HomeMy WebLinkAboutMFP22006411.pdfDEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Minor Franchise Permit: MFP22006411
IVR Number: 22006411
Permit Information
Permit Name: Puget Sound Energy - Electric
Address/Location:12/12/2022Application Date:2023059162Parcel Number: 1620 BENSON RD S
Permit Type:12/22/2022Issue Date:Franchise
Permit Work Class:12/22/2023Expiration Date:Minor Utility
Job Number: 101146281Franchise Type:Electric
Description: Puget Sound Energy Electric CREW TO PARK IN ROW AT 317326 166063 TO REMOVE POLE ON PRIVATE
PROPERTY. ASPLUNDH TO TRIM TREES AND BUSHES AS NEEDED AT POLE. RESTORATION PER CITY OF
RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031ApplicantX
Vicki Henson
Potelco Inc
8001 212th St S
Kent, WA 98032
B: (253) 863-0484Contractor
Business License Number: 5109Electrical Contractor: POTELI*344O4
Construction Contractor: POTELI*227PL
Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08
Bellevue, WA 98009
B: (888) 225-5773Emergency
Contact
MARVIN F POER AND COMPANY 2151 MICHELSON DR #282
IRVINE , CA 92612
Owner
Corrie Rydberg
Puget Sound Energy
3702 71st Ave W
University Place, WA 98466
C: (253) 905-5031Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
PLEASE SEE ATTACHED
POTELCO, INC
6905 S 228TH ST KENT, WA 98032
101146281
1620 BENSON RD S
KELLY ULICNY 425-429-0949
MFP22006411
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 12/22/2022
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
CORRIE RYDBERG
P01W20-7AW20-4ONE LANEROADAHEAD350'350'350'ROADWORKAHEADW20-1W20-7AW20-4ONE LANE
ROAD
AHEAD
ROAD
WORK
AHEAD W20-1350'350'350'
STOP
FLAGGER
STOP
FLAGGER
1811
1811
BENSON RD
S
EAGLE R
I
D
G
E
D
R
S
TEMPORARY TRAFFIC CONTROL PLAN
N
SIGN SPACING
MPH
60/65
45/55
35/40
30
25
"X"
1000'
500'
350'
200'
100'
CHANNELIZATION
DEVICE SPACING
MPH
55/70
35/45
25/30
TAPER
40
30
20
TANGENT
80
60
40
Notes:
1. All signs and spacing to conform to the
MUTCD and City of Renton standards.
2. All sidewalks, driveways, exits and egresses
shall be completely clear unless otherwise indicated.
3. Channelizing devices are 28" traffic cones.
Use traffic drums (barrels) with steady burning
Type C lights on all State State Routes and Hwys.
4. Sign size can be a minimum of 36" x 36" and
shall not obstruct pedestrian access.
5. Crew is required to leave a minimum of 11' for
traveling lane width.
6. Alert affected residents and businesses.
7. Work to take place between 9 a.m. and 4 p.m
unless otherwise specified. All work for arterials
and major roadways will be from 9 a.m. to 3 p.m.Project Address:
Page
PSE PUGETSOUNDENERGY
Designer:
Job #
REV
10/27/2022
11801240
0
1400 TALBOT RD S, RENTON, WA 98055.
JOSE RODRIGUEZ
425-424-6658
Jose.rodriguez@pse.com
1 OF 1
Puget Sound Energy
Traffic Control Supervisor:
Gregory Harwood
Card No. 012238
Card Exp. 09/30/2023
gregory.harwood@pse.com
(425)424-6425
WORK PIT
28" TRAFFIC CONE
LEGEND
TRAFFIC FLOW
SIGN LOCATION
FLAGGER
STOP
WORK VEHICLE/
FLASHING LIGHTS
RIGHT OF WAY
MFP22006411
AØAFR065
BØAFR066
CØAFR067
AØAFR062
BØAFR063
CØAFR064
S
P
U
G
E
T
D
RTALBOT RD SBRUSH CLEARNING
REQ'D FOR ACCESS
CBAN
Vicinity Map
N.T.S.
Owner / Developer Contact Info
officeATTN:
PSE
-
-
KELLY ULICNY 425-429-0949
THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL (800) 424-5555
2 BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
PHONE
CABLE TV
11801240 101146281
N/A 593242777
N/A N/A
N/A N/A
N/A N/A
N/A 108134682
PROJECT PHASE
PWR
NOTIF#ORDER#
Superior
OH Misc Expense
UG Misc Expense
OH Xfmr Expense
UG Xfmr Expense
Removal
DESIGNED BY
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
K. ULICNY 425-429-0949 10/13/22
MS JEWELL 360-434-5315 10/13/22
...
