Loading...
HomeMy WebLinkAboutRES 4318 CITY OF RENTON, WASHINGTON , RESOLUTION N0. 4318 A RESOLUTION OF THE CITY OF RENTON, WASHIN6TON, ADOPTING REDUCED DEVELOPMENT FEES, INCLUDING TRANSPORTATION AND PARKS IMPACT FEES, UTILITY SYSTEM DEVELOPMENT CHARGES (ALSO KNOWN AS UTILITY HOOK UP FEES), AND LAND USE REVIEW AND BUILDING FEES, FOR ACCESSORY DWELLING UNITS THAT WILL SUNSET DECEMBER 31, 2018;AND ADOPTING THE AMENDED 2017/2018 CITY OF RENTON FEE SCHEDULE TO INCORPORATE REDUCED DEVELOPMENT FEES FOR ACCESSORY DWELLING UNITS. WHEREAS, the City charges building fees; land use review fees; use of public works ' facilities fees, which include system development charges; and transportation and parks impact � fees based on adopted rate studies; and WHEREAS, the above fees are listed in Section XII, Development Fees, of the 2017-2018 � City of Renton Fee Schedule which is adopted by resolution; and s WHEREAS, the City of Renton strives to facilitate the creation and preservation of an . affordable and diverse housing stock; and ` WHEREAS, provisions were adopted in 2010 allowing the establishment of Accessory Dwelling Units (ADUs) as a form of affordable market-rate housing in the City, but the City's records suggest that only five ADUs have been created since 2010; and WHEREAS, reducing development fees, including transportation and parks impact fees, utility system development charges, and land use review and building fees, applicable to all ADUs by half, and waiving all such fees for every third ADU created within a new subdivision of ten (10) or more lots may result in a greater number of ADUs within the City; and WHEREAS, the City Council finds that the public benefit of encouraging ADUs warrants a temporary modification of fees for ADUs for a trial period sunsetting on December 31, 2018; and : 1 i � � RESOLUTION N0. 431 8 � � WHEREAS, on November 23, 2009, the Council adopted Ordinance No. 5509, which removed many fees from the Renton Municipal Code and consolidated them into the 2010 City of Renton Fee Schedule ("fee schedule"); and WHEREAS,the fee schedule has been amended several times since 2009; and WHEREAS,on November 21, 2016,the City Council passed Resolution No.4300, adopting a fee schedule for 2017 and 2018 as part of the 2017/2018 biennial budget; and WHEREAS, on April 17, 2017, the City Council passed Resolution No. 4309, adopting an amended fee schedule for 2017 and 2018; and � WHEREAS, on July 10, 2017, the City Council passed Resolution No. 4315, adopting an amended fee schedule as part of the City's 2017 2"d Quarter Budget Adjustment to the 2017/2018 biennial budget; NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO RESOLVE AS FOLLOWS: SECTION I. The following development fees are reduced by half(50%) for new ADUs: • Building permit fees; • Combination building permit fees; � • Building plan check fee; • Electrical permit fees for single-family and duplex; • Mechanical permit fees; • Plumbing permit fees; • Administrative Conditional Use Permit fees; • Water Service and Wastewater Fees (excluding Fire Service Fees); • Storm Water System Development Charges for new single family residences; • Water construction permit fees; • Wastewater and surface water construction permit fees; and 2 i RESOLUTION N0. 431 8 ! • Transportation and park impact fees for ADUs. SECTION II. The development fees listed in Section I of this resolution are waived in full for every third new ADU created within a subdivision of ten (10) or more lots that receives final plat approval on or after the effective date of this resolution. SECTION II1. The fees modified by or under the authority of this resotution shall remain modified through December 31,2018, upon which date the fees modifications shall sunset unless the City Council takes action to the contrary. SECTION IV. The amended 2017-2018 City of Renton Fee Schedule, attached hereto, is hereby adopted by reference. A copy of the fee schedule is at all times filed with the City Clerk. SECTION V. This resolution shall take effect and be in force immediately upon its passage and approval. � PASSED BY THE CITY COUNCIL this 1 6th day of October , 2017. �; , . � Ja n A. Set , City Clerk APPROVED BY THE MAYOR this 1 6th day of O tober , 2017. , r � Denis Law, Mayor Approved as to form: !t�`+`����,,,u,,,,� .�`,y 0�r R EN''+'�+, �,,,,r'� . �,�.��G,��,,,,,,,,,,��„���,,,,,,rQ���; = '��, � S�✓ % i � Shane Moloney, City Attorney = � ' S E A L = * ' RES.1744:10/5/17:scr �,y���'��,, � �,�''`��' ��i���P�p������uwa�a'� tp•���� �,���//pRq'Ep1 S�p`````�� 3 City of Renton Fee Schedule 2017‐2018 SECTION I. MISCELLANEOUS FEES 2016 2017 2018 1. Maps: a. Zoning maps ‐ standard 11 x 17 $4 $4 $4 b.  Zoning maps ‐ large 24 x 36 $12 $12 $12 c.  Comprehensive Plan map ‐ standard 11 x 17 $4 $4 $4 d.  Comprehensive Plan map ‐ large 24 x 36 $12 $12 $12 e.  Precinct maps $5 $5 $5 2. Plat: a.  First page $2 $2 $2 b.  Each additional page $1 $1 $1 3. Photocopies:  a.  Each 8.5" x 11" or 8.5" x 14"$0.15 $0.15 $0.15 b.  Each 11" x 17"$0.20 $0.20 $0.20 c.  Each 8.5" x 11" or 8.5" x 14" color $0.25 $0.25 $0.25 4. Budget: a.  City's Budget $10 $10 $10 b.  City's Budget to other municipality or quasi‐municipal N/C N/C N/C corporation or other nonprofit charitable or education organization 5. Audio or Video Recording Copies: a.Audio recording, each copy $2 $2 $2 b.Video recording, each copy $2 $2 $2 6. Regulations and Plans: a.Comprehensive Plan and Map $30 $30 $30 b.Title IV, Development Regulations: (i) Text and Zoning Map $110 $110 $110 (ii) Text only $100 $100 $100 c.Individual Chapters of Development Regulations $10 $10 $10 d. Renton Municipal Code (two volumes)$400 $400 $400 e.Code Supplements, per year: (i) Titles I ‐ III and VI ‐ X $70 $70 $70 (ii) Title IV $70 $70 $70 7. Miscellaneous Services: a.Certification and Notary Fees ‐ Clerk's Certification $10 $10 $10 b.Notary Public Attestation or Acknowledgement or as $6 $10 $10 otherwise provided for in RCW 42.28.090, per signature c.Hold Harmless Agreements and other similar documents $20 $20 $20 not otherwise provided for d.Lamination of licenses, pictures $6 $6 $6 e.Community Development Block Grants (CDBG) Loan Program: (i) Application Fee $200 $200 $200 (ii) Loan Origination Fee $150 or 0.25% of  loan amount,  whichever is  greater $150 or 0.25% of  loan amount,  whichever is  greater $150 or 0.25% of  loan amount,  whichever is  greater (iii) Closing Costs (including any legal fees)50% of total actual  costs 50% of total actual  costs 50% of total actual  costs 8.Miscellaneous Charges for Police Services: a.Police Reports per page $0.15 $0.15 $0.15 b.Record Checks (Written Response) $5 $5 $5 c.Photographs ‐ Digital on CD $2 $2 $2 d.Photographs ‐ black & white or color ‐ Cost Cost Cost Cost of developing film e.Fingerprint Cards $5 $5 $5 (i) Each additional card $1 $1 $1 9. Charges for Fire Documents: a.Fire reports per page $0.15 $0.15 $0.15 b.Fire investigative report on CD $2 $2 $2 c.First copy ‐ black & white or color ‐ Cost of developing film Cost Cost Cost d.Additional copy ‐ black & white or color ‐ Cost of developing film Cost Cost Cost 10. Computer Listings: a.City of Renton new business list $10 $10 $10 b.List of all business licenses $20 $20 $20 c.Copies requested to be faxed, local number $3 $3 $3 d.Copies requested to be faxed, long distance number (i) One (1) ‐ five (5) pages $10 $10 $10 (ii) Six (6) or more pages (ten (10) page limit)$20 $20 $20 11. Utility Fee: a.Special Request Water Meter Reading $30 $30 $30 b.Utility New Account Setup $25 $25 $25 c.Utility Billing Account Transfer (tenant billing form)$5 $5 $5 d.Water utility outstanding balance search requested by $25 $25 $25 fax, messenger, or letter RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION I. MISCELLANEOUS FEES (CONTINUED)2016 2017 2018 12. Schedule of Fines for False Alarms ‐ Security/Burglar: a.First, second, and third false alarms in a N/C N/C N/C registration year* b.Fourth and fifth false alarms in a registration year*$50 $50 $50 c.Sixth false alarm and successive false alarms in a $100 $100 $100 registration year* d.Late Registration Penalty $50 $50 $50 e.Late