul Gafour Dave Christianson Kayren Kittrick Neil Watts 1900 West Nickerson #116-168 Seattle,WA 98119 � �"C��R ��I�I �E �IC� 9419 S. 204 P[.a►CE - KENT, WASHINGTON 98031 - PHONE (253) 850-0934 F'..a►►x (253) 850-0 i 55 July 14, 2005 � {:;i�OF RE(VTfli� Dave.Christianson ��� a � ���� City of Renton Public Works 1055 S. Grady Way �E������ Renton, WA. 98055 ,�I�iY CLERK'S OFFICE Project: Urban Crafts -Olyrnpia Ave. Final Construction Costs for Public Improvements Dave, The construction at the Urban Craft project is nearing compietion. The work that was performed within Olympia Ave. NE included improvements to the Olympia Ave. infrastructure in addition to those that would normally be reqvired for the project and will benefit the public/City. Those improvements included a water and sewer main installation that extended north of the site's frontage to service existing lots on Olympia Ave. The new water and sewer mains replaced existing sub-standord sysfiems that have been abandoned._ The City has agreed to the financial responsibility for the total cost of the water and sewer systems in that portion of Olympia Ave. that is norfh of . the site. The City also agreed to pay for 50% of the cost of the water and sewer systems within the site frontage along Olympia Ave. I had prepared an estimate of the water and sewer main construction in May, 2003, that was used to discuss the work and establish costs. I have now reviewed the actual construction costs for the project that are being submitted for reimbursement by the City. The City had set a budget �f $75,000 for the work. The requested reirnbursement is approx. $114,000. The increase is due to a number of factors. The cost of materials, particularly steel pipe, has tripled in the last 2 years. The estimated unit costs for the water and sewer main have tripled due to the materials increase and also due to the recons#ruction of the raad. The estimated unit costs did not include the gravel trench backfill, testing, compaction, etc. Also, the locates for the existing water and sewer services to the houses/businesses along Olympia Ave. have been factored into the unit costs. The cost for re-surfacing the road was also higher due to constraints by existing drainage and driveways. The developer has prepared a table that compares the actual costs and the estimated costs using similar line items. I have reviewed the actual costs and have compared them to the estimates. I agree that the actual � � costs are representative of the work that was performed and are justified � by unforeseen job site conditions, the uncertainty of the original utilities and the industry cost increases. Please feel free to cali or meet with me to discuss any questions. Thank you. Sincerely, �� James Jaeger �� � � � �� + � 9� � ay s i' ���9� � _� � �`���� ��°��.�,:s� � � BDJS Associates LLC INV4ICE 1900 W Nitkerson PMB 116-166 Seattle WA 98119 Phone(206)264-7603 Fax(206)264-6625 INYOICE x442-0305-02 DATE:MAY 20,2005 TO: SHIP T0: Abdoul Gafour City Of Renton Public Works Department Utilities Systems-Flfth Floor 3055 South Grody Way Renton WA 98055 Phone(425)430•7210 Fax(425)430-7241 COMMENTS OR SPECIAL INSTRUCTIONS: SALESPERSON P.O.NUMBER REQUISMONER SHIPPED VIA F.O.B.POINT 7ERM5 Due on receip[ QUANTITY DESCRIPTION UNIT PRICE TOTAI 90.50 LF 8"O.I.Water main and fittings(181 LF on property frentage split 50/50 with Contrador and City of Renton) 115,46 10,444.13 130 lF 8"0.1.Water main and fittings north of preperty frontage 115.46 15,009.80 1 ea New Ilre hydrant assembiy 2,795.00 2,795.00 0.5 ea ��ectbn to the existing main(Cost split with Contractor and Ciry of 7,857.00 3,928.50 Renton 50/SO) 153.5 LF 8"P�C sewer ma(n(307 LF on property frontaqe split SO/50 wfth 106.19 16,300.17 Contractor and Gry of Renton) 91 LF 8"PVC Sewer main north of property frontage 106.19 9,663.29 0.5 ea Man hole split 50/SO with Contractor and Cky of Renton 3,642.00 1,821.00 i ea Man hole City ot Renton Only 3,642.00 3,642.00 8 ea Side sewer connections 1,228.00 9,824.00 .OS ea Connettfon to existing sewer(50/50 split between�antractar and Clty 1,200.00 600.00 o(Renton SUBTOTAL 74,032.89 SALES TAX SHIPPING&HANDl1NG TOTAL OUE /�/��t �/ --� �� ao ,�"� b0 ��-�I/v ��.�.�Gll�''1 � o? 2g b� � � BDJS Associates LLC INVOICE 1900 W Nickerson PMB 116-168 Seattle WA 98119 Phone(206)284-7603 Fax(206)284-6625 INVOiCE�a42-0305-02 OATE:MAY 20, 2005 TO: � SHIP T0: Abdoul Gafour Ctty Of Renton Publlc Works Oepanment Utilitles Systems-FlRh FlOor 1055 South Grady Way Renton WA 98055 Phone(425)430-7210 Fax(425)430•7Z41 COMMENTS OR SPECIAL INSTRUCTIONS: SALESPERSON P.O.NUMBER REQUISTTIONER SHIPPED VIA F.O.B.POINT TERMS Due on recetpt QUANTITY DESCRIPTION UNITPRICE TOTAL 4711 SF Street restoration along frontage of property City of Renton portlon 3.25 15,310.75 3639 SF Street restoration north of pro/ect 95'x 38.31' 3.25 11,826.75 0.5 ea Trafflc Control(50/50 split with between Co�tractor and City of 5,000.00 2,500.00 Renton) 0.5 ea Signage and Striping(50/50 split between fantractor and Ciry of 500.00 250.00 Renton) 0.5 ea Demolition and disposai(50/50}spNt between Contracto�and City of 3,609.99 1,805.00 Renton) 0.5 ea Engineering and ptan preparation(SO/SO split between Cantractor and 2,500.00 1,Z50.00 City o(Renton) 0.5 ea Surveyfng and as•builts(50/50 split between Contrador and Ciry of 2,g30.00 1,465.00 tienton) 0.5 ea �nstruction management(50/50 split between Contractor and Clry of 11,132.72 5,56b.36 Renton) SUBTOTAL 114,006.74 SAlES TAX 10,932.59 SHIPPING&HANDLING TOTALDUE ;124,039.34 Make alf checks payabte to 8DJ5 Associates LLC If you have any quesiions concerning this invoice,con[act Alan Foss�m,(425)957-1234,Emall: alanf�fossumconswctlon.com Thank you for your buslness! p�s�'�/ �°� V" --' °b �� ��Su� b?,2�i,b�' . � � F O���� p: 425.957.1234 f: 425.401,1830 e: infoaQfossumconstruc6on.com www.fossumconstrucGon.com C 0 N S T R U C T I 0 N 2005 152n0 Place SE Bellewe,WA 98007 Unit Calculations February 14, 2005 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Part One Linear footage Cost Calculations: LF of Owners private 8"D.I.water main = 96 If LF of City's portion of 8"D.I.water main = 181 lf LF Shared cost Owner/City 8"D.I.water main = 130 If Total LF of water 8'D.I.water main =407 If LF City's portion of 8"PVC sewer main = 91 If LF shared portion of ownedcity 8"PVC sewer main =307�f Total LF of sewer 8"PVC sewer main =398 If Total LF of sewer and water mains 407 If+39$If =805 If. Total costs that applied to both sewer and water(gravel fill etc)_ $5,687.00. Cost per If to be applied to both water and sewer mains. $5,687.00/8051f= 7.06 er If. Total Costs for 8"D.I.water main and fittings=$44,119.00. Costs per If for 8"D.