S. MORALES 253-244-1200 10/13/22
N/A RENTON
GRA-25 REPL 1 POLE
DISTRIBUTION POLE REPLACEMENT
1400 TALBOT RD S, RENTON, WA 98055
ASPLUNDH CONSTRUCTION
N/A N/A
N/A 101146281
AS NOTED 1 OF 1
KING N/A N/A QCSOKE
NW20-T23N-R05E N/A N/A
2305E078 2305E088 2305E078 GRA-25
COMCAST
.
.
.
.
.
.
.
.
.
.
.
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:KELLY ULICNY
425-429-0949
KELLY.ULICNY@PSE.COM
...
...
...101146281GRA-25 REPL 1 POLE
DISTRIBUTION POLE REPLACEMENT
No
No
No
Yes
Yes
Yes
"Flagging Required"
"Outages Required"
"Locates Required"
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
POLE RETIREMENT TABLE TEMP TRANSFERS ST. LIGHT TRANSFERS
SITE
#
POLE DATA POLE
TEL TV FIBER TRAN RMVD ID NUMBER
GRID #HEIGHT CLASS YEAR TOPPED RMVD
P01 317326-166063 40 3 1958
POLE TABLE (NEW)
Site
#
Pole Data
Grid #Height Class Year Remarks / Location Ref.
P01 317326-166063 45 1
LEGEND
CONDUIT RISER
OVERHEAD TRANSFORMER
JUNCTION VAULT/JUNCTION BOX
NEW CONDUCTOR AND OR TRENCH LINE
DISCONNECT - FUSED
PULL VAULT OR SPLICE VAULT
EXISTING POLE
DOWN GUY
DISCONNECT - UNFUSED
NEW POLE
PADMOUNT TRANSFORMER
SECONDARY HANDHOLE
EXISTING CONDUCTOR TO BE REMOVED
OR ABANDONED
STREET LIGHT
TOTAL UNDERGROUND TRANSFORMER
ENERGY CUSTOMER DEMAND POINT
OR
OR
OR
OVERHEAD JUMPER CONNECTION
SITE 1
S PUGET
DR
P01: 317326-166063
BRUSH REMOVAL REQ'D
GRID # MISSING IN FIELD
-EX 40' CL 3, 1958 POLE TO BE REPLACED
-INST 45' CL 1 (PD451) 6010.1000
-DEEP SET +2' DUE TO SLOPE
-INST 3Ø DE 336ACSR (DE3315) (E) 6033.1042
-INST 3Ø SLACK SPAN 336ACSR (SSF313) (W) 6033.5010
-TRANSFER 3Ø 336 ACSR PRI & 4/0 NEUT (E/W)
-ROLL NEUT TO COMMON POSITION
-RM EX DG (E)
-INST 24" PLATE ANC (ANDP24) 6012.1000 (30', E)
-INST 7/16” DBL PR & 3/8” NEUT DG (GYDD71A) (GYD3SAN) 6013.1000 TO NEW ANC
-TOP POLE ABOVE COMM
-REMOVE POLE STUB AFTER COMM HAS TRANSFERRED
SITE PLAN 1
1" = 50'
General
-Return removed materials to the local storeroom or PSE storeroom.
OVERHEAD CONSTRUCTION
Poles & Structures
- Poles are to be installed or relocated as staked. Unless otherwise noted, all pole location measurements
are from the roadside face of the pole.
- All new poles set shall be the class indicated on the sketch, or better. Do not set a lower class pole than
specified.
- Install ground plate assembly on all new poles. Install Switch Ground Assembly per standard specification
6014.1000 at new gang operated switch locations.
- Install grid numbers on all new and existing poles as shown on sketch.
- Straighten existing poles as indicated or as necessary.
- Treat all field-drilled poles with copper napthenate wood preservative.
- Remove old poles after communication companies have transferred off and return to PSE storeroom. Fill
and crown pole holes and restore area similar to adjacent landscaping.
Conductors & Equipment
-Transfer all overhead and underground primary, secondary and service conductors and guys to new poles
set, unless otherwise indicated on this sketch.
-Transfer existing transformers to new poles unless otherwise indicated on this sketch.
-Use stirrups to connect all overhead and underground primary taps, and all transformers. Install at all sites
being worked within the scope of the project where they are currently missing.
-For 12kV construction, always install avian protection with 4/0 Cu covered jumpers and #4 SD
aluminum-covered tie-wire (MID 8454500), For 34 kV construction, use bare wire primary jumpers with
preformed helical grip ties.
-Apply avian protection devices when required per Standard 6015.2000.
-Apply grit inhibitor on all Ampact, stirrup, and dead-end connections.
-Connect primary taps and transformers to same phase as existing unless otherwise shown on the drawing.
-All neutral connections to be made with solid compression connectors. Connect all pole grounds to
common neutral.
-Use Load-interrupter cutouts (with arc shields) on all primary overhead and underground taps with fused
protection above 40T.
- Install Wildlife Protectors on all transformers.
MFP22006411
RESTORATION PER CITY OF RENTON STANDARDS