False Alarm Payment Penalty $25 $25 $25 f.Appeal Hearing Cancellation Fee $10 $10 $10 *A registration year shall mean January 1 thru December 31 each year. 13. NSF Check Fees $25 $25 $25 14. Veteran Park Tile: Three lines $75 $75 $75 SECTION II. MAPLEWOOD GOLF COURSE 2016 2017 2018 1. a.Weekday: (i) 18 Hole $34 $35 $35 (ii) 9 Hole $25 $27 $27 (iii) 18 Hole, Senior $25 $27 $27 (iv) 9 Hole, Senior $17 $19 $19 (v) 18 Hole, Junior $18 $18 $18 (vi) 9 Hole, Junior $14 $14 $14 b.Weekend: (i) 18 Hole $40 $42 $42 (ii) 9 Hole $25 $27 $27 2. Club Rental $15 $15 $15 3. Golf Cart Fees: a.18 Hole $28 $28 $28 b.9 hole $17 $17 $18 c.Single Rider $20 $20 $20 4. Driving Range Fees: a.Large Bucket $8 $8 $8 b.Small Bucket $5 $5 $5 c.Warm‐up Bucket $3 $3 $3 5. Lesson Fees: a.1/2 Hour Private $45 $45 $45 b.1 Hour Private $65 $65 $65 c.1/2 Hour Series Private $160 $160 $160 d.1 Hour Series Private $240 $240 $240 e.Group Series $100 $100 $100 f.1/2 Hour Private, Junior $25 $25 $25 g.Playing Lesson(3‐hole minimum/9‐hole maximum) per hole $15 $15 $15 SECTION III. CITY CENTER PARKING FEES 2016 2017 2018 1. City Center Parking Garage Fees Parking rates for retail parking will be as follows: a.Zero (0) ‐ two (2) hours N/C N/C N/C b.Two (2) ‐ four (4) hours $2 $2 $2 c.Four (4) ‐ six (6) hours $4 $4 $4 d.Six (6) ‐ (10) hours $6 $6 $6 e. 10 hours or more $10 $10 $10 f.Monthly pass‐holders, tax included $35 $35 $35 SECTION IV. AQUATIC FEES 2016 2017 2018 1. Admission for the Aquatic Center shall be as follows: a.Regular Session: (i) Resident infants ‐ under 1 year N/C N/C N/C (ii) Non‐resident infants ‐ under 1 year N/C N/C N/C (iii) Resident youth ‐ 1 to 4 years $4 $4.50 $4.50 (iv) Non‐resident youth ‐ 1 to 4 years $8 $8.50 $8.50 (v) Resident ages 5 and up $8 $8.50 $8.50 (vi) Non‐resident ages 5 and up $14 $15 $15 (vii) Resident lap swim ‐ water walking only $3 $3 $3 (viii) Non‐resident lap swim ‐ water walking only $4.50 $4.50 $4.50 b.Season Pass: (i) Resident infants ‐ under 1 year N/C N/C N/C (ii) Non‐resident infants ‐ under 1 year N/C N/C N/C (iii) Resident ages 1 and up $60 $60 $60 (iv) Non‐resident ages 1 and up $120 $120 $120 Note:  Should total of Section I fees due is less than $4.00 and not other fee is due to the city at the same time, the department administrator may authorize to waive the entire  amount due at their discretion. Green Fees:  For purposes of this section, "weekend" shall mean Friday, Saturday, and Sunday. "Weekday" shall mean the remaining four days of the week. "Junior" shall mean ages 17  and under, "Senior" shall mean ages 62 and over.  Off‐season and promotional rates determined by management; posted on website. RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION IV. AQUATIC FEES (CONTINUED)2016 2017 2018 1. Admission for the Aquatic Center shall be as follows: (continued) c.Miscellaneous Rates: (i) Resident regular session per person rate (group rates)$10 $10 $10 (ii) Non‐resident regular session per person rate $16 $16 $16 (iii) Locker Rental $0.25 $0.25 $0.25 d.Canopy Rental Fees*: (includes canopy and admission for one leisure swim session): (i) Henry Moses Party Tent #1  (10' x 20' for up to twenty‐five (25) guests): (1) Resident Rate, per session $300 $310 $310 (2) Non‐resident Rate, per session $450 $475 $475 (ii) Henry Moses Party Tent #2  (10' x 10' for up to fifteen (15) guests): (1) Resident Rate $200 $200 $200 (2) Non‐Resident Rate $290 $300 $300 *Sales tax not included in the rental fee e.Resident Rate all inclusive $1,500 $1,800 $1,800 f.Non‐resident Rate all inclusive $1,500 $2,300 $2,300 g.Swim Lesson Program: (i) Resident swim lesson per lesson $7 $7.50 $7.50 (ii) Non‐resident swim lesson per lesson $9 $9.50 $9.50 h.End‐of‐year School Party Rentals: (i) Renton School District (1) 001 ‐ 299 students $1,900 $1,900 $1,900 (2) 300 ‐ 399 students $2,250 $2,250 $2,250 (3) 400 ‐ 499 students $2,400 $2,400 $2,400 (4) 500 ‐ 599 students $2,550 $2,550 $2,550 (ii) Other Schools and Districts (1) 001 ‐ 299 students $2,450 $2,450 $2,450 (2)300 ‐ 399 students $2,850 $2,850 $2,850 (3) 400 ‐ 499 students $3,150 $3,150 $3,150 (4) 500 ‐ 599 students $3,360 $3,360 $3,360 2. Boat Launch Rates: a.Daily resident ‐ 7 days a week $10 $10 $10 b.Daily Non‐resident ‐ 7 days a week $20 $20 $20 c.Overnight resident ‐ 7 days a week $20 $20 $20 d.Overnight Non‐resident ‐ 7 days a week $40 $40 $40 e.Annual parking permit ‐ resident $60 $60 $60 f.Annual parking permit ‐ non‐resident $120 $120 $120 g.Additional sticker (launching permit)$5 $5 $5 h.$50 $50 $50 SECTION V. CARCO THEATER (REPEALED)2016 2017 2018 SECTION VI. PARKS AND FACILITIES USE AND RENTAL 2016 2017 2018 1. Outlying Picnic Shelters (Cedar River Trail, Liberty Park, Phillip Arnold Park, Teasdale Park and Heritage Park) Maximum of 75 people: a.Resident 8:30am‐1:30pm/3:30pm‐8:30pm $90 $90 $90 b.Non‐resident 8:30am‐1:30pm/3:30pm‐8:30pm $180 $180 $180 c.Full day resident 8:30am‐sunset $140 $140 $140 d.Full day non‐resident 8:30am‐sunset $280 $280 $280 2. Gene Coulon Beach Park Shelters (South #1, South #2 and Creekside) Maximum of 75 people: a.Resident 8:30am‐1:30pm/3:30pm‐8:30pm $100 $100 $100 b.Non‐resident 8:30am‐1:30pm/3:30pm‐8:30pm $180 $180 $180 c.Full day resident 8:30am‐sunset $140 $140 $140 d.Full day non‐resident 8:30am‐sunset $260 $260 $260 e.South Shelters 1 & 2 Resident rate $300 $300 $300 f.South Shelters 1 & 2 Non‐resident rate $600 $600 $600 3. Gene Coulon Beach Park Shelters (North Shelter): a.Resident 8:30am‐1:30pm/3:30pm‐8:30pm $120 $120 $120 b.Non‐resident 8:30am‐1:30pm/3:30pm‐8:30pm $240 $240 $240 c.Full day resident 8:30am‐sunset under 75 people $160 $160 $160 d.Full day resident 8:30am‐sunset 76 ‐ 100 people $190 $190 $190 e.Full day non‐resident 8:30am‐sunset under 75 people $320 $320 $320 f.Full day non‐resident 8:30am‐sunset 76 ‐ 100 people $380 $380 $380 4. Tennis, Basketball and Sand Volleyball court rate per hour (Tournament Play Only): a.Tennis court $10 $10 $10 b.Park basketball court $10 $10 $10 c.Sand volleyball court $10 $10 $10 5. Catering and Event Rate (All city parks apply): a.Resident half day $200 $200 $200 b.Resident full day $350 $350 $350 c.Non‐resident half day $400 $400 $400 d.Non‐resident full day $700 $700 $700 *Group Rates: Group rates offer guaranteed admission for the group. In order to qualify for a group rate, the group must consist of ten (10) or more persons, and the session must  be scheduled in advance. Please note that the number of groups may be limited each day. Staff has the authority to offer discounted daily rates for partial sessions or Renton‐ only events. Fishing Tournaments at Coulon Beach (additional rental fee if using the Pavilion area for weigh in and or electricity at  the current rental rate) per event RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION VI. PARKS AND FACILITIES USE AND RENTAL (CONTINUED)2016 2017 2018 6.$50 $50 $50 7. a.Resident rate per hour $10 $10 $10 b.Non‐resident rate per hour $25 $25 $25 8. Photo Shoots per hour:$40 $40 $40 a.Commercial Film and Photo Shoots per hour $300 $300 $300 9. Athletic Field Rental, Lights and Prep Fees: a.Sports field rental per hour ‐ resident $25 $25 $25 b.Sports field rental per hour ‐ non‐resident $30 $30 $30 c.Renton Area Youth Sports Agencies, per hour $6 $6 $6 d.Field prep for softball/baseball ‐ resident per occurrence $30 $30 $30 e.Field prep for soccer ‐ resident per occurrence $45 $45 $45 f.Field prep other ‐ resident per occurrence Varies Varies Varies g.Field prep for softball/baseball ‐ non‐resident per occurrence $35 $35 $35 h.Field prep for soccer ‐ non‐resident per occurrence $50 $50 $50 i.Field prep other ‐ non‐resident per occurrence Varies Varies Varies j.Field lights all sports ‐ resident per hour $25 $25 $25 k.Field lights all sports ‐ non‐resident per hour $30 $30 $30 10. Banquet & Classroom Rental ‐ Community Center & Senior Activity Center: a.Friday 5 hour minimum ‐ resident $650 $650 $650 b.Weekend Rates 10 hour minimum ‐ resident $1,300 $1,300 $1,300 c.Extra hours ‐ per hour ‐ resident $130 $130 $130 d.Friday 5 hour minimum ‐ non‐resident $750 $750 $750 e.Weekend Rates 10 hour minimum ‐ non‐resident $1,500 $1,500 $1,500 f.Extra hours ‐ per hour ‐ non‐resident $150 $150 $150 g.Kitchen charge ‐ per hour $100 $100 $100 h.Banquet Room ‐ Mon ‐ Thurs ‐ resident/hr 3 hour min $85 $85 $85 i.Banquet Room ‐ Mon ‐ Thurs ‐ non‐resident/hr 3 hour min $90 $90 $90 j.Damage deposit ‐ senior center/community center ‐ resident and non‐resident $550 $550 $550 k.Contract violation fee ‐ per hour $200 $200 $200 11. Classroom and Gymnasium Rental ‐ Renton Community Center: a.Resident single gym athletic ‐ per hour $45 $45 $45 b.Non‐resident single gym athletic ‐ per hour $50 $50 $50 c.Resident double gym athletic ‐ per hour $90 $90 $90 d.Non‐resident double gym athletic ‐ per hour $100 $100 $100 e.Resident single gym non‐athletic $550 $550 $550 f.Non‐resident single gym non‐athletic $675 $675 $675 g.Resident double gym non‐athletic $1,100 $1,100 $1,100 h.Non‐resident double gym non‐athletic $1,350 $1,350 $1,350 i.Carpet fee single gym ‐ resident & non‐resident $175 $175 $175 j.Carpet fee double gym ‐ resident & non‐resident $350 $350 $350 k.Classroom resident $35 $35 $35 l.Classroom Non‐resident $40 $40 $40 12. Birthday Party Packages: a.Bounce package ‐ resident $75 $75 $75 b.Sports package ‐ resident $65 $65 $65 c.Bounce package ‐ non‐resident $85 $85 $85 d.Sports package ‐ non‐resident $75 $75 $75 13. Facility Rental ‐ Neighborhood Center: a.Meeting room ‐ resident $35 $35 $35 b.Gymnasium ‐ resident $35 $35 $35 c.Meeting room ‐ non‐resident $40 $40 $40 d.Gymnasium ‐ non‐resident $40 $40 $40 SECTION VII. COMMUNITY CENTER PASS CARD & FEES 2016 2017 2018 1. One Month Fitness Pass:  a.Resident $20 $20 $20 b.Non‐resident $24 $24 $24 2. Yearly Pass: a.Resident $200 $200 $200 b.Non‐resident $240 $240 $240 3. Racquetball Pass: a.Resident $55 $55 $55 b.Non‐resident $55 $55 $55 4. Community Center Drop In Fees: a.Resident adult/senior/student aerobics $6 $6 $6 b.Non‐resident aerobics $6 $6 $6 c.Resident basketball $3 $3 $3 d.Non‐resident basketball $3 $3 $3 e.Senior/student basketball $2 $2 $2 f.Resident volleyball $3 $3 $3 g.Non‐resident volleyball $3 $3 $3 h.Senior/student volleyball $2 $2 $2 Inflatable and big toy rate, each.  Note: Along with rental fee for the use of City facility for each inflatable or big toy, Applicant or Renter shall provide proof of insurance naming the City of Renton as additional insured. Open Space Area in the Parks (Cascade, Teasdale, Phillip Arnold, Cedar River, Earlington, Gene Coulon, Glencoe, Kennydale Lions, Sunset, and Riverview Parks): RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION VII. COMMUNITY CENTER PASS CARD & FEES (CONTINUED)2016 2017 2018 4. Community Center Drop In Fees: (continued) i.Resident fitness $3 $3 $3 j.Non‐resident fitness $3 $3 $3 k.Senior/student fitness $2 $2 $2 l.Resident/senior/student shower pass $20 $20 $20 m.Non‐resident shower pass $20 $20 $20 n.Resident racquetball per hour $7 $7 $7 o.Non‐resident racquetball per hour $7 $7 $7 p.Senior/student racquetball per hour $7 $7 $7 q.Resident wallyball per hour $10.85 $10.85 $10.85 r.Non‐resident wallyball per hour $13 $13 $13 s.Senior/student wallyball per hour $9.75 $9.75 $9.75 SECTION VIII. AIRPORT CHARGES 2016 2017 2018 1.Airport Fuel Flow Charge:  per gallon $0.06 $0.08 $0.08 2.JetA Fuel Flow Charge:  per gallon $0 $0.10 $0.10 3.Transient airplane parking daily $4 $8 $8 4.Hangar wait list, one time fee $100 $100 $100 5.Tie‐down wait list, one time fee $25 $25 $25 6.Lost gate card fee per occurrence $50 $50 $50 7.T‐Hangar, Non‐Refundable Move‐in Fee $250 $250 $250 8.Penalty for violation of Minimum Standards/Airport Rules & Regulations (each occurrence)$0 $500 $500 9.Penalty for Movement Area Incursions (each occurrence), assessed to sponsor/tenant $0 $500 $500 SECTION IX. ANIMAL LICENSES FEES* ‐ RMC 5‐4‐2 2016 2017 2018 1.Altered Animal Annual License $0 $30 $30 2.Unaltered Animal Annual License $0 $50 $50 3.Economically Qualified Resident Special Lifetime License $0 $0 $0 4.Duplicate Tag $10 $10 $10 5.Late Charge $30 $30 $30 *Please note, impounded animals are subject to license fees, microchipping costs, and other out‐of‐pocket costs as specified in RMC 6‐6‐2. SECTION X. BUSINESS LICENSES 2016 2017 2018 1. General Business License (Base fee  + Per hour fee = Total fee): a.Registration Fee $110 $150 $150 b.Per hour fee, for each worker hour *$0.0352 $0.0352 $0.0352 c.Appeal of Business License Decision $0 $250 $250 2. Short Term Employment within the City: a.A temporary ninety (90) day license maybe purchased for each FTE on a temporary job*$50 $50 $50 *Not to exceed 270 consecutive days 3.Penalties: a.The penalty to reinstate an expired business license $50 $50 $50 b.The penalty  for failure to obtain a business license* $250                +20%  APR on  outstanding Fees $250                +20%  APR on  outstanding Fees $250                +20%  APR on  outstanding Fees c. SECTION XI. ADULT ENTERTAINMENT LICENSES 2016 2017 2018 1. Every person applying for a adult entertainment license  shall pay the applicable nonrefundable application fee: a.Adult Entertainment Business License $750 $750 $750 b.Entertainer $75 $75 $75 c.Manager $75 $75 $75 d.License Replacement $10 $10 $10 2. Penalties: a.Civil Penalty, per violation $1,000 $1,000 $1,000 * Payment of all license fee amounts still owing for the last three (3) years, plus a penalty of (20%) per annum for all amounts owing, plus any accounting, legal or administrative  expenses incurred by the City in determining the nonreporting, or the unpaid portion over the last (3) years or in collecting the tax and/or penalty. * Per hour rate shall be adjusted every other year by Seattle‐Tacoma‐Bremerton, All Items, Urban Wage Earners and Clerical Workers (also known as CPI‐W) ending August  31, for the same two year period. Failure to pay the license fee within one day after the day on which it is due and payable pursuant to subsection C7 of  Chapter 5 of the RMC shall render the business enterprise subject to a penalty of (5%) of the amount of the license  fee for the first month of the delinquency and an additional penalty of (5%) for each succeeding month of  delinquency, but not exceeding a total penalty of (25%) of the amount of such license fee. 5%‐25%5%‐25%5%‐25% RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES 2016 2017 2018 1. Building Fees a.Building Permit Fees: Building Permit Fees are payable prior to the issuance of a building permit1 (i) Base Fee/Valuation $1.00 to $500.00 $28 $28 $28 (ii) Valuation $501.00 to $2,000.00 $28 + $3.65 x each  $100 value $28 + $3.65 x each  $100 value $28 + $3.65 x each  $100 value (iii) Valuation $2001.00 to 25,000.00 $82.75 + $16.75 x  each $1,000 value $82.75 + $16.75 x  each $1,000 value $82.75 + $16.75 x  each $1,000 value (iv) Valuation $25,001.00 to $50,000.00 $468 + $12 x each  $1,000 value $468 + $12 x each  $1,000 value $468 + $12 x each  $1,000 value (v)Valuation $50,001.00 to $100,000.00 $768 + $8.35 x  each $1,000 value $768 + $8.35 x  each $1,000 value $768 + $8.35 x  each $1,000 value (vi) Valuation $100,001.00 to $500,000.00 $1,185.50 + $6.70 x  each $1,000 value $1,185.50 + $6.70 x  each $1,000 value $1,185.50 + $6.70 x  each $1,000 value (vii)Valuation $500,001.00 to $1,000,000.00   $3,865.50 + $5.65 x  each $1,000 value $3,865.50 + $5.65 x  each $1,000 value $3,865.50 + $5.65 x  each $1,000 value (viii) Valuation $1,000,001.00 and up $6,690.50 + $4.35 x  each $1,000 value $6,690.50 + $4.35 x  each $1,000 value $6,690.50 + $4.35 x  each $1,000 value b.Combination Building Permit Fees*1 (i) Plumbing up to 3,000 sq ft $150 $200 $200 (ii) Plumbing over 3,000 sq ft $175 $225 $225 (iii) Mechanical up to 3,000 sq ft $150 $200 $200 (iv) Mechanical over 3,000 sq ft $175 $225 $225 (v) Electrical up to 3,000 sq ft $75 $125 $125 (vi) Electrical over 3,000 sq ft $100 $150 $150 c.Building Plan Check Fee1 (i) Initial Building Plan Check Fee*$0 65% of permit fee 65% of permit fee (ii) Additional Building Plan Check Fee $0 50% of initial plan  Check Fee 50% of initial plan  Check Fee d.Demolition Permit Fee: (i) Residential $115 $118.50 $118.50 (ii) Commercial $250 $257.50 $257.50 e.State Building Code Fee: (i) All projects:$4.50 $4.50 $4.50 (ii) Multi‐family projects:$4.50 $4.50 $4.50 (1) Each additional card:$2 $2 $2 f.Electrical Permit Fees: (i) Residential Fees ‐ Single ‐Family and Duplex (1) New Service ‐ Single Family and Duplex1 (a) Up to 200 AMP $70 $206 $206 (b) Over 200  AMP $80 $206 $206 (2) Service Changes/New Circuits ‐ Single Family and Duplex: (a) Change up to 200 AMP $60 $150 $150 (b) Change over 200 AMP $75 $150 $150 (c) Any new circuits added to above price is per each up to a maximum of $80.00 $15 $20 $20 (d) Minimum fee for remodel/addition of new circuits without a service charge $60 $150 $150 (ii) Multi‐Family, Commercial and Industrial Fees: (1)Value of work: $1.00 to $500.00 $60 $63 $63 $500.01 to $1,000.00 $45 + 3.3% of  value $47 + 3.5% of  value $47 + 3.5% of  value $1,000.01 to 5,000.00 $78 + 2.9% of  value $82 + 3.05% of  value $82 + 3.05% of  value $5,000.01 to $50,000.00 $223 + 1.7% of  value $234 + 1.8% of  value $234 + 1.8% of  value $50,000.01 to $250,000.00 $1,073 + 1.0% of  value $1,127 + 1.05% of  value $1,127 + 1.05% of  value $250,000.01 to $1,000,000.00 $3,573 + 0.8% of  value $3,752 + 0.85% of  value $3,752 + 0.85% of  value $1,000,000.01 and up $11,573 + 0.45% of  value $12,152 + 0.47% of  value $12,152 + 0.47% of  value * Combination Building Permit fees are required for each new single family residential structure, and are payable prior to the issuance of a building permit * Building Plan Check Fee is in addition to the building permit fees and combination building permit fees.  The plan check fee is equal to 65% of the building permit fee or the  combination building permit fee, payable at the time of building permit application submittal.  Includes three (3) review cycles. RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 1. Building Fees (continued) f.Electrical Permit Fees: (continued) (ii) Multi‐Family, Commercial and Industrial Fees: (continued) (1) Value of work: (iii) Temporary Electrical Services $60 $150 $150 (iv) Miscellaneous Electrical Fees (1) Job Trailers $60 $150 $150 (2) Signs per each $60 $150 $150 (3) Mobile Homes $60 $150 $150 (4)50% of commercial  fees Minimum  $60.00  50% of commercial  fees Minimum  $150.00  50% of commercial  fees Minimum  $150.00  g.House Moving* ‐ minimum per hour Inspection Fee:$100 $150 $150 h.Inspection Fee For Condominium Conversions $100 on 1st unit /  $15 each add'l unit $150 on 1st unit /  $20 each add'l unit $150 on 1st unit /  $20 each add'l unit i.Manufactured/Mobile Home Installation Fees*: (i)Within a manufactured home park $100 $150 $150 (ii) Outside of a manufactured home park Building Permit  Fees Building Permit  Fees Building Permit  Fees j.Mechanical Permit Fees:1 (i) Basic permit fee plus itemized fees below:$45 $49.50 $49.50 (1)$17 $18.75 $18.75 (2) Boiler or Compressor:   (a) Single & Multi Family $17 $18.75 $18.75 (b) Commercial $60 $66 $66 (3) Commercial Refrigeration system $60 $66 $66 (4) Residential ventilation/exhaust fan $8 $8.75 $8.75 (5)$17 $18.75 $18.75 (6)$50 $55 $55 (7) Incinerator:   Installation or relocation of each  $75 $82.50 $82.50 (8)$17 $18.75 $18.75 (9) Fuel Gas Piping: (a) Each gas‐piping system of 1 to 4 outlets $12 $13.25 $13.25 (b) Each additional outlet over 4, per outlet $2.50 $2.75 $2.75 k.Plumbing Permit Fees:1 (i) Base fee for all types of work; plus itemized fees below:$45 $49.50 $49.50 (1) (2) For meter to house water service $8 $8.75 $8.75 (3) Fuel Gas Piping: (a) Each gas‐piping system of 1 to 4 outlets $12 $13.25 $13.25 (b) Each additional outlet over 4, per outlet $2.50 $2.75 $2.75 (4) Per drain for rainwater systems   $8 $8.75 $8.75 (5) Per lawn sprinkler system, includes backflow prevention $8 $8.75 $8.75 (6) Per fixture for repair or alteration of drainage or vent piping $8 $8.75 $8.75 (7) Per vacuum breaker or backflow protection device on tanks, vats, etc.$8 $8.75 $8.75 (8) Per interceptor for industrial waste pretreatment $8 $8.75 $8.75 (9) Medical Gas Piping: (a) Each gas‐piping system of 1 to 5 outlets $60 $66.00 $66.00 (b) Each additional outlet over 5, per outlet $5 $5.50 $5.50 l.Sign Permit Fees: (i) Permanent Signs: (1) Roof, projecting, awning, canopy, marquee, and wall signs $125 $250 $250 (2) Freestanding ground and pole signs  $175 $250 $250 (ii) Temporary and Portable Signs: (1) Real Estate Directional Signs, pursuant to RMC 4‐4‐100J2, permit valid for a 12‐months period $50 $75 $75 (2) Grand Opening Event Signs, pursuant to RMC 4‐4‐100J6d(i) $50 $75 $75 (3) Event Signs, pursuant to RMC 4‐4‐100J6d(ii) and (iii) per sign, per promotion $25 $50 $50 (4)$100 $125 $125 Low Voltage Work (e.g., alarm systems; thermostats; computer, data, or phone lines; fiber optics, cable  television, etc.) Exemption: Residential telephone communication systems, thermostats, security systems, and cable television installations are exempt from fees *This covers only the Building Section inspection of the structure prior to move. There is a separate additional fee charged by the Public Works Department to cover the actual  house move permit. A building permit is also required in order to site the structure on the new site. A‐Frame Signs, pursuant to RMC 4‐4‐100J5 Charge is for the first sign, all subsequent signs are $50.00 *  Includes plan review and inspection fees for the foundation (electrical, plumbing, mechanical, sewer and water connection fees are in addition to the below amounts). Heating system (furnace, heat pump, suspended heater, fireplace, wood stove, etc.).  A/C system (air  conditioner, chiller or Air Handling Unit (VAV) including ducts and vents) Commercial ventilation/exhaust system not a portion of any heating or air conditioning system  authorized by a permit. Commercial Hood:   Installation of each served by a mechanical exhaust, including the ducts for such  hood each  Appliance or piece of equipment regulated by this code but not classed in other appliance categories, or  for which no other fee is listed in this code Per plumbing fixture (e.g., sink, shower, toilet, dishwasher, tub, etc.) or set of fixtures on one trap $8 $8.75 $8.75 RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 1. Building Fees (continued) l.Sign Permit Fees: (continued) (ii) Temporary and Portable Signs: (continued) (5) Commercial Property Real Estate Banner each sign permit is valid for 12 months.$50 $75 $75 (6) Decorative Flags fee is per entrance and valid until flag(s) are removed $50 $75 $75 (iii) Request for Administrative Modifications of City Center Sign Regulations per RMC 4‐4‐100H9:$100 $150 $150 (iv)All above fees  doubled All above fees  doubled All above fees  doubled m.Miscellaneous Fees: (i) Minimum Housing Inspection: (1) Assessed under the provisions of Section 305.8 of the International Building Code.$75 $100 $100 (2) WABO ‐ Adult Family Home; Misc building inspection $100 $100 $100 (ii) Plan Review Fees for Electrical, Plumbing, or Mechanical Permits* 40% of permit fee 40% of permit fee 40% of permit fee (iii) Reinspection Fee $75/hr $100 $100 (iv) Safe and Healthy Housing Program: (1) Registration Fee (a) 1 ‐ 4 dwelling unit(s), each, per year N/A $12 $12 (b) 5 ‐ 24 dwelling units, each, per year N/A $10 $10 (c) 25 or more dwelling units, each, per year N/A $8 $8 (d) Communal residence, each, per year N/A $20 $20 (2) City Inspection (a) Initial inspection N/A $50 $50 (b) First (1st) reinspection N/A $90 $90 (c) Second (2nd) reinspection N/A $125 $125 (d) Third (3rd) reinspection N/A $200 $200 (3) Contractor Inspection; admin fee to City N/A $40 $40 (4) Appeal of Inspection N/A $250 $250 2. Land Use Review Fees a.General Land Use Review (i) Additional Animals Permit $50 $50 $50 (ii) Address Change N/A $100 $100 (iii) Annexation: (1) Less than 10 acres N/C $5,000 $5,000 (2) 10 acres or more N/C $2,500 $2,500 (iv) Appeal of: (1) Hearing Examiner's Decision $250 $500 $500 (2) Administrative Decision $250 $500 $500 (3) Environmental Decision $250 $500 $500 (v) Binding Site Plan (total fee for both preliminary and final phases)$2,500 $5,000 $5,000 (vi) Code Text Amendment N/C N/C N/C (vii) Comprehensive Plan Map or Text Amendment (each)$2,500 $5,000 $5,000 (viii) Conditional Use Permit  (1) HEX $2,500 $3,000 $3,000 (2) Administrative 3 $1,000 $1,500 $1,500 (ix) Critical Areas Exemption N/C N/C N/C (x) Critical Areas Permit N/A $1,200 $1,200 (xi)100% of 100% of 100% of  contract cost contract cost contract cost (xii) Development Agreement N/A $10,000 $10,000 (xiii)100% of cost 100% of cost 100% of cost (xiv) Environmental Checklist Review $1,000 $1,500 $1,500 (xv) Fence Permit (special)$100 $150 $150 (xvi) Grading and Filling Permit (Hearing Examiner)$2,500 $5,000 $5,000 (xvii) Landscape Review Fee $100 $150 $150 (xviii) Legal Lot Segregation N/C N/C N/C (xix) Lot Consolidation N/A $500 $500 (xx) Lot Line Adjustment $450 $1,000 $1,000 (xxi) Manufactured/Mobile Home Park: (1) Tentative $500 $1,000 $1,000 (2) Preliminary $2,500 $3,000 $3,000 (3) Final $1,000 $1,500 $1,500 (xxii) Open Space Classification Request $100 $150 $150 (xxiii)Plats: (1) Short Plat (total fee for both preliminary and final phases)$2,000 $5,000 $5,000 (2) Preliminary $4,500 $10,000 $10,000 (3) Final Plat $1,500 $5,000 $5,000 Work in Advance of Sign Permit Issuance:  Where work for which the permit is required by this Title IV of  RMC is started or proceeded with prior to obtaining said permit, the fees above specified shall be doubled;  but the payment of such double fee shall not relieve any persons from complying with the requirements in  the execution of the work nor from any other penalties prescribed herein. *In addition to the above permit fees, a plan check fee equal to forty percent (40%) of the permit fee may be charged when required by the Building Official.  1Per Resolution XXXX, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more  lots and vested as of the adoption date of Res. XXXX, through December 31, 2018. Critical Areas Review Fee:  for those projects that propose impacts to critical areas and will be billed at  the cost of contract biologist’s review.1  Environmental Impact Statement Cost include the coordination, review and appeal. Draft and Final2  RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 2. Land Use Review Fees (continued) a.General Land Use Review (continued) (xxiv) Planned Urban Development: (1) Preliminary Plan $2,500 $5,000 $5,000 (2) Final Plan $1,000 $2,500 $2,500 (3) Reasonable Use Exception: (a) In conjunction with land use permit N/A $500 $500 (b) Stand alone N/A $1,500 $1,500 (xxv) Rezone  $2,500 $5,000 $5,000 (xxvi) Routine Vegetation Management Permit without Critical Areas  $75 $100 $100 (xxvii) Shoreline‐Related Permits   (1) Shoreline Permit Exemption N/C N/C N/C (2) Substantial Development Permit $2,000 $2,500 $2,500 (3) Conditional Use Permit $2,500 $3,000 $3,000 (4) Variance $2,500 $3,000 $3,000 (xxix) Site Development Plan (Site Plan or Master Plan  which includes design review fee for projects subject to RMC 4‐3‐100): (1)Hearing Examiner Review $2,500 $3,500 $3,500 (2) Administrative Review  $1,500 $2,500 $2,500 (3) Modification (minor, administrative) N/C $250 $250 (4)Application Application Application  Fees Fees Fees (xxx) Special Permit (Hearing Examiner) $2,500 $2,500 $2,500 (xxxi) Temporary Use Permits: (1) Tier 1 $75 $100 $100 (2) Tier 2 $150 $200 $200 (xxxii) Variance (per each variance requested) Administrative or Hearing Examiner $1,200 $1,300 $1,300 (xxxiii) Waiver or Modification of Code Requirements cost is per request $150 $250 $250 (xxxiv) Zoning Compliance Letter $400 $450 $450 b. 3. Public Works Fees a.Franchise Application Fee N/A $5,000 $5,000 b.Franchise Permit Fees: 1,2 (i) Small work, including trenching less than 60 linear feet or installation of 6 or less utility poles $350 $350 $350 (ii) All other work permit fee plus $60 per hour of inspection.$350 $350 $350 1Bond required pursuent to RMC 9‐10‐5 c.Latecomers' Agreement Application Fees: (i) Processing fee* (Nonrefundable)  (1) If amount covered by latecomers’ is $20,000 or less $500 $500 $500 (2) If amount covered by latecomers' is between $20,000 and $100,000 $1,000 $1,000 $1,000 (3) If amount covered by latecomers' is greater than $100,000 $2,000 $2,000 $2,000 (ii) Latecomers' Agreement – Administration and collection fee  (1) if amount covered by latecomers' is $20,000.00 or less 15% of total 15% of total 15% of total (2) If amount covered by latecomers' is between $20,000 and $100,000 10% of total 10% of total 10% of total (3) If amount covered by latecomers' is greater than $100,000 5% of total 5% of total 5% of total (iii) Segregation processing fee, if applicable $750 $750 $750 d.System Development Charge Tables: (i)Water and Wastewater System Development Charges: (1) 5/8 x 3/4 inch and 1 inch (a) Water service fee3 $3,245 $3,486 $3,727 (b) Fire service fee 1,2 $422 $450 $477 (c) Wastewater fee3 $2,242 $2,540 $2,837 (2) 1‐1/2 inch (a) Water service fee3 $16,225 $17,430 $18,635 (b) Fire service fee 1,2 $2,110 $2,247 $2,384 (c) Wastewater fee3 $11,210 $12,700 $14,185 2The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. *The processing fee is due at the time of application. The administration and collection fee is deducted from each individual latecomer fee payment and the balance  forwarded to the holder of the latecomer’s agreement pursuant to RMC 9‐5, Tender of Fee. Modification (major) required new application and repayment of fee required Exception for Projects Vested in the County: For those projects that have vested to a land use permit under the development regulations of King County, the King County Land Use  Review Fee Schedule shall apply, and is hereby adopted by reference. A copy of that fee schedule has been filed with the City Clerk and is available at the City Clerk’s office for  public review. 1Per RMC 4‐3‐050F7, the City may charge and collect fees from any applicant to cover costs incurred by the city in review of plans, studies, monitoring reports and other  documents related to evaluation of impacts to or hazards from critical areas and subsequent code‐required monitoring. 2 When the City is the lead agency for a proposal requiring an Environmental Impact Statement (EIS) and the Environmental Review Committee (ERC) determines that the EIS shall  be prepared, the City may charge and collect a reasonable fee from any applicant to cover costs incurred by the City in preparing the EIS. The ERC shall advise the applicant(s) of  the projected costs for the EIS prior to actual preparation; the applicant shall post bond or otherwise ensure payment of such costs. The ERC may determine that the City will  contract directly with a consultant for preparation of an EIS, or a portion of the EIS, and may bill such costs and expenses directly to the applicant. Such consultants shall be  selected by mutual agreement of the City and applicant after a call for proposals. If a proposal is modified so that an EIS is no longer required, the ERC shall refund any fees  collected under this subsection which remain after incurred costs are paid. The City may collect a reasonable fee from an applicant to cover the cost of meeting the public notice  requirements of this Title relating to the applicant’s proposal. The City shall not collect a fee for performing its duties as a consulted agency. The City may charge any person for  copies of any document prepared under this Title, and for mailing the document, in a manner provided by chapter 42.17 RCW. 3Per Resolution XXXX, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more lots  and vested as of the adoption date of Res. XXXX, through December 31, 2018. Unless otherwise specified in a franchise agreement, the fee shall be due and payable at or prior to the time of construction permit issuance. If a franchise agreement does not specify the fee amount, the generic fee, as identified in the following table, shall be collected.  RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 3. Public Works Fees (continued) d.System Development Charge Tables: (continued) (3) 2 inch (a) Water service fee3 $25,960 $27,888 $29,816 (b) Fire service fee 1,2 $3,376 $3,596 $3,815 (c) Wastewater fee3 $17,936 $20,320 $22,696 (4) 3 inch (a) Water service fee3 $51,920 $53,776 $59,632 (b) Fire service fee 1,2 $6,752 $7,191 $7,630 (c) Wastewater fee3 $35,872 $40,640 $45,392 (5) 4 inch (a) Water service fee3 $81,125 $87,150 $93,175 (b) Fire service fee 1,2 $10,550 $11,236 $11,922 (c) Wastewater fee3 $56,050 $63,500 $70,925 (6) 6 inch (a) Water service fee3 $162,250 $174,300 $186,350 (b) Fire service fee 1,2 $21,100 $22,476 $23,843 (c) Wastewater fee3 $112,100 $127,000 $141,850 (7) 8 inch (a) Water service fee3 $259,600 $278,880 $298,160 (b) Fire service fee 1,2 $33,760 $35,955 $38,149 (c) Wastewater fee3 $179,360 $203,200 $226,960 (ii) Storm Water System Development Charges: (1) New single family residence (including mobile/manufactured homes)3 $1,485 $1,608 $1,718 (2) (3)$0.594 $0.641 $0.687 per sq foot per sq foot per sq foot 1 Based upon the size of the fire service (NOT detector bypass meter) e.Administrative Fees for SDC Segregation Request* $750 +  administrative  costs   $750 +  administrative  costs   $750 +  administrative  costs  f. (i) Water Construction Permit Fees:1 (1) Water meter tests for 3/4” to 2" meter $50 $50 $50 (a) Water meter tests on meters 2" or larger $60 deposit + time  and materials $60 deposit + time  and materials $60 deposit + time  and materials (b) Open and close fire hydrants for fire flow tests conducted by others.  Time and materials Time and materials Time and materials (c) Water service disconnection (cut at main)$250 $250 $250 (d) Meter resets $95 $95 $95 (e) Repair of damage to service $225 $225 $225 (f)Water main connections $535 $535 $535 (g) Water main cut and cap $1,000 $1,000 $1,000 (h) Water quality/inspection/purity tests $65 $80 $80 (i) Specialty water tests (lead, copper, etc) Cost of test + $70  processing fee Cost of test + $70  processing fee Cost of test + $70  processing fee (j) Water turn ons/offs after hours $185 $185 $185 (k) Installation of isolation valve.  $2,000 deposit +  time and materials $2,000 deposit +  time and materials $2,000 deposit +  time and materials (l)$250 + $0.15 $250 + $0.15 $250 + $0.15  per lineal per lineal per lineal  foot foot foot (m) Miscellaneous water installation fees.  Time and materials Time and materials Time and materials (n) Service size reductions $50 $50 $50  (o)Installation fees for ring and cover castings $200 $200 $200  (2) Water meter installation fees – City installed: The following fees are payable at the time of application for water meter installation(s) (a) 3/4” meter installed by City within City limits. Installation of stub service and meter setter only.$3,075 $2,850 $2,850 (i) 3/4" meter drop in only $400 $400 $400 (b) 3/4” meter installed by City outside City limits. Installation of stub service and meter setter only.$3,310 $2,910 $2,910 (i) 3/4" meter drop in only $400 $400 $400 Addition to existing single family residence greater than 500 square feet (including  mobile/manufactured homes) Fee not to exceed $1,608 (2017) or $1,718 (2018)0.594 per sq foot 0.641 per sq foot 0.687 per sq foot the first two hundred fifty (250) lineal feet All other uses charge per square foot of new impervious surface, but not less than $1,608 (2017)  or $1,718 (2018) 2 Unless a separate fire service is provided, the system development charge(s) shall be based upon the size of the meter installed and a separate fire service fee will not be  charged. 3Per Resolution XXXX, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more  lots and vested as of the adoption date of Res. XXXX, through December 31, 2018. *The applicant shall pay the City’s administrative costs for the preparation, processing and recording of the partial payment of the fee(s). The adminitrative fee is due at the  time of application for special assessment district, and/or latecomer’s charge partial payment for each segregation. If the same segregation is used for more than one utility’s  special assessment district, and/or latecomer’s charge, then only one administrative fee is collected. Public Works Construction Permit Fees:  The following public works construction permit fees, utility permit fees, and miscellaneous charges are payable at or prior to the time of  construction permit issuance. New water line chlorination fee. Fee plus $0.15 per lineal foot for any footage after RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 3. Public Works Fees (continued) f. (i) Water Construction Permit Fees:1 (continued) (2) Water meter installation fees – City installed: The following fees are payable at the time of application for water meter installation(s). (continued) (c) 1” meter installed by the City.  Installation of stub service and meter setter only.$3,310 $2,850 $2,850 (i) 1" meter drop in only $460 $460 $460 (d) 1‐1/2" meter installed by the City. Installation of stub service and meter setter only.$5,330 $4,580 $4,580 (i) 1‐1/2” meter drop in only $750 $750 $750 (e) 2” meter installed by the City. Installation of stub service and meter setter only.$5,660 $4,710 $4,710 (i) 2" meter drop in only $950 $950 $950 (3)NA $220 $220 (4) Hydrant Meter fees: The following fees are payable at the time of application for a hydrant meter: (a) Hydrant meter permit fee $50 $50 $50 (b) Deposits: (i) 3/4” meter and backflow prevention assembly.$300 $500 $500 (ii) 3” meter and backflow prevention assembly.$800 $2,000 $2,000 (iii) Deposit processing charge, nonrefundable.$25 $25 $25 (c) Meter rental (begins on day of pickup): (i) 3/4” meter and backflow prevention assembly. Per month.$11.66 $50 $50 (ii) 3” meter and backflow prevention assembly. Per month.$143.67 $250 $250 (ii) Wastewater and surface water construction permit Fees:1 (1) Residential: (a) Wastewater permit fee $250 $300 $300 (b) Surface water permit fee $250 $300 $300 (2) Commercial: (a) Wastewater permit fee $300 $300 $300 (b) Surface water permit fee $300 $300 $300 (3) Industrial: (a) Wastewater permit fee $300 $300 $300 (b) Surface water permit fee $300 $300 $300 (4) Repair of any of the above (a) Wastewater permit fee $200 $300 $300 (b) Surface water permit fee $200 $300 $300 (5) Cut and cap/Demolition permit (a) Wastewater permit fee $250 $300 $300 (b) Surface water permit fee $250 $300 $300 (6)N/C $300 $300 (7)$300 $300 $300 plus King plus King plus King County County County sewer rate on sewer rate on sewer rate on discharged discharged discharged  amount amount amount (iii) (1) Less than 35 feet in length $100 $100 $100 (2) 35 to 100 feet in length $125 $125 $125 (3) Greater than 100 feet in length $150 $150 $150 (4) Wastewater or storm water service $150 $300 $300 (5) King County ROW Permits/Inspections (a) Service Installation Only $600 $1,000 $1,000 (b) Utility Extension per 100' of Length (Min 200' Length)$300 $500 $500 (iii) (iv)$500 $500 $500 g. (i) (1) $150,000.00 or less 6% of cost 6% of cost 6% of cost (2) Over $150,000.00 but less than $300,000.00. $9,000 + 5% over  $150,000 $9,000 + 5% over  $150,000 $9,000 + 5% over  $150,000 (3) $300,000.00 and over.  $16,500 + 4% over  $300,000 $16,500 + 4% over  $300,000 $16,500 + 4% over  $300,000 (ii)Standard or minor drainage adjustment review $550 $550 $550  Public Works Construction Permit Fees:  The following public works construction permit fees, utility permit fees, and miscellaneous charges are payable at or prior to the time of  construction permit issuance. (continued) Water meter processing fees – Applicant installed: For meters larger than 2”, the applicant must  provide materials and installs.  The City charges a $220.00 processing fee at the time of meter  application. Reinspection for Watewater or Surface Water Permits Ground water discharge (temporary connection to wastewater system for discharge of contaminated  ground water over 50,000 gallons) Rate plus billed for current Renton and King County sewer rate on  discharged amount (meter provided by property owner) Work in right‐of‐way – construction permit: Utility and street/sidewalk improvements: A bond is required, as stipulated in RMC 9‐10‐5, Street Excavation Bond. Work in right‐of‐way – construction permit: Utility and street/sidewalk improvements: A bond is required, as stipulated in RMC 9‐10‐5, Street Excavation Bond.  (continued) Street light system fee, per new connection to power system (payable at or prior to the time of  construction permit issuance): Exception: No permit fee shall be charged for individual homeowners for work in street rights‐of‐way for street tree or parking strip irrigation systems. 1Per Resolution XXXX, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more  lots and vested as of the adoption date of Res. XXXX,  through December 31, 2018. Public works plan review and inspection fees1,3: All developers, municipal or quasi‐municipal entities, or utility corporations or companies, except those specifically exempted, shall  pay fees under this Section. Exempted entities include City‐franchised cable TV, cable modem, natural gas, telecommunications, and electrical power. Half of this fee must be paid  upon application and the remainder when the permit(s) is issued. There are additional construction permit fees which are also payable upon issuance. The fee will be based upon  percentages of the estimated cost of improvements using the following formula. Street and utility plan review and inspection fees; estimated construction cost2: The applicant must submit separate, itemized cost estimates for each item of  improvement subject to the approval by the Public Works Plan Review Section. RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 3. Public Works Fees (continued) g. 1Includes three (3) review cycles. Additional reviews will be charged $1,500 each. h.Grade and Fill License Fees: Fees shall be based on Tier. Grade and Fill Quantity Tier < 50 cy 1 50 cy ‐ 499 cy 2 500 cy ‐ 4,999 cy 3 5,000 cy ‐ 49,999 cy 4 50,000 cy ‐ 99,999 cy 5 100,000 cy and larger 6 (i) Review/Intake Fee1: (1) Tier 1 N/A $155 $155 (2) Tier 2 N/A $466 $466 (3) Tier 3 N/A $621 $621 (4) Tier 4 N/A $932 $932 (5) Tier 5 N/A $1,242 $1,242 (6) Tier 6 N/A $1,553 $1,553 (ii) Inspection/Issuance Fee2: (1) Tier 1 N/A $148 $148 (2) Tier 2 N/A $444 $444 (3) Tier 3 N/A $887 $887 (4) Tier 4 N/A $1,183 $1,183 (5) Tier 5 N/A $2,366 $2,366 (6) Tier 6 N/A $3,550 $3,550 (iii)1.5 x plan 1.5 x plan 1.5 x plan  check fee check fee check fee (iv) Annual Licenses of Solid Waste Fills:  1.5 x plan 1.5 x plan 1.5 x plan  check fee check fee check fee 1Intake/review fees are payable at the time of application. 2Inspection/Issuance fees are payable at the time of issuance. i.Release of easement fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9‐1 RMC, Easements (i) Filing fee, payable at the time of application $250 $250 $250 (ii) Processing fee (paid upon Council approval of release of easement)$250 $250 $250 j. (i) Single family and two family uses annually, fee plus leasehold excise tax1 if applicable $10.00 + LET1 $10.00 + LET1 $10.00 + LET1 (ii) 0.5% x Value2 LET1 0.5% x Value2 LET1 0.5% x Value2 LET1 (iii) 0.5% x Value2 LET2 0.5% x Value2 LET1 0.5% x Value2 LET1 (iv) Insurance Required:   (v) Exception for Public Agencies:  2Right‐of‐way value shall be based on the assessed value of the land adjoining the property as established by the King County Assessor k.Street and Alley vacation Fees: The imposition, collection, payment and other specifics concerning this charge are detailed in chapter 9‐14 RMC, Vacations (i) Filing fee, payable at the time of application $500 $500 $500 (ii) Appraised Value of Vacated right‐of‐way: (1) Less than $25,000 $750 $750 $750 (2) $25,000 to $75,000 $1,250 $1,250 $1,250 (3) Over $75,000 $2,000 $2,000 $2,000 Public works plan review and inspection fees1,3: All developers, municipal or quasi‐municipal entities, or utility corporations or companies, except those specifically exempted, shall  pay fees under this Section. Exempted entities include City‐franchised cable TV, cable modem, natural gas, telecommunications, and electrical power. Half of this fee must be paid  upon application and the remainder when the permit(s) is issued. There are additional construction permit fees which are also payable upon issuance. The fee will be based upon  percentages of the estimated cost of improvements using the following formula. (continued) 2Construction cost, also known as the Engineer’s Estimate or the Contractor’s Bid, shall mean cost estimate for all project related improvements outside of the building  envelopes, including, but not limited to, all costs required to construct the following: paved parking lots, private sidewalks or walkways; private and public storm water  management facilities; temporary erosion and sedimentation control facilities; water quality facilities; public and private streets; public and private sanitary sewers; public  water main improvements; required off‐site street, bike and pedestrian improvements; street lighting improvements; required landscaping and street tree improvements;  and site grading and mobilization costs. 3The City may decide to contract with a consultant to perform plan reviews and inspections and may bill such costs and expenses directly to the applicant. Cleared or Distrurbed New or Replaced Hard Surface 1 ac ‐ < 2.5 ac 1 ac ‐ < 2.5 ac 2.5 ac ‐ < 5 ac 2.5 ac ‐ < 5 ac 5 ac and larger 5 ac and larger < 7,000 sf < 2,000 sf 7,000 sf ‐ < 3/4 acre 2,000 sf ‐ 4,999 sf 3/4 ac ‐ < 1 ac 5,000 sf ‐ < 1 ac a no‐fee permit may be issued only when the applicant is a public agency  and when the proposed use of the  right‐of‐way provides a direct service to the public (e.g., Metro applications for right‐of‐way for bus shelters). 1There is hereby levied and shall be collected a leasehold excise tax on that act or privilege of occupying or using public owned real or personal property through a leasehold  interest at the rate established by the State of Washington Processing and completion fee, payable upon Council approval of the vacation and upon administrative  determination of appraised value of vacated right‐of‐way. Solid Waste Fills:                                                                                                                                                            The plan check fee for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking fees  listed above. The fee for a grading license authorizing additional work to that under a valid license shall  be the difference between the fee paid for the original license and the fee shown for the entire project.  The fee for annual licenses for solid waste fills shall be one and one‐half (1‐1/2) times the plan checking  fees listed above. The fee for a grading license authorizing additional work to that under a valid license  shall be the difference between the fee paid for the original license and the fee shown for the entire  project. Any unused fee may be carried forward to the next year. If any work is done before the license  is issued, the grading license fee shall be doubled. Right‐of –Way use permit fees & Revocable permits for the Use of Excess Public Right‐of way: These fees are payable at the time of application. The imposition, collection,  payment and other specifics concerning this charge are detailed in chapter 9‐2 RMC, Excess Right‐of Way Use. All uses without public benefit fee is a per month charge based on property value2 of land to be utilized, plus  leasehold excise tax1, if applicable. Payable yearly in advance Uses with public benefit fee is a per year of assessed value of land adjoining the property, plus leasehold  excise tax1, if applicable. In no case less than $10.00. Payable yearly in advance.    