�.water main $44,119.00/407 If= 108.40 + 7.09= $115.16 ae�If. Total Costs for 8"PVC sewer main =$39,452.00. Costs per If for 8"PVC sewer main $39,452.00/398 If=99.13+7.09=�106.19 ner If. Note: Linear Feet is based on actual Measurements. Square Footage Cost Calculations: Square Feet of Asphalt that is the owners�esponsibility = 6,300 sqft Square Feet of Asphalt City's responsibility along frontage of Property = 4,711 sqft Square Feet of Asphali City's Responsibility North of Project = 3.639 sQft - Total Square Feet of asphalt per Northwest Asphalt = 14,650 sqft Total Costs of New Asphalt including grading and fill $47,609.80 Cost per Square Foot for New Asphalt=$47,609.60/14,650sqft =3.25 per SQFt �Ri�S t�L°� �i..An�f ��'�wc c�7.2,q,c�� , "V � F O���� p: 425.957.1234 f: 425.401.1830 e: info@fossumconstruction.com c 0 N S T R U t T I 0 H �w•fossumconstruction.com 2005 152"0 Place SE Bellevue,WA 980�7 Part 2 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Billing for City Portion of Utility Improvements: Water 8"D.I.Water Main and fittings 181 LF $ 115.46 = $20,898.26 @ 50%= $10,449.13 8"D.i.Water Main and fittings 130 LF $ 115.46 = $ 15,009.80 @ 1�O�o= $15,009.80 New Fire Hydrant Assembly i Ea $ 2,795.00 = � 2,7g5,00 @ 100%= $2,795.Q0 Estimated service connection/stubs 0 Ea $ - _ $ - @ 100%_ $ - Connection to the Existing main 1 Ea $ 7,857.00 = _� 7,857.00 50%= $3,928 50 Total Water = 532,182.43 Sewer 8" PVC sewer main 307 LF $ 106.19 = $32,600.33 @ 509�0= $16,300.17 8" PVC sewer main 91 LF $ 106.19 = $ 9,66329 @ 100%= $9,663.29 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 (c� 50%= $ 1,82i.00 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 @ 100%_ $3,642.00 Estimated side sewer connections 8 Ea $ 1,228.00 = $ 9,824.00 @ 1009'0= $9,824.00 connection to existing sewer 1 Ea $ 1,200.00 = $ 1,200.00 50°/a= $ 600 00 Total Sewer = 541,850.46 Street Restoration Along Frontage 315'x14.96' 4711 sf $ 3.25 = $ 15,310.75 @ 100%= $15,310.75 North of Project 95'x38.31' 3639 sf $ 3.25 = $ 11,826.75 @ 100%_ $11,826.75 Traffic control 1 ea $ 5,000.00 = � 5,000.00 @ 50%= $ 2,500.00 Signage and striping 1 ea $ 500.00 = $ 500.00 @ 50%= $ 250.00 Demolition and disposal 1 ea $ 3,609.99 = $ 3,609.99 @ SO%= $ 1 805 00 Total Road = $31,692.50 Total Hard Costs $105,725.38 Miscellaneous Costs Engineering and Plan Preparation 1 Ea $ 2,500.00 = $ 2,500.00 @ 50%= $ 1,250.00 - Surveying and As-Builts 1 Ea $ 2,930.00 = $ 2,930.00 @ 50%= $ 1,465.00 - Construction Management 1 Ea $11,132.72 = $ 11,132,72 @ 50%= $5,566.36 10%Contingencies 1 Pct $ - _ $ - u� 50�0= $ - Total Miscellaneous = $8,281.36 Total Cost to City of Renton = �114,006.74 050520 CreWor CitRen UtiImp Invoice dbs ver 2.doc _ � /�/ �.�� �� ��c� a?24'.�s` . CHy ol RoMon S�.wr 6 Wat�r lmproWrtrnta CMy Estim+t�P�r Ja�p�r EnpteNdnO daqd May 7 MO] foawm Conslruqbn Costa Wal�r Walo� E'D.I.WaUr Myn�nd Myeqf 213 lR S �p.00 • S e,EE0.00 � 50%• S 1,M0.00 e'O.I.Walat MaM and fltlYfps tEt LF S 115.�8 � f TO.eoe.se � 30%• f 10,�40.t3 e'D.1.W�r Maln ard fittlrpf 9E Lf S ]2.00 • S J.1�6.00 � 700lL� S 3,1J6.00 0'0.1.Watar Msh srd firiYqa t�0 lF S 115.�6 � S 15.009.60 @ 100%. S t3.009.s0 Ne�r Ffrp F{yE�aM/1Ss��p�y 1 Ea S 2.200.00 e S 2,200.00 � 100X� S 2�.� Naw f4o HyErrN ASpmOy 1 Ea S 2.785.00 � S 2,785.00 � 100%• S 2,795.00 Esttnaod sonko oorrrctibNswbs 5 C•a i �00.00 � f 2.000.00 � 100%� 1 2000.00 Est4noled wtvbs ooModloiJslubs 0 En S - • S ' Q 1007.' • S ' Corriacuona Il,o Ealaunp inin �Es S �.000.00 • S �.000.00 � sOx � S s0o.00 CannsNw+a�na F�dsiYq maln 1 Ea .S >.es7.0o • S 7.e57.00 � SOX• S 3.9ze.so Toul Wabr = S t1,21400 Total Wat�r = f 12,16243 Sewe� S�w�r E'PVC soNer mak� 108 LF S l0.00 • S 12.]20.00 � SOX,� S 6,16QD0 0'PVC sowor mah �07 LF 3 /09.19 � S 32.800.]� � 3�%= S 16.�00.17 � !'PVC sewer main 92 LF S 4�.00 . S 3.680.00 � 100lG= S 3.6E0.00 !`PVC se.+er maln 91 lf S 108.10 = 1 9,86�.29 � 700lG= Z 9,863.29 Man Hde t Ea S T.400.00 • S 2.400.00 Q 50%= S 7,200•DO Man Hole 1 Eo S �.642.00 � S J.6a2.00 � 50%• S 1,621.00 Wn FWie �Ea S 2�00.00 * S 2.�00.00 � 100Y.+ S 2,400.00 Man Hoie 7 Eo f J.6�2.00 e S J,81Y.00 � 100%= f 3,6I2.00 Estlrn�tadsldesewcrconnecilons EE., S e00.00 . S e,400A0 � t001G• f B,t00.00 Esumatodsidoww�rtorrwdiorx EEa S i.?26.00 = S 9.e2�.00 � 100%= f 9,62<.00 canectbn m WsWq sewer t Ea S t,000.00 . S t,000.00 � 50%� S 500.00 corr�ectbn b edsllnp sowor t Ea I t,�00.00 = S t.200.00 fA SOY.= S 600.00 Tolai Srw�r = S 20,ii0.00 Tota!Sewor . { t7,t50,�6 Strod Rn�ontlon Sirea/Roatontlon ' Norg Fronups 315Sc1Q 3�50 sl S 250 . S a,625.00 � 100lG = i a.625.00 Abrq Frontaps�15kt�.96' 4711 sl S J.?5 • S 15,970.�5 � 100%= f 75,310.75 NOM d Pearect 95k20' 1900 al S 2.50 . S 1,750.0p � 100%■ S 4.750.00 NoM d Rojec�8Su3E.31' �8,19 sl S 3,25 = S 7�,a26,75 � 100%� S 71.026.75 Tq[fic oonWt t ea S S.00O.OD � S 5.000.00 @ fip%• 5 2.500.00 Traffie cont+ot t oa f 5,000.00 • S S.OD0.00 � 50X� S 2.500.00 Sigruge aM striphp t m S 500.00 * i 500.00 � SOlL. S 250.00 34��and stA01n9 1 ea S 500.00 = 3 500.00 Q) 50X= S 250.00 OBIIIOf1i0n Jfd dlapOSal 1 62 S 7.000.00 = S �.000.00 � 509L� S 1.500.00 QWTIOiti0f18nd QKPosal 1!i S �.609.99 • S 7.809.99 1Q 507L• S 1.E05.00 To41 Road � S iT,B2i00 ToUI Road • f 11,697.50 Total Haro Cosb i a8,24t.00 Total Hard Costs f tOS,�25.�t Misullaneous Costs MhcNlan�ous Cosb ErqfnaerY�p an0 P�an P�eparatlon t Ea S 2500.OU = S 2.500.00 � 50%= S t,T50.00 E�q4�a�g anA PWn Weparatlon 7 Ea S 2.500.00 • 3 2,500.00 � 5076� S t.250.00 SunayhqandAvBuMs t Ea 1 2,000.0o a S 2,000.00 Q 50'K= S t.000A0 SuveyMgarWAs-13uMa 1 Ea 1 2.970.00 � S T.9�o.00 � Sox= S t.s85.o0 C.anlnKftonManapemerR 1 Ea S 3.500.00 • S 7.500.00 � 50K� S t.750.00 f;onslrudionMan.�qemeM 1 Ea S tt.t�2.72 • S tt,1J2.)2 � 50%■ 5 5.566.38 t0y.CanUnperKks t Pct S S.00O.00 � S 5.000.00 �SOX• S 2.500.00 tOX Contirqantbs t Pa S - • S @ 507G= S TWaI Misc�lls��ous ■ f 8,500.00 Total Mlsc�llanoous • S [,2�1.J6 � ToW Estlmat�d Cosl to City * i 55.711.00 ToUI Cod�o Cky • f 11�.o06.7t � /��l��d/ �4� �LCrsN 0�_2�,�� . � 050520 CinWor ClUten ostlmate Foscan Costs Comp�rison dbr von.ds Sent By: ; � 208 284 8825; Ju1-15-0;� :22AM; Page 1 /1 BDJ� Associ2�tes, LLC ; C1�i'oF Ft�'�VT�;Fy : Cbrres�,ondenc� 8-�-aoos ��L � �� 2��� July 1�, 20a� ��'�t`'�n . Clf�l��ies Overslz+'n� a�'c�-���°� v�F�c� � �e��m.b u r s e n1 ertt Rc Grc'sf .lan Illian � C�%�� �ue-oS-oo�� City Counci�member's ,p 1055 South:grady Way I�e.�er -�D �f�����l�eS Renton, W� 98055 C�.ornrn��'�� SUBJ�CT: Urban Craft �teimbursement far Water and Sewer. Dear Jan &�City Councilmember's: Thank you"�r you recent response regarding the cos#o�erruns for the water& sewer lines:ir� Olympia Ave NE. As you are:aw�re, the costs far cornpleting this wortc have exceecied the approved r�aximum reimbur�ement amount. We have ir�cluded fve your review a copy o#the Actual cost vs. th�original estimates �y Jaeger Engineering. The balanc�e for the City's por#ion of the work is $51,264_24. Please submit this request to the city council for approval as soon as possible. If you h�ve;any questions regarding the costs or estimates that were provided by thg engine�r and contr�ctar please do not hesi#ate to call. Sincer ' nn av Managing P�rtner BDJS Associates (206) 284-��03 Cc: Jan�Ili�n Abdou! Gafour Dava Christianson Kay�-en Kittrick Neil'Watts 1900 West Midcer5on �t 16-168 5eattie,WA 85119 Sent By';� ! _ _ _ � 206 2B4 6625; Ju1-15-0' :02AM; Page 1/2 Jua 15 �5 09: 07a James Jae�pr 253 850 0155 P• 1 ..�A�C�R �1V�rl���F�I�iC� .. .� PHD�i�G�� SSiO-09��wx(2�5�i3 BSt�-O 5�S 1 July 14, 2QOS � pove Christiansvn City af ttenton Pubiic W�� 1055 S. Grady Wc�y Renton, tNA. 98U55 Proj�ct: �Jrban Craffs-t7lympics Ave_ �inal Construction Costs fo�Pubfic Improvements Dc�ve, The cons;tr�+�tion a#th� Urbon CCaff pro}ect is nearing completian. The work ihat was perFormed within Olymp�a Ave. NE included impravements to the O�Ymp�� Ave. infrastructure in additian to those that wauld normally be requi�ed far fhe project and witl bene�it the public/City. Those 'tmprovements included a water and sewer main instc�llation fihat extende�d ���ateh and sewer ma ns�ep aCed exiS�ng�ub-stan+dard� Ave. Th� new systems�h�t have begn abandvned. .. 7he City hax agreed to the financic�i responsibil+ty�Ave.th t s narth of�, w�te�a n d sewer s y stems in that portipn of Ofymp the site.. the City also agreed to pay for 50°,�of the cost of the water and sewer systems withtn the site frontage along O lympip Ave. I ha d prepared c�n estimate ot th�water c�nd sewer main constrvction in May. 2p0�, th�t was used to discuss th�work and esfabfish �osts. I have r�ow reviewed the actual�anstrucfian costs for the project that c�re being submitted for reimbursement by the City. The City had s�Xt a b4�Q f of�75,C�00 for the work. '[he requested reimbursemerit is app � The inctet�se is due to a number of factars. 7he cast af materia{s. pa�ticuEar{y s'teel pipe, has fipled in the lasfi 2 years. 1`he estimated unit c�sts fGr the water and sewer main have tt+pied due fio the rnaterials increpse and also due to the recvnstructian of the road. The estimated unit costs did nat inClude fhe gravet trench backfill,tesfiing, campacfion, efc. AS�a,the locat�s for the e�astin9 Water and sewer services to the housesjbu�inesses along Qlympia Ave. have been factored into the unit �osts. �he cast f4r re--surfacing the road was also higher due to constraints by exis�ing drainage and driveways. 1'he d�veloper has prepared a tdbte thaf compares the actu�xl costs and the estima#ed casts u5ing simi4ar line items. 1 have reviewed the actu�l .. costs and have compared them to the esfiimates. 1 agree that fihe actua� Sent By: ; _ _ _ _ _ � 20B 284 6625; Ju1-15-0�:02AM; Page 2/2 _ ._ ._ ._. _ .._ , 363 BKf1 0155 -} 206 2B4 �625; r " Recvlved: 7/15/05 A:U7AM; Jul 15 05 09: 07� . James J�eser 253 8S0 0155 P• � costs ar�e representative of the worlc that was p���mn�pri nal ut t�ties� by vnforeseen job site conditions,the uncertatntY o 9 and the in�lustry Gost increases. Piease feel free to cali or meet with me to discuss an�r questions. Thc�nk you. 5incerely. � �� � � Jpmes Ja�:g�r . . `'�w" `� BD]5 Associates LLC INVQICE 1900 W Nickerson PMB 116-166 Seattle WA 98119 Phone(206)284-7603 Fax(206) 284-6625 INvOICE�t442-0305-02 DATE;MAY 20, 2005 T�� SHIP TO: Abdoul Gafour City Of Renton Public Works Department Utilities Systems-FiRh Floor 1055 South Grady Way Renton WA 98055 Phone(425)430-7210 Fax(425)430-7241 COMMENTS OR SPECIAL INSTRUCTIONS: SALESPERSON P.O.NUMBER REQUISITIONER SHIPPED VIA F.O.B.POINT TERMS Due on receipt QUANTITII DESCRIPTION UNIT PRICE TOTAL 90.50 LF 8"D.I.Water main and fittings(181 LF on property frontage split 115.46 10,449.13 50/50 with Contrador and City of Renton) 130 LF 8"D.I.Water ma(n and �ttings north of property frontage 115.46 15,009.80 1 ea New fire hydrant assembly 2,795.00 2,795.00 0.5 ea Connectfon to the ex(sting main(Cost spltt with Contractor and City of 7�g57.00 3,428.50 Renton 50/SO} 153.5 LF 8"PVC sewer main (307 LF on property frontage split 50/50 with 106.19 16,300.17 Contrador and City of Renton) 91 LF 8"PVC Sewer main north