Public Liability and property damage insurance is also required pursuant to RMC 9‐2‐5B, Minimum Permit  Requirements for Excess Right‐of‐Way Use. RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 3. Public Works Fees (continued) l. (i) (ii) (iii) m.Water or Sewer ‐ Redevelopment: Credit for existing water or sewer service: Any parcel that currently has water and or sewer service is eligible for a prorated system development charge. (i) Fee(s) based upon meter(s) proposed for final project minus fee(s) based upon meter existing on site. n.Miscellaneous Fees: (i) Re‐inspection Fee N/A $100 $100 (ii) Plan Revision following Permit Issuance (1) Minor N/A $250 $250 (2) Major N/A Application Fee Application Fee (iii) Street Frontage Improvements: Fee‐In‐Lieu (1) Street with existing storm drainage main line N/A $107/LF $107/LF (2) Street with existing conveyance ditch N/A $122/LF $122/LF 4. Technology Surcharge Fee 3.0%3.0%3.0% 5. Impact Fees a. School Impact Fees: (i) Issaquah School District (1) Single Family Fee $4,635 $7,921 $7,921 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$1,534 $2,386 $2,386 (ii) Kent School District (1) Single Family Fee $4,990 $5,100 $5,100 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$2,163 $2,210 $2,210 (iii) Renton School District (1) Single Family Fee $5,643 $6,432 $6,432 (2) Multi Family, Duplex, & Accessory Dwelling Fee (ADU)$1,385 $1,448 $1,448 b. Transportation Impact Fees:1 (i) Light Industrial, per sq foot $3.69 $4.75 $4.75 (ii)Apartment, per dwelling & Accessory Dwelling Unit (ADU)$1,923.83 $3,358.55 $3,358.55 (iii) Church, per sq foot $1.70 $2.68 $2.68 (iv)Coffee/Donut Shop, no drive up, per sq foot N/A $110.55 $110.55 (v)Coffee/Donut Shop, with drive up, per sq foot N/A $116.12 $116.12 (vi) Condominium & Duplexes per dwelling $1,546.31 $2,822.61 $2,822.61 (vii)Convenience market ‐ 24 hour, per sq foot $26.84 $110.91 $110.91 (viii)Daycare, per sq foot N/A $48.88 $48.88 (ix)Drinking Place, per sq foot N/A $30.77 $30.77 (x)Drive‐in bank, per sq foot $17.26 $69.89 $69.89 (xi)Fast food, no drive‐up, per sq foot $22.65 $70.93 $70.93 (xii) Fast food, with drive‐up, per sq foot $27.66 $90.36 $90.36 (xiii)Gas station with convenience store, per pump $8,588.71 $32,656.54 $32,656.54 (xiv)Gas station, per pump $8,033.75 $43,661.15 $43,661.15 (xvi) General office, per sq foot $5.10 $7.29 $7.29 (xvii)Health/fitness club, per sq foot $6.85 $18.01 $18.01 (xviii) Hospital, per sq foot $3.02 $3.90 $3.90 (xix)Hotel, per room $1,952.79 $2,143.76 $2,143.76 (xx) Manufacturing, per sq foot $2.78 $3.58 $3.58 (xxvi)Marina, per boat berth $476.56 $1,143.34 $1,143.34 (xxi) Medical office, per sq foot $9.39 $16.47 $16.47 (xxii) Mini‐warehouse, per sq foot $0.99 $1.29 $1.29 (xxiii)Mobile home, per dwelling $1,662.92 $3,215.64 $3,215.64 (xxiv) Motel, per room $1,555.62 $1,965.11 $1,965.11 (xxv)Movie theater, per seat $6.09 $321.57 $321.57 (xxvii)Nursing home, per bed $494.92 $893.23 $893.23 (xxviii) Restaurant: sit‐down, per sq foot $11.58 $30.48 $30.48 (xxix)Senior housing ‐ attached, per dwelling $384.76 $1,464.90 $1,464.90 (xxx) Shopping center, per sq foot $3.33 $13.29 $13.29 (xxxi)Single family house, per dwelling $2,951.17 $5,430.85 $5,430.85 (xxxii) Supermarket, per sq foot $11.83 $32.91 $32.91 Temporary connections to a City utility system may be granted for a one‐time, temporary, short‐term use of a portion of the property for a period not to exceed three (3)  consecutive years. Storm Water Fee; Fee equal to thirty percent (30%) of the current system development charge  applicable to that portion of the property.*10% of system  development  charge 30% of system  development  charge 30% of system  development  charge *Fee shall be paid annually (non‐prorated), and shall be nonrefundable, nontransferable (from one portion of the property to another) and shall not constitute a credit to the  system development charge due at the time of permanent use of the utility system. The application for temporary connection shall consist of a detailed plan and a boundary  line of the proposed development service area for use in the fee determination. An additional 3% technology surcharge shall be required for all fees included in the  following Subsections of Section  XII, Development Fees, of the City of Renton Fee Schedule Brochure: Subsection 1, Building Fees; Subsection 2, Land  Use Review Fees, except for appeals, critical areas review fee, and direct EIS costs; Subsections b, e, f, g and h of  subsection 3, Public Works Fees; and Section XIII, Fire Department Community Risk Reduction Fees Wastewater Fee; Annual fFee equal to thirty percent (30%) of the current system development charge  applicable to the size of the temporary domestic water meter(s).* 10% of system  development  charge 30% of system  development  charge 30% of system  development  charge Water Fee;Annual fFee equal to thirty percent (30%) of the current system development charge  applicable to the size of the temporary water meter(s).* 10% of system  development  charge 30% of system  development  charge 30% of system  development  charge RESOLUTION NO. 4318 City of Renton Fee Schedule 2017‐2018 SECTION XII. DEVELOPMENT FEES (CONTINUED)2016 2017 2018 5. Impact Fees (continued) c.Park Impact Fees:1 (i) Single family $1,887.94 $2,740.07 $2,740.07 (ii) Multi‐family: 2 units, Duplexes, & Accessory Swelling Unit (ADU)$1,532.56 $2,224.29 $2,224.29 (iii) Multi‐family: 3 or 4 units $1,458.52 $2,116.84 $2,116.84 (iv) Multi‐family: 5 or more units $1,280.84 $1,858.95 $1,858.95 (v) Mobile home $1,340.06 $1,944.91 $1,944.91 d.Fire Impact Fees: (i) Residential ‐ single family (detached dwellings & duplexes)$495.10 $718.56 $718.56 (ii) Residential ‐ multi family & Accessory Dwelling Unit (ADU)$495.10 $718.56 $718.56 (iii) Hotel/motel/resort $0.65 $0.94 $0.94 (iv) Medical care facility $5.56 $8.04 $8.04 (v) Office $0.14 $0.21 $0.21 (vi) Medical/dental office $0.87 $1.26 $1.26 (vii) Retail $0.61 $0.88 $0.88 (viii) Leisure facilities $1.36 $1.98 $1.98 (ix) Restaurant/lounge $1.84 $2.67 $2.67 (x) Industrial/manufacturing $0.08 $0.12 $0.12 (xi) Church/non‐profit $0.25 $0.36 $0.36 (xii) Education $0.45 $0.66 $0.66 (xiii) Special public facilities $3.33 $4.83 $4.83 *(i)‐(ii) is per unit *(iii)‐(xiii) is per square foot SECTION XIII. FIRE DEPARMENT COMMUNITY RISK REDUCTION FEES (RFA)2016 2017 2018 a.Fire plan review and inspection fees (i) $0 to $249.99 $30 $30 $30 (ii) $250.00 to $999.99 $30 + 2% of the  cost $30 + 2% of the  cost $30 + 2% of the  cost (iii) $1,000.00 to $4,999.99 $50 + 2% of the  cost $50 + 2% of the  cost $50 + 2% of the  cost (iv) $5,000.00 to $49,999.99 $150 + 1.5% of the  cost $150 + 1.5% of the  cost $150 + 1.5% of the  cost (v) $50,000.00 to $99,999.99 $350 + 1.2% of the  cost $350 + 1.2% of the  cost $350 + 1.2% of the  cost (vi) $100,000.00 and above $800 + .75% of the $800 + .75% of the $800 + .75% of the  (vii)$75 $75 $75 (viii) (ix) (x) Preventable Fire alarm fee: (1)First, second, and third preventable alarms N/C N/C N/C (2) Fourth and fifth preventable alarms in a calendar year, fee is per each alarm.$70 $70 $70 (3)$150 $150 $150 (xi) Late Payment Penalty $35 $35 $35 b.Fire Permit type: (i) Operational fire code permit (issued in accordance with Section 105.6 of the IFC) fee is yearly $84 $84 $84 (ii) Hazardous materials and HPM facilities yearly $150 $150 $150 (iii) Construction permit:  (iv) Replacement for lost permit, per each $35 $35 $35 (v) (vi) Underground tank removal permit (commercial)See Fire plan  review and  construction  permit fees See Fire plan  review and  construction  permit fees See Fire plan  review and  construction  permit fees (vii) Underground tank removal or abandonment‐in‐ place permit (residential)$84 $84 $84 1Per Resolution XXXX, fees for an Accessory Dwelling Unit (ADU) will be assessed at 50%; fees will be waived for every third ADU created within a subdivision of ten or more  and vested as of the adoption date of Res. XXXX, through December 31, 2018. Construction Re‐inspection. Fee is per hour with a 2 hour minimum. The minimum may be assessed if  the requested inspection does not meet the approval of the inspector. Violation/Second Re‐Inspection after 30‐day period (whenever 30 days or more have passed since Fire  Department notification of a violation, which required a first re‐inspection, and such violation has not  been remedied or granted an extension) $150 $150 $150 Hazardous production materials permit (for businesses storing, handling, or using hazardous production  materials as regulated in the fire code) permit is yearly $150 $150 $150 Third Re‐Inspection/Pre‐Citation Follow‐Up Inspection when re‐inspections are required beyond the  first and second re‐inspections $250 $250 $250 Sixth preventable alarm and successive preventable alarms in a calendar year, fee is per each  alarm. 20% of plan review  fee Min. $50 20% of plan review  fee Min. $51 20% of plan review  fee Min. $52 RESOLUTION NO. 4318