of property frontage 106.19 9,663.29 0.5 ea Man hole spli[SO/50 with Contractor and City of Renton 3,642.00 1,821.00 1 ea Man hole City of Renton Only 3,642.00 3,642.00 8 ea Side sewer connedions 1,228.00 9,824.00 .05 ea �nnectfon to existing sewer(50/50 split behveen Contractor and City 1,200.00 600.00 of Renton SUBTOTAL 74,032.89 SALES TAX SHIPPING&HANDLING TOTAL DUE a�� v'°� . � � B��s Assoc�ates ��c INVOICE 1900 W Nickerson PMB 116-168 Seattle WA 98119 Phone(206) 284-7603 Fax(206) 284-6625 INVOtCE#442-0305-02 DATE: MAY 20, 2005 TO: SHIP TO: Abdoul Gafour City Of Renton Pubilc Works Department Utllities Systems—Fifth Floor 1055 South Grady Way Renton WA 98055 Phone(425)430-7210 Fax(425)430-7241 COMMENTS OR SPECIAL INSTRUCTIONS: SALESPERSON P.O.NUMBER REQUISITIONER SHIPPED VIA F.0.8.POINT TERMS Due on receipt QUANTI'fY DESCRIPTION UNIT PRICE TOTAL 4712 SF Street restoration along frontage of property City oF Renton portfon 3.25 15,310.75 3639 SF Street restoration north of project 95'x 38,31' 3.25 11,826.75 0.5 ea Trafflc Control(50/SO split with between Contractor and City of 5,000.00 2,500.00 Renton) 0.5 ea Signage and Striping(50/SO split between Contractor and City of 500.00 250.00 Renton) 0.5 ea Demolition and disposal(50/SO)split between Contractor and City of 3,609.99 1,805.00 Renton) 0.5 ea Engfneering and plan preparation(50/50 spltt between Contractor and z,500.00 1,250.00 City of Renton) 0.5 ea Surveyfng and as-builts(SO/50 split between Contractor and City oF 2,g30.00 1,465.00 Renton) 0.5 ea Construction management(50/50 split between Contrador and City of 11,132.72 5,566.36 Renton) SUBTOTAL 114,006.74 SALES TAX 10,932.59 SHIPP[NG&HANDLING TOTAL DUE $124,039.34 Make all checks payable to BDJS Associates LLC If you have any questions concerning this invoice,contact Alan Fossum, (425)957-1234, Email: alanf@fossumconstructfon.com Thank you for your business! � / �oy b� 0 �' � F O���� p: 425.957.1234 f: 425.401.1830 e: info@fossumconstruction.com www.fossumconstruction.com C 0 N S T R U C T 1 0 N 2005 152ntl Place SE Bellevue,WA 98007 Unit Calculations February 14, 2005 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Part One Linear footage Cost Calculations: LF of Owners private 8" D.I. water main = 96 If LF of City's portion of 8" D.I.water main = 181 If LF Shared cost Owner/City 8" D.I. water main = 130 If Total LF of water 8'D.I. water main =407 If LF City's portion of 8" PVC sewer main = 91 If LF shared portion of owner/city 8" PVC sewer main = 307 If Total LF of sewer 8" PVC sewer main =398 If Total LF of sewer and water mains 407 If+ 398 If =805 If. Total costs that applied to both sewer and water(gravel fill etc) _ $5,687.00. Cost per If to be applied to both water and sewer mains. $5,687.00/8051f= 7.06 er If. Total Costs for 8" D.I. water main and fittings =$44,119.00. Costs per If for 8" D.I. water main $44,119.00/407 If= 108.40 + 7.09 = $115.16 per If. Total Costs for 8" PVC sewer main = $39,452.00. Costs per If for 8" PVC sewer main $39,452.00/398 If= 99.13 + 7.09 =$106.19 per If. Note: Linear Feet is based on actual Measurements. Square Footage Cost Calculations: Square Feet of Asphalt that is the owners responsibility = 6,300 sqft Square Feet of Asphalt City's responsibility along frontage of Property = 4,711 sqft Square Feet of Asphalt City's Responsibility North of Project = 3.639 sqft Total Square Feet of asphalt per Northwest Asphalt = 14,650 sqft Total Costs of New Asphalt including grading and fill $47,609.80 Cost per Square Foot for New Asphalt= $47,609.80/14,650sqft =3.25 per SqFt �� • � � �O���� p.e42VnVfWo`@fos um o st u t o1n1 o3m ossumconstruction.com C 0 N S T R U C T I 0 N 2005 152ntl Place SE Bellevue, WA 98007 Part 2 City of Renton Job 457 City Clerk's Office Urban Crafts Utility Work 1055 South Grady Way (Creative Work Space) Renton WA 98005 Permit U031356 401 Olympia Ave, Renton WA Billing for City Portion of Utility Improvements: Water 8" D.I. Water Main and fittings 181 LF $ 115.46 = $20,898.26 @ 50%_ $10,449.13 8" D.I. Water Main and fittings 130 LF $ 115.46 = $ 15,009.80 @ 100%= $15,009.80 New Fire Hydrant Assembly 1 Ea $ 2,795.00 = $ 2,795.00 @ 100%= $2,795.00 Estimated service connection/stubs 0 Ea $ - _ $ - @ 100%_ $ - Connection to the Existing main 1 Ea $ 7,857.00 = $ 7,857.00 @ 50%= $3,928.50 Total Water = $32,182.43 Sewer 8" PVC sewer main 307 LF $ 106.19 = $32,600.33 @ 50%= $16,300.17 8" PVC sewer main 91 LF $ 106.19 = $ 9,663.29 @ 100%= $9,663.29 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 @ 50%_ $ 1,821.00 Man Hole 1 Ea $ 3,642.00 = $ 3,642.00 @ 100%= $3,642.00 Estimated side sewer connections 8 Ea $ 1,228.00 = $ 9,824.00 @ 100%_ $9,824.00 connection to existing sewer 1 Ea $ 1,200.00 = $ 1,200.00 @ 50%_ $ 600.00 Total Sewer = $41,850.46 Street Restoration Along Frontage 315'x14.96' 4711 sf $ 3.25 = $ 15,310.75 @ 100%= $15,310.75 North of Project 95'x38.31' 3639 sf $ 3.25 = $ 11,826.75 @ 100%_ $11,826.75 Traffic control 1 ea $ 5,000.00 = $ 5,000.00 @ 50%= $ 2,500.00 Signage and striping 1 ea $ 500.00 = $ 500.00 @ 50%= $ 250.00 Demolition and disposal 1 ea $ 3,609.99 = $ 3,609.99 @ 50%_ $ 1,805.00 Total Road = $31,692.50 Total Hard Costs $105,725.38 Miscellaneous Costs Engineering and Plan Preparation 1 Ea $ 2,500.00 = $ 2,500.00 @ 50%_ $ 1,250.00 Surveying and As-Builts 1 Ea $ 2,930.00 = $ 2,930.00 @ 50%_ $ 1,465.00 Construction Management 1 Ea $11,132.72 = $ 11,132.72 @ 50%_ $ 5,566.36 10% Contingencies 1 Pct $ - _ $ - @ 50%_ $ - Total Miscellaneous = $ 8,281.36 Total Cost to City of Renton = $114,006.74 050520 CreWor CitRen Utilmp Invoice dbs ver 2.doc City of Ronlon Sew�r 6 Water Improvements Cky Estimate P�r JaQpor Enpi�a�rinQ datW May 1 2003 Fossum Conatrudion Costs Watx Wato► B'D.1.Waler Maln and flt1(nqs 215 LF S 32.00 = S 8,860.00 � 5096= S 3,440.00 8'D.1.Waler Main and frtWips 181 LF S 175.46 • S 20,898.Z6 � 50%= S 10,44fl.1J 6'D.1.Water Main and filtfnps 99 LF S 32.00 = S 3,136.00 � 700%� S 3.138.00 8'O.I.Water Main and fittinps 130 lF 5 175.46 = S 75,009.80 � 100% = S 15,009.80 Nexr Fice�{yy,gM Assembly 7 Ea S 2,2Q0.00 = S 2,2�.00 � 100%= S 2.20�.�0 New Flre HydtaM/lssembly 1 Ea S 2,795.00 s S 2.795.00 � 100X= S 2,795.00 Estmated swvico cannectWNstubs 5 Ea S 40p,00 = S 2,000.00 � 1009G= S 2.00O.UO EsNrtwled servke connedbrJslubs 0 Ea S - = S - � 7�� S - Cwme{,'tbn to Iho Existlrg main 1 EB S �.000.00 = S 1,000.00 � 50%= S 500.00 Connectjon to the Existin0 ma(n 1 Ea 5 7,E57.00 = S 7.857.00 � 5076= S 3.928.50 Total Water a S 11,276.00 ToUI Water = S 32.182.43 Sewer Sewer 8'PVC Sewer maln 308 LF S 40.00 = j 12.320.00 � 5096= S 6.160.00 8•PVC sewer mafn 307 LF 5 108.19 = S 32.600.33 � 50%= S 16,300.17 8'PVC sewer main 92 LF S 40.00 = S 3,680.00 � 100% = S 3,680.00 8'PVC sewer main 91 lf S 106.79 = S 9.663.29 � t00y. = S 9,663.29 Man Fio{e 1 Ea S 2.400.00 = S 2.400.00 � 50%= 5 �.200.00 Man Hole 9 Ea S 3,642.00 = S 3,642.00 � 509G= S 1,821.00 Man Hole 7 Ea S 2.400•00 = S 2.400.00 � 100'� = S 2,400.00 Man Hole 'I Ea S 3,842.00 = S 3,642,00 � 100%= S 3,642.00 � Estlmated side sewer conr�edior�s 8 Ea S 800.00 = S 8,400.00 � 100l6 = S B,a00.Op Estimated side sewer comecfioru 8 Ea S 1.228.00 = S 9,824.00 � t009L • S 9,824.00 corwection to existirq sewer 7 Ea S 1.000.00 = S 1.000.00 � 50%= S 500.00 coruieaUon�o existlng sevrer 1 Ea S 1,200.00 = S 1,200.00 � 5096= 5 600.00 I TMaI S�wor = S 20,340,00 Total Sowar = i <1,850.16 Streat Resloratfon Streol Rostoratlon /Uorg fronlage 345k10' 3450 st S 2.50 = S 6,625.00 � 100% = 1 8,625.0p Abng Ftontapa 315x14.96' 4711 s( S 3.25 = S 15,310.75 � 100%= S 15,310.75 North of Project 95�c20' 1900 st S 2.50 = S 4.750.00 � 100yL= S 4,750.00 NaM of Project 95x38.31' 3639 sl S 3.25 = S �1,826.75 � 100% = S t 1.826.75 Tr�fic control 1 ea S 5,000.00 = S 5,000.00 � 509G= S 2,500.00 Traffic coMrd 1 ea S 5,000.00 � S S.00O.OQ � 50%= S 2.500.00 s�nage and sa� � ea s soo.00 = s soo.00 � sox = S 2so.00 st�na9e ara sn+ain9 � ea s soo.00 = s soo.00 � sox= s 2so.00 QenWpliOnanddisposal 1 ea S 3.OW.00 = S J.OQU.00 � 50X= S 7,500.00 Demolitiortanddisposal 1 ea 5 3.6Q9.99 = S 3.609.99 �$ 50%= S 1.805.00 Total Road = S 17.625.00 ToWI Road = j 3�,69250 Totnl Hard Cosb S 49,241.00 Total Hard Costs 5105,725.18 Misultaneous Costs Miscellaneous Coats Engineering and Plan Preparation 1 Ea S 2,500.00 = S 2.500.00 � 50'Ya= S 7,250.00 Ergineering and Plan Preparation 1 Ea 5 2.500.00 = S 2,500.00 � 5096= S 1,250.00 surveymp ana ns-su�ns 1 Ea S 2,000.00 = S 2.00a.00 � sw/. = s �.000.00 survey�ara ns-eu+ns � ea s z.�o.00 = S z.sao.00 � so%= 3 i,ass.ao Constnxyion Managemerrt 1 Ea S 3,500.00 = S 3,500.00 � 50'4= S 7.750.00 Conslnxtiot�Management 1 Ea S 71.132.72 = S 17.132.72 � 50%= S 5,586.38 �ox c«+u�endes � � s s.000.ao = S s.000.00 � so�= s z.soo.ao �ox c«,nn9enc�es � Pa s - = s � sox= S Total Miscollaneous = 3 &�.a0 Total Miseallanoous = S 8,281.36 I Total Estlmatad Cosl to Cky = S 55,741.00 Total Cost to Cily = f t 14.o06.7t .� � . � 050520 CreWor CitRen estknate Foscan Costs Compa�ison dbs varl.�ds " '�"` CIT�OF RENTON c. �-: "LL City Clerk J Tanner,Mayor Bonnie I.Watton August 26, 2003 Glenn R. Davis &Jeffrey M. Silesky Davis & Silesky Real Estate Investment Services 15600 NE 8�'St., Suite B1-173 Bellevue, WA 98008 Re: Request for Joint Participation of Utility Costs Urban Craft Development-NE 4�`St. &Olympia Ave. NE Dear Mr. Davis and Mr. Silesky: At the regular meeting of July 7, 2003,the Renton City Council adopted the recommendation of the Utilities Committee regarding the referenced request. The Committee recommended approval of your request for reimbursement for the actual costs of the extension of the water and sanitary sewer lines that do not directly benefit the developer. The Committee further recommended that reimbursement by the City based upon final construction costs of the water and sewer line utilities be allowed,not to exceed$35,075 for the water utility and$37,700 for the wastewater utility. If final project costs exceed those amounts, then the developer would need to request such additional funding through the City Council. Attached is a copy of the Committee report for your information. If I can provic�e further information or assistance, please feel free to contact me. Sincerely, ���9�t.rt,c-t-�I. WG�:C.d'��� Bonnie I. Walton City Clerk/Cable Manager attachment cc: Dave Christensen,Utility Engineering Supervisor H. Lee Johnson,BDJS Associates, Inc.,4223 E. Lee Street, Seattle, WA 98112 1055 South Grady Way-Renton,Washington 98055-(425)430-6510/FAX(425)430-6516 R E N T O N �This paper contains 50%recvcled matenal 30 i r,��t��„���.,,A� A H E A D O F T H E C U R V E �✓ vwp ` ruly 7,2003 Renton City Council Minutes Page 236 estimated amount of$801,097.66 to ensure that project costs are equitably distributed to those who benefit. Refer to Utilities Committee. MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE, COUNCIL APPROVE THE CONSENT AGENDA AS PRESENTED. CARRIED. Streets: S Grady Way Commenting on consent agenda item 6.e.,S. Grady Way westbound lanes Westbound Lanes Weekend weekend closures, Councilman Persson ernphasized the importance of the S. Closures Grady Way Pavement Rehabilitation Project, stating that it would be hard to complete without traffic disruptions. Added Correspondence was read from Mary and Kevin Nelson, 17252 128th Ave. SE, CORRESPONDENCE Renton, 98058,expressing support for an off-leash dog park in Renton. Citizen Comment: Nelson- MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON,COLTNCIL Off-Leash Dog Park REFER THIS CORRESPONDENCE TO COMMITT'EE OF THE WHOLE. CARRIED. Citizen Comment: Johnson- Correspondence was read from Marci Johnson, 510 Stevens Ave. SW, 5404, Fireworks Ban Renton,98055,requesting that Renton ban the use of fireworks. MOVED BY CLAWSON, SECONDED BY KEOLKER-WHEELER, COUNCIL REFER THIS CORRESPONDENCE TO THE PUBLIC SAFETY COMMITTEE. CARRIED. Citizen Comment: Marconi et A petition containing 13 signatures was read submitted by Mary and Terry al-Smithers Ave S Closure Marconi,2114 Smithers Ave. S.,Renton,98055,requesting the closure of Smithers Ave. S. at SW 21st St. for the following reasons: excessive vehicle speed,excessive vehicle usage;hazardous comer(Smithers and 21st),drainage and surface conditions, and pedestrian endangerment due to lack of shoulder. MOVED BY PERSSON,SECONDED BY NELSON,COUNCIL REFER THIS PETITION TO THE TRANSPORTATION COMMITTEE. CARRIED. OLD BUSINESS Utilities Committee Vice Chair Briere presented a report recommending Utilities Committee concurrence in the recommendation of the Planning/Building/Public Works CAG: 03-073,East Valley Lift Department that the East Valley Lift Station Replacement Project be awarded Station Replacement, Stouder to Stouder General Construction,LLC,in the amount of$607,321.60. General Construction,Fund The Committee further recommended that funds totaling$250,000 be Transfer transferred from Wastewater Account 421.000400.018.5960.0035.65.045000 (WO#45365 Central Plateau Interceptor)to Wastewater Account 421.000400.018.5960.0035.65.045010(WO#45360 East Valley Lift Station Replacement)to cover the cost of the project. MOVED BY BRIERE, SECONDED BY CLAWSON,COUNCIL CONCUR 1N THE COMMITTEE REPORT. CARRIED. Utility: Olympia Ave NE Utilities Committee Vice Chair Briere presented a report recommending Utilities Installation, Urban concurrence in the recommendation of the Planning/Building/Public Works Craft Development Request Department that Council approve the request by Urban Craft Development to for Cost Sharing have the Water Utility and Wastewater Utility reimburse the developer for the actual costs of the extension of the water and sanitary sewer lines that do not �i� directly benefit the developer. ���� �j���`�� The Committee also recommended that Council authorize the Administration to allow reimbursement by the City based upon final construction costs of the above utilities not to exceed$35,075 for the Water Utility and$37,700 for the Wastewater Utility. If final project costs exceed this amount,then the _ - �` �' July 7,2003 Renton City Council Minutes Page 237 developer shall request such additional funding through City Council. MOVED BY BRIERE,SECONDED BY CLAWSON,COUNCII.CONCUR IN THE CONIlVIITTEE REPORT. CARRIED. In response to Council President Keolker-Wheeler's inquiry,Councilwoman Briere stated that the location of the utility extension is Olympia Ave.NE, north of IVE 4th St. Finance Committee Finance Committee Chair Pazker presented a report recommending approval of Finance: Vouchers Claim Vouchers 21b400-215817 and three wire transfers totaling $2,758,538.57;and approval of Payroll Vouchers 44706-44958,one wire transfer and 575 direct deposits totaling$1,725,448.82. MOVED BY PARKER,SECONDED BY PERSSON, COUNCIL CONCUR IN'THE COMMITTEE REPORT. CARRIED. • Transportation(Aviation) Transportation(Aviation)Committee Chair Persson presented a report Committee recommending concurrence in the staff recommendation that Council approve Transportation: Six-Yeaz TIP the proposed 2004—2009 Six-Yeaz Transportation Improvement Program(TII') (2004-2009) and Arterial Street Plan. The Committee further recommended that the resolution regarding this matter be presented for reading and adoption. MOVED BY PERSSON,SECONDED BY NELSON, COUNCII.CONCUR IN THE CONiMTTTEE REPORT. CARRIED. (See later this page for resolution.) ORDINANCFS AND The following resolutions were presented for reading and adoption: RESOLUTIONS Resolution#3644 A resolution was read authorizing the Mayor and City Clerk to enter into an Public Works: Cedar River interlocal cooperative agreement with the State of Washington Department of Spawning Channel Natural Resources for an aquatic lands easement for the Cedar River Spawning Replacement Project,DNR Channel Replacement Project. MOVED BY BRIERE, SECONDED BY Aquatic Lands Easement CI,AWSON,COiJNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Resolution#3645 A resolution was read authorizing the temporary closure of the westbound lanes Streets: S Grady Way of S.Grady Way,between Shattuck Ave. S. and Rainier Ave. S.,for a period of Westbound Lanes Weekend six days (consecutive or non-consecutive)between August 1 and September 30, Closures 2003,for the S. Grady Way Pavement Rehabilitation Project. MOVED BY PERSSON,SECONDED BY NELSON,COUNCIL ADOPT THE RESOLUTION AS READ. CARRIED. Resolution#3646 A resolution was read updating the City's Six-Year Transportation Transportation: Six-Yeaz TIP Improvement Program,2004-2009. MOVED BY PERSSON,SECONDED BY (2004-2009) NELSON,COUNCII,ADOPT THE RESOLUTION AS READ. CARRIED. The following ordinance was presented for second and final reading and adoption: Ordinance#5014 An ordinance was read establishing an assessment district for sanitary sewer SAD:East Kennydale Sanitary service for properties adjacent to Monterey Ct.NE,NE 16th St.,Blaine Ave. Sewer Infill Phase I NE,Camas Ave.NE,Dayton Ave.NE,Edmonds Ave. NE,and Monterey Ave. NE,and establishing the amount of the charge upon connection to the facilities. MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON,COUNCIL ADOPT TT�ORDINANCE AS READ. ROLL CALL: ALL AYES. CARRIED. , . '� 'r.r►' �������� �� � �s"����6�1C1L UTILITIES CONIlVIITTEE Date �� 7 a0o3 � CONIlVIITTEE REPORT July 7,2003 URBAN CRAFT DEVELOPMENT REQIJEST FOR COST PARTICIPATION FOR EXTENSION OF CITY UTILITIES (Refened March 17, 2003) T'he Utilities Committee recommends concurrence in the Planning/Building/Public Works Department's recomtnendation that Counc' t�r�e request by Urban Craft Development to have the Water Utility and the�� ' ,e�vat�r,,i�tility r urse the developer for the actual costs of the extension of the wa�er �ii�sani�ry sewer��e kat do not directly benefit the developer. � �° ��-. �, � ;� �y , y x,�� �� The Committee also recc�ir�mends'that Council auth�ri�'�t1�e�Administration to allow e� � . reimbursement by the Cit�% b��upo�� ion`��osts°o " e above utilities not to exceed $35,075 for the V�ater Uti�ity�iic� ;;�,�;�r °e W�stewat Utility. If final project costs exceed�this amount� tl��n t�e�."'`��, � �, 'uest � '�itional funding through City Council. �. � � � .�� �����,,�; ` w� °� >��>���� ,_ <:��- � + � ,{� � , . �� ���* s�< . ,�4; ��" � dy Corman, �air � :-�� ����~ � Terri Briere.Vice Chair I Dan Clawson, Member cc: Lys Hornsby Dave Christensen Abdoul Gafour c; �- � CIT�c""�F RENTON ' � City Clerk _ lesse Tanner,Mayor Bonnie I.Walton Mazch 18, 2003 Glenn R.Davis Jeffrey M. Silesky Davis &Silesky Real Estate Investment Services 15600 NE 8th St. Suite B1-173 Bellevue,WA 98U08 Re: Urban Craft Development—NE 4th St. &Olympia Ave. NE DeaF Mr.Davis and Mr. Silesky:` � At its regular meeting o�March 17, 2003,the Renton City Council referred your letter regarding the Urban Craft'development and infrastructure impr�vements to the Utilities Committee for review and re�orrimendation: You will be notified;Qf the time and date of the committee meeting by the Council lia,ison v�rhen tfie item is sc�ieduled. If I can provide additional informat�on or•assi�t�ince,please feel free to contact me. , Sincerely, - Michele Neumann Deputy City Clerk cc: Mayor Jesse Tanner Council President Kathy Keolker-Wheeler Gregg Zimmerman,Planning/Building/Public Works Administrator 1055 South Grady Way-Renton,Washington 98055-(425)430-65101 FAX(425)430-6516 �-` � lr T O jr �7h�<..�,.er,.,.���;,,��no�,�,„,,.ien..,��e,;,,i anw_..,...�,..,_........._ A H E A D O F T H E C U R V E � March 17,2003 � Renton City Council Minutes � Page 102 Transportation:NE 3rd/4th St Transportation Systems Division recommended approval of an agreement with Corridor Signal King County to receive grant funding in the amount of$80,000 for the signal Synchronization,King County synchronization of 13 traffic signal locations along the NE 3rd and NE 4th St. Grant corridor. Refer to Transportation Committee. Transportation:NE Sunset Transportation Systems Division recommended approval of an agreement with Blvd&Duvall Ave NE the Washington State Department of Transportation(WSDOT)for the design Intersection Improvements, and construction of intersection and traffic signal improvements at NE Sunset WSDOT Grant Blvd. and Duvall Ave.NE. City project share is$44,000. Refer to Transportation Committee. Utility:Annual Consultant Utility Systems Division requested approval of the annual consultant roster Roster for Appraisal&Right- listing eleven firms to provide appraisal and right-of-way services for 2003, of-Way Services with the option of extending the roster annually in 2004 and 2005 upon Public Works Administrator approval. Council concur. CAG: 02-120, Springbrook Utility Systems Division submitted CAG-02-120, Springbrook Springs Springs Watershed Property Watershed Property Fencing Installation;and requested approval of the project, Fencing Installation,F&H authorization for final pay estimate in the amount of$13,798.02, Fence Co. commencement of 60-day lien period,and release of retained amount of $3,440.13 to F&H Fence Co.,Inc.,contractor,if all required releases aze obtained. Council concur.* Public Works: City Shops Referring to items 8.e. and 8.f.,Councilman Persson inquired whether there is Fiber Optic Connection an existing fiber optic connection for the City Shops site. Gregg Zimmerman, Planning/Building/Public Works Administrator,responded that he would investigate the matter. *MOVED BY KEOLKER-WHEELER,SECONDED BY NELSON, COUNCIL APPROVE THE CONSENT AGENDA AS AMENDED TO REMOVE TTEM 8.b.FOR SEPARATE CONSIDERATION. CARRIED. Senarate Consideration Development Services Division recommended approval of an agreement with Item 8.b. Parametrix to prepare the Environmental Impact Statement(EIS)for the Bazbee Development Services: Barbee Mill Preliminary Plat proposal(LUA-02-040). Barbee Mill Company will pay Mill Preliminary Plat EIS for the EIS prepazation. Preparation,Parametrix Councilwoman Briere requested that the scope of the EIS report be expanded to include adequate review of historical and cultural resources. MOVED BY KEOLKER-WHEELER, SECONDED BY BRIERE,COUNCIL HOLD ITEM 8.b.FOR ONE WEEK FOR REVISION TO THE AGREEMENT. CARRIED. CORRESPONDENCE Correspondence was read from Glenn R.Davis&Jeffrey M. Silesky of Davis Citizen Comment:Davis& &Silesky Real Estate Investment Services, 15600 NE 8th St.,Suite B 1-173, Siles cy— ympia Ave NE Bellevue,98008,stating that Urban Crafts is proposing to construct a mixed- Utilities Installation use facility at the comer of NE 4th St. and Olympia Ave.NE in the Renton Highlands. Due to the substandard utilities in that area,they requested that a sanitary sewer and water main be constructed in Olympia Ave.NE as a joint project with the City. MOVED BY KEOLKER-WHEELER, SECONDED BY CLAWSON, COUNCIL REFER THIS CORRESPONDENCE TO UTII.ITIES COMMTTTEE. CARRIED. � � - r,cv 3-17�00�3 . ������ -f� ��ls f��� (,���,�,� ����o����rc�,, I�iPI� 1 :v �t�'JJ Davis & Silesky �;.,.Y�?���������� March 8, 2003 The Honorable Mayor Jesse Tanner& City Council The City of Renton 1055 S. Grady Way Renton, Washington 98055 Re: Urban Craft Development-NE 4`h St. & Olympia Ave NE Dear M�yor& rity Ce�ancil: Urban Crafts is proposing to construct a mixed-use facility on the parcel at the corner of NE 4th St. and Olympia Ave NE in the Renton Highlands. We look forward to constructing this project; however,the amount of utility work required makes most any development on this site financially infeasible. We've had Jaeger Engineering estimate the costs which both Jaeger and our development team feel are in excess of what would be considered fair and technically appropriate for our development. We are asking the City to agree to pay for their appropriate share. Enclosed is a letter from Jaeger Engineering itemizing these costs and the scope of work involved based upon City guidelines & standards. BACKGROUND The subject parcel has been vacant for several years. Many other development proposals on this site have failed because of the unusual amount of utility and street construction anticipated to meet City standards on Olympia Ave NE. Olympia is a City street that does not meet current City standards. This road does not have curbs, sidewalks or a storm sewer system. The sanitary sewer was installed privately and although it fails to meet City standards, the City may own it. In addition, a city water main has not been installed along most of the street. As a consequence most businesses along Olympia are cormected io smaii private water services. It is our understanding that the City has no plan to improve this substandard situation in the near future. Most other parcels in the area of the subject property have been developed. The project we are proposing does not require the sanitary sewer or water main on Olympia Avenue NE in order to meet code. The existing sewer in NE 4�h Street will serve our needs. The water main in NE 4ih Street and along our West property line will provide all the water required for our buildings including fire flow. There are four fire hydrants within 150 feet of our building available for use in a fire emergency. The upgraded utilities along Olympia Avenue will serve other property owners along Olympia but will not benefit our project whatsoever. �5600�vE 8tn sr Suite B1-173 PHONt(425)8?0-7�37 Beilevue,WA 98008 REAL ES?ATE INVESTM�PJT SERVICES F�X�4Z51 88�-7149 . ��.rr � The Honorable Mayor Jesse Tanner& City Council Urban Craft Development-NE 4th St. & Olympia Ave NE March 8, 2003 Page 2 of 2 In the case of projects similar to ours, the City of Renton development standards require that all needed off-site improvements be constructed on abutting streets. Generally, a proportionality test should be met to determine who is responsible for improvement costs. In tnis case, �here is no ponion of the sewer or water services needed for our project. PROPOSAL We propose that the sanitary sewer and water main be constructed in Olympia Avenue as a joint project with the City of Renton. We have met with City staff and have their concurrence for joint participation in the project. City staff has suggested that we install both the sewer and water main along the distance of our property and that the City be responsible for the additional costs of connecting the other businesses and parcels to the sewer and water mains. This would include the cost of street restoration on the East Side of the centerline. Thank you for your review and consideration of this proposal. We look forward to meeting with City council to discuss our proposal and finalize a joint project to improve the infrastructure along, currently substandard, Olympia Avenue NE. Sincerely, � �. � �/ � � ,,` � �'���! Glenn R. Davis&Jeffrey M. Sile Managing Partners Davis & Silesky Real Estate Investment Services Enclosure: Jaeger estimate for public utility work cc: Mr. Jim Hanson(Hanson Consulting) Various Renton City staff inembers - - -- : - . . . .�.��-.�, . MAR-7-2003 11:00A FROM: " �14258857149 P:1�z � .�A.�C�� ����N����G sa i a s. 2oa.��c� - 6cEe�,wasxr���oH s8o3 t PHoe�� (2S3) 8s�-09�d E�►x (�53) 8�0�15S February 21, 2003 Lee Johnson Glen DaviS Project: Urhan Crafts�-City of Renton I have prepared a rough estimate for the public utility work within the right-of-ways for the Urban Craffs project. This work is limited to those items�that are improvin� an existing substandvrd system This estimatA. does not include any addifiional work within the ROW that is understood to be for the benefit of this project (ie: trontage im�rovements to NE 4�h St. and a portion of Qlympia Ave. NE. The estimates do not include taxes or City fees. Please keep in mind that this is an estimate F�ased on a cursory review of the projcct scope. WAtER: Connection to the exisling water main�near the existing #ire hydrant within Olympia Ave. , instoll a new 8" water main within Olympio Ave. to tt�e north properfy line, then tuming west across the n�rth property line and connection to the existing water mairi near the n�rfhwest corner of the yite. The section of pipe running along the north properfy line would.be within an easement. It is assumed that meter stubs would need to be set along Olympia Ave.for future services to the east. • 345 LF of 8" duct. Iron waler main and fittings C� $32ILF = �11,040 . 1 new fire hydrant assembly C� $2000 = $2,040 • 8 sErvice connection stubs @ $400 ea. _ $3,200 • 2 connections to existing main 0 $1000 ea. _ $2,000 SEWER: Installation of a new S" se.wer main�within Olympia Ave. to repla�e an existing sub-standard main. Connect to 7he exisfing sewer main within NE 4'h St. and terminate at the north property line (extended). Connect all existing services along the east side of Olympia Ave. Received: 3./ 7/03 71 :30AM; -> 425 885 7y49; Page 2 MAR-7-2003 11:00A FROM: T •14258857149 p:z�z . ' �'n''�` `r.r`' � 375 LF of 8" PVC sewer main @ $40/ LF = 15,000 • 2 man holEs �� $2400 ea. _ $4,800 • estimated 10 side sewer conneciions @ $800 ea. _ �8,000 � 1 connection to exi5tir�g sewer C� $700 ea = $700 STREET RESTORATION: Installation of both woter and sewer mains within Olympia Ave. will require demolition of approx_ 20' width of the existing street surface. As such, a new 20' widlh of asphalt road section will need to be re-constructed. It is assurned that the road section will be 3" of asphalt over 8" of gravel base. . 7200 SF o� road restoration (�? $2.50/ SF = $�8,C00 • traffic control: lump sum of $5,000 • signage and striping: Iump sum of $500 • demolition and disposal: lump sum of$3,000 Total Hard Costs: $73,240 MISCELLANEOUS COSTS: • Engineerinc� and Plan preparation: $3,500 • Surveying: $3,000 • Constr��ction Management: $5,000 • 10� Contingencies: $7,000 Total Estimated Costs